CN111236567A - Cross construction method for outer wall decoration integrated plate and dry hanging stone - Google Patents

Cross construction method for outer wall decoration integrated plate and dry hanging stone Download PDF

Info

Publication number
CN111236567A
CN111236567A CN202010007970.XA CN202010007970A CN111236567A CN 111236567 A CN111236567 A CN 111236567A CN 202010007970 A CN202010007970 A CN 202010007970A CN 111236567 A CN111236567 A CN 111236567A
Authority
CN
China
Prior art keywords
integrated plate
plate
stone
wall
less
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010007970.XA
Other languages
Chinese (zh)
Inventor
李�杰
曹志钱
王健
卞海进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Bajian Construction Group Co ltd
Original Assignee
Nantong Bajian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Bajian Construction Group Co ltd filed Critical Nantong Bajian Construction Group Co ltd
Priority to CN202010007970.XA priority Critical patent/CN111236567A/en
Publication of CN111236567A publication Critical patent/CN111236567A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0875Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a cross construction method of an outer wall decoration integrated plate and dry hanging stone, which comprises the steps of base layer processing, elastic line typesetting, installation of a wall connecting piece and a main keel, sticking of the integrated plate and a stone internal insulation board, installation of a stone secondary keel, gluing, cleaning, checking, acceptance and the like. The invention has the advantages of convenient construction, good construction effect, beautiful appearance and good quality.

Description

Cross construction method for outer wall decoration integrated plate and dry hanging stone
Technical Field
The invention relates to a cross construction method of an outer wall decoration integrated plate and dry-hanging stone.
Background
The construction method of the decoration of the outer wall of the building is many, but how to organically combine the dry hanging stone and the decorative plate is a difficult point in the field, and research and solution are needed.
Disclosure of Invention
The invention aims to provide a cross construction method of an outer wall decoration integrated plate and dry-hanging stone, which is convenient to construct and good in effect.
The technical solution of the invention is as follows:
a cross construction method of an outer wall decoration integrated plate and dry-hanging stone is characterized by comprising the following steps: comprises the following steps:
first, base layer treatment
The outer wall structure wall surface mainly comprises a concrete structure wall and an air-entraining block wall, a construction process of a concrete clear water surface is selected in the structure construction stage, and the air-entraining block wall is leveled by using cement mortar;
(II) line-snapping typesetting
Popping separation lines on a structural leveling wall surface by using ink lines according to a layout pattern in the early stage of construction, adopting a stone integrated plate, embedding the integrated plate into stone by 22mm, and counting the processing size of the integrated plate according to the actual situation on site by combining a scheme;
(III) installation of wall connecting piece and main keel
The installation distance between adjacent anchoring pieces of the butterfly code anchoring pieces adopted by the integrated plate is not more than 420mm, 8 sets of the butterfly code anchoring pieces are used per square meter, and the effective anchoring depth of the expansion bolts is not less than 6 cm;
the stone keel adopts square steel as a vertical main keel, is connected with a wall anchor, and takes galvanized angle steel as a cross bar to transmit force to a vertical bar, and the cross bar is connected with the vertical keel in a welding way;
the framework installation sequence is as follows:
(1) installing a vertical rod piece, connecting the vertical rod piece with the main body structure, and installing a transverse rod piece after the vertical rod piece is in place;
(2) connecting a long framework by using section steel, respectively penetrating the long framework into the end parts of an upper rod piece and a lower rod piece, and then screwing the long framework by using bolts, wherein a transverse rod piece is connected with a vertical rod piece in a welding manner;
(IV) sticking of integrated plate and stone internal heat insulation plate
(1) Bonding of integrated plate
Firstly, uniformly mixed adhesive is smeared on the back surface of the heat-insulating composite board by using a trowel point or a strip. The diameter of each coating point is not less than 100mm, and each square meter is not less than 9 coating points. Pressing the board on the wall surface by hands, then adsorbing the sucker on the surface of the board, and adjusting the position of the composite board by the sucker to keep the whole board surface flat and align with the dividing joint;
the quality requirement is as follows:
the flatness of the whole plane is less than or equal to 3mm/2 m straight scale, and the height difference of the plate seam is less than or equal to 3 mm;
ensuring that the number of bonding points within each square meter is not less than 6-8, the diameter of each coating point is not less than 100mm, the periphery of the integrated plate is required to be fully bonded, the bonding area is not less than 80% of the plate surface, and the position is required to be horizontal, flat and vertical;
the detection method comprises the following steps:
leaning a ruler on the bonded board surface, detecting the size of the gap by using a feeler gauge, lightly hammering the board surface by using a small wooden hammer, and judging the size of the bonded area and the number of bonded points according to the compaction degree;
(2) anchoring part
After the pasting position of the heat preservation decoration is determined, a mechanical fastener is installed; the fasteners are firstly installed at intervals of 300-. No matter the inner fastener or the outer fastener is installed, the force cannot be too large, so that the wavy shape of the layout is avoided; the adjustment is carried out according to the flatness of the board surface;
after the pasting position of the heat preservation and decoration integrated plate is determined, an anchoring part is installed; the cross anchoring pieces are arranged at the notches of the corners of the four heat-preservation and decoration integrated plates, the linear anchoring pieces are arranged between the two plates at intervals of 300-500mm, and the force is adjusted according to the flatness of the plate surface so as to avoid the wave shape of the plate surface;
(V) installing stone secondary keel
The installation style of the secondary keel is determined according to the building modeling requirement;
(VI) gluing
Popping the dividing lines, pasting adhesive tapes, cleaning the surface of the glue applying plate by using a special cleaning agent, popping the dividing lines according to the requirement of dividing width, and pasting the adhesive tapes along the pasting lines;
applying a proper amount of sealant uniformly in the dividing joint by using a sealant gun, and then leveling the sealant by using a leveling scraper, wherein the width of the sealant on the plate is required to be 0.8-1.1mm, and the paper adhesive tape is pulled off after the glue application is finished;
the quality requirement is as follows: no trace and no dirt;
(VII) cleaning, checking and accepting
Cleaning the edges of the integrated plate and the stone, coating dust and dirt, tearing off the protective film of the integrated plate, and then cleaning the adhesive residues by using a clean towel; if cement is adhered to the local part, the sand and the ash are washed clean by using clear water.
In the step (IV), the thickness of the bonding layer is preferably equal to or less than 4mm, and the bonding layer of the integrated board can be leveled. The thicker the bond layer, the more bond defects, and the greater the negative pressure effect created by the wind flow.
The invention has the advantages of convenient construction, good construction effect, beautiful appearance and good quality.
The present invention will be further described with reference to the following examples.
Detailed Description
A cross construction method of an outer wall decoration integrated plate and dry-hanging stone comprises the following steps:
first, base layer treatment
The outer wall structure wall surface mainly comprises a concrete structure wall and an air-entraining block wall, a construction process of a concrete clear water surface is selected in the structure construction stage, and the air-entraining block wall is leveled by using cement mortar;
(II) line-snapping typesetting
Popping separation lines on a structural leveling wall surface by using ink lines according to a layout pattern in the early stage of construction, adopting a stone integrated plate, embedding the integrated plate into stone by 22mm, and counting the processing size of the integrated plate according to the actual situation on site by combining a scheme;
(III) installation of wall connecting piece and main keel
The installation distance between adjacent anchoring pieces of the butterfly code anchoring pieces adopted by the integrated plate is not more than 420mm, 8 sets of the butterfly code anchoring pieces are used per square meter, and the effective anchoring depth of the expansion bolts is not less than 6 cm;
the stone keel adopts square steel as a vertical main keel, is connected with a wall anchor, and takes galvanized angle steel as a cross bar to transmit force to a vertical bar, and the cross bar is connected with the vertical keel in a welding way;
the framework installation sequence is as follows:
(1) installing a vertical rod piece, connecting the vertical rod piece with the main body structure, and installing a transverse rod piece after the vertical rod piece is in place;
(2) connecting a long framework by using section steel, respectively penetrating the long framework into the end parts of an upper rod piece and a lower rod piece, and then screwing the long framework by using bolts, wherein a transverse rod piece is connected with a vertical rod piece in a welding manner;
(IV) sticking of integrated plate and stone internal heat insulation plate
(1) Bonding of integrated plate
Firstly, uniformly mixed adhesive is smeared on the back surface of the heat-insulating composite board by using a trowel point or a strip. The diameter of each coating point is not less than 100mm, and each square meter is not less than 9 coating points. Pressing the board on the wall surface by hands, then adsorbing the sucker on the surface of the board, and adjusting the position of the composite board by the sucker to keep the whole board surface flat and align with the dividing joint;
the quality requirement is as follows:
the flatness of the whole plane is less than or equal to 3mm/2 m straight scale, and the height difference of the plate seam is less than or equal to 3 mm;
ensuring that the number of bonding points within each square meter is not less than 6-8, the diameter of each coating point is not less than 100mm, the periphery of the integrated plate is required to be fully bonded, the bonding area is not less than 80% of the plate surface, and the position is required to be horizontal, flat and vertical;
the detection method comprises the following steps:
leaning a ruler on the bonded board surface, detecting the size of the gap by using a feeler gauge, lightly hammering the board surface by using a small wooden hammer, and judging the size of the bonded area and the number of bonded points according to the compaction degree;
(2) anchoring part
After the pasting position of the heat preservation decoration is determined, a mechanical fastener is installed; the fasteners are firstly installed at intervals of 300-. No matter the inner fastener or the outer fastener is installed, the force cannot be too large, so that the wavy shape of the layout is avoided; the adjustment is carried out according to the flatness of the board surface;
after the pasting position of the heat preservation and decoration integrated plate is determined, an anchoring part is installed; the cross anchoring pieces are arranged at the notches of the corners of the four heat-preservation and decoration integrated plates, the linear anchoring pieces are arranged between the two plates at intervals of 300-500mm, and the force is adjusted according to the flatness of the plate surface so as to avoid the wave shape of the plate surface;
(V) installing stone secondary keel
The installation style of the secondary keel is determined according to the building modeling requirement;
(VI) gluing
Popping the dividing lines, pasting adhesive tapes, cleaning the surface of the glue applying plate by using a special cleaning agent, popping the dividing lines according to the requirement of dividing width, and pasting the adhesive tapes along the pasting lines;
applying a proper amount of sealant uniformly in the dividing joint by using a sealant gun, and then leveling the sealant by using a leveling scraper, wherein the width of the sealant on the plate is required to be 0.8-1.1mm, and the paper adhesive tape is pulled off after the glue application is finished;
the quality requirement is as follows: no trace and no dirt;
(VII) cleaning, checking and accepting
Cleaning the edges of the integrated plate and the stone, coating dust and dirt, tearing off the protective film of the integrated plate, and then cleaning the adhesive residues by using a clean towel; if cement is adhered to the local part, the sand and the ash are washed clean by using clear water.
In the step (IV), the thickness of the bonding layer is preferably equal to or less than 4mm, and the bonding layer of the integrated board can be leveled. The thicker the bond layer, the more bond defects, and the greater the negative pressure effect created by the wind flow.

Claims (2)

1. A cross construction method of an outer wall decoration integrated plate and dry-hanging stone is characterized by comprising the following steps: comprises the following steps:
first, base layer treatment
The outer wall structure wall surface mainly comprises a concrete structure wall and an air-entraining block wall, a construction process of a concrete clear water surface is selected in the structure construction stage, and the air-entraining block wall is leveled by using cement mortar;
(II) line-snapping typesetting
Popping separation lines on a structural leveling wall surface by using ink lines according to a layout pattern in the early stage of construction, adopting a stone integrated plate, embedding the integrated plate into stone by 22mm, and counting the processing size of the integrated plate according to the actual situation on site by combining a scheme;
(III) installation of wall connecting piece and main keel
The installation distance between adjacent anchoring pieces of the butterfly code anchoring pieces adopted by the integrated plate is not more than 420mm, 8 sets of the butterfly code anchoring pieces are used per square meter, and the effective anchoring depth of the expansion bolts is not less than 6 cm;
the stone keel adopts square steel as a vertical main keel, is connected with a wall anchor, and takes galvanized angle steel as a cross bar to transmit force to a vertical bar, and the cross bar is connected with the vertical keel in a welding way;
the framework installation sequence is as follows:
(1) installing a vertical rod piece, connecting the vertical rod piece with the main body structure, and installing a transverse rod piece after the vertical rod piece is in place;
(2) connecting a long framework by using section steel, respectively penetrating the long framework into the end parts of an upper rod piece and a lower rod piece, and then screwing the long framework by using bolts, wherein a transverse rod piece is connected with a vertical rod piece in a welding manner;
(IV) sticking of integrated plate and stone internal heat insulation plate
(1) Bonding of integrated plate
Firstly, uniformly mixed adhesive is smeared on the back surface of the heat-insulating composite board by using a trowel point or a strip; the diameter of each coating point is not less than 100mm, and each square meter is not less than 9 coating points; pressing the board on the wall surface by hands, then adsorbing the sucker on the surface of the board, and adjusting the position of the composite board by the sucker to keep the whole board surface flat and align with the dividing joint;
the quality requirement is as follows:
the flatness of the whole plane is less than or equal to 3mm/2 m straight scale, and the height difference of the plate seam is less than or equal to 3 mm;
ensuring that the number of bonding points within each square meter is not less than 6-8, the diameter of each coating point is not less than 100mm, the periphery of the integrated plate is required to be fully bonded, the bonding area is not less than 80% of the plate surface, and the position is required to be horizontal, flat and vertical;
the detection method comprises the following steps:
leaning a ruler on the bonded board surface, detecting the size of the gap by using a feeler gauge, lightly hammering the board surface by using a small wooden hammer, and judging the size of the bonded area and the number of bonded points according to the compaction degree;
(2) anchoring part
After the pasting position of the heat preservation decoration is determined, a mechanical fastener is installed; the fasteners are firstly installed at intervals of 300-; no matter the inner fastener or the outer fastener is installed, the force cannot be too large, so that the wavy shape of the layout is avoided; the adjustment is carried out according to the flatness of the board surface;
after the pasting position of the heat preservation and decoration integrated plate is determined, an anchoring part is installed; the cross anchoring pieces are arranged at the notches of the corners of the four heat-preservation and decoration integrated plates, the linear anchoring pieces are arranged between the two plates at intervals of 300-500mm, and the force is adjusted according to the flatness of the plate surface so as to avoid the wave shape of the plate surface;
(V) installing stone secondary keel
The installation style of the secondary keel is determined according to the building modeling requirement;
(VI) gluing
Popping the dividing lines, pasting adhesive tapes, cleaning the surface of the glue applying plate by using a special cleaning agent, popping the dividing lines according to the requirement of dividing width, and pasting the adhesive tapes along the pasting lines;
applying a proper amount of sealant uniformly in the dividing joint by using a sealant gun, and then leveling the sealant by using a leveling scraper, wherein the width of the sealant on the plate is required to be 0.8-1.1mm, and the paper adhesive tape is pulled off after the glue application is finished;
the quality requirement is as follows: no trace and no dirt;
(VII) cleaning, checking and accepting
Cleaning the edges of the integrated plate and the stone, coating dust and dirt, tearing off the protective film of the integrated plate, and then cleaning the adhesive residues by using a clean towel; if cement is adhered to the local part, the sand and the ash are washed clean by using clear water.
2. The cross construction method of the exterior wall decoration integrated plate and the dry hanging stone as claimed in claim 1, which is characterized in that: in the step (IV), the thickness of the bonding layer is preferably equal to or less than 4mm, and the bonding layer of the integrated board can be leveled.
CN202010007970.XA 2020-01-06 2020-01-06 Cross construction method for outer wall decoration integrated plate and dry hanging stone Pending CN111236567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010007970.XA CN111236567A (en) 2020-01-06 2020-01-06 Cross construction method for outer wall decoration integrated plate and dry hanging stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010007970.XA CN111236567A (en) 2020-01-06 2020-01-06 Cross construction method for outer wall decoration integrated plate and dry hanging stone

Publications (1)

Publication Number Publication Date
CN111236567A true CN111236567A (en) 2020-06-05

Family

ID=70868568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010007970.XA Pending CN111236567A (en) 2020-01-06 2020-01-06 Cross construction method for outer wall decoration integrated plate and dry hanging stone

Country Status (1)

Country Link
CN (1) CN111236567A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764607A (en) * 2020-07-10 2020-10-13 黄金飞 Installation and construction process of ecological plastic-wood exterior wall board
CN111980184A (en) * 2020-08-13 2020-11-24 安徽镜铭建筑装饰工程有限公司 Method for mounting composite board
CN114263336A (en) * 2021-10-29 2022-04-01 成都建工第二建筑工程有限公司 Construction method of KTC plate composite outer wall decoration system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201826468U (en) * 2010-09-25 2011-05-11 苏红红 Thermal decorating plate
CN207277742U (en) * 2017-08-14 2018-04-27 河北诚泰建筑节能科技有限公司 A kind of external wall thermal insulation/decoration integration board hanger system
US20180171642A1 (en) * 2012-08-29 2018-06-21 Acculign Holdings, Inc. Front adjustable wall panel mounting device
CN208220087U (en) * 2017-12-22 2018-12-11 苏州金螳螂建筑装饰股份有限公司 A kind of cladding aluminum alloy framework
CN110206249A (en) * 2019-05-09 2019-09-06 苏州宜特加建筑工程有限公司 A kind of light-duty keel heat insulation decoration integrated plate system
CN110306744A (en) * 2019-04-25 2019-10-08 克拉玛依市住房和城乡建设局 A kind of installation method building outer wall decorating insulation board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201826468U (en) * 2010-09-25 2011-05-11 苏红红 Thermal decorating plate
US20180171642A1 (en) * 2012-08-29 2018-06-21 Acculign Holdings, Inc. Front adjustable wall panel mounting device
CN207277742U (en) * 2017-08-14 2018-04-27 河北诚泰建筑节能科技有限公司 A kind of external wall thermal insulation/decoration integration board hanger system
CN208220087U (en) * 2017-12-22 2018-12-11 苏州金螳螂建筑装饰股份有限公司 A kind of cladding aluminum alloy framework
CN110306744A (en) * 2019-04-25 2019-10-08 克拉玛依市住房和城乡建设局 A kind of installation method building outer wall decorating insulation board
CN110206249A (en) * 2019-05-09 2019-09-06 苏州宜特加建筑工程有限公司 A kind of light-duty keel heat insulation decoration integrated plate system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
石材保温装饰一体板厂家: "什么是石材保温装饰一体板", <<什么是石材保温装饰一体板>> *
西北工程人: "外墙保温装饰一体板施工步骤及注意事项", <<外墙保温装饰一体板施工步骤及注意事项>> *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764607A (en) * 2020-07-10 2020-10-13 黄金飞 Installation and construction process of ecological plastic-wood exterior wall board
CN111764607B (en) * 2020-07-10 2021-07-13 叶东升 Installation and construction process of ecological plastic-wood exterior wall board
CN111980184A (en) * 2020-08-13 2020-11-24 安徽镜铭建筑装饰工程有限公司 Method for mounting composite board
CN114263336A (en) * 2021-10-29 2022-04-01 成都建工第二建筑工程有限公司 Construction method of KTC plate composite outer wall decoration system

Similar Documents

Publication Publication Date Title
CN100526577C (en) Exterior wall heat-preserving decorating curtain wall and construction method thereof
CN104018598B (en) A kind of exterior wall structure and construction installation method
CN111236567A (en) Cross construction method for outer wall decoration integrated plate and dry hanging stone
CN210857803U (en) Circular stone decorative column
CN110258873A (en) A kind of construction method of exterior wall dried hanging clay plate curtain wall
CN111305410A (en) Anti-cracking wall and construction method thereof
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN112900783A (en) Assembled wallboard dry hanging device and installation method thereof
CN210127563U (en) Connection structure of Ether plate curtain wall
CN214658446U (en) Assembled wallboard dry-hanging device
CN102046898A (en) Roof tile attachment method
CN105672527A (en) Reinforced heat insulation decoration wall and construction method thereof
CN109025131A (en) A kind of novel heat insulation decorative integrated plate
CN204662719U (en) A kind of indoor seamless spliced secondary light partition wall system
CN112922272B (en) EPS line construction method
CN114922438A (en) A construction method of an assembled back-bolt slotted stone curtain wall
CN201738538U (en) Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
CN104389396B (en) Pseudo-classic architecture eaves lower decoration and heat-insulation system
CN104196192B (en) Grade-A fireproofing, insulation and decoration integrated combined hanging board of building exterior wall
CN204081348U (en) Building exterior-wall A-class fireproof heat-preservation decoration integrated combination link plate
CN111749379B (en) A vertically hung ceramic panel curtain wall transverse rubber strip waterproof system and its installation process
CN217268500U (en) Integral assembled type integral wallboard and integral bathroom wallboard structure
CN116591418A (en) Indoor wall surface dry-hanging ceramic sheet decoration and construction method thereof
CN102877580A (en) Dry-hanging structure of stone curtain wall installed with back buckle and tight seam
CN205637437U (en) Wall wraps mounting structure who lays one&#39;s hand on skin firmly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605