CN106223354B - The construction method of shallow foundation stay in place form - Google Patents
The construction method of shallow foundation stay in place form Download PDFInfo
- Publication number
- CN106223354B CN106223354B CN201610681438.XA CN201610681438A CN106223354B CN 106223354 B CN106223354 B CN 106223354B CN 201610681438 A CN201610681438 A CN 201610681438A CN 106223354 B CN106223354 B CN 106223354B
- Authority
- CN
- China
- Prior art keywords
- template
- reinforcement cage
- steel reinforcement
- construction method
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/013—Shuttering specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The invention discloses a kind of construction methods of foundation structure template, including:Step 1:Earth excavation;Step 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;Step 3:In the side installation form of steel reinforcement cage;Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.The present invention can reduce working procedure, under the premise of ensuring architecture quality construction safety, largely reduce the use of the turnover equipment material such as template 5, timber, steel pipe, fastener, project scale is bigger, and cost reduction is more apparent.In addition, the present invention is simple to operation, template stress system more adapts to changeable construction operating mode.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of construction method of shallow foundation stay in place form.
Background technology
Currently, with the rapid development of modern architecture industry, the continuous renewal of construction techniques, underground infrastructures are more next
It is more complicated, it is desirable that higher and higher.And underground infrastructures engineering casting concrete would generally be come using conventional mould, steelframe mostly
As support, using the molding mode of conventional mould, need to use a large amount of material, construction speed is slow and form bracing system not
Surely, architecture quality problem is easy tod produce.
Invention content
The present invention provides a kind of construction method of shallow foundation stay in place form, to solve above-mentioned technology existing in the prior art
Problem.
In order to solve the above technical problems, the present invention provides a kind of construction method of shallow foundation stay in place form, including:
Step 1:Earth excavation;
Step 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;
Step 3:In the side installation form of steel reinforcement cage;
Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.
Preferably, in the step 1:It is excavated from top to bottom at the construction field (site), and earthwork both sides are slope.
Preferably, the template uses steel plate, aluminium sheet or plastic plate.
Preferably, in the step 2:Protective layer cushion block, the protective layer cushion block are set while setting up steel reinforcement cage
Region between steel reinforcement cage and template.
Preferably, the protective layer cushion block is piled up using concrete, and its concrete strength for using and step 4
The concrete strength of middle use is identical.
Preferably, in the step 4, when the height for filling backfill is flush to the tip height of steel reinforcement cage, in steel
Cushion cap concrete is poured in muscle cage.
Compared with prior art, the construction method of foundation structure template of the invention, including:Step 1:Earth excavation;Step
Rapid 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;Step 3:In the side of steel reinforcement cage
Face installation form;Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.The present invention can reduce construction work
Sequence largely reduces the turnover equipment material such as template 5, timber, steel pipe, fastener under the premise of ensuring architecture quality construction safety
It uses, project scale is bigger, and cost reduction is more apparent.In addition, the present invention is simple to operation, template stress system more adapts to more
The construction operating mode of change.
Description of the drawings
Fig. 1 is that the structural schematic diagram after earth excavation is carried out in the embodiment of the invention;
Fig. 2 is that the structural schematic diagram after steel reinforcement cage construction is carried out in the embodiment of the invention;
Fig. 3 is that the structural schematic diagram after template installation is carried out in the embodiment of the invention;
Fig. 4 is that the structural schematic diagram after cushion cap concreting is carried out in the embodiment of the invention.
As shown in the figure:1- cubic metres of earth, 2- protective layers cushion block, 3- steel reinforcement cages, 4- cushion caps cushion block, 5- templates, 6- backfills, 7- hold
Platform concrete.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings to the present invention
Specific implementation mode be described in detail.It should be noted that attached drawing of the present invention is all made of simplified form and uses non-essence
Accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
The present invention provides a kind of construction method of shallow foundation stay in place form, including:
Step 1:It is excavated as shown in Figure 1, carrying out the earthwork 1 from top to bottom at the construction field (site), certainly, excavation should be by design grade
1 both sides of slope, that is, earthwork are slope, are excavated from top to bottom, and take corresponding measure depending on the case where geology.
Step 2:As shown in Fig. 2, in 1 bottom construction bearing platform bed course 4 of the earthwork and setting up steel on the cushion cap bed course 4
Muscle cage 3 specifically carries out setting and assembling reinforcement while cushion cap bed course 4 is constructed using concrete, is put into protective layer cushion block 2,
The region of the protective layer cushion block 2 between steel reinforcement cage 3 and template 5, for carrying out protection to template 5
Step 3:As shown in figure 3, in the side installation form 5 of steel reinforcement cage 3, specifically, the template 5 is certain using having
The steel flexible thin or other materials flexible thin of rigidity, such as aluminium sheet, plastic plate, 5 stress system of template more adapts to changeable
Construction operating mode.Further, template 5 of the invention is no longer needed to reinforce and be supported, and stress system more adapts to changeable construction
Operating mode, and subsequently no longer need to carry out dismounting process, reduce working procedure, reduce cost, accelerates construction speed, economic benefit
It is significantly improved.
Step 4:As shown in figure 4, the backfill 6 in the earthwork 1 of 5 surrounding of template, waits for the height and steel reinforcement cage 3 of backfill 6
Height when flushing, cushion cap concrete seven is poured in steel reinforcement cage 3.
Preferably, the protective layer cushion block 2 is piled up using concrete, and its concrete strength for using and step
The concrete strength used in 4 is identical.
Above-mentioned construction method using the present invention, it is possible to reduce working procedure, before ensuring architecture quality construction safety
It puts, largely reduces the use of the turnover equipment material such as template 5, timber, steel pipe, fastener, project scale is bigger, and cost reduction is brighter
It is aobvious.In addition, the present invention is simple to operation, template stress system more adapts to changeable construction operating mode.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the present invention is also intended to including these modification and variations.
Claims (6)
1. a kind of construction method of shallow foundation stay in place form, which is characterized in that including:
Step 1:Earth excavation (1);
Step 2:Steel reinforcement cage (3) is set up in the earthwork (1) bottom construction bearing platform bed course (4) and on the cushion cap bed course (4);
Step 3:In the side installation form (5) of steel reinforcement cage (3);
Step 4:Backfill (6) is carried out in the earthwork (1) of template (5) surrounding to fill, and pours cushion cap concrete (7).
2. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 1:It is constructing
Scene is excavated from top to bottom, and the earthwork (1) both sides are slope.
3. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that the template (5) uses steel
Plate, aluminium sheet or plastic plate.
4. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 2:It is setting up
Protective layer cushion block (2) is set while steel reinforcement cage (3), and the protective layer cushion block (2) is located between steel reinforcement cage (3) and template (5)
Region.
5. the construction method of shallow foundation stay in place form as claimed in claim 4, which is characterized in that the protective layer cushion block (2)
It is piled up using concrete, and its concrete strength used is identical as the concrete strength used in step 4.
6. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 4, work as filling
When the height of backfill (6) is flush to the tip height of steel reinforcement cage (3), cushion cap concrete (7) is poured in steel reinforcement cage (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610681438.XA CN106223354B (en) | 2016-08-18 | 2016-08-18 | The construction method of shallow foundation stay in place form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610681438.XA CN106223354B (en) | 2016-08-18 | 2016-08-18 | The construction method of shallow foundation stay in place form |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106223354A CN106223354A (en) | 2016-12-14 |
CN106223354B true CN106223354B (en) | 2018-08-24 |
Family
ID=57553795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610681438.XA Active CN106223354B (en) | 2016-08-18 | 2016-08-18 | The construction method of shallow foundation stay in place form |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223354B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374425B (en) * | 2018-02-09 | 2023-12-22 | 中交二航局第四工程有限公司 | Bearing platform and foundation pit cushion layer construction structure and pouring method thereof |
CN109056776A (en) * | 2018-08-01 | 2018-12-21 | 五冶集团上海有限公司 | A kind of construction method of single pile cap |
CN112663619A (en) * | 2020-11-18 | 2021-04-16 | 中铁二局集团有限公司 | Foundation pit cover plate and support system construction method |
CN112482345A (en) * | 2020-11-30 | 2021-03-12 | 上海宝冶冶金工程有限公司 | Method and structure for improving bearing capacity of natural foundation |
CN113279394A (en) * | 2020-12-30 | 2021-08-20 | 中国五冶集团有限公司 | Cylinder formwork-free pouring concrete structure and method |
CN115821853A (en) * | 2022-12-20 | 2023-03-21 | 中国一冶集团有限公司 | Construction method of bank slope concrete foot protector |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55119830A (en) * | 1979-03-06 | 1980-09-13 | Denki Kagaku Kogyo Kk | Monolithic construction method for foundation and heat-insulating floor |
CN101532288A (en) * | 2008-03-14 | 2009-09-16 | 上海市基础工程公司 | Method for fabricating cross-shaped reinforcing cage processing platform |
CN203961284U (en) * | 2014-07-16 | 2014-11-26 | 陕西建工第十一建设集团有限公司 | A kind of concrete cylindrical regularization constructing structure |
JP2016079683A (en) * | 2014-10-17 | 2016-05-16 | 大和ハウス工業株式会社 | Earth retaining structure for banking, and integrally cast body for foundation and earthen floor |
CN205348767U (en) * | 2015-12-31 | 2016-06-29 | 上海欧本钢结构有限公司 | Utilize steel reinforcement cage to make external formwork system of skeleton |
-
2016
- 2016-08-18 CN CN201610681438.XA patent/CN106223354B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55119830A (en) * | 1979-03-06 | 1980-09-13 | Denki Kagaku Kogyo Kk | Monolithic construction method for foundation and heat-insulating floor |
CN101532288A (en) * | 2008-03-14 | 2009-09-16 | 上海市基础工程公司 | Method for fabricating cross-shaped reinforcing cage processing platform |
CN203961284U (en) * | 2014-07-16 | 2014-11-26 | 陕西建工第十一建设集团有限公司 | A kind of concrete cylindrical regularization constructing structure |
JP2016079683A (en) * | 2014-10-17 | 2016-05-16 | 大和ハウス工業株式会社 | Earth retaining structure for banking, and integrally cast body for foundation and earthen floor |
CN205348767U (en) * | 2015-12-31 | 2016-06-29 | 上海欧本钢结构有限公司 | Utilize steel reinforcement cage to make external formwork system of skeleton |
Also Published As
Publication number | Publication date |
---|---|
CN106223354A (en) | 2016-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106223354B (en) | The construction method of shallow foundation stay in place form | |
CN101245602A (en) | Construction technique for pits in foundation-pit support system | |
CN102653945A (en) | Foundation reinforcing and replacing structure and construction method thereof | |
CN103821523A (en) | Excavating method for extending existing single-hole two-driveway tunnel into four-driveway tunnel | |
CN103696784A (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN103603359A (en) | Deep foundation pit diagonal bracing support structure demolition method | |
CN101787701B (en) | Construction method for supporting pine pile in elevator shaft foundation pit | |
CN106836262A (en) | A kind of construction method of packaged type bridges substructure | |
CN108301440A (en) | With waterproof, the underground pipe gallery construction method of drain function | |
CN106836281A (en) | Precast concrete segment height adjusting mechanism and adjusting construction method | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN104264683A (en) | Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building | |
CN103952979B (en) | A kind of steel concrete superposed beam top board erection without scaffolding device and construction method | |
CN110748354A (en) | Construction method of assembled shield maintenance well | |
CN203160254U (en) | Pit support structure | |
CN204780979U (en) | Install steel -pipe pile basis of anti horizontal force of iron tower fast | |
CN105040709A (en) | Construction method for support replacement of fender-post retaining and protecting of deep foundation pit | |
CN107542065A (en) | Suddenly let out the small punching block of groove turns over a liter construction method to a kind of height | |
CN203066083U (en) | Supporting structure for two adjacent foundation pits | |
CN203113515U (en) | Slip form jacking integrated device | |
CN202767095U (en) | Set pile cap foundation | |
CN105298147A (en) | Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof | |
CN109930610A (en) | Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete | |
CN110042851A (en) | Reduce and wears riverway cofferdam and river bed reinforcement means under neighbouring high-speed rail deformation of pile foundation | |
CN110273435A (en) | A kind of construction of city open trench tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |