CN106223354B - The construction method of shallow foundation stay in place form - Google Patents

The construction method of shallow foundation stay in place form Download PDF

Info

Publication number
CN106223354B
CN106223354B CN201610681438.XA CN201610681438A CN106223354B CN 106223354 B CN106223354 B CN 106223354B CN 201610681438 A CN201610681438 A CN 201610681438A CN 106223354 B CN106223354 B CN 106223354B
Authority
CN
China
Prior art keywords
template
reinforcement cage
steel reinforcement
construction method
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610681438.XA
Other languages
Chinese (zh)
Other versions
CN106223354A (en
Inventor
马爱民
崔晓强
周敏勇
张帆晋
盛旭凯
宗宇鹏
周军
梁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201610681438.XA priority Critical patent/CN106223354B/en
Publication of CN106223354A publication Critical patent/CN106223354A/en
Application granted granted Critical
Publication of CN106223354B publication Critical patent/CN106223354B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/013Shuttering specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of construction methods of foundation structure template, including:Step 1:Earth excavation;Step 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;Step 3:In the side installation form of steel reinforcement cage;Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.The present invention can reduce working procedure, under the premise of ensuring architecture quality construction safety, largely reduce the use of the turnover equipment material such as template 5, timber, steel pipe, fastener, project scale is bigger, and cost reduction is more apparent.In addition, the present invention is simple to operation, template stress system more adapts to changeable construction operating mode.

Description

The construction method of shallow foundation stay in place form
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of construction method of shallow foundation stay in place form.
Background technology
Currently, with the rapid development of modern architecture industry, the continuous renewal of construction techniques, underground infrastructures are more next It is more complicated, it is desirable that higher and higher.And underground infrastructures engineering casting concrete would generally be come using conventional mould, steelframe mostly As support, using the molding mode of conventional mould, need to use a large amount of material, construction speed is slow and form bracing system not Surely, architecture quality problem is easy tod produce.
Invention content
The present invention provides a kind of construction method of shallow foundation stay in place form, to solve above-mentioned technology existing in the prior art Problem.
In order to solve the above technical problems, the present invention provides a kind of construction method of shallow foundation stay in place form, including:
Step 1:Earth excavation;
Step 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;
Step 3:In the side installation form of steel reinforcement cage;
Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.
Preferably, in the step 1:It is excavated from top to bottom at the construction field (site), and earthwork both sides are slope.
Preferably, the template uses steel plate, aluminium sheet or plastic plate.
Preferably, in the step 2:Protective layer cushion block, the protective layer cushion block are set while setting up steel reinforcement cage Region between steel reinforcement cage and template.
Preferably, the protective layer cushion block is piled up using concrete, and its concrete strength for using and step 4 The concrete strength of middle use is identical.
Preferably, in the step 4, when the height for filling backfill is flush to the tip height of steel reinforcement cage, in steel Cushion cap concrete is poured in muscle cage.
Compared with prior art, the construction method of foundation structure template of the invention, including:Step 1:Earth excavation;Step Rapid 2:In the earthwork bottom construction bearing platform bed course and set up steel reinforcement cage on the cushion cap bed course;Step 3:In the side of steel reinforcement cage Face installation form;Step 4:The backfill in the earthwork of template surrounding pours cushion cap concrete.The present invention can reduce construction work Sequence largely reduces the turnover equipment material such as template 5, timber, steel pipe, fastener under the premise of ensuring architecture quality construction safety It uses, project scale is bigger, and cost reduction is more apparent.In addition, the present invention is simple to operation, template stress system more adapts to more The construction operating mode of change.
Description of the drawings
Fig. 1 is that the structural schematic diagram after earth excavation is carried out in the embodiment of the invention;
Fig. 2 is that the structural schematic diagram after steel reinforcement cage construction is carried out in the embodiment of the invention;
Fig. 3 is that the structural schematic diagram after template installation is carried out in the embodiment of the invention;
Fig. 4 is that the structural schematic diagram after cushion cap concreting is carried out in the embodiment of the invention.
As shown in the figure:1- cubic metres of earth, 2- protective layers cushion block, 3- steel reinforcement cages, 4- cushion caps cushion block, 5- templates, 6- backfills, 7- hold Platform concrete.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings to the present invention Specific implementation mode be described in detail.It should be noted that attached drawing of the present invention is all made of simplified form and uses non-essence Accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
The present invention provides a kind of construction method of shallow foundation stay in place form, including:
Step 1:It is excavated as shown in Figure 1, carrying out the earthwork 1 from top to bottom at the construction field (site), certainly, excavation should be by design grade 1 both sides of slope, that is, earthwork are slope, are excavated from top to bottom, and take corresponding measure depending on the case where geology.
Step 2:As shown in Fig. 2, in 1 bottom construction bearing platform bed course 4 of the earthwork and setting up steel on the cushion cap bed course 4 Muscle cage 3 specifically carries out setting and assembling reinforcement while cushion cap bed course 4 is constructed using concrete, is put into protective layer cushion block 2, The region of the protective layer cushion block 2 between steel reinforcement cage 3 and template 5, for carrying out protection to template 5
Step 3:As shown in figure 3, in the side installation form 5 of steel reinforcement cage 3, specifically, the template 5 is certain using having The steel flexible thin or other materials flexible thin of rigidity, such as aluminium sheet, plastic plate, 5 stress system of template more adapts to changeable Construction operating mode.Further, template 5 of the invention is no longer needed to reinforce and be supported, and stress system more adapts to changeable construction Operating mode, and subsequently no longer need to carry out dismounting process, reduce working procedure, reduce cost, accelerates construction speed, economic benefit It is significantly improved.
Step 4:As shown in figure 4, the backfill 6 in the earthwork 1 of 5 surrounding of template, waits for the height and steel reinforcement cage 3 of backfill 6 Height when flushing, cushion cap concrete seven is poured in steel reinforcement cage 3.
Preferably, the protective layer cushion block 2 is piled up using concrete, and its concrete strength for using and step The concrete strength used in 4 is identical.
Above-mentioned construction method using the present invention, it is possible to reduce working procedure, before ensuring architecture quality construction safety It puts, largely reduces the use of the turnover equipment material such as template 5, timber, steel pipe, fastener, project scale is bigger, and cost reduction is brighter It is aobvious.In addition, the present invention is simple to operation, template stress system more adapts to changeable construction operating mode.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the present invention is also intended to including these modification and variations.

Claims (6)

1. a kind of construction method of shallow foundation stay in place form, which is characterized in that including:
Step 1:Earth excavation (1);
Step 2:Steel reinforcement cage (3) is set up in the earthwork (1) bottom construction bearing platform bed course (4) and on the cushion cap bed course (4);
Step 3:In the side installation form (5) of steel reinforcement cage (3);
Step 4:Backfill (6) is carried out in the earthwork (1) of template (5) surrounding to fill, and pours cushion cap concrete (7).
2. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 1:It is constructing Scene is excavated from top to bottom, and the earthwork (1) both sides are slope.
3. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that the template (5) uses steel Plate, aluminium sheet or plastic plate.
4. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 2:It is setting up Protective layer cushion block (2) is set while steel reinforcement cage (3), and the protective layer cushion block (2) is located between steel reinforcement cage (3) and template (5) Region.
5. the construction method of shallow foundation stay in place form as claimed in claim 4, which is characterized in that the protective layer cushion block (2) It is piled up using concrete, and its concrete strength used is identical as the concrete strength used in step 4.
6. the construction method of shallow foundation stay in place form as described in claim 1, which is characterized in that in the step 4, work as filling When the height of backfill (6) is flush to the tip height of steel reinforcement cage (3), cushion cap concrete (7) is poured in steel reinforcement cage (3).
CN201610681438.XA 2016-08-18 2016-08-18 The construction method of shallow foundation stay in place form Active CN106223354B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610681438.XA CN106223354B (en) 2016-08-18 2016-08-18 The construction method of shallow foundation stay in place form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610681438.XA CN106223354B (en) 2016-08-18 2016-08-18 The construction method of shallow foundation stay in place form

Publications (2)

Publication Number Publication Date
CN106223354A CN106223354A (en) 2016-12-14
CN106223354B true CN106223354B (en) 2018-08-24

Family

ID=57553795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610681438.XA Active CN106223354B (en) 2016-08-18 2016-08-18 The construction method of shallow foundation stay in place form

Country Status (1)

Country Link
CN (1) CN106223354B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374425B (en) * 2018-02-09 2023-12-22 中交二航局第四工程有限公司 Bearing platform and foundation pit cushion layer construction structure and pouring method thereof
CN109056776A (en) * 2018-08-01 2018-12-21 五冶集团上海有限公司 A kind of construction method of single pile cap
CN112663619A (en) * 2020-11-18 2021-04-16 中铁二局集团有限公司 Foundation pit cover plate and support system construction method
CN112482345A (en) * 2020-11-30 2021-03-12 上海宝冶冶金工程有限公司 Method and structure for improving bearing capacity of natural foundation
CN113279394A (en) * 2020-12-30 2021-08-20 中国五冶集团有限公司 Cylinder formwork-free pouring concrete structure and method
CN115821853A (en) * 2022-12-20 2023-03-21 中国一冶集团有限公司 Construction method of bank slope concrete foot protector

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55119830A (en) * 1979-03-06 1980-09-13 Denki Kagaku Kogyo Kk Monolithic construction method for foundation and heat-insulating floor
CN101532288A (en) * 2008-03-14 2009-09-16 上海市基础工程公司 Method for fabricating cross-shaped reinforcing cage processing platform
CN203961284U (en) * 2014-07-16 2014-11-26 陕西建工第十一建设集团有限公司 A kind of concrete cylindrical regularization constructing structure
JP2016079683A (en) * 2014-10-17 2016-05-16 大和ハウス工業株式会社 Earth retaining structure for banking, and integrally cast body for foundation and earthen floor
CN205348767U (en) * 2015-12-31 2016-06-29 上海欧本钢结构有限公司 Utilize steel reinforcement cage to make external formwork system of skeleton

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55119830A (en) * 1979-03-06 1980-09-13 Denki Kagaku Kogyo Kk Monolithic construction method for foundation and heat-insulating floor
CN101532288A (en) * 2008-03-14 2009-09-16 上海市基础工程公司 Method for fabricating cross-shaped reinforcing cage processing platform
CN203961284U (en) * 2014-07-16 2014-11-26 陕西建工第十一建设集团有限公司 A kind of concrete cylindrical regularization constructing structure
JP2016079683A (en) * 2014-10-17 2016-05-16 大和ハウス工業株式会社 Earth retaining structure for banking, and integrally cast body for foundation and earthen floor
CN205348767U (en) * 2015-12-31 2016-06-29 上海欧本钢结构有限公司 Utilize steel reinforcement cage to make external formwork system of skeleton

Also Published As

Publication number Publication date
CN106223354A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106223354B (en) The construction method of shallow foundation stay in place form
CN101245602A (en) Construction technique for pits in foundation-pit support system
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN103821523A (en) Excavating method for extending existing single-hole two-driveway tunnel into four-driveway tunnel
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN101787701B (en) Construction method for supporting pine pile in elevator shaft foundation pit
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN106836281A (en) Precast concrete segment height adjusting mechanism and adjusting construction method
CN109706952A (en) Large-scale well-sinking construction method
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
CN110748354A (en) Construction method of assembled shield maintenance well
CN203160254U (en) Pit support structure
CN204780979U (en) Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN105040709A (en) Construction method for support replacement of fender-post retaining and protecting of deep foundation pit
CN107542065A (en) Suddenly let out the small punching block of groove turns over a liter construction method to a kind of height
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN203113515U (en) Slip form jacking integrated device
CN202767095U (en) Set pile cap foundation
CN105298147A (en) Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN110042851A (en) Reduce and wears riverway cofferdam and river bed reinforcement means under neighbouring high-speed rail deformation of pile foundation
CN110273435A (en) A kind of construction of city open trench tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant