CN202248279U - Concrete overflow time controlling rod for steel pipe concrete jacking construction process - Google Patents

Concrete overflow time controlling rod for steel pipe concrete jacking construction process Download PDF

Info

Publication number
CN202248279U
CN202248279U CN2011204113763U CN201120411376U CN202248279U CN 202248279 U CN202248279 U CN 202248279U CN 2011204113763 U CN2011204113763 U CN 2011204113763U CN 201120411376 U CN201120411376 U CN 201120411376U CN 202248279 U CN202248279 U CN 202248279U
Authority
CN
China
Prior art keywords
concrete
steel pipe
rod
overflow
connecting line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204113763U
Other languages
Chinese (zh)
Inventor
黄建维
吴永辉
张山林
薛斐然
李建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
SUZHOU ERJIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU ERJIAN CONSTRUCTION GROUP CO Ltd filed Critical SUZHOU ERJIAN CONSTRUCTION GROUP CO Ltd
Priority to CN2011204113763U priority Critical patent/CN202248279U/en
Application granted granted Critical
Publication of CN202248279U publication Critical patent/CN202248279U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete overflow time controlling rod for a steel pipe concrete jacking construction process. The controlling rod comprises a rod body and a connecting line, wherein the connecting line is arranged on the top of the rod body; and the bottom of the rod body is sealed. Through the designed concrete overflow time controlling rod special for the steel pipe concrete jacking construction process, the time that concrete overflows from an overflow hole can be conveniently pre-controlled by an operator, problems caused by overflow of the concrete are solved, meanwhile, site construction is facilitated, and the construction efficiency is improved.

Description

The concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology
Technical field
The utility model relates to a kind of parts that are used for concrete filled steel tube jack-up construction technology, is specifically related to a kind of concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology.
Background technology
Concrete filled steel tube jack-up construction technology is a kind of concrete placing of in steel pipe, filling out, and utilizes the pumping pressure of concrete pump that self-compacting concrete is poured into from the steel pipe column bottom, until a kind of concrete without vibration job practices of filling with whole steel pipe column.This construction technology need not to vibrate when construction, relies on jacking extruding nature closely knit, leaves the without vibration method with a high position and compares, and can effectively avoid defectives such as steel pipe column inner concrete leakiness, segregation, guarantees that concrete quality adheres to specification; In addition, this technology can be disposable with the concrete lift-up in the steel core concrete column to desired height, can reduce process links, reduce labour intensity, accelerating construction progress.The concrete filled steel tubular member that makes has thus overcome the danger of the easy local buckling of steel pipe column, and rust-proofing simultaneously, fire resistance also strengthen greatly, have good stress performance and workability; And easy construction, the duration shortens greatly; Help the anti-fire and the fire prevention of steel pipe; Decay resistance is superior to steel work.Therefore, the application in high level and large-sized workshop engineering construction of concrete filled steel tube jack-up construction technology and concrete filled steel tubular member more and more widely.
Existing concrete filled steel tube jack-up construction technology is: concrete pump selection → design of concrete → fabrication and installation feed conduit → concrete fixed pump is connected with feed conduit → stop 2 ~ 3min after jacking → voltage stabilizing after material loading pumping, jacking concrete → concrete overflows, close charging aperture valve → dismantling concrete delivery pump → dismounting bleed off pipe, hole floating → remove charging aperture valve → repair welding shrouding after the concrete final set.Generally speaking, before construction, need open 2 steam vents by design drawing, and 2 length are installed is the steel pipe about 250 mm, as steam vent and spout hole in the concrete filled steel tube column top.The effect of spout hole is that unnecessary concrete overflows after supplying concrete to fill up steel pipe, thereby judges the construction completion.
Yet, find that in actual job because the length of existing steel pipe is generally all longer, and according to different construction sites and condition, concrete rate of pumping also has difference, therefore is difficult to confirm the time of concrete lift-up.And in the jacking process; Concrete is " gush shape " and rises in steel pipe, in case do not note observing, concrete will overflow from steel pipe; Not only influenced construction; Cause concrete waste, and the concrete that overflows also can pollute surrounding environment and mounted steel work, and make troubles for follow-up removing.
Summary of the invention
The utility model purpose provides a kind of concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology, overflows to prevent concrete.
For achieving the above object, the technical scheme that the utility model adopts is: a kind of concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology, comprise the body of rod and connecting line, and said connecting line is located at the top of the body of rod; The bottom seal of the body of rod.
In the preceding text, an end of said connecting line is connected with the body of rod, and the other end can be connected in the top of steel pipe or overflow on the steel pipe, thereby the body of rod is hung in steel pipe, plays and whether surveys concrete near the effect of overflowing.
In the technique scheme, the bottom of the said body of rod is provided with the chassis.The effect on chassis is to increase lifting surface area, makes the body of rod be easier to eject, and prevents that the body of rod from sinking in the concrete.Preferably, the shape on chassis is the circular arc of indent.
In the technique scheme, the length of the said body of rod is 0.8 ~ 1.5 m.
In the technique scheme, the length of said connecting line is 0.2 ~ 0.3 m.
The operating principle of the utility model is: before concrete lift-up; The body of rod of the utility model hung through connecting line (end of connecting line is connected with the body of rod in steel pipe; The other end can be connected in the top of steel pipe or overflow on the steel pipe), and make the top of the body of rod concordant with spout hole; Need only the top of observing steel pipe at any time in the work progress; When the body of rod of concrete overflow time control lever is slowly ejected; Operating personnel just can be controlled the time that concrete overflows in advance from spout hole, when concrete overflows back voltage stabilizing 1 ~ 2min from the overflow hole, stop pumping, jacking and build.
Because the technique scheme utilization, the advantage that the utility model compared with prior art has is:
1, the utility model design has obtained being specifically designed to the concrete overflow time control lever of concrete filled steel tube jack-up construction technology, can the handled easily personnel control the time that concrete overflows in advance from spout hole, has avoided concrete to overflow and has brought problem; Simultaneously also make things convenient for site operation, improved efficiency of construction.
2, the utility model is simple in structure, is easy to preparation, is specially adapted to the superelevation large diameter steel pipe, has active operation significance.
Description of drawings
Fig. 1 is the user mode figure of the utility model embodiment one.
Wherein: 1, the body of rod; 2, connecting line; 3, steel pipe; 4, spout hole.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described:
Embodiment one
Referring to shown in Figure 1, a kind of concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology comprises the body of rod 1 and connecting line 2, and said connecting line is located at the top of the body of rod; The bottom seal of the body of rod.
The length of the said body of rod is 1 m.The length of said connecting line is 0.25 m.
The said body of rod can adopt the PVC plastic pipe of diameter 25cm, and an end of plastic pipe is fastened the long nylon rope (being connecting line) of 25 cm that hangs with counterweight, and the other end seals with plastic cap.
Before the jacking concrete, hang over overflow steel pipe mouth in it, the time of coming control concrete in advance from the overflow hole, to overflow.
Concrete operations are following: before the jacking concrete, in steel pipe 3, put into overflow time control lever; Make the control lever upper end suitable for reading concordant with spout hole; When the slowly emersion from overfall of 1 meter long concrete overflow time control lever; Operating personnel just can be controlled the time that concrete overflows in advance from the overflow hole, when concrete overflows back voltage stabilizing 1 ~ 2min from spout hole 4, stop pumping, jacking and build.Treat the back flashboard of insertion flow-stop valve fast, the concrete lift-up pouring construction finishes, and simultaneously at flexible pipe of overflow steel pipe termination, prevents that the overflow concrete from spraying, and pollutes mounted steel work everywhere.Concreting finishes behind 30 min, observes the capital concrete and has or not and fall after rise, and if any sinking, adopts artificial teeming capital concrete.Treat back dismounting overflow steel pipe, after concreting finishes 30 min, observe this engineering capital concrete and all do not have the sinking of falling after rise, close a position floating to the capital concrete by the operative employee.

Claims (4)

1. concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology, it is characterized in that: comprise the body of rod (1) and connecting line (2), said connecting line is located at the top of the body of rod; The bottom seal of the body of rod.
2. the concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology according to claim 1, it is characterized in that: the bottom of the said body of rod is provided with the chassis.
3. the concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology according to claim 1, it is characterized in that: the length of the said body of rod is 0.8 ~ 1.5 m.
4. the concrete overflow time control lever that is used for concrete filled steel tube jack-up construction technology according to claim 1, it is characterized in that: the length of said connecting line is 0.2 ~ 0.3 m.
CN2011204113763U 2011-10-25 2011-10-25 Concrete overflow time controlling rod for steel pipe concrete jacking construction process Expired - Lifetime CN202248279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204113763U CN202248279U (en) 2011-10-25 2011-10-25 Concrete overflow time controlling rod for steel pipe concrete jacking construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204113763U CN202248279U (en) 2011-10-25 2011-10-25 Concrete overflow time controlling rod for steel pipe concrete jacking construction process

Publications (1)

Publication Number Publication Date
CN202248279U true CN202248279U (en) 2012-05-30

Family

ID=46109541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204113763U Expired - Lifetime CN202248279U (en) 2011-10-25 2011-10-25 Concrete overflow time controlling rod for steel pipe concrete jacking construction process

Country Status (1)

Country Link
CN (1) CN202248279U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147578A (en) * 2013-03-22 2013-06-12 中冶南方工程技术有限公司 Concrete filled steel tube factory building column excessively grouted cylinder
CN112359655A (en) * 2020-09-27 2021-02-12 北京鸿锐嘉科技发展有限公司 Ballastless track self-compacting concrete pouring intelligent management system and pouring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147578A (en) * 2013-03-22 2013-06-12 中冶南方工程技术有限公司 Concrete filled steel tube factory building column excessively grouted cylinder
CN112359655A (en) * 2020-09-27 2021-02-12 北京鸿锐嘉科技发展有限公司 Ballastless track self-compacting concrete pouring intelligent management system and pouring method

Similar Documents

Publication Publication Date Title
CN105239775B (en) A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction
CN111236238A (en) Cast-in-place pile top concrete elevation control device and installation and recovery method thereof
CN202248279U (en) Concrete overflow time controlling rod for steel pipe concrete jacking construction process
CN205617811U (en) A hopper arrangement for steel -pipe column concreting
CN105332511A (en) Huge concrete filled steel tubular column core grouting pouring and tamping device and method
CN207419261U (en) A kind of stayed bridge pylon cable concrete distributing device
CN112133183B (en) Assembled building grouting teaching training device
JP5390919B2 (en) Removal method of earth retaining members
CN109098178A (en) A kind of concrete-spouting plant
CN202787267U (en) Automatic venting hopper device
CN206379110U (en) A kind of filling pile construction analogue means
CN102561355B (en) Method for treating burst and jam of bored pile guide pipe
CN207392758U (en) Concrete casting device
CN205242407U (en) A cluster pipe, chute combination system for deep basal pit concrete placement
CN105696468B (en) Underwater concreting method in the construction of water Bridge
CN204247953U (en) A kind of tundish centralizer
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN209261225U (en) A kind of tool for pouring concrete into steel column
CN209476858U (en) Cast-in-situ bored pile tremie cleaning device
CN205975589U (en) Hoist device of pile foundation steel reinforcement cage
CN202925562U (en) Suspended scaffold passing overhead contact line equipment pole foundation
CN205711756U (en) A kind of distance vertical prestressing pipeline pneumatic mortar device
CN215053245U (en) Cast-in-place inspection shaft mould device
CN204876093U (en) Steel shotcrete node structure
CN216304686U (en) Deep basal pit pipe well precipitation well plugging device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 215008, No. 380 Tong Jing North Road, Suzhou District, Jiangsu, Suzhou

Patentee after: ZHONGYIFENG CONSTRUCTION GROUP CO., LTD.

Address before: 215131 No. 88, Yang Cheng Road, Xiangcheng Economic Development Zone, Jiangsu, Suzhou

Patentee before: Suzhou Erjian Construction Group Co., Ltd.