CN104314072B - A kind of construction method of special-shaped in situ concrete pile - Google Patents

A kind of construction method of special-shaped in situ concrete pile Download PDF

Info

Publication number
CN104314072B
CN104314072B CN201410586983.1A CN201410586983A CN104314072B CN 104314072 B CN104314072 B CN 104314072B CN 201410586983 A CN201410586983 A CN 201410586983A CN 104314072 B CN104314072 B CN 104314072B
Authority
CN
China
Prior art keywords
pile
special
concrete
shaped
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410586983.1A
Other languages
Chinese (zh)
Other versions
CN104314072A (en
Inventor
程书昌
刘文东
马玉生
丛瑞江
马新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical industry first survey and Design Institute Co.,Ltd.
Original Assignee
No1 Rock-Soil Engineering Co Ltd China Chemical Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Rock-Soil Engineering Co Ltd China Chemical Engineering Corp filed Critical No1 Rock-Soil Engineering Co Ltd China Chemical Engineering Corp
Priority to CN201410586983.1A priority Critical patent/CN104314072B/en
Publication of CN104314072A publication Critical patent/CN104314072A/en
Application granted granted Critical
Publication of CN104314072B publication Critical patent/CN104314072B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses the construction method of a kind of special-shaped in situ concrete pile, including: special-shaped pile pipe is installed;Lay pile top vibration sinking tube, control last two minutes pile penetrations;Transferring steel reinforcement cage, steel reinforcement cage vertically, lay between two parties, controls location absolute altitude deviation;Concrete perfusion, concrete controls the slump of concrete;Vibration pipe-drawing, by vibration and tube drawing with the use of, strict control pipe-pulling speed and height, and check the height of pipe inner concrete;Pile maintenance, after pile pipe is extracted, according to care environments, selects corresponding maintenance method;Wherein, the special-shaped pile pipe used is different from traditional cylinder pile pipe.The present invention uses design have the pile pipe of profiled-cross-section, prepare concrete-pile by cast-in-place perfusion, decrease material usage, reduce production cost.Meanwhile, the present invention, by the Cross section Design to special-shaped in situ concrete pile, improves the intensity of concrete-pile.

Description

A kind of construction method of special-shaped in situ concrete pile
Technical field
The present invention relates to the construction method of a kind of special-shaped in situ concrete pile.
Background technology
In the future development of pile foundation, along with high-rise, super high rise building and Large bridge foundation of main pylon etc. Carrying needs, and stake footpath is increasing, and stake is long more and more longer;As a example by pouring material, pile shaft material kind has Normal concrete, Superfluid state concrete, non-fine concrete, fiber concrete, self-leveling concrete and Slightly expanded concrete etc.;Develop different the most in a large number to improve bearing capacity of single pile or Bearing Capacity Per Volume of Bored-cast Type stake;Improve bearing capacity and save the two principal themes that material is the development of current piling Technology, relating to The various fields of foundation industry.In the case of guaranteeing construction quality and safety, save material usage It is the demand complying with society energy-conserving and environment-protective, and shaped pile can also be able to carry while saving material usage High-bearing capacity, reaches the social need of energy efficiency, is divided into cast-in-place and prefabricated two for cross section shaped pile Big class, special-shaped precast pile by mould, yield, transport, lift, the factor such as arrangement of reinforcement limits it and uses model Enclose, and cast-in-place concrete shaped pile, only by the abnormal shapeization realizing stake of construction equipment, it is easy to promote Application.
Summary of the invention
The present invention has designed and developed the construction method of a kind of special-shaped in situ concrete pile.The present invention uses and sets Meter has the pile pipe of profiled-cross-section, prepares concrete-pile by cast-in-place perfusion, decreases material usage, fall Low production cost.Meanwhile, the present invention, by the Cross section Design to special-shaped in situ concrete pile, improves mixed The intensity of solidifying soil stake.
The technical scheme that the present invention provides is:
A kind of construction method of special-shaped in situ concrete pile, including:
Step 1), measure the hole depth of stake holes, determine the riding position of special-shaped pile pipe, by the placement of abnormal shape pile pipe In stake holes;
Step 2), step 1) in complete the installation of special-shaped pile pipe after, the position of the special-shaped pile pipe of verification, protect The perpendicularity of the special-shaped pile pipe of card, the pile top that will lay is placed in special-shaped pile pipe, and ensures hanging down of pile top Straight degree, the top of pile top is provided with localizer;
Step 3), step 2) in complete the laying of pile top after, the special-shaped pile pipe of vibration, control last two points The pile penetration of clock abnormal shape pile pipe;
Step 4), step 3) in complete the vibration of special-shaped pile pipe after, by steel reinforcement cage vertical lower to abnormal shape In pile pipe, and the lower section of steel reinforcement cage is provided with the positioner corresponding with the localizer on pile top top, complete Become laying between two parties of steel reinforcement cage, measure steel reinforcement cage perpendicularity, in the feelings guaranteeing that steel reinforcement cage vertical center is placed Under condition, steel reinforcement cage fixed above one with steel reinforcement cage below the corresponding cross mark of positioner;
Step 5), concrete perfusion, by observation steel reinforcement cage above cross mark determine the placed in the middle of steel reinforcement cage And perpendicularity, and control the slump of concrete;
Step 6), step 5) concrete perfusion time, the special-shaped pile pipe inner concrete height of monitoring;
Step 7), step 6) in concrete after special-shaped pile pipe maintains into type, abnormal shape pile pipe is extracted, According to care environments, select corresponding maintenance method.
Preferably, in the construction method of described special-shaped in situ concrete pile, described special-shaped pile pipe is transversal Face is gear type, selenodont, cross or other noncircular cross section.
Preferably, in the construction method of described special-shaped in situ concrete pile, described concrete pile tip is Precast concrete, by filling concrete, the demoulding, maintenance prepares.
Preferably, in the construction method of described special-shaped in situ concrete pile, described vibration sinking tube, with Penetration control embedded depth, within last two minutes, pile penetration is not more than 5 millimeters.
Preferably, in the construction method of described special-shaped in situ concrete pile, before the welding of described steel reinforcement cage, First carry out bar straightening, reinforcing bar cutting, spiral bar makes and reinforcing bar is removed contamination process work, and checks solder joint The defects such as place's fusing metal, the lap of splice, solder joint, solder skip, crackle, obvious burn.
Preferably, in the construction method of described special-shaped in situ concrete pile, described concrete is strictly pressed According to concrete mix dispensing, mixing time is no less than 90 seconds.
Preferably, in the construction method of described special-shaped in situ concrete pile, described vibration pipe-drawing, first Vibration 5-10s, then start tube drawing, answer and shake while pull out, often pull out 0.5-1.0 rice, stop pulling out the vibration 5-10 second, The most repeatedly, until pile pipe is all extracted, to general soil layer, pipe-pulling speed controls as 1.2-1.5 m/min, In soft layer, control pipe-pulling speed 0.6-0.8 m/min.
The present invention uses design have the pile pipe of profiled-cross-section, prepares concrete-pile by cast-in-place perfusion, Decrease material usage, reduce production cost.Meanwhile, the present invention is by special-shaped in situ concrete pile Cross section Design, improve concrete-pile intensity.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the construction method of special-shaped in situ concrete pile of the present invention;
Fig. 2 is the cross sectional representation of special-shaped in situ concrete pile of the present invention.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art's reference Description word can be implemented according to this.
As it is shown in figure 1, the present invention provides the construction method of a kind of special-shaped in situ concrete pile, the measuring of stake position After completing, measurement hole depth, and again measure the position of concrete-pile to be irrigated, will choosing Select the moon type or gear type pile pipe carry out location and installation, deviations be not more than regulation maximum deflection difference value; Before carrying out pile pipe installation, using the slump is 90 filling concrete prefabricated component pile tops, supports after form removal Protect, in case using;Stake machine in place after, again verification stake position, errorless after, pile pipe is inserted in pile top, and adjusts Whole perpendicularity, then static pressure, immersed tube, during static pressure, immersed tube difficulty, tighten up wire rope pressurization immersed tube, and pile pipe enters The soil degree of depth is based on penetration control, and it is auxiliary that designing pile length controls, and within last two minutes, pile penetration is 3cm.
About steel reinforcement cage making with lay, steel reinforcement cage welding before, first carry out bar straightening, reinforcing bar cutting, Process work that spiral bar makes and reinforcing bar is removed contamination;Metal is melted uniform at solder joint;The lap of splice meets the requirements; Solder joint without coming off, the defect such as solder skip, crackle, obvious burn;The main muscle of steel reinforcement cage uses flash butt welding, with The main muscle joint quantity in one cross section must not exceed the 50% of main muscle sum, and adjacent two joint longitudinal pitches are not Less than 540 millimeters, stirrup uses spot welding with main muscle, and each interface to weld, and prevents sealing-off, reinforcing bar Cage lay vertical, placed in the middle, be firmly placed in pile pipe, location absolute altitude deviation be not more than 30 millimeters.
The concrete that perfusion is used, before ready-mixed concrete, first verification measurement instrument and the cooperation of regulation Ratio, confirm errorless after can feeding, put in hopper successively by sand, cement, rubble, then send blender; In strict accordance with concrete mix metering and loading materials;Mixing time should be no less than 90 seconds, it is ensured that stir; Every machine-team at least leaves and takes one group of test block (150 × 150 × 150), and its indwelling and maintenance should comply with relevant regulations; During concrete transportation, its homogeneity should be kept, accomplish not stratified, do not isolate, not spillage, no Knot is hard;Scene wouldn't materials time, the concrete being stirred must not be discharged to stack pallet waiting;Because midway is stopped When electricity maybe to rest more than one hour, mixing drum inner concrete all must be drawn out, and mixing drum is cleaned Totally.
After filling concrete in pile pipe, first vibrate 5-10s, then start tube drawing, answer and shake while pull out, often Pull out 0.5-1.0m, stop pulling out vibration 5-10s;The most repeatedly, extracting speed is 0.8 m/min, until pile pipe All extract.
Finally, the concrete-pile cast is added wet curing, until maintenance completes.
In Fig. 2, two shapes are month type concrete-pile and the cross section of gear type concrete-pile respectively.
It is the pile pipe having special cross-section by the pile pipe of use, forms special-shaped concrete-pile, mixed in guarantee In the case of the intensity of solidifying soil stake and safety in utilization, decrease materials'use amount, reduce production cost. Can select to use the pile pipe of different cross section according to the different use environment of concrete-pile, reach to meet and make With, reduce the purpose of materials'use amount.
The present invention uses design have the pile pipe of profiled-cross-section, prepares concrete-pile by cast-in-place perfusion, Decrease material usage, reduce production cost.Meanwhile, the present invention is by special-shaped in situ concrete pile Cross section Design, improve concrete-pile intensity.
Although embodiment of the present invention are disclosed as above, but it is not restricted to description and embodiment party Listed utilization in formula, it can be applied to various applicable the field of the invention completely, for being familiar with ability For the personnel in territory, be easily achieved other amendment, therefore without departing substantially from claim and etc. homotype Enclosing under limited general concept, the present invention is not limited to specific details and shown here as the figure with description Example.

Claims (5)

1. the construction method of a special-shaped in situ concrete pile, it is characterised in that comprise the following steps:
Step 1), measure the hole depth of stake holes, determine the riding position of special-shaped pile pipe, by the placement of abnormal shape pile pipe In stake holes;
Step 2), step 1) in complete the installation of special-shaped pile pipe after, the position of the special-shaped pile pipe of verification, protect The perpendicularity of the special-shaped pile pipe of card, the pile top that will lay is placed in special-shaped pile pipe, and ensures hanging down of pile top Straight degree, the top of pile top is provided with localizer;
Step 3), step 2) in complete the laying of pile top after, the special-shaped pile pipe of vibration, control last two points The pile penetration of clock abnormal shape pile pipe, wherein, the special-shaped pile pipe immersed tube of vibration, control pile penetration, last two minutes Pile penetration is not more than 5 millimeters;
Step 4), step 3) in complete the vibration of special-shaped pile pipe after, steel reinforcement cage is vertically transferred to abnormal shape In pile pipe, and the lower section of steel reinforcement cage is provided with the positioner corresponding with the localizer on pile top top, complete Become laying between two parties of steel reinforcement cage, measure steel reinforcement cage perpendicularity, in the feelings guaranteeing that steel reinforcement cage vertical center is placed Under condition, steel reinforcement cage fixed above one with steel reinforcement cage below the corresponding cross mark of positioner;
Step 5), concrete perfusion, by observation steel reinforcement cage above cross mark determine the placed in the middle of steel reinforcement cage And perpendicularity, and control the slump of concrete;
Step 6), step 5) concrete perfusion time, the special-shaped pile pipe inner concrete height of monitoring;
Step 7), step 6) in concrete after special-shaped pile pipe maintains into type, abnormal shape pile pipe is extracted, According to care environments, select corresponding maintenance method, wherein, abnormal shape pile pipe extracted employing vibration pipe-drawing, First vibrate 5-10s, then start tube drawing, answer and shake while pull out, often pull out 0.5-1.0 rice, stop pulling out vibration 5-10 Second, the most repeatedly, until pile pipe is all extracted, to general soil layer, pipe-pulling speed control for 1.2-1.5 rice/ Point, in soft layer, control pipe-pulling speed 0.6-0.8 m/min.
2. the construction method of special-shaped in situ concrete pile as claimed in claim 1, it is characterised in that institute Stating special-shaped pile pipe cross section is noncircular cross section.
3. the construction method of special-shaped in situ concrete pile as claimed in claim 1, it is characterised in that stake Point is precast concrete, and by filling concrete, the demoulding, maintenance prepares.
4. the construction method of special-shaped in situ concrete pile as claimed in claim 1, it is characterised in that institute Before stating steel reinforcement cage welding, first carry out bar straightening, reinforcing bar cutting, spiral bar makes and reinforcing bar is removed contamination process Work, and check and melt metal, the lap of splice, solder joint, solder skip, crackle, substantially burn at solder joint Defect.
5. the construction method of special-shaped in situ concrete pile as claimed in claim 1, it is characterised in that institute State concrete to be no less than 90 seconds in strict accordance with concrete mix dispensing, mixing time.
CN201410586983.1A 2014-10-28 2014-10-28 A kind of construction method of special-shaped in situ concrete pile Active CN104314072B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410586983.1A CN104314072B (en) 2014-10-28 2014-10-28 A kind of construction method of special-shaped in situ concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410586983.1A CN104314072B (en) 2014-10-28 2014-10-28 A kind of construction method of special-shaped in situ concrete pile

Publications (2)

Publication Number Publication Date
CN104314072A CN104314072A (en) 2015-01-28
CN104314072B true CN104314072B (en) 2016-08-24

Family

ID=52369373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410586983.1A Active CN104314072B (en) 2014-10-28 2014-10-28 A kind of construction method of special-shaped in situ concrete pile

Country Status (1)

Country Link
CN (1) CN104314072B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113490A (en) * 2015-09-21 2015-12-02 陆见华 Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile
CN106498938B (en) * 2016-10-26 2019-05-21 重庆大学 A kind of application method of cast-in-place concrete pile head shaping equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3898849A (en) * 1974-08-12 1975-08-12 Dresser Ind Method of packing heat pipes within a pipe pile involving the optimized frequency of vibration of the packing material
CN1103915A (en) * 1993-07-29 1995-06-21 三台县地质勘探队 Process and equipment for settling pipe and pouring concrete pile in situ
CN101864769A (en) * 2010-07-02 2010-10-20 河海大学 Cast-in-place X-shaped large-diameter hollow concrete pile and construction method thereof
CN103556629A (en) * 2013-10-23 2014-02-05 叶长青 Construction method of special-shaped pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3898849A (en) * 1974-08-12 1975-08-12 Dresser Ind Method of packing heat pipes within a pipe pile involving the optimized frequency of vibration of the packing material
CN1103915A (en) * 1993-07-29 1995-06-21 三台县地质勘探队 Process and equipment for settling pipe and pouring concrete pile in situ
CN101864769A (en) * 2010-07-02 2010-10-20 河海大学 Cast-in-place X-shaped large-diameter hollow concrete pile and construction method thereof
CN103556629A (en) * 2013-10-23 2014-02-05 叶长青 Construction method of special-shaped pile

Also Published As

Publication number Publication date
CN104314072A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier
CN108330835A (en) The construction method of setting bracket
CN104278841B (en) The method of casting concrete in steel pipe column
CN101886386B (en) Construction method for jointing of steel reinforcement cages of reinforced concrete drilling bored concrete pile
CN206859235U (en) For the edge slope structure after the precast lattice beam of slope reinforcement and reinforcing
CN112663774B (en) Construction method of unbonded prestressed large-diameter reinforced concrete thin-wall circular water tank
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN207513158U (en) Concrete stack shell constructing device
CN101481902A (en) V type pier inclined leg combined type support for continuous rigid frame bridge and layered cast-in-situ construction method
CN108716189A (en) Large span T-steel structure beam sections for joining island bridge install closure method
CN104947603A (en) Reinforced concrete girder bridge girder reinforcing structure and method
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN108708273A (en) A kind of wet seam type of attachment of sectional type floorings
CN110184948A (en) A kind of Bridge beam construction method
CN106948374A (en) A kind of hot band tooth pre-buried channel flow construction method of pipe gallery
CN104314072B (en) A kind of construction method of special-shaped in situ concrete pile
CN206408515U (en) Precast pier section assembling structure
CN108252290A (en) The soft thick soil treatment structures and methods of high-strength water-permeable fiber concrete pipe rubble core stake
CN105752864B (en) Derrick crane adheres to node and its construction method
CN104846745B (en) Urban high-pier support-free formwork turnover construction method
CN110318403A (en) A kind of deep basal pit inner support assembled support replacement construction tool and construction method
CN103938871A (en) Method for constructing concrete-filled steel tube column and bonded prestressed frame beam structure adopting reinforced concrete ring beam joints

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220112

Address after: 061001 No. 28, Yuhe Road, Yunhe District, Cangzhou City, Hebei Province

Patentee after: Chemical industry first survey and Design Institute Co.,Ltd.

Address before: 061001 No. 28, Yuhe Road, Yunhe District, Cangzhou City, Hebei Province

Patentee before: CHINA CHEMICAL ENGINEERING FIRST GEOTECHNICAL ENGINEERING Corp.,Ltd.