CN216304686U - Deep basal pit pipe well precipitation well plugging device - Google Patents

Deep basal pit pipe well precipitation well plugging device Download PDF

Info

Publication number
CN216304686U
CN216304686U CN202122039793.6U CN202122039793U CN216304686U CN 216304686 U CN216304686 U CN 216304686U CN 202122039793 U CN202122039793 U CN 202122039793U CN 216304686 U CN216304686 U CN 216304686U
Authority
CN
China
Prior art keywords
sewage pump
concrete
well
foundation pit
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122039793.6U
Other languages
Chinese (zh)
Inventor
黄菲
国立庆
卢兰华
刘长沙
艾广勤
倪运来
邵芳
梁昊
宁凡军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Installation Group Huanghe Construction Co ltd
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Installation Group Huanghe Construction Co ltd
China Construction Industrial and Energy Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Installation Group Huanghe Construction Co ltd, China Construction Industrial and Energy Engineering Group Co Ltd filed Critical China Construction Installation Group Huanghe Construction Co ltd
Priority to CN202122039793.6U priority Critical patent/CN216304686U/en
Application granted granted Critical
Publication of CN216304686U publication Critical patent/CN216304686U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a plugging device for a dewatering well of a deep foundation pit pipe well. The technical scheme is as follows: the bottom of pond main part is equipped with the concrete bottom plate, is equipped with the foundation ditch at the middle part of concrete bottom plate, and the middle part of foundation ditch is equipped with down the stagnant water sleeve pipe, the sewage pump is installed to stagnant water sleeve pipe cavity bottom, and the raceway is connected to the output of sewage pump, and the power cord of sewage pump upwards extends to steel sheet lid below, is equipped with the felt at the upside of sewage pump, and concrete layer is filled on the upper portion of felt, installs the steel sheet lid at the top of stagnant water sleeve pipe. The beneficial effects are that: the waterproof sleeve and the waterproof construction adopted by the utility model can effectively prevent sewage leakage, and the felt is arranged above the sewage pump, so that the sewage pump is effectively isolated from concrete, and the sewage pump is prevented from being blocked by concrete leakage; after the water conveying pipe and the power line are cut off, the steel plate cover of the wellhead is quickly sealed and welded, so that water seepage from an inlet is avoided, and the steel plate cover cannot be welded; the utility model has simple operation and fast construction progress, improves the construction quality and reduces the construction cost.

Description

Deep basal pit pipe well precipitation well plugging device
Technical Field
The utility model relates to a deep foundation pit pipe well dewatering device, in particular to a deep foundation pit pipe well dewatering well plugging device.
Background
When the large-volume large-area structural water pool is constructed, because the underground water level is higher and the foundation pit is excavated deeper, a pipe well dewatering method is generally adopted for dewatering, so as to facilitate the excavation of the foundation pit and the construction of the foundation, but when the construction of the foundation is finished and the well point dewatering equipment is removed, the water pressure of the underground water can cause difficult plugging of the downcomer, and simultaneously the outward seepage after the water storage of the sewage pool is finished is avoided, causing pollution to underground water, generally pouring high-grade concrete in the downcomer until the concrete top plate is below 30 mm, welding and sealing the downcomer by adopting a steel plate with the thickness of 10 mm, however, because the underground water pressure is high, after the precipitation is stopped, the underground water still surges upwards in a large amount, and the plugging part of the precipitation pipe is easy to leak, so that the construction difficulty is high, the construction quality is difficult to control, the hidden danger is high after the construction, and the water seepage of the bottom plate of the water pool is difficult in the future.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides the plugging device for the dewatering well of the deep foundation pit pipe well, which effectively solves the problem of leakage caused by plugging of the dewatering pipe, is simple and convenient to operate and quick in construction progress, improves construction quality and reduces construction cost.
The utility model provides a deep basal pit tube well precipitation well plugging device which technical scheme is: comprises a concrete layer (1), a steel plate cover (2), a felt (4), a water stop sleeve (5), a sewage pump (6), a lower water pipe (7), a power line (8), a concrete bottom plate (9), a foundation pit (10) and a pool main body (11), the bottom of the pool main body (11) is provided with a concrete bottom plate (9), a foundation pit (10) is arranged in the middle of the concrete bottom plate (9), a water stop sleeve (5) is arranged downwards in the middle of the foundation pit (10), a sewage pump (6) is arranged at the bottom of the inner cavity of the water stop sleeve (5), the output end of the sewage pump (6) is connected with a lower water pipe (7), a power line (8) of the sewage pump (6) extends upwards to the lower part of the steel plate cover (2), the upper side of the sewage pump (6) is provided with a felt (4), the upper part of the felt (4) is filled with a concrete layer (1), and the top of the water stop sleeve (5) is provided with a steel plate cover (2).
Preferably, the upper end of the lower water delivery pipe (7) is provided with a switch valve (3).
Preferably, the waterproof sleeve (5) is made of a steel plate with the thickness of 4mm and is made into a sleeve with the diameter of 500 mm.
Preferably, the concrete bottom plate (9) is provided with raft steel bars (13).
Preferably, the top of the water stop sleeve (5) is welded on the raft steel bar (13).
Preferably, an upper water conveying pipe (12) is arranged above the steel plate cover (2).
The utility model has the beneficial effects that: the waterproof sleeve and the waterproof construction adopted by the utility model can effectively prevent sewage leakage, and the felt is arranged above the sewage pump, so that the sewage pump is effectively isolated from concrete, and the sewage pump is prevented from being blocked by concrete leakage; after the water conveying pipe and the power line are cut off, the steel plate cover of the wellhead is quickly sealed and welded, so that water seepage from an inlet is avoided, and the steel plate cover cannot be welded; the utility model solves the problem of leakage caused by untight plugging of the pool; not only easy and simple to handle, the construction progress is fast, improves construction quality moreover, reduces construction cost.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the present invention when a steel plate cover is not welded;
in the upper diagram: concrete layer 1, steel plate cover 2, switch valve 3, felt 4, stagnant water sleeve 5, sewage pump 6, lower raceway 7, power cord 8, concrete bottom plate 9, foundation ditch 10, pond main part 11, go up raceway 12, raft reinforcing bar 13.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Embodiment 1, referring to fig. 1, the deep foundation pit dewatering well plugging device provided by the utility model comprises a concrete layer 1, a steel plate cover 2, a felt 4, a water stop sleeve 5, a sewage pump 6, a lower water delivery pipe 7, a power line 8, a concrete bottom plate 9, a foundation pit 10 and a pool main body 11, wherein the concrete bottom plate 9 is arranged at the bottom of the pool main body 11, the foundation pit 10 is arranged in the middle of the concrete bottom plate 9, the water stop sleeve 5 is downwards arranged in the middle of the foundation pit 10, the sewage pump 6 is arranged at the bottom of an inner cavity of the water stop sleeve 5, the output end of the sewage pump 6 is connected with the lower water delivery pipe 7, the power line 8 of the sewage pump 6 upwards extends to the lower part of the steel plate cover 2, the felt 4 is arranged on the upper side of the sewage pump 6, the concrete layer 1 is filled in the upper part of the felt 4, and the steel plate cover 2 is arranged at the top of the water stop sleeve 5.
Wherein, the upper end of the lower water pipe 7 is provided with a switch valve 3 which can be connected with an upper water pipe 12 arranged above the steel plate cover 2;
the waterproof jacket pipe 5 is made of a steel plate having a thickness of 4mm and has a diameter of 500 mm.
Preferably, foretell concrete bottom plate 9 is equipped with raft reinforcing bar 13, and foretell stagnant water sleeve 5's top welding is at raft reinforcing bar 13, can guarantee that concrete bottom plate 9 and stagnant water sleeve 5 are fixed firm, and the foundation bottom plate structure is not influenced, and lower floor's reinforcing bar can also take the reinforcement measure on the bottom plate.
The using process of the utility model is as follows:
1. installation sewage pump
A sewage pump is placed at the bottom of a precipitation well made of a water stop sleeve, a water delivery pipe is connected to a drainage ditch at the outer side of the foundation pit, and a switch valve is additionally arranged on the water delivery pipe, so that the switch valve is closed after the precipitation well is plugged, and the groundwater is prevented from being backwashed;
2. precipitation well precipitation
After the sewage pump is installed, the sewage pump begins to descend to enable the water level to be lowered to a position 3-4 meters below the bottom plate, and the water level is kept unchanged;
3. wadding felt cotton wool
After the sewage pump is installed, felt or cotton wool is filled above the sewage pump, so that concrete is effectively isolated, and the sewage pump is prevented from being blocked by the seepage of the concrete layer above the sewage pump;
4. pouring high-grade concrete
Referring to fig. 2, after the felt is filled, concrete is poured, the grade of a concrete layer is recommended to be one grade larger than that of the bottom plate concrete, the concrete is poured into the dewatering well, the dewatering well is vibrated and compacted by using a vibrating rod, and the pouring is stopped when the concrete is poured to be 100mm below the switch valve;
5. closing the sewage pump switch, cutting off the water pipe and cable
And when the concrete reaches 80% of the designed strength, the switch is closed, and the water delivery pipe and the power line above the switch of the sewage pump are cut off.
6. Welding plugging steel plate
The steel plate cover of the wellhead is sealed and welded quickly after the water conveying pipe and the power line are cut off, and the phenomenon that the steel plate cover cannot be welded due to water seepage of an inlet is avoided. The steel plate cover welding plugging means that a steel cover plate is directly welded on the water-stopping steel sleeve, and the steel plate cover and the water-stopping steel sleeve are required to be fully welded to prevent water seepage.
Embodiment 2, the deep foundation pit dewatering well plugging device provided by the utility model comprises a concrete layer 1, a steel plate cover 2, a felt 4, a water stopping sleeve 5, a sewage pump 6, a lower water conveying pipe 7, a power line 8, a concrete bottom plate 9, a foundation pit 10 and a pool main body 11, wherein the concrete bottom plate 9 is arranged at the bottom of the pool main body 11, the foundation pit 10 is arranged in the middle of the concrete bottom plate 9, the water stopping sleeve 5 is downwards arranged in the middle of the foundation pit 10, the sewage pump 6 is arranged at the bottom of an inner cavity of the water stopping sleeve 5, the output end of the sewage pump 6 is connected with the lower water conveying pipe 7, the power line 8 of the sewage pump 6 upwards extends to the lower portion of the steel plate cover 2, the felt 4 is arranged on the upper side of the sewage pump 6, the concrete layer 1 is filled in the upper portion of the felt 4, and the steel plate cover 2 is arranged at the top of the water stopping sleeve 5.
The difference from the embodiment 1 is that: and finally, pouring impervious micro-expansion agent concrete with a higher-level strength on the steel plate cover, pouring the concrete until the concrete is flush with the concrete bottom plate 9, and filling the foundation pit 10 to better prevent leakage.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solution described above. Therefore, any simple modifications or equivalent changes made according to the technical solution of the present invention shall fall within the scope of the present invention as claimed.

Claims (6)

1. The utility model provides a deep basal pit tube well precipitation well plugging device, characterized by: comprises a concrete layer (1), a steel plate cover (2), a felt (4), a water stop sleeve (5), a sewage pump (6), a lower water pipe (7), a power line (8), a concrete bottom plate (9), a foundation pit (10) and a pool main body (11), the bottom of the pool main body (11) is provided with a concrete bottom plate (9), a foundation pit (10) is arranged in the middle of the concrete bottom plate (9), a water stop sleeve (5) is arranged downwards in the middle of the foundation pit (10), a sewage pump (6) is arranged at the bottom of the inner cavity of the water stop sleeve (5), the output end of the sewage pump (6) is connected with a lower water pipe (7), a power line (8) of the sewage pump (6) extends upwards to the lower part of the steel plate cover (2), the upper side of the sewage pump (6) is provided with a felt (4), the upper part of the felt (4) is filled with a concrete layer (1), and the top of the water stop sleeve (5) is provided with a steel plate cover (2).
2. The plugging device for the dewatering well of the deep foundation pit pipe well according to claim 1, wherein: the upper end of the lower water delivery pipe (7) is provided with a switch valve (3).
3. The plugging device for the dewatering well of the deep foundation pit pipe well according to claim 1, wherein: the water stop sleeve (5) is made of a steel plate with the thickness of 4mm and has the diameter of 500 mm.
4. The plugging device for the dewatering well of the deep foundation pit pipe well according to claim 1, wherein: the concrete bottom plate (9) is provided with raft steel bars (13).
5. The plugging device for the dewatering well of the deep foundation pit pipe well is characterized in that: the top of the water stop sleeve (5) is welded on a raft plate steel bar (13).
6. The plugging device for the dewatering well of the deep foundation pit pipe well according to claim 2, wherein: an upper water delivery pipe (12) is arranged above the steel plate cover (2).
CN202122039793.6U 2021-08-27 2021-08-27 Deep basal pit pipe well precipitation well plugging device Active CN216304686U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122039793.6U CN216304686U (en) 2021-08-27 2021-08-27 Deep basal pit pipe well precipitation well plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122039793.6U CN216304686U (en) 2021-08-27 2021-08-27 Deep basal pit pipe well precipitation well plugging device

Publications (1)

Publication Number Publication Date
CN216304686U true CN216304686U (en) 2022-04-15

Family

ID=81088018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122039793.6U Active CN216304686U (en) 2021-08-27 2021-08-27 Deep basal pit pipe well precipitation well plugging device

Country Status (1)

Country Link
CN (1) CN216304686U (en)

Similar Documents

Publication Publication Date Title
CN201172828Y (en) Well-covering device for dewatering well
CN103343543B (en) Foundation pit dewatering well pressure-reduction-type plugging method
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN207193996U (en) A kind of precipitation pipe well well-sealing device
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN107326918B (en) Hidden type plugging impervious water collecting well penetrating through raft plates and construction process thereof
CN109519150B (en) Dewatering well plugging device and method for large water yield
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN212506349U (en) Water-logging well sealing device for water-lowering zone of ultra-deep foundation pit pipe well
CN106088123A (en) A kind of sand geology steel tube well fall water level device and construction method thereof
CN203768925U (en) Seal device for dewatering well in foundation pit
CN207121916U (en) Shut-in well structure
CN216304686U (en) Deep basal pit pipe well precipitation well plugging device
CN104060622A (en) Method for discharging water in pint through steel bucket in pit
CN103174154A (en) Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN110258660A (en) The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN204825940U (en) Precipitation well well casing
CN211547782U (en) Pipe well sealing device for high-pressure water head of sand layer deep foundation pit
CN211849526U (en) Deep basal pit secretly buries drainage well slip casting block structure
CN112227395A (en) Well sealing device and method for large-water-pressure-drop well in building raft
CN207314371U (en) Use the foundation trench structure of cylinder caisson
CN204491643U (en) The constructing structure that on a kind of raft plate, dewatering well is closed

Legal Events

Date Code Title Description
GR01 Patent grant