CN106639226A - Ceramic tile dry hanging rack and ceramic tile dry hanging construction method - Google Patents
Ceramic tile dry hanging rack and ceramic tile dry hanging construction method Download PDFInfo
- Publication number
- CN106639226A CN106639226A CN201611004809.7A CN201611004809A CN106639226A CN 106639226 A CN106639226 A CN 106639226A CN 201611004809 A CN201611004809 A CN 201611004809A CN 106639226 A CN106639226 A CN 106639226A
- Authority
- CN
- China
- Prior art keywords
- ceramic tile
- wall
- fixture
- backing plate
- support member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention relates to the technical field of buildings, in particular to a ceramic tile dry hanging rack and a ceramic tile dry hanging construction method. The ceramic tile dry hanging rack comprises fixing elements, connection and supporting elements and a backing plate. The fixing elements are fixed to the surface of a wall through bolts, the connection and supporting elements are horizontally arranged, one end of each connection and supporting element is fixed to the corresponding fixing element, the other end of each connection and supporting element extends to the position, away from the surface of the wall, on the outer side of the corresponding fixing element, the backing plate is vertically fixed to the other ends of the connection and supporting elements, and the side, opposite to the surface of the wall, of the backing plate is an adhesive face fixed to a ceramic tile. A crossed positioning marking piece used for positioning the ceramic tile is arranged in the middle of the other end of each connection and supporting element, and the positioning marking pieces horizontally extend opposite to the surface of the wall to the outer side of the backing plate. The dry hanging rack has the advantages that the structure is simple, installation is convenient and quick, the ceramic tile can be conveniently and precisely positioned and fixedly installed, the quality is stable, and the construction period is short.
Description
Technical field
The present invention relates to a kind of technical field of buildings, the side of the cladding frame of more particularly to a kind of ceramic tile and ceramic tile dry hanging construction
Method.
Background technology
Big specification ceramic tile due to economical, attractive in appearance, color is wide in variety and be widely adopted on decorative wall, cylinder.In recent years,
Dry-hang stone material construction technology is used for indoor wall or building exterior wall face decoration rises in many cities.Its construction technology master
To be fixedly installed on wall, cylinder using crab-bolt and hanging fastener, generally require and slotted on ceramic tile, but due to tile thickness
It is relatively thin, ceramic tile is easily caused in grooving process and is burst apart, while because the unbalance stress that expands with heat and contract with cold is caused during later stage use
Ceramic tile cracking comes off, it is therefore necessary to through relevant PROCESS FOR TREATMENT, just can guarantee that the quality of construction.
The content of the invention
The method that the technical problem to be solved is to provide a kind of cladding frame of ceramic tile and ceramic tile dry hanging construction, effectively
The defect for overcoming prior art.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of cladding frame of ceramic tile, including fixture, connection
Support member and backing plate;
Above-mentioned fixing piece is bolted on surface of wall, and above-mentioned connection support member is horizontally disposed with, and its one end is fixed
On fixture, the other end extends to fixture outside to away from surface of wall, and above-mentioned backing plate is vertically fixed on above-mentioned connection
Support member other end end, and its one side for deviating from surface of wall is set to the adhesive surface with ceramic tile fixation;
The centre position of above-mentioned connection support member other end end is provided with the cross telltale mark for positioning ceramic tile
Piece, and above-mentioned telltale mark piece extends horizontally to above-mentioned backing plate outside to away from the direction of above-mentioned surface of wall.
The invention has the beneficial effects as follows:Simple structure, it is easy for installation, quick, it is easy to ceramic tile to be accurately positioned, ceramic tile installs jail
Gu.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, above-mentioned fixing piece is the right angle angle steel of horizontally set, and the one of side of above-mentioned fixing piece is resisted against
State on surface of wall, and be fixed on above-mentioned surface of wall by expansion bolt, another side is arranged perpendicular to body of wall, and thereon
End is fixed with above-mentioned connection support member.
It is that use cost is low using the beneficial effect of above-mentioned further scheme, is easy to layout of constructing.
Further, it is connected by some spaced reinforcements between two sides of above-mentioned fixing piece.
It is to ensure that the intensity of fixture is enough using the beneficial effect of above-mentioned further scheme, is not susceptible to deformation.
Further, above-mentioned connection support member is horizontally disposed rectangular slab, and is arranged perpendicular to above-mentioned surface of wall, and
Its one end is bolted on above-mentioned fixing piece another side, other end end respectively straight up, it is lower extension formation stop
Follow block, above-mentioned backing plate is provided with and the above-mentioned fitting recess that only follow block is matched, above-mentioned connection away from a Middle face of surface of wall
Support member runs through above-mentioned backing plate by the position of the above-mentioned fitting recess of correspondence, and above-mentioned only follow block is stretched into above-mentioned fitting recess and and bottom land
Place abuts, and above-mentioned only follow block is provided with above-mentioned telltale mark piece away from the one side centre position of surface of wall.
That connection supporting piece structure is simple using the beneficial effect of above-mentioned further scheme, it is easy for installation, with backing plate it
Between install compact, firm.
Further, the vertical range that above-mentioned telltale mark piece stops between one end of follow block and above-mentioned backing plate away from correspondence is little
In or equal to the thickness of ceramic tile.
It is to avoid marker slip after ceramic tile installation from projecting ceramic tile surface using the beneficial effect of above-mentioned further scheme.
Further, above-mentioned connection support member upper and lower end is respectively welded the one side that surface of wall is faced with above-mentioned backing plate
The wedge shape limited block for offseting.
It is to ensure that backing plate is installed than stronger using the beneficial effect of above-mentioned further scheme, is not susceptible to loosen.
Further, above-mentioned backing plate is made up of granite.
Affinity is higher when being so that the bonding between backing plate and ceramic tile using the beneficial effect of above-mentioned further scheme,
Bonding is than stronger.
Further, above-mentioned fixing piece for strip overall structure or multiple interval settings and be distributed in the list of same level
The combination of individual above-mentioned fixing piece, and when overall structure of the above-mentioned fixing piece for bar shaped, be arranged at intervals with above-mentioned fixing piece many
Individual above-mentioned connection support member;When the combination of the single above-mentioned fixing piece that above-mentioned fixing piece is multiple interval settings and lineal layout
When, an above-mentioned connection support member is provided with each above-mentioned fixing piece.
It is that its design is simple using the beneficial effect of above-mentioned further scheme, it is rationally distributed.
A kind of method of ceramic tile dry hanging construction is also provided, is comprised the following steps:
Step 1:The cladding frame of ceramic tile is installed, specifically, by the cladding frame level of multiple ceramic tiles and between the upper and lower every be fixed on wall
On body surface face, and all the telltale mark piece of connection support member end is distributed in ranks in the cladding frame of above-mentioned ceramic tile, and same a line
And equal with the width of ceramic tile and height dimension respectively, the adjacent lines of the distance between the two neighboring above-mentioned telltale mark piece of same row
Above-mentioned telltale mark piece on row forms ceramic tile installing zone;
Step 2:Ceramic tile is installed, specifically, ceramic tile is placed in each above-mentioned ceramic tile installing zone, and by ceramic tile medial surface with
The adhesive surface of corresponding backing plate is adhesively fixed;
Step 3:Filleting is done to the seam crossing between two neighboring ceramic tile by jointing agent to process.
Beneficial effect is that construction is simple, quick, effectively reduces construction cost.
Description of the drawings
Fig. 1 is the vertical section structure schematic diagram of the cladding frame of ceramic tile of the present invention;
Fig. 2 is the overlooking the structure diagram of the cladding frame of ceramic tile of embodiment one;
Fig. 3 is the overlooking the structure diagram of the cladding frame of single ceramic tile of embodiment two
Fig. 4 be the present invention the cladding frame of ceramic tile and body of wall between install vertical section structure schematic diagram;
Fig. 5 for embodiment one the cladding frame of ceramic tile and ceramic tile between coordinate positive structure schematic.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, fixture, 2, connection support member, 3, backing plate, 4, body of wall, 11, expansion bolt, 12, reinforcement, 21, only support
Plate, 22, wedge shape limited block, 211, telltale mark piece.
Specific embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, example is served only for explaining the present invention, and
It is non-for limiting the scope of the present invention.
Embodiment one:As shown in Fig. 1,2,4,5, the cladding frame of ceramic tile of the present embodiment includes fixture 1, connection support member 2
With backing plate 3;
Above-mentioned fixing piece 1 is bolted on the surface of body of wall 4, and above-mentioned connection support member 2 is horizontally disposed with, and its one end is solid
It is scheduled on fixture 1, the other end extends to the outside of fixture 1 to away from the surface of body of wall 4, above-mentioned backing plate 3 is vertically fixed on
Connection support member 2 other end end is stated, and its one side for deviating from the surface of body of wall 4 is set to the adhesive surface with ceramic tile fixation;
The centre position of the other end end of above-mentioned connection support member 2 is provided with the cross telltale mark for positioning ceramic tile
Piece 211, and above-mentioned telltale mark piece 211 extends horizontally to the outside of above-mentioned backing plate 3 to the direction away from the surface of above-mentioned body of wall 4.
Above-mentioned fixing piece 1 is the right angle angle steel of horizontally set, and the one of side of above-mentioned fixing piece 1 is resisted against above-mentioned body of wall
On 4 surfaces, and it is fixed on the surface of above-mentioned body of wall 4 by expansion bolt 11, another side is arranged perpendicular to body of wall 4, and thereon
End is fixed with above-mentioned connection support member 2.
Above-mentioned fixing piece 1 is the overall structure of strip, and multiple above-mentioned connection support members are arranged at intervals with above-mentioned fixing piece 1
2。
It is connected by some spaced reinforcements 12 between 1 two sides of above-mentioned fixing piece.
Above-mentioned connection support member 2 is horizontally disposed rectangular slab, and is arranged perpendicular to the surface of above-mentioned body of wall 4, and one
End is bolted on the another side of above-mentioned fixing piece 1, other end end respectively straight up, it is lower extend to be formed stop follow block
21, a Middle face of the above-mentioned backing plate 3 away from the surface of body of wall 4 is provided with and the above-mentioned fitting recess that only follow block 21 is matched, above-mentioned connection
Support member 2 runs through above-mentioned backing plate 3 by the position of the above-mentioned fitting recess of correspondence, and above-mentioned only follow block 21 is stretched into above-mentioned fitting recess simultaneously
Abut with bottom land, above-mentioned only follow block 21 is provided with above-mentioned telltale mark piece 211 away from the one side centre position on the surface of body of wall 4.
The vertical range that above-mentioned telltale mark piece 211 stops between one end of follow block 21 and above-mentioned backing plate 3 away from correspondence is little
In or equal to the thickness of ceramic tile so that ceramic tile install when, telltale mark piece 211 will not project ceramic tile outer surface.
The above-mentioned upper and lower end of connection support member 2 is respectively welded the one side for facing the surface of body of wall 4 with above-mentioned backing plate 3 and offsets
Wedge shape limited block 22.
Above-mentioned backing plate 3 is made up of granite so that affinity is higher between backing plate 3 and ceramic tile, viscous by adhesive
Knot is than stronger.
Construction procedure is as follows:
Step 1:The cladding frame of ceramic tile is installed, specifically, by the cladding frame level of multiple ceramic tiles and between the upper and lower every be fixed on wall
On the surface of body 4, and all connect the telltale mark piece 211 of the end of support member 2 in the cladding frame of above-mentioned ceramic tile in ranks distribution, and together
The distance between a line and the two neighboring above-mentioned telltale mark piece 211 of same row respectively with the width and height dimension phase of ceramic tile
Deng the above-mentioned telltale mark piece 211 formation ceramic tile installing zone on adjacent ranks;
Step 2:Ceramic tile is installed, specifically, ceramic tile is placed in each above-mentioned ceramic tile installing zone, and by ceramic tile medial surface with
The adhesive surface of corresponding backing plate 3 is adhesively fixed by binding agent;
Step 3:Filleting is done to the seam crossing between two neighboring ceramic tile by jointing agent to process.
Embodiment two:As shown in Fig. 1,3,4, above-mentioned fixing piece 1 is multiple interval settings and is distributed in same level
The combination of single above-mentioned fixing piece 1, is provided with an above-mentioned connection support member 2 in each above-mentioned fixing piece 1.
Other are with embodiment one.
It is identical that construction procedure also leads to construction procedure in embodiment one.
When constructing to the cladding frame of the superiors' ceramic tile, itself and spacing from top to bottom between the cladding frame of second layer ceramic tile
Less than the height dimension of ceramic tile, and the telltale mark piece 211 to connecting the end of support member 2 in the cladding frame of the superiors' ceramic tile cuts off
Process, the superiors' ceramic tile upper end near body of wall tip position, and by jointing agent to the superiors' ceramic tile upper end and body of wall top
Jointing process is done at seam;When constructing to the cladding frame of orlop ceramic tile, it is cladding with second layer ceramic tile from lower to upper
The height dimension for being smaller than ceramic tile between frame, and the positioning mark to connecting the end of support member 2 in the cladding frame of orlop ceramic tile
Note piece 211 does removal procedure, and corresponding undermost ceramic tile lower end is near ground etc. (such as skirting, ground) position and right
Seam crossing between orlop ceramic tile lower end and ground etc. does jointing and processes by jointing agent.
The foregoing is only presently preferred embodiments of the present invention, not to limit the present invention, all spirit in the present invention and
Within principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.
Claims (9)
1. the cladding frame of a kind of ceramic tile, it is characterised in that:Including fixture (1), connection support member (2) and backing plate (3);
The fixture (1) is bolted on body of wall (4) surface, and the connection support member (2) is horizontally disposed with, and its one end
It is fixed on fixture (1), the other end extends to fixture (1) outside to away from body of wall (4) surface, the backing plate (3) is erected
Connection support member (2) other end end is directly fixed on, and its one side for deviating from body of wall (4) surface is set to be fixed with ceramic tile
Adhesive surface;
The centre position of connection support member (2) other end end is provided with the cross telltale mark piece for positioning ceramic tile
, and the telltale mark piece (211) extends horizontally to the backing plate (3) to away from the direction on the body of wall (4) surface (211)
Outside.
2. the cladding frame of a kind of ceramic tile according to claim 1, it is characterised in that:The fixture (1) is horizontally set
Right angle angle steel, the one of side of the fixture (1) is resisted against on the body of wall (4) surface, and by expansion bolt (11)
It is fixed on the body of wall (4) surface, another side is arranged perpendicular to body of wall (4), and its upper end is fixed with the connection and supports
Part (2).
3. the cladding frame of a kind of ceramic tile according to claim 2, it is characterised in that:Between (1) two side of the fixture
It is connected by some spaced reinforcements (12).
4. the cladding frame of a kind of ceramic tile according to claim 3, it is characterised in that:Connection support member (2) sets for level
The rectangular slab put, and arrange perpendicular to the body of wall (4) surface, and its one end is bolted on the fixture (1)
On another side, other end end respectively straight up, it is lower extend to be formed stop follow block (21), the backing plate (3) is away from body of wall
(4) Middle face on surface is provided with and the fitting recess that only follow block (21) is matched, and the connection support member (2) is described by correspondence
The backing plate (3) is run through in the position of fitting recess, and the only follow block (21) is stretched into the fitting recess and abutted with bottom land,
The only follow block (21) is provided with the telltale mark piece (211) away from the one side centre position on body of wall (4) surface.
5. the cladding frame of a kind of ceramic tile according to claim 4, it is characterised in that:The telltale mark piece (211) is away from right
Thickness of the vertical range between one end of follow block (21) and the backing plate (3) less than or equal to ceramic tile should be stopped.
6. the cladding frame of a kind of ceramic tile according to claim 5, it is characterised in that:Connection support member (2) upper and lower end point
It is not welded with the wedge shape limited block (22) that the one side for facing body of wall (4) surface with the backing plate (3) offsets.
7. the cladding frame of a kind of ceramic tile according to any one of claim 1 to 6, it is characterised in that:The backing plate (3) is by spending
Gang Yan makes.
8. the cladding frame of a kind of ceramic tile according to any one of claim 1 to 6, it is characterised in that:The fixture (1) is bar
The overall structure of shape or multiple interval settings and be distributed in same level single described fixture (1) combination, and work as institute
State fixture (1) for bar shaped overall structure when, be arranged at intervals with the fixture (1) it is multiple it is described connection support member (2);
When the combination of the single described fixture (1) that the fixture (1) is multiple interval settings and lineal layout, each is described solid
Determine to be provided with connection support member (2) on part (1).
9. method of a kind of cladding frame of ceramic tile using as described in any one of claim 1 to 8 to ceramic tile dry hanging construction, its feature
It is to comprise the following steps:
Step 1:The cladding frame of ceramic tile is installed, specifically, by the cladding frame level of multiple ceramic tiles and between the upper and lower every be fixed on body of wall (4)
On surface, and all connect the telltale mark piece (211) of support member (2) end in the cladding frame of the ceramic tile in ranks distribution, and
With the distance between two neighboring described telltale mark piece (211) of a line and same row respectively with the width and height dimension of ceramic tile
Equal, the telltale mark piece (211) on adjacent ranks forms ceramic tile installing zone;
Step 2:Ceramic tile is installed, specifically, ceramic tile is placed in each described ceramic tile installing zone, and by ceramic tile medial surface with it is corresponding
The adhesive surface of backing plate (3) be adhesively fixed by binding agent;
Step 3:Filleting is done to the seam crossing between two neighboring ceramic tile by jointing agent to process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611004809.7A CN106639226A (en) | 2016-11-15 | 2016-11-15 | Ceramic tile dry hanging rack and ceramic tile dry hanging construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611004809.7A CN106639226A (en) | 2016-11-15 | 2016-11-15 | Ceramic tile dry hanging rack and ceramic tile dry hanging construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639226A true CN106639226A (en) | 2017-05-10 |
Family
ID=58806054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611004809.7A Pending CN106639226A (en) | 2016-11-15 | 2016-11-15 | Ceramic tile dry hanging rack and ceramic tile dry hanging construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639226A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090960A (en) * | 2017-06-14 | 2017-08-25 | 安徽中烟工业有限责任公司 | The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method |
CN109469223A (en) * | 2018-11-09 | 2019-03-15 | 宁夏大学 | A kind of novel outer maintenance wall of green |
CN112282319A (en) * | 2020-10-09 | 2021-01-29 | 浙江亚厦装饰股份有限公司 | Composite wallboard seam width fixing device and using method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201202525A (en) * | 2010-07-09 | 2012-01-16 | Kuen Ting Construction Co Ltd | Tile positioning device |
CN102561161A (en) * | 2011-12-31 | 2012-07-11 | 深圳市建筑科学研究院有限公司 | Method for paving water-permeable brick-paved ground and water permeation locator |
CN203891396U (en) * | 2014-06-06 | 2014-10-22 | 深圳市晶艺装饰设计工程有限公司 | Aluminum honeycomb board ceramic tile structure |
CN204920095U (en) * | 2015-06-30 | 2015-12-30 | 北京丽贝亚建筑装饰工程有限公司 | Ceramic tile device is hung futilely to wall |
CN205206215U (en) * | 2015-12-21 | 2016-05-04 | 新疆更高固建材有限公司 | Special pendant of pottery surface course |
CN206158082U (en) * | 2016-11-15 | 2017-05-10 | 东易日盛家居装饰集团股份有限公司 | Dry stores pylon of ceramic tile |
-
2016
- 2016-11-15 CN CN201611004809.7A patent/CN106639226A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201202525A (en) * | 2010-07-09 | 2012-01-16 | Kuen Ting Construction Co Ltd | Tile positioning device |
CN102561161A (en) * | 2011-12-31 | 2012-07-11 | 深圳市建筑科学研究院有限公司 | Method for paving water-permeable brick-paved ground and water permeation locator |
CN203891396U (en) * | 2014-06-06 | 2014-10-22 | 深圳市晶艺装饰设计工程有限公司 | Aluminum honeycomb board ceramic tile structure |
CN204920095U (en) * | 2015-06-30 | 2015-12-30 | 北京丽贝亚建筑装饰工程有限公司 | Ceramic tile device is hung futilely to wall |
CN205206215U (en) * | 2015-12-21 | 2016-05-04 | 新疆更高固建材有限公司 | Special pendant of pottery surface course |
CN206158082U (en) * | 2016-11-15 | 2017-05-10 | 东易日盛家居装饰集团股份有限公司 | Dry stores pylon of ceramic tile |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090960A (en) * | 2017-06-14 | 2017-08-25 | 安徽中烟工业有限责任公司 | The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method |
CN107090960B (en) * | 2017-06-14 | 2022-11-08 | 安徽中烟工业有限责任公司 | Supporting and limiting device for dry hanging of wall bricks and wall brick assembly type dry hanging construction method |
CN109469223A (en) * | 2018-11-09 | 2019-03-15 | 宁夏大学 | A kind of novel outer maintenance wall of green |
CN112282319A (en) * | 2020-10-09 | 2021-01-29 | 浙江亚厦装饰股份有限公司 | Composite wallboard seam width fixing device and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639226A (en) | Ceramic tile dry hanging rack and ceramic tile dry hanging construction method | |
CN107090960B (en) | Supporting and limiting device for dry hanging of wall bricks and wall brick assembly type dry hanging construction method | |
CN206158082U (en) | Dry stores pylon of ceramic tile | |
CN111236567A (en) | Cross construction method for outer wall decoration integrated plate and dry hanging stone | |
CN112922272B (en) | EPS line construction method | |
CN210659081U (en) | Mounting system of building indoor wall assembled veneer | |
CN104018605A (en) | Argil curtain wall and construction method thereof | |
CN201794248U (en) | Installing fastener of board integrating heat preservation with decoration | |
CN215166847U (en) | Exterior wall system | |
CN110056148A (en) | A kind of assembled cladding mounting structure of small dimension ceramic tile | |
CN103015656B (en) | Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method | |
CN213653907U (en) | Back bolt pendant connection structure | |
CN212427881U (en) | Wall surface hanging integral external corner system | |
CN115182496A (en) | Transverse-through and vertical-breaking type multi-element combined curtain wall system and construction method thereof | |
KR20190078792A (en) | Multi system bracket | |
CN210421734U (en) | Mounting structure is hung futilely to assembled of small dimension ceramic tile | |
CN104213659B (en) | Curtain wall installation system | |
CN211341371U (en) | Large-space suspended ceiling | |
CN110821027A (en) | Ceiling suspended ceiling structure with adjustable height and construction method thereof | |
JP5317272B2 (en) | Tile panel construction method | |
CN105604287A (en) | Paving method of prefabricated composite wallboards | |
CN205776940U (en) | A kind of without Os Draconis light steel fastener direct hanging type Back-tied stone curtain wall | |
CN211572373U (en) | Adjustable clearance system of little gap metal shingle nail | |
CN216921095U (en) | Ceramic tile fixer and integrated ceramic tile board | |
CN205012558U (en) | Glass fiber reinforced cement decorates brick link plate and decorates shaped steel truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |