TW201202525A - Tile positioning device - Google Patents

Tile positioning device Download PDF

Info

Publication number
TW201202525A
TW201202525A TW99122649A TW99122649A TW201202525A TW 201202525 A TW201202525 A TW 201202525A TW 99122649 A TW99122649 A TW 99122649A TW 99122649 A TW99122649 A TW 99122649A TW 201202525 A TW201202525 A TW 201202525A
Authority
TW
Taiwan
Prior art keywords
floor
monument
floor tile
base
rib
Prior art date
Application number
TW99122649A
Other languages
Chinese (zh)
Inventor
Song Shu
Original Assignee
Kuen Ting Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuen Ting Construction Co Ltd filed Critical Kuen Ting Construction Co Ltd
Priority to TW99122649A priority Critical patent/TW201202525A/en
Publication of TW201202525A publication Critical patent/TW201202525A/en

Links

Landscapes

  • Floor Finish (AREA)

Abstract

A tile positioning device includes a base, whose bottom is provided for disposing on a floor surface, and a stop portion protruded from the floor surface, such that one or more abutting surfaces are formed on the surface of the base and provided for abutting corner surfaces of the bottom of adjacent tiles at the same tile positioning device, and different abutting surfaces maintain the corner surfaces of adjacent tiles to have substantially the same height and form a contractible seam at opposite lateral sides of the tiles, so as to save construction time effectively and prevent a height difference at surfaces of the adjacent tiles.

Description

201202525 六、發明說明: 【發明所屬之技術領域】 種地磚疋位器,尤和使用於地碑錦設時,可節省施工時間 • 之地磚定位器。 【先前技術】 按’近齡來隨著生活轉餅,絲縣家魏也相對的提 升’以地磚來說’從以前大家相的石英碑觀在拋光地磚顯現 出大家對居家地板要求,然而,目前地碑_設方法,請參閱第 八圖所示’ _巾可清楚看出’在地碑A鋪設時,係將水泥與沙 子以適自之比例混合均句後’加人酌量的水混合湖^,再以抹尺 抹平於地板C上形成乾水泥砂土層b,而乾水泥妙土層B之厚度應 在4CM以上,待乾水泥砂土層B水份略乾時,再將地碑a鋪上, 並以輕敲地碑A ’以調整_A表面之高度,靜待乾水泥砂土層B 硬化後將地磚A黏著,但此種鋪設方式為具有下列缺失: ㈠為了可於地磚A鋪設於乾水泥砂土層Μ面後進行高度 調整,水泥與沙子在混合時,為混合成類似海棉質(具有較大之可 壓縮空間)之乾水泥砂土層Β,且形成厚度必須非常的厚,以讓地 碑Α鋪設於乾水泥砂土層β表面後可進行高度調整,因此乾水泥 砂土層B於硬化後,其可承受之壓力也相對較低,而使地碑A表 面於承受壓力後,地磚A與乾水泥砂土層B之接合面料產生脫 離之現象發生,且在發生地震時,乾水泥砂土層B也會因地板c 產生變動而破裂,進而使地磚A與乾水泥砂土層B之接合面產生 201202525 脫離現象,且在二樓以上之樓層更加容易發生。 (二) 當地磚A發生破裂或脫離之情形,而欲更換地碑A時,201202525 VI. Description of the invention: [Technical field of invention] The floor tile clamper, especially when used in the landmark decoration, can save construction time • The floor tile locator. [Prior Art] According to the recent age, the life of the cake is changed, and the Wei County’s Wei is also relatively improved. In terms of floor tiles, the quartz stone monument from the previous stage shows the requirements for the floor of the home floor. At present, the method of erection _, please refer to the figure shown in the eighth figure. _The towel can be clearly seen. When laying the monument A, the cement and sand are mixed at a suitable ratio. Lake ^, then wipe the floor with a plaster to form a dry cement sand layer b, and the thickness of the dry cement layer B should be above 4CM, when the dry cement sand layer B water is slightly dry, then The monument is paved, and the grounder A' is tapped to adjust the height of the surface of the _A. After the hardened cement sand layer B is hardened, the floor tile A is adhered, but the laying method has the following defects: (1) After the floor tile A is laid on the dry cement sand layer, the height is adjusted. When the cement and the sand are mixed, the dry cement sand layer which is similar to the sponge (with a large compressible space) is mixed and formed. The thickness must be very thick to allow the monument to be laid on the dry cement sand layer β After the height adjustment can be carried out, the dry cement sand layer B can withstand relatively low pressure after hardening, and the joint fabric of the floor tile A and the dry cement sand layer B after the surface of the monument A is subjected to pressure. The occurrence of detachment occurs, and in the event of an earthquake, the dry cement sand layer B will also rupture due to changes in the floor c, and the joint surface of the floor tile A and the dry cement sand layer B will be 201202525, and in the second Floors above the building are more likely to happen. (2) When the local brick A is broken or detached, and the landmark A is to be replaced,

由於乾水泥砂土層B為整片之鋪設,因此當敲除欲更換之地碑A •時’會影響到相誠碑A與乾水泥砂土層B之接合,使得地碑a . 再進行更換時之困難度增加。Since the dry cement sand layer B is laid for the whole piece, when knocking out the monument A to be replaced, it will affect the joint of the Xiangchengbei A and the dry cement sand layer B, so that the monument a. The difficulty in replacement increases.

(三) 地碑A _設_整高度,完全#施功之經驗以及目 視來進行碰,常常會發生二婦_ A之高度落差,影響地轉A 籲整體品質’且因地碑A再置放於乾水泥砂土層B表面時,常常會 發生地磚A過度下陷’而讓駐者必須將地磚A触,所以單一 地碑A之面積不可過A,賜止因地磚A過重崎施工者無法進 行高度調整之情形。 是以,要如何解決習知地确設所產生之_與缺失,即為 從事此行業相關業者所亟欲改善之問題所在。 【發明内容】 • 本發明之主要目的乃在於’利用相鄰地碑之角落底面抵持於 同-地磚定位器之基部’使相鄰地魏面可藉由地磚定位器直接 形成_高度,財效㈣省虹_,也可避免相鄰地碑表面 產生高度落差之問題。 參 為達上述目地,本發明之地碑定位器係設置有基部,基部底 面為供置放於地板表面,基部表面凸設有止擔部,使基部表面形 $個以上之抵持面,以讓相鄰地碑之角落底面抵持於同一地碑 定位器^不同抵持面之表面’使相鄰地碑之角落表面可呈同樣高 201202525 度’且地磚與地磚之相對側邊形成有伸縮縫。 【實施方式】 請參閱第一圖至第三圖所示,由圖中可清楚看出,本發明地 磚定位器1係設置有基部11,基部11表面凸設有止擋部12,使 基部11表面形有一個以上之抵持面111 ’而止擋部12係設置有複 數凸肋121’且凸肋121 一側表面形成有抵靠面122,各抵靠面122 為與抵持面111呈垂直狀,而複數凸肋121為交錯形成十字狀(如 第一圖所示)、Y字狀(如第二圖所示)或T字狀(如第三圖所示), 以供不同之使用狀態使用。(3) Landmark A _ set _ whole height, complete # 功功的经验 and visual contact to touch, often there will be a height difference between the two women _ A, affecting the transfer of A to call the overall quality 'and re-positioned by the monument A When placed on the surface of dry cement sand layer B, it often happens that the floor tile A is excessively sunken, and the resident must touch the floor tile A, so the area of the single monument A cannot pass A, and the construction of the floor tile A can not be over. The case of height adjustment. Therefore, how to solve the problems and deficiencies caused by the conventional identification is the problem that those who are engaged in this industry want to improve. SUMMARY OF THE INVENTION The main purpose of the present invention is to 'use the corner bottom surface of the adjacent monument to resist the base of the same-floor tile locator' so that the adjacent Wei surface can be directly formed by the floor tile locator. Effect (4) Provincial Rainbow _ can also avoid the problem of height drop on the surface of adjacent monuments. In order to achieve the above object, the inscription locator of the present invention is provided with a base, the bottom surface of the base is placed on the floor surface, and the base surface is convexly provided with a stopping portion, so that the surface of the base is shaped by more than one resisting surface, Let the corner bottom surface of the adjacent monuments resist the surface of the same monument locator ^ different resisting surfaces 'the corner surface of the adjacent monuments can be the same height 201202525 degrees' and the opposite sides of the floor tiles and the tiles form a telescopic Seam. [Embodiment] Referring to the first to third figures, it can be clearly seen from the figure that the tile locator 1 of the present invention is provided with a base portion 11 on the surface of which a stop portion 12 is convexly provided to make the base portion 11 The surface has one or more resisting faces 111 ′, and the stopper portion 12 is provided with a plurality of ribs 121 ′ and a surface of one side of the rib 121 is formed with an abutting surface 122 , and each abutting surface 122 is formed with the abutting surface 111 . Vertical, and the plurality of ribs 121 are staggered to form a cross shape (as shown in the first figure), a Y shape (as shown in the second figure) or a T shape (as shown in the third figure) for different Use status to use.

請參閱第一圖及第四圖至第六圖所示,由圖中可清楚看出, 當施工者_地碑定位器1鋪設鱗2時,係於地板5表面於欲 鋪設地磚2之位置處塗佈一層水泥接著劑4,並利用工具將水泥接 著劑4表面抹成凹凸狀’續將地磚定位n丨設置於地板5,使基 部11底面底持於地板5表面,並讓地磚定位$丨位於水泥接著 劑4之各角落2卜此時,柯將地磚2置放於地磚定位器工上, 並將地碑2朝向地板5推動,俾使地碑2之各角落21底面分綱 持於不同地碑定位H 1之婦面m絲,桃磚2會完全與^ 泥接著劑4接合’並推動地碑定位$ j使凸肋ΐ2ι之抵靠面12 抵靠於地磚2之侧邊22,重複上述频,即可依序將多數地碑 鋪設於地板5上’抑__ 2之祕21為抵持於同—地蹲定相 益1且不同抵持面111之表面’而二相鄰之地碑2由於側邊22 ^ 別抵持凸肋121二側之抵靠面122,因此地碑2與地碑2之間會你 201202525 據凸肋121之寬度形成有伸縮縫3。 請參閱第五圖及第七圖所示,當地磚2施工後,地碑2與地 碍2之間所形成之伸縮縫3可利用填縫劑6填補,而填縫劑6'可 •選用與地磚2表面相同之顏色,除了可防止髒汗都堆積於伸縮縫3 • 内,並可讓地磚2表面’顯得更加美觀。 再者,由於地磚2在鋪設時,須考慮與牆面之接合,或是地 碑2要以拼花方式拼湊成圖案時,須有多種不同方向之拼接,妹 • 參閱第一圖至第三圖所示,本發明止檔部12所設置之凸肋121即 可有多種不同形式之設置,來符合各種不同方式之使用。 是以’本發明為可解決習知技術之不足與缺失,其關鍵技術 乃在於: (一)本發明為利用相鄰地碑2之角落21底面底持於同一地碑 定位器1之基部11,使相鄰地磚2表面高度可藉由地磚定位器 1直接形成相同高度,而不需施工者加以調整,除了可有效的節省 _施工時間外’也可避免習知技術中因高度由施I者進行調整,而 發生高度落差之_,朋地磚2高度不需由施工者進行調整, 因此單-地磚2之面積可大幅增加,使地磚2更加顯得美觀大方。 • (二)由於地磚2高度為由地磚定位H 1所限制,因此地磚2 •底面與地板5之間可直接施以水泥接著劑4加以接合,而不需習 知技術中财泥與沙子齡來進行高賴整,所财泥接著劑4 可非常穩固的將地磚2接合於地板5,進而使地碑2可承受較大之 壓力,且地磚2不易與水泥接著劑4產生脫離。 201202525 (一)地碑2與地磚2底面之水泥接著劑4並未相互連接,因 此在部分地磚2進行汰換移_,料影響至其他_ 2,可使更 換施工變得更加料,且當地震發生時,地板5之_為透過水 •泥接著劑4分別作用於不同之地磚2,因此各地碑2所承受之變形 力相對會相對縮+,不易與水泥接著劑4產生脫離或是地碑2破 裂之情形發生。 【圖式簡單說明】 鲁第圖係為本發明較佳時施例之立體外觀圖。 第二圖係為本發明再一較佳時施例之立體外觀圖。 第二圖係為本發明又一較佳時施例之立體外觀圖。 第四圖係為本發明於使用時之立體動作示意圖。 第五圖係為本發明於使用時之立體圖。 第六圖係為本發明於使用時之側視動作示意圖。 第七圖係為本發明於使用時之側視圖。 • 第八圖係為習知技術之之側視示意圖。 【主要元件符號說明】 I、 地碑定位器 II、 基部 III、 抵持面 12、止擋部 121、 凸肋 122、 抵靠面 201202525 2、 地磚 21、角落 - 22、侧邊 3、 伸縮縫 $ 4、水泥接著劑 5地板 6填縫劑 A、 地磚 B、 乾水泥砂土層 C、地板Please refer to the first figure and the fourth figure to the sixth figure. As can be clearly seen from the figure, when the constructor_landmark locator 1 lays the scale 2, it is placed on the surface of the floor 5 at the position where the floor tile 2 is to be laid. A layer of cement adhesive 4 is applied, and the surface of the cement adhesive 4 is embossed with a tool. The floor tile is positioned on the floor 5 so that the bottom surface of the base 11 is held on the surface of the floor 5, and the floor tile is positioned.丨 is located in each corner of the cement adhesive 4 2 At this time, Ke placed the floor tile 2 on the floor locator, and pushed the monument 2 toward the floor 5, so that the bottom surface of each corner 21 of the monument 2 is divided. Positioning the female face of the H 1 on different monuments, the peach brick 2 will completely engage with the mud adhesive 4 and push the monument positioning $ j so that the abutment surface 12 of the rib 2 is abutted against the side of the floor tile 2 22, repeat the above frequency, you can lay most of the monuments on the floor 5 in sequence. The secret 21 of the __ 2 is to resist the same surface and the surface of the different resisting surface 111. The adjacent monument 2 is opposite to the abutment surface 122 on both sides of the rib 121 by the side edge 22, so that between the monument 2 and the monument 2 will be 201202525 according to the rib 121 The width is formed with an expansion joint 3. Please refer to the fifth and seventh figures. After the construction of the local brick 2, the expansion joint 3 formed between the monument 2 and the ground barrier 2 can be filled with the caulking agent 6, and the caulking agent 6' can be selected. The same color as the surface of the floor tile 2, in addition to preventing dirty sweat from accumulating in the expansion joint 3, and making the surface of the floor tile 2 look more beautiful. In addition, since the floor tiles 2 must be considered for jointing with the wall when laying, or when the floor tablets 2 are to be assembled into a pattern by means of a mosaic, there must be a plurality of different directions of stitching, and the sisters are referred to the first to third figures. As shown, the ribs 121 provided by the stop portion 12 of the present invention can be arranged in a variety of different forms to suit the various uses. The invention is directed to the deficiencies and shortcomings of the prior art, and the key technology is: (1) The present invention is to use the bottom surface of the corner 21 of the adjacent monument 2 to hold the base 11 of the same monument locator 1 Therefore, the height of the surface of the adjacent floor tiles 2 can be directly formed by the floor tile locator 1 without the need of adjustment by the constructor, in addition to effectively saving _ construction time, it can also avoid the height of the conventional technology. The adjustment is made, and the height drop occurs. The height of the floor tile 2 does not need to be adjusted by the constructor, so the area of the single-floor tile 2 can be greatly increased, making the floor tile 2 more beautiful and generous. • (b) Since the height of the floor tile 2 is limited by the floor tile positioning H 1 , the floor tile 2 • can be directly joined by the cement adhesive 4 between the bottom surface and the floor 5, without the need for the technology and the sand and sand age. The high-level finishing agent 4 can firmly bond the floor tile 2 to the floor 5, so that the monument 2 can withstand a large pressure, and the floor tile 2 is not easily separated from the cement adhesive 4. 201202525 (1) The cement adhesive 4 on the bottom surface of the monument 2 and the floor tile 2 is not connected to each other, so that some of the tiles 2 are replaced, and the material is affected to other _ 2, which makes the replacement construction more material, and when At the time of the earthquake, the floor 5 is made of water and mud adhesive 4 acting on different floor tiles 2, so the deformation force of the monument 2 will be relatively reduced, and it is not easy to separate from the cement adhesive 4 or ground. The situation of the rupture of the monument 2 occurred. BRIEF DESCRIPTION OF THE DRAWINGS Lutu is a three-dimensional appearance of a preferred embodiment of the present invention. The second drawing is a perspective view of a further preferred embodiment of the present invention. The second drawing is a perspective view of another preferred embodiment of the present invention. The fourth figure is a schematic diagram of the three-dimensional action of the invention in use. The fifth drawing is a perspective view of the invention in use. The sixth figure is a schematic view of the side view of the invention in use. Figure 7 is a side view of the invention in use. • Figure 8 is a side view of a prior art technique. [Description of main component symbols] I. Landmark locator II, base III, resisting surface 12, stopper 121, rib 122, abutment surface 201202525 2, floor tile 21, corner - 22, side 3, expansion joint $4, cement adhesive 5 floor 6 caulking agent A, floor tile B, dry cement sand layer C, floor

Claims (1)

201202525 七、申請專利範圍: 1 ' 一種地碑定位器’該地碑定位器係設置有基部,基部底 面為供置放於地板表面,基部表面凸設有止擋部,使基部表面形 .· 有一個以上之抵持面’以讓相鄰地碑之角落底面抵持於同一地碑 定位器且不同抵持面之表面,使相鄰地碑之角落表面可呈同樣高 度’且地碑與地磚之相對側邊形成有伸縮縫。 2、如申請專利範圍第1項所述之地磚定位器,其中該止撞 φ部係設置有複數凸肋,且凸肋二侧表面形成有抵靠面,各抵靠面 為與抵持面呈垂直狀。 3、 如申請專利範圍第丨項所述之地磚定位器,其中該止擋 部係設置有複數凸肋,且凸肋二纖面形成有抵靠面,而二相鄰 地磚之側邊為分別抵持凸肋二側之抵靠面,使地碑與地碑之間會 依據凸肋寬度形成有伸縮縫。201202525 VII. Patent application scope: 1 'A landmark locator' is provided with a base. The bottom surface of the base is placed on the floor surface, and the base surface is convexly provided with a stop to make the base surface shape. There is more than one resisting surface' to allow the corner bottom surface of the adjacent monument to resist the surface of the same monument and different resisting surfaces, so that the corner surface of the adjacent monument can be of the same height' and the monument An expansion joint is formed on the opposite side of the floor tile. 2. The floor tile locator of claim 1, wherein the Φ portion is provided with a plurality of ribs, and the two sides of the rib are formed with an abutting surface, and each abutting surface is a resisting surface. Vertical. 3. The floor tile locator of claim 2, wherein the stop portion is provided with a plurality of ribs, and the ribbed surface of the rib is formed with an abutting surface, and the sides of the two adjacent tiles are respectively The abutting surface of the two sides of the rib is resisted, so that an expansion joint is formed between the monument and the monument according to the width of the rib. 4、 如申請糊難第丨撕述之地礙位I,其中該伸縮 縫填補有填縫劑。 且地碑與地磚底面 中5"專利範圍第1項所述之地磚定位H,其中該地磚 氏面與地板之間為彻水泥接著#1加以接合, 之水泥接著継未相互連接。4. If the application is difficult, the tearing of the ground is blocked, and the expansion joint is filled with a caulking agent. And the floor tile and the bottom of the floor tile are 5" the floor tile H of the first aspect of the patent range, wherein the floor between the floor and the floor is cemented and then cemented, and the cement is then not connected to each other.
TW99122649A 2010-07-09 2010-07-09 Tile positioning device TW201202525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW99122649A TW201202525A (en) 2010-07-09 2010-07-09 Tile positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW99122649A TW201202525A (en) 2010-07-09 2010-07-09 Tile positioning device

Publications (1)

Publication Number Publication Date
TW201202525A true TW201202525A (en) 2012-01-16

Family

ID=46756110

Family Applications (1)

Application Number Title Priority Date Filing Date
TW99122649A TW201202525A (en) 2010-07-09 2010-07-09 Tile positioning device

Country Status (1)

Country Link
TW (1) TW201202525A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639226A (en) * 2016-11-15 2017-05-10 东易日盛家居装饰集团股份有限公司 Ceramic tile dry hanging rack and ceramic tile dry hanging construction method
CN106760442A (en) * 2016-12-26 2017-05-31 张福杰 A kind of alignment of floor tile corner balance element and its application method
CN107476550A (en) * 2017-08-24 2017-12-15 南京佰居艺装饰工程有限公司 Modular tile laying method and its ceramic tile laying mould

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639226A (en) * 2016-11-15 2017-05-10 东易日盛家居装饰集团股份有限公司 Ceramic tile dry hanging rack and ceramic tile dry hanging construction method
CN106760442A (en) * 2016-12-26 2017-05-31 张福杰 A kind of alignment of floor tile corner balance element and its application method
CN107476550A (en) * 2017-08-24 2017-12-15 南京佰居艺装饰工程有限公司 Modular tile laying method and its ceramic tile laying mould

Similar Documents

Publication Publication Date Title
JP2006283541A (en) Backing member body of sticking finishing material and finishing construction method using backing member body of its sticking finishing material
CN205152741U (en) Compound ceramic tile of environmental protection antiskid
TW201202525A (en) Tile positioning device
CN104533093B (en) Floor tile paving ground structure and laying method thereof
CN205712898U (en) A kind of soft ceramic tile module
CN208072478U (en) A kind of mass concrete bottom plate basement waterproofing system
JP3148085U (en) Tile flooring
CN213806349U (en) SPC floor with buckles
CN205712729U (en) A kind of wallboard
CN105064539B (en) New wall and old wall connector
CN205444676U (en) Wallboard
CN212053612U (en) Anti-skid thick plate ceramic tile easy to splice
CN210369437U (en) Brick wall body terrace basement structure that mixes
CN205444777U (en) Wallboard
CN203499095U (en) Autoclaved aerated concrete slab
CN212582929U (en) Modified asphalt waterproof coiled material
CN210563138U (en) Ceramic tile surface composite wallboard
CN207277568U (en) Metallic water stop tie device
WO2007119175A2 (en) An interlockable brick/block with a top finish surface of granite, marble, ceramic, porcelain or terra cotta or imitations
CN205713005U (en) A kind of soft ceramic tile module
CN205712897U (en) A kind of soft ceramic tile module
CN208857851U (en) A kind of hydrous fluids bottom plate post-poured strip waterproof structure
CN104727448A (en) Double-surface heat-insulation plate with wide-bottom pits for buildings
CN205444775U (en) Soft tiles module
CN205712706U (en) A kind of wallboard