CN207113751U - A kind of impact load tests tool - Google Patents
A kind of impact load tests tool Download PDFInfo
- Publication number
- CN207113751U CN207113751U CN201621242593.3U CN201621242593U CN207113751U CN 207113751 U CN207113751 U CN 207113751U CN 201621242593 U CN201621242593 U CN 201621242593U CN 207113751 U CN207113751 U CN 207113751U
- Authority
- CN
- China
- Prior art keywords
- fixed latches
- right panel
- left plate
- cantilever
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of impact load to test tool, left plate and right panel are symmetrical on center line, surrounded by center line, the first long side, the second long side and the 3rd long side, the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole are respectively arranged with left plate and right panel, the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th Fixed latches and the 6th Fixed latches are set gradually from outside to center line one end in the 3rd long side, the first circular hole and the second circular hole are set respectively in the outside of left plate and right panel;Because erecting bed does not possess the ability of rectification cantilever, cantilever avoids the Product Precision problem run into during installation at the scene, ensure that cantilever quality, reduce assembly difficulty, improve efficiency of assembling by originally testing after the inspection and checking of tool.
Description
Technical field
The verifying attachment of light heat generator is the utility model is related to, especially a kind of impact load tests tool.
Background technology
From after the rise of photo-thermal power generation industry, the processing of the light field support of parabolic trough type solar energy system, installation, debugging into
The focus that professional quarters focus on, because the precision that they are debugged determines the installation accuracy of speculum, and each concentrator
All it is made up of multiple mirrors, so each mirror accurately is installed into theoretical position, maximumlly can reflexes to sunshine
On thermal-collecting tube, the capture efficiency of thermal-collecting tube is improved by the loss of less sunlight.Therefore, the pole bracket of speculum is installed
Installation accuracy determines the capture efficiency of thermal-collecting tube, determines the height of generating efficiency indirectly.
According to traditional handicraft and installation steps, the inspection of cantilever is to examine the size of cantilever finished product public by the frock of cantilever
Difference, if it is certified products that error, which in Measurement Allowance, is judged as this cantilever, it can dispatch from the factory.
The content of the invention
The shortcomings that the utility model overcomes in the prior art, there is provided a kind of impact load tests tool.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of impact load tests tool, including left plate and right panel, between left plate and right panel draw have center line, left plate and right panel on
Center line is symmetrical, and left plate and right panel surround by center line, the first long side, the second long side and the 3rd long side, divides in left plate and right panel
The first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the first quadrilateral hole, the two or four are not provided with
Side shape hole and second tri-angle-holed to be arranged in parallel, the first delthyrium is located at the top of the first quadrilateral hole, in the 3rd long side
From outside to center line one end set gradually the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches,
5th Fixed latches and the 6th Fixed latches, the first circular hole and the second circular hole are set respectively in the outside of left plate and right panel.
Moreover, described left plate and the length of right panel are 2.6-2.8 rice.
Moreover, the length of described center line is 2-2.2 rice.
Moreover, the first described delthyrium, the second delthyrium, the angle of the first quadrilateral hole and the second quadrilateral hole are circle
Angle.
Moreover, the first described Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th solid
Determine latch and the 6th Fixed latches to form by latch pipe and fork, a diameter of 8-10mm of fork.
Moreover, the first described checking circular hole is more than the second checking circular hole.
A kind of impact load tests the application method of tool, is carried out according to the following steps:
Step 1:The torque tube cantilever design of groove type solar concentrator to be detected is transported in detection place, institute
The torque tube cantilever design stated is that the installation of both sides cantilever has been completed on torque tube, and reflecting optics are not yet installed on cantilever,
The position of torque tube cantilever design is adjusted, ensures that torque tube both ends flange center line keeps vertical, torque tube itself circle
Circumferential direction does not rotate, and the cantilever quantity on the torque tube is 10-12 groups;
Step 2:Impact load is tested to the top for having and being placed on one group of cantilever, impact load is tested tool and remains perpendicular to ground
Face, the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th in left plate and right panel are fixed
Latch and the 6th Fixed latches, the mounting hole of epi mirror first being respectively aligned on cantilever, the mounting hole of epi mirror second, epi mirror the 3rd are installed
Hole, the mounting hole of scope first, the mounting hole of scope second and the mounting hole of scope the 3rd, and latch is inserted in mounting hole, make cantilever
Flat board tests tool and fixation is combined with cantilever;
Step 3:Observation impact load is tested at tool and cantilever contacts gap, finds gap, and use clearance gauge measurement gap
Thickness;If this group of cantilever clearance test result does not meet validation criteria, the dismounting and change of cantilever is carried out, if this group of cantilever gap
Test result meets validation criteria, then carries out next step;
Step 4:Extract impact load and test tool and the Fixed latches of cantilever junction, impact load is tested into tool and is placed on down
On one group of cantilever, repeat step two is with step 3 until completing the inspection of the torque tube cantilever design of whole groove type solar concentrator
Survey.
Compared with prior art, the beneficial effects of the utility model are:Because erecting bed does not possess the energy of rectification cantilever
Power, cantilever avoid the Product Precision problem run into during installation at the scene, ensure that by originally testing after the inspection and checking of tool
Cantilever quality, reduces assembly difficulty, improves efficiency of assembling.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is the partial structural diagram of Fixed latches.
Fig. 3 is the epi mirror mounting hole and scope position of mounting hole schematic diagram of cantilever.
Wherein, 1 is left plate, and 2 be the first delthyrium, and 3 be center line, and 4 be the first long side, and 5 be right panel, and 6 be the second long side, 7
It is the second circular hole for the first circular hole, 8,9 be the first Fixed latches, and 10 be the second Fixed latches, and 11 be the 3rd long side, and 12 be the 3rd
Fixed latches, 13 be the 4th Fixed latches, and 14 be the 5th Fixed latches, and 15 be the 6th Fixed latches, and 16 be the first quadrilateral hole,
17 be the second quadrilateral hole, and 18 be second tri-angle-holed, and 19 be latch pipe, and 20 be fork, and 21 be the mounting hole of epi mirror first, 22
For the mounting hole of epi mirror second, 23 be the mounting hole of epi mirror the 3rd, and 24 be the mounting hole of scope first, and 25 be the mounting hole of scope second, 26
For the mounting hole of scope the 3rd.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
As shown in FIG., a kind of impact load tests tool, including left plate and right panel, and being drawn between left plate and right panel has center line, left
Plate and right panel are symmetrical on center line, and left plate and right panel surround by center line, the first long side, the second long side and the 3rd long side, on a left side
The first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the one or four side are respectively arranged with plate and right panel
Shape hole, the second quadrilateral hole and second are tri-angle-holed to be arranged in parallel, and the first delthyrium is located at the top of the first quadrilateral hole,
In 3rd long side the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th are set gradually from outside to center line one end
Fixed latches, the 5th Fixed latches and the 6th Fixed latches, the first circular hole and second are set respectively in the outside of left plate and right panel
Circular hole.
Moreover, described left plate and the length of right panel are 2.6 meters.
Moreover, the length of described center line is 2 meters.
Moreover, the first described delthyrium, the second delthyrium, the angle of the first quadrilateral hole and the second quadrilateral hole are circle
Angle.
Moreover, the first described Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th solid
Determine latch and the 6th Fixed latches to form by latch pipe and fork, a diameter of 8mm of fork.
Moreover, the first described checking circular hole is more than the second checking circular hole.
A kind of impact load tests the application method of tool, is carried out according to the following steps:
Step 1:The torque tube cantilever design of groove type solar concentrator to be detected is transported in detection place, institute
The torque tube cantilever design stated is that the installation of both sides cantilever has been completed on torque tube, and reflecting optics are not yet installed on cantilever,
The position of torque tube cantilever design is adjusted, ensures that torque tube both ends flange center line keeps vertical, torque tube itself circle
Circumferential direction does not rotate, and the torque tube chosen is for zero error or close to zero error, so that the error and moment of torsion of cantilever detection
The error of pipe is mutually distinguished, and the cantilever quantity on torque tube is 11 groups;
Step 2:Impact load is tested to the top for having and being placed on one group of cantilever, impact load is tested tool and remains perpendicular to ground
Face, the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th in left plate and right panel are fixed
Latch and the 6th Fixed latches, the mounting hole of epi mirror first being respectively aligned on cantilever, the mounting hole of epi mirror second, epi mirror the 3rd are installed
Hole, the mounting hole of scope first, the mounting hole of scope second and the mounting hole of scope the 3rd, and latch is inserted in mounting hole, make cantilever
Flat board tests tool and fixation is combined with cantilever;
Step 3:Observation impact load is tested at tool and cantilever contacts gap, finds gap, and use clearance gauge measurement gap
Thickness;If this group of cantilever clearance test result does not meet validation criteria, the dismounting and change of cantilever is carried out, if this group of cantilever gap
Test result meets validation criteria, then carries out next step;
Step 4:Extract impact load and test tool and the Fixed latches of cantilever junction, impact load is tested into tool and is placed on down
On one group of cantilever, repeat step two is with step 3 until completing the inspection of the torque tube cantilever design of whole groove type solar concentrator
Survey.
Because erecting bed does not possess the ability of rectification cantilever, cantilever avoids by originally testing after the inspection and checking of tool
The Product Precision problem run into when installing at the scene, ensure that cantilever quality, reduces assembly difficulty, improve assembling effect
Rate.
The utility model is described in detail above, but the content is only preferred embodiment of the present utility model,
It is not to be regarded as being used to limit practical range of the present utility model.All equivalent changes made according to present utility model application scope with
Improve etc., all should still it belong within patent covering scope of the present utility model.
Claims (5)
1. a kind of impact load tests tool, it is characterised in that:Including left plate and right panel, being drawn between left plate and right panel has center line, left plate
Symmetrical on center line with right panel, left plate and right panel surround by center line, the first long side, the second long side and the 3rd long side, in left plate
With the first delthyrium, the second delthyrium, the first quadrilateral hole and the second quadrilateral hole, the first quadrangle are respectively arranged with right panel
Hole, the second quadrilateral hole and second are tri-angle-holed to be arranged in parallel, and the first delthyrium is located at the top of the first quadrilateral hole, the
In three long sides the first Fixed latches, the second Fixed latches, the 3rd Fixed latches, the 4th solid are set gradually from outside to center line one end
Determine latch, the 5th Fixed latches and the 6th Fixed latches, set the first circular hole and second to justify respectively in the outside of left plate and right panel
Hole.
2. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described left plate and the length of right panel are
2.6-2.8 rice.
3. a kind of impact load according to claim 1 tests tool, it is characterised in that:The length of described center line is 2-2.2
Rice.
4. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described the first delthyrium, the two or three
The angle of corner apertures, the first quadrilateral hole and the second quadrilateral hole is fillet.
5. a kind of impact load according to claim 1 tests tool, it is characterised in that:Described the first Fixed latches, second
Fixed latches, the 3rd Fixed latches, the 4th Fixed latches, the 5th Fixed latches and the 6th Fixed latches are by latch pipe and latch
Head composition, a diameter of 8-10mm of fork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621242593.3U CN207113751U (en) | 2016-11-15 | 2016-11-15 | A kind of impact load tests tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621242593.3U CN207113751U (en) | 2016-11-15 | 2016-11-15 | A kind of impact load tests tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207113751U true CN207113751U (en) | 2018-03-16 |
Family
ID=61594588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621242593.3U Active CN207113751U (en) | 2016-11-15 | 2016-11-15 | A kind of impact load tests tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207113751U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106643380A (en) * | 2016-11-15 | 2017-05-10 | 天津滨海光热技术研究院有限公司 | Cantilever plate examination tool and examination method thereof |
-
2016
- 2016-11-15 CN CN201621242593.3U patent/CN207113751U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106643380A (en) * | 2016-11-15 | 2017-05-10 | 天津滨海光热技术研究院有限公司 | Cantilever plate examination tool and examination method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102435150B (en) | Method and device for detecting surface precision of dish parabolic reflecting mirror | |
CN102768026B (en) | The equipment of the full-scale quick detection of a kind of blade | |
CN103706673B (en) | A kind of node component radial location method of dome-like roof | |
CN103217126B (en) | A kind of solar groove type condenser surface testing system and method | |
CN203203496U (en) | Bend pipe inspection device | |
CN103528676B (en) | A kind of semiconductor laser light intensity distribution testing method and device thereof | |
WO2011051778A1 (en) | System for determining wind turbine blade pitch settings | |
CN207113751U (en) | A kind of impact load tests tool | |
CN104596639B (en) | Far-field three-dimensional strength representation device for semiconductor light source | |
CN203337560U (en) | Detection and sorting device for sub-fissures of crystalline silicon wafer of solar cell | |
CN106680964B (en) | Tower heliostat assembly tool and assembly method | |
CN106643380A (en) | Cantilever plate examination tool and examination method thereof | |
CN106918313B (en) | A kind of dish-style Stirling Salar light-gatherings minute surface quality determining method | |
CN207113264U (en) | A kind of light field cell module accurate positioning device | |
CN205825842U (en) | A kind of special-shaped part assembling hole position degree dedicated test frock | |
CN109237817B (en) | Accurate positioning device for light field unit module and application method thereof | |
CN103206792B (en) | Solar energy flow measurement instrument for trough light condenser | |
CN108072328B (en) | A kind of method of inspection of condenser cantilever | |
CN203725898U (en) | Square pipe cutting positioning and clamping device | |
CN207832119U (en) | A kind of internal thread detection machine based on measurement of coordinates | |
CN106524969B (en) | A method of for gas-turbine combustion chamber changeover portion size detection | |
CN206281466U (en) | A kind of concentrator surface figure accuracy detection means | |
CN106595475A (en) | Concentrator surface accuracy detection system and applications thereof | |
CN205373618U (en) | High accuracy automated inspection examines excellent axiality and beats detector | |
CN205537459U (en) | Three maintenance on large -scale mixed flow pump impeller water conservancy shape line survey frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |