- CN106643380A CN106643380A CN201611029559.2A CN201611029559A CN106643380A CN 106643380 A CN106643380 A CN 106643380A CN 201611029559 A CN201611029559 A CN 201611029559A CN 106643380 A CN106643380 A CN 106643380A
- Authority
- CN
- China
- Prior art keywords
- cantilever
- fixed latches
- tool
- hole
- impact load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B5/00—Measuring arrangements characterised by the use of mechanical techniques
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B5/00—Measuring arrangements characterised by the use of mechanical techniques
- G01B5/14—Measuring arrangements characterised by the use of mechanical techniques for measuring distance or clearance between spaced objects or spaced apertures
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The invention discloses a cantilever plate examination tool and an examination method thereof. The cantilever plate examination tool comprises a left plate and a right plate which are symmetric about a center line, the left plate and the right plate are each formed by enclosing a first long edge, a second long edge and a third long edge, the left plate and the right plate are each provided with a first triangular hole, a second triangular hole, a first quadrilateral hole and a second quadrilateral hole, the portion from an outer side to one end of the center line on each third long edge is successively provided with a first fixation latch, a second fixation latch, a third fixation latch, a fourth fixation latch, a fifth fixation latch and a sixth fixation latch, and the outer side of the left plate and the outer side of the right plate are each provided with a first circular hole and a second circular hole. Since an installation field does not have the capability of rectifying cantilevers, after the cantilevers are examined and verified by the examination tool, the problem of product precision occurring in the installation field is avoided, the cantilever quality is guaranteed, the assembling difficulty is reduced, and the assembling efficiency is improved.
Description
Technical field
The present invention relates to the verifying attachment of light heat generator, especially a kind of impact load test tool and its method for inspection.
Background technology
After rising from photo-thermal power generation industry, the processing of the light field support of parabolic trough type solar energy system, install, debug into
The focus that professional quarters focus on, because the precision that they are debugged determines the installation accuracy of speculum, and each concentrator
All it is made up of multiple mirrors, so accurately each mirror is installed into theoretical position, substantially can be reflexed to sunshine
On thermal-collecting tube, the capture efficiency of thermal-collecting tube is improved by the loss of less sunlight.Therefore, the pole bracket of speculum is installed
Installation accuracy determines the capture efficiency of thermal-collecting tube, and the height of generating efficiency is determined indirectly.
According to traditional handicraft and installation steps, the inspection of cantilever is to be checked the size of cantilever finished product public by the frock of cantilever
Difference, if error is in Measurement Allowance, it is certified products to be judged as this cantilever, can be dispatched from the factory.
The content of the invention
Instant invention overcomes shortcoming of the prior art, there is provided a kind of impact load tests tool and its method for inspection.
In order to solve above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of impact load tests tool, including left plate and right panel, and drawing between left plate and right panel has a center line, left plate and right panel with regard to
Center line is symmetrical, left plate and right panel by center line, first it is long while, second it is long while with the 3rd long skirt into left plate and right panel point
It is not provided with the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the first quadrilateral hole, the two or four
Side shape hole and second tri-angle-holed to be arranged in parallel, the first delthyrium is located at the top of the first quadrilateral hole, on the 3rd long side
From outside to center line one end set gradually the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches,
5th Fixed latches and the 6th Fixed latches, are respectively provided with the first circular hole and the second circular hole on the outside of left plate and right panel.
And, described left plate and the length of right panel is 2.6-2.8 rice.
And, the length of described center line is 2-2.2 rice.
And, the angle of described the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole is circle
Angle.
And, described the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th consolidate
Determine latch and the 6th Fixed latches to be constituted by latch pipe and fork, a diameter of 8-10mm of fork.
And, the first described checking circular hole is more than the second checking circular hole.
A kind of impact load tests the method for inspection of tool, carries out according to the following steps:
Step one:The torque tube cantilever design of groove type solar concentrator to be detected is transported in detection place, institute
The torque tube cantilever design stated is to have completed the installation of both sides cantilever on torque tube, and reflecting optics are not yet installed on cantilever,
The position of torque tube cantilever design is adjusted, it is ensured that torque tube two ends flange center line keeps vertical, torque tube itself circle
Circumferential direction does not rotate, and the cantilever quantity on torque tube is 10-12 groups;
Step 2:Impact load is tested into the top that tool is placed on one group of cantilever, is made impact load test tool and is remained perpendicular to ground
Face, the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th in left plate and right panel are fixed
Latch and the 6th Fixed latches, the installing hole of epi mirror first, the installing hole of epi mirror second, the installation of epi mirror the 3rd being respectively aligned on cantilever
Hole, the installing hole of scope first, the installing hole of scope second and the installing hole of scope the 3rd, and latch is inserted in installing hole, make cantilever
Flat board tests tool and fixation is combined with cantilever;
Step 3:Observation impact load is tested at tool and cantilever contacts gap, finds gap, and using clearance gauge measurement gap
Thickness;If this group of cantilever clearance test result does not meet validation criteria, the dismounting and change of cantilever is carried out, if this group of cantilever gap
Test result meets validation criteria, then carry out next step;
Step 4:The Fixed latches that impact load tests tool and cantilever junction are extracted, impact load is tested into tool and is placed on down
On one group of cantilever, repeat step two is with step 3 until completing the inspection of the torque tube cantilever design of whole groove type solar concentrator
Test.
Compared with prior art, the invention has the beneficial effects as follows:Because erecting bed does not possess the ability of rectification cantilever, hang
Arm is after the inspection and checking of originally testing tool, it is to avoid the Product Precision problem run into when installing at the scene, it is ensured that cantilever
Quality, reduces assembly difficulty, improves efficiency of assembling.
Description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is the partial structural diagram of Fixed latches.
Fig. 3 is the epi mirror installing hole and scope position of mounting hole schematic diagram of cantilever.
Wherein, 1 is left plate, and 2 is the first delthyrium, and 3 is center line, and 4 is the first long side, and 5 is right panel, and 6 is the second long side, 7
For the first circular hole, 8 is the second circular hole, and 9 is the first Fixed latches, and 10 is the second Fixed latches, and 11 is the 3rd long side, and 12 is the 3rd
Fixed latches, 13 is the 4th Fixed latches, and 14 is the 5th Fixed latches, and 15 is the 6th Fixed latches, and 16 is the first quadrilateral hole,
17 is the second quadrilateral hole, and 18 is second tri-angle-holed, and 19 is latch pipe, and 20 is fork, and 21 is the installing hole of epi mirror first, 22
For the installing hole of epi mirror second, 23 is the installing hole of epi mirror the 3rd, and 24 is the installing hole of scope first, and 25 is the installing hole of scope second, 26
For the installing hole of scope the 3rd.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is described in further detail with specific embodiment:
As shown in FIG., a kind of impact load tests tool, including left plate and right panel, and drawing between left plate and right panel has center line, left
Plate and right panel are symmetrical with regard to center line, left plate and right panel by center line, first it is long while, second it is long while with the 3rd long skirt on a left side
The first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the one or four side are respectively arranged with plate and right panel
Shape hole, the second quadrilateral hole and second are tri-angle-holed to be arranged in parallel, and the first delthyrium is located at the top of the first quadrilateral hole,
On 3rd long side from outside to center line one end set gradually the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th
Fixed latches, the 5th Fixed latches and the 6th Fixed latches, are respectively provided with the first circular hole and second on the outside of left plate and right panel
Circular hole.
And, described left plate and the length of right panel is 2.6 meters.
And, the length of described center line is 2 meters.
And, the angle of described the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole is circle
Angle.
And, described the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th consolidate
Determine latch and the 6th Fixed latches to be constituted by latch pipe and fork, a diameter of 8mm of fork.
And, the first described checking circular hole is more than the second checking circular hole.
A kind of impact load tests the method for inspection of tool, carries out according to the following steps:
Step one:The torque tube cantilever design of groove type solar concentrator to be detected is transported in detection place, institute
The torque tube cantilever design stated is to have completed the installation of both sides cantilever on torque tube, and reflecting optics are not yet installed on cantilever,
The position of torque tube cantilever design is adjusted, it is ensured that torque tube two ends flange center line keeps vertical, torque tube itself circle
Circumferential direction does not rotate, and the torque tube chosen is zero error or close zero error, so that the error and moment of torsion of cantilever detection
The error of pipe is mutually distinguished, and the cantilever quantity on torque tube is 11 groups;
Step 2:Impact load is tested into the top that tool is placed on one group of cantilever, is made impact load test tool and is remained perpendicular to ground
Face, the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th in left plate and right panel are fixed
Latch and the 6th Fixed latches, the installing hole of epi mirror first, the installing hole of epi mirror second, the installation of epi mirror the 3rd being respectively aligned on cantilever
Hole, the installing hole of scope first, the installing hole of scope second and the installing hole of scope the 3rd, and latch is inserted in installing hole, make cantilever
Flat board tests tool and fixation is combined with cantilever;
Step 3:Observation impact load is tested at tool and cantilever contacts gap, finds gap, and using clearance gauge measurement gap
Thickness;If this group of cantilever clearance test result does not meet validation criteria, the dismounting and change of cantilever is carried out, if this group of cantilever gap
Test result meets validation criteria, then carry out next step;
Step 4:The Fixed latches that impact load tests tool and cantilever junction are extracted, impact load is tested into tool and is placed on down
On one group of cantilever, repeat step two is with step 3 until completing the inspection of the torque tube cantilever design of whole groove type solar concentrator
Test.
Because erecting bed does not possess the ability of rectification cantilever, cantilever is after the inspection and checking of originally testing tool, it is to avoid
The Product Precision problem run into when installing at the scene, it is ensured that cantilever quality, reduces assembly difficulty, improves assembling effect
Rate.
The present invention has been described in detail above, but the content is only presently preferred embodiments of the present invention, it is impossible to recognized
It is the practical range for limiting the present invention.All impartial changes made according to the present patent application scope and improvement etc., all should still return
Belong within the patent covering scope of the present invention.
Claims (7)
1. a kind of impact load tests tool, it is characterised in that:Including left plate and right panel, drawing between left plate and right panel has center line, left plate
It is symmetrical with regard to center line with right panel, left plate and right panel by center line, first it is long while, second it is long while with the 3rd long skirt into left plate
With the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the first quadrangle are respectively arranged with right panel
Hole, the second quadrilateral hole and second are tri-angle-holed to be arranged in parallel, and the first delthyrium is located at the top of the first quadrilateral hole, the
On three long sides from outside to center line one end set gradually the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th consolidate
Determine latch, the 5th Fixed latches and the 6th Fixed latches, the first circular hole and the second circle are respectively provided with the outside of left plate and right panel
Hole.
2. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described left plate and the length of right panel be
2.6-2.8 rice.
3. a kind of impact load according to claim 1 tests tool, it is characterised in that:The length of described center line is 2-2.2
Rice.
4. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described the first delthyrium, the two or three
The angle of corner apertures, the first quadrilateral hole and the second quadrilateral hole is fillet.
5. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described the first Fixed latches, second
Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th Fixed latches and the 6th Fixed latches are by latch pipe and latch
Head composition, a diameter of 8-10mm of fork.
6. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described first checking circular hole is more than the
Two checking circular holes.
7. a kind of impact load tests the method for inspection of tool, it is characterised in that carry out according to the following steps:
Step one:The torque tube cantilever design of groove type solar concentrator to be detected is transported in detection place, it is described
Torque tube cantilever design is to have completed the installation of both sides cantilever on torque tube, and reflecting optics are not yet installed on cantilever, will be turned round
The position of quarter bend cantilever design is adjusted, it is ensured that torque tube two ends flange center line keeps vertical, itself circumference side of torque tube
To not rotating, the cantilever quantity on torque tube is 10-12 groups;
Step 2:Impact load is tested into the top that tool is placed on one group of cantilever, is made impact load test tool and is remained perpendicular to ground, will
First Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th Fixed latches in left plate and right panel
With the 6th Fixed latches, be respectively aligned to the installing hole of epi mirror first on cantilever, the installing hole of epi mirror second, the installing hole of epi mirror the 3rd,
The installing hole of scope first, the installing hole of scope second and the installing hole of scope the 3rd, and latch is inserted in installing hole, make impact load
Test tool and fixation is combined with cantilever;
Step 3:Observation impact load is tested at tool and cantilever contacts gap, finds gap, and using the thickness of clearance gauge measurement gap
Degree;If this group of cantilever clearance test result does not meet validation criteria, the dismounting and change of cantilever is carried out, if this group of cantilever gap is surveyed
Test result meets validation criteria, then carry out next step;
Step 4:The Fixed latches that impact load tests tool and cantilever junction are extracted, impact load is tested into tool and is placed on next group
On cantilever, repeat step two is with step 3 until completing the inspection of the torque tube cantilever design of whole groove type solar concentrator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611029559.2A CN106643380A (en) | 2016-11-15 | 2016-11-15 | Cantilever plate examination tool and examination method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611029559.2A CN106643380A (en) | 2016-11-15 | 2016-11-15 | Cantilever plate examination tool and examination method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106643380A true CN106643380A (en) | 2017-05-10 |
Family
ID=58807660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611029559.2A Pending CN106643380A (en) | 2016-11-15 | 2016-11-15 | Cantilever plate examination tool and examination method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106643380A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2299398C1 (en) * | 2006-01-17 | 2007-05-20 | Открытое акционерное общество "АВТОВАЗ" | Bench for measuring position of axes of opening in spatial structure |
CN202420412U (en) * | 2012-02-03 | 2012-09-05 | 河北中兴汽车制造有限公司 | Window-frame inspection device for vehicles |
CN205102728U (en) * | 2015-11-12 | 2016-03-23 | 韩涛 | Inspection of slot type solar -thermal power generation spotlight ware side of a ship arm roof beam specially possesses |
CN205175286U (en) * | 2015-12-09 | 2016-04-20 | 安徽合力股份有限公司 | A quick self -checking instrument for fork truck frame counter weight mounting dimension |
CN207113751U (en) * | 2016-11-15 | 2018-03-16 | 天津滨海光热技术研究院有限公司 | A kind of impact load tests tool |
-
2016
- 2016-11-15 CN CN201611029559.2A patent/CN106643380A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2299398C1 (en) * | 2006-01-17 | 2007-05-20 | Открытое акционерное общество "АВТОВАЗ" | Bench for measuring position of axes of opening in spatial structure |
CN202420412U (en) * | 2012-02-03 | 2012-09-05 | 河北中兴汽车制造有限公司 | Window-frame inspection device for vehicles |
CN205102728U (en) * | 2015-11-12 | 2016-03-23 | 韩涛 | Inspection of slot type solar -thermal power generation spotlight ware side of a ship arm roof beam specially possesses |
CN205175286U (en) * | 2015-12-09 | 2016-04-20 | 安徽合力股份有限公司 | A quick self -checking instrument for fork truck frame counter weight mounting dimension |
CN207113751U (en) * | 2016-11-15 | 2018-03-16 | 天津滨海光热技术研究院有限公司 | A kind of impact load tests tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107741198B (en) | A method of it is demarcated based on four axis optical scanning system turntables | |
CN102435150B (en) | Method and device for detecting surface precision of dish parabolic reflecting mirror | |
CN102768026A (en) | Full-size quick blade detection method and equipment | |
WO2011051778A1 (en) | System for determining wind turbine blade pitch settings | |
CN104729430B (en) | A kind of tower type solar energy thermal power generation heliostat surface testing method | |
US11313936B2 (en) | Probe systems and methods for characterizing optical coupling between an optical probe of a probe system and a calibration structure | |
WO2020199656A1 (en) | Foundation pile bearing capacity test and displacement test integrated device and test method | |
CN103528676A (en) | Light distribution test method of semiconductor laser and device of test method | |
CN107407502B (en) | CSP tracking | |
CN104596639B (en) | Far-field three-dimensional strength representation device for semiconductor light source | |
CN207113751U (en) | A kind of impact load tests tool | |
CN106643380A (en) | Cantilever plate examination tool and examination method thereof | |
Meiser et al. | Analysis of parabolic trough concentrator mirror shape accuracy in different measurement setups | |
US20130152411A1 (en) | Method for determining defects in a wind turbine blade root attachment and measuring tool for carrying out such method | |
CN206422916U (en) | Automatic orienting device | |
CN203672592U (en) | Novel groove-type solar heat-collection effect testing mechanism | |
CN105222991A (en) | Disc type solar energy condenser focussing plane energy flux density measuring method and measurement mechanism | |
CN205664761U (en) | A cooperation clearance detection device for auto parts | |
CN104515592A (en) | Rapid characterization device for three-dimensional far field intensity of semi-conductor light source | |
CN204346582U (en) | A kind of fast characterizing device of the three-dimensional far field intensity for semiconductor light sources | |
CN103206792B (en) | Solar energy flow measurement instrument for trough light condenser | |
CN204788256U (en) | Remote benchmark laser displacement sensor | |
CN108072328B (en) | A kind of method of inspection of condenser cantilever | |
CN206281451U (en) | A kind of concentrator surface figure accuracy detecting system | |
CN203672332U (en) | Laser interference paraboloid symmetry measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |