CN107476550A - Modular tile laying method and its ceramic tile laying mould - Google Patents
Modular tile laying method and its ceramic tile laying mould Download PDFInfo
- Publication number
- CN107476550A CN107476550A CN201710736275.5A CN201710736275A CN107476550A CN 107476550 A CN107476550 A CN 107476550A CN 201710736275 A CN201710736275 A CN 201710736275A CN 107476550 A CN107476550 A CN 107476550A
- Authority
- CN
- China
- Prior art keywords
- mould
- grid
- laying
- outside
- tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000919 ceramic Substances 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000004568 cement Substances 0.000 claims description 12
- 238000010276 construction Methods 0.000 claims description 10
- 239000004576 sand Substances 0.000 claims description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 239000011449 brick Substances 0.000 claims description 3
- 239000003292 glue Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000007493 shaping process Methods 0.000 claims description 3
- 239000000428 dust Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- VIKNJXKGJWUCNN-XGXHKTLJSA-N norethisterone Chemical compound O=C1CC[C@@H]2[C@H]3CC[C@](C)([C@](CC4)(O)C#C)[C@@H]4[C@@H]3CCC2=C1 VIKNJXKGJWUCNN-XGXHKTLJSA-N 0.000 description 1
- 229910052573 porcelain Inorganic materials 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1883—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by simultaneously applying several elements, e.g. templates
Abstract
The present invention relates to a kind of method of modular tile laying and its ceramic tile laying mould, laid suitable for all flat tiles.Modular tile laying mould includes the first mould and the second mould, first mould includes hard platform, cross and connection strap, cross is arranged in the middle part of hard platform upper surface, and connection strap is arranged in the middle part of hard platform side and extended, to be connected with other first moulds;Second mould includes outside grid and inner side grid, and inner side grid is closely packed together with outside grid, and inner side grid is located in the grid of outside;The height of the inner side grid is less than outside grid height, and the width of inner side grid is more than outside mesh width.
Description
Technical field
The present invention relates to a kind of modular tile laying method and its ceramic tile laying mould, suitable for all plane porcelain
Brick is laid.
Background technology
Building and repairs profession at present, ceramic tile laying all rely on worker's manual operations, the problem of many be present:First,
Worker is integrally older, and outstanding skilled worker is in great shortage, causes cost of labor to raise year by year;Secondly, laying standard is without legally constituted authority
One;Furthermore larger room noise and dust can be produced in process of deployment, is harmful to worker's health.
The content of the invention
The present invention provides a kind of modular tile laying method and its ceramic tile laying mould for above-mentioned weak point, uses
This method and its ceramic tile laying mould, it is possible to reduce the dependence to skilled worker, so as to reduce cost of labor, and can unify
Laying standard, worker's operating efficiency is improved, reduce noise and dust pollution;Laying modularization is realized, improves materials'use, scheme
The degree of accuracy of design.
Modular tile laying method and its ceramic tile laying mould of the present invention takes following technical scheme to realize:
Modular tile laying mould includes the first mould and the second mould, and first mould includes hard platform, cross
And connection strap, cross are arranged in the middle part of hard platform upper surface, connection strap is arranged in the middle part of hard platform side and extended, and uses
To be connected with other first moulds;Evenly spaced slotted eye is provided with connection strap side wall;
Second mould includes outside grid(Outer lattice)With inner side grid(Interior lattice), inner side grid(Interior lattice)With outside grid
(Outer lattice)It is closely packed together, inner side grid(Interior lattice)Positioned at outside grid(Outer lattice)In;The inner side grid(Interior lattice)Height
Less than outside grid(Outer lattice)Highly, inner side grid(Interior lattice)Width be more than outside grid(Outer lattice)Width;Inner side grid(It is interior
Lattice)With outside grid(Outer lattice)Frame side wall be provided with evenly spaced overfolw hole;
First mould and the second mould can splice use.
The cross is three-dimensional shape, and the height of cross, width and length are adjustable.
Height, the length and width of the hard platform are adjustable.
The length of the connection strap can modify according to floor tile length, have on connection strap and be spaced equal hole, unnecessary
Cement can from the side hole overflow, make ground tile paving more smooth.
The overfolw hole is used for when laying ceramic tile, is overflowed for unnecessary cement from overfolw hole so that ceramic tile is laid more
It is smooth.
The inner side grid of second mould(Interior lattice)With outside grid(Outer lattice)Size can be repaiied according to floor tile length
Change, can be used according to the multiple splicings of laying area.
A kind of modular tile laying method of the present invention, including step are as follows:
1)Construction area is measured using 3D scanners, obtains paved surface precise angle, length and width dimensions;
2)The connection scheme that the data for requiring and measuring according to laying carry out ceramic tile laying mould designs, it is determined that need to use
The position of first mould or the second mould, the region for laying ceramic tile is numbered, determines the ceramic tile chi of paved surface region corner
Very little, the mould as corresponding to making Die & Mould Manufacture, the mould for making shaping can be folded convenience in transport;
3)Ceramic tile factories are produced according to the size of planning, cutting tile and are carried out region of the ceramic tile in design
Reference numeral;
4)Worker carries out floor leveling after the completion of Hydroelectric Project Construction;Floor leveling is using laying concrete leveling ground;
5)Unit in charge of construction carries out installation mold and fixation according to laying scheme, and the mould made is transported into scene and deployed,
Laid according to drawing.Mould is fixed on ground using screw or structure glue(Two kinds of mould laying methods are identical), the
One mould, the second mould can be used or are used alone simultaneously;First mould, the second mould general principle are identicals, user
Method is identical, while uses no particular/special requirement;
6)Cement sand, water are mixed be put into mould in proportion by worker, are then put into mould and are spread according to ceramic tile numbering
And if flatten compacting, wherein cement, sand, water weight be 1:2.5-5:0.2-0.4, make mixed cement bonded sand caiquejee
Pinch agglomerating, landing is bloomed;
7)Laying is completed, and is inspected for acceptance.
Modular tile laying method and its ceramic tile laying mold design of the present invention is reasonable, compact-sized, due to using 3D
Scanner measures to construction area, obtains paved surface precise angle, length and width dimensions;Had using the inventive method laying floor tile
Specific advantages below, first reduces the dependence for skilled worker, and so as to reduce cost of labor, second can unify laying mark
Accurate, the 3rd raising worker's operating efficiency, the 4th reduces noise and dust pollution, and the 5th realizes laying modularization, and improving material makes
With the degree of accuracy of, conceptual design.
Brief description of the drawings
Below with reference to accompanying drawing, the invention will be further described:
Fig. 1 is the structural representation of the first mould of the invention;
Fig. 2 is the structural representation of the second mould of the invention;
Fig. 3 is the first mold use view of the invention;
Fig. 4 is the second mold use view of the invention.
Embodiment
Referring to the drawings 1-4, modular tile laying mould includes the first mould and the second mould, and first mould includes
Hard platform 1, cross 2 and connection strap 3, cross 2 are arranged on the upper surface middle part of hard platform 1, and connection strap 3 is arranged on hard
In the middle part of the side of platform 1 and extend, to be connected with other first moulds;Evenly spaced slotted eye is provided with the side wall of connection strap 3
4;
Second mould includes outside grid(Outer lattice)5 and inner side grid(Interior lattice)6, inner side grid(Interior lattice)6 with outside net
Lattice(Outer lattice)5 are closely packed together, inner side grid(Interior lattice)6 are located at outside grid(Outer lattice)In 5;The inner side grid(Interior lattice)6
Height be less than outside grid(Outer lattice)5 height, inner side grid(Interior lattice)6 width is more than outside grid(Outer lattice)5 width;It is interior
Side grid(Interior lattice)6 and outside grid(Outer lattice)5 frame side wall is provided with evenly spaced overfolw hole 7;
First mould and the second mould can splice use.
The cross 2 is three-dimensional shape, and the height of cross 2, width and length are adjustable.
Height, the length and width of the hard platform 1 are adjustable.
The length of the connection strap 3 can modify according to the length of floor tile 8, there is evenly spaced slotted eye 4 on connection strap, more
Remaining cement hole can overflow from the side, set floor tile paving 8 more smooth.
The overfolw hole 7 is used for when laying ceramic tile 8, is overflowed for unnecessary cement from overfolw hole so that ceramic tile is laid more
Add smooth.
The inner side grid of second mould(Interior lattice)6 and outside grid(Outer lattice)5 sizes can be carried out according to floor tile length
Modification, it can be used according to the multiple splicings of laying area.
A kind of laying method of modular tile of the present invention, including step are as follows:
1)Construction area is measured using 3D scanners, obtains paved surface precise angle, length and width dimensions;
2)The connection scheme that the data for requiring and measuring according to laying carry out ceramic tile laying mould designs, it is determined that need to use
The position of first mould or the second mould, the region for laying ceramic tile is numbered, determines the ceramic tile chi of paved surface region corner
Very little, the mould as corresponding to making Die & Mould Manufacture, the mould for making shaping can be folded convenience in transport;
3)Ceramic tile factories are produced according to the size of planning, cutting tile 8 and are entered region of the ceramic tile in design
Row reference numeral;
4)Worker carries out floor leveling after the completion of Hydroelectric Project Construction;Floor leveling is using laying concrete leveling ground;
5)Unit in charge of construction carries out installation mold and fixation according to laying scheme, and the mould made is transported into scene and deployed,
Laid according to drawing.The first mould, the second mould are fixed on ground respectively using screw or structure glue(First mould,
Second two kinds of mould mould laying method is identical), the first mould, the second mould can be used or are used alone simultaneously;First mould,
Second mould general principle is identical, and application method is identical, while uses no particular/special requirement;
6)Cement sand, water are mixed be put into mould in proportion by worker, are then put into mould and are spread according to the numbering of ceramic tile 8
And if flatten compacting, wherein cement, sand, water weight be 1:2.5-5:0.2-0.4, make mixed cement bonded sand caiquejee
Pinch agglomerating, landing is bloomed;
7)Laying is completed, and is inspected for acceptance.
The laying method of described modular tile, it is characterised in that:First mould includes hard platform, cross
And connection strap, cross are arranged in the middle part of hard platform upper surface, connection strap is arranged in the middle part of hard platform side and extended, and uses
To be connected with other first moulds;
Second mould includes outside grid and inner side grid, and inner side grid is closely packed together with outside grid, inner side grid
In the grid of outside;The height of the inner side grid is less than outside grid height, and the width of inner side grid is more than outside grid
Width.
First mould, the second mould can be used or are used alone simultaneously.
Embodiment:
The cross 2 of first mould grows 2 millimeters of 20 mm wide(The gap that can be actually needed according to ceramic tile is adjusted)High 4 milli
Rice.Lower section is the 20 millimeters high 30 millimeters hard platform 1 of long 20 mm wide, and the length of 1 connection strap of hard platform can base area
Brick length is modified.
A kind of modular tile paving laying model of second mould is double-deck hard grid, and grid single size in outside is a width of
2 millimeters, a height of 50 millimeters(It can be adjusted according to actual conditions), length is adjusted according to the size of ceramic tile 8.
A width of 10 millimeters of inner side grid(It can be adjusted according to actual conditions), a height of 50 millimeters(Can be according to actual conditions
It is adjusted), length is identical with outside grid inner length, when laying ceramic tile 8 so that floor tile 8 is more smooth.
Claims (10)
1. a kind of modular tile lays mould, it is characterised in that:Including the first mould and the second mould, the first mould bag
Hard platform, cross and connection strap are included, cross is arranged in the middle part of hard platform upper surface, and connection strap is arranged on hard platform
In the middle part of side and extend, to be connected with other first moulds;
Second mould includes outside grid and inner side grid, and inner side grid is closely packed together with outside grid, inner side grid
In the grid of outside;The height of the inner side grid is less than outside grid height, and the width of inner side grid is more than outside grid
Width.
2. modular tile according to claim 1 lays mould, it is characterised in that:It is provided with connection strap side wall uniform
The slotted eye at interval.
3. modular tile according to claim 1 lays mould, it is characterised in that:
The frame side wall of inner side grid and outside grid is provided with evenly spaced overfolw hole.
4. modular tile according to claim 1 lays mould, it is characterised in that:
First mould and the second mould can splice use.
5. modular tile according to claim 1 lays mould, it is characterised in that:The cross is three-dimensional shape,
The height of cross, width and length are adjustable.
6. modular tile according to claim 1 lays mould, it is characterised in that:Height, the length of the hard platform
Degree and width are adjustable.
7. modular tile according to claim 1 lays mould, it is characterised in that:The length base area of the connection strap
Brick length is modified.
8. modular tile according to claim 1 lays mould, it is characterised in that:The inner side grid of second mould
It can be modified, can be used according to the multiple splicings of laying area according to floor tile length with outside size of mesh opening.
A kind of 9. modular tile laying method, it is characterised in that:It is as follows including step
1)Construction area is measured using 3D scanners, obtains paved surface precise angle, length and width dimensions;
2)The connection scheme that the data for requiring and measuring according to laying carry out ceramic tile laying mould designs, it is determined that need to use
The position of first mould or the second mould, the region for laying ceramic tile is numbered, determines the ceramic tile chi of paved surface region corner
Very little, the mould as corresponding to making Die & Mould Manufacture, the mould for making shaping can be folded convenience in transport;
3)Ceramic tile factories are produced according to the size of planning, cutting tile and are carried out region of the ceramic tile in design
Reference numeral;
4)Worker carries out floor leveling after the completion of Hydroelectric Project Construction;Floor leveling is using laying concrete leveling ground;
5)Unit in charge of construction carries out installation mold and fixation according to laying scheme, and the mould made is transported into scene and deployed,
Laid according to drawing;The first mould, the second mould are fixed on ground respectively using screw or structure glue;
6)Cement sand, water are mixed be put into mould in proportion by worker, are then put into mould and are spread according to ceramic tile numbering
And if flatten compacting, wherein cement, sand, water weight be 1:2.5-5:0.2-0.4;
7)Laying is completed, and is inspected for acceptance.
10. the laying method of modular tile according to claim 9, it is characterised in that:First mould includes hard
Matter platform, cross and connection strap, cross are arranged in the middle part of hard platform upper surface, and connection strap is arranged on hard platform side
Middle part simultaneously extends, to be connected with other first moulds;
Second mould includes outside grid and inner side grid, and inner side grid is closely packed together with outside grid, inner side grid
In the grid of outside;The height of the inner side grid is less than outside grid height, and the width of inner side grid is more than outside grid
Width;
First mould, the second mould can be used or are used alone simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736275.5A CN107476550A (en) | 2017-08-24 | 2017-08-24 | Modular tile laying method and its ceramic tile laying mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736275.5A CN107476550A (en) | 2017-08-24 | 2017-08-24 | Modular tile laying method and its ceramic tile laying mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107476550A true CN107476550A (en) | 2017-12-15 |
Family
ID=60602515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710736275.5A Pending CN107476550A (en) | 2017-08-24 | 2017-08-24 | Modular tile laying method and its ceramic tile laying mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107476550A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083381A (en) * | 2018-09-20 | 2018-12-25 | 刘爱民 | The quick patch block machine of construction |
CN109441077A (en) * | 2018-12-13 | 2019-03-08 | 张幸 | Patch block method and its patch block system, storage medium |
CN109989551A (en) * | 2019-04-12 | 2019-07-09 | 中国建筑设计研究院有限公司 | A kind of standard earth module and house body |
CN111364308A (en) * | 2020-03-24 | 2020-07-03 | 绵阳西康新材料有限公司 | Preparation and laying method of composite stone for municipal road surface laying |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201202525A (en) * | 2010-07-09 | 2012-01-16 | Kuen Ting Construction Co Ltd | Tile positioning device |
CN104153535A (en) * | 2014-06-24 | 2014-11-19 | 上海市建筑装饰工程集团有限公司 | Method for splicing and laying flexible hinged face brick units |
CN204126226U (en) * | 2014-08-15 | 2015-01-28 | 天津贝利泰陶瓷有限公司 | Tile laying lattice plate |
CN105672635A (en) * | 2015-12-31 | 2016-06-15 | 浙江亚厦装饰股份有限公司 | Brick laying device, veneer assembly and brick laying method |
CN205713009U (en) * | 2016-03-11 | 2016-11-23 | 浙江培苗装饰材料有限公司 | Ceramic tile cross |
CN206091190U (en) * | 2016-10-14 | 2017-04-12 | 青岛有屋科技有限公司 | Ground fixing system |
CN206346466U (en) * | 2016-12-14 | 2017-07-21 | 浙江亚厦装饰股份有限公司 | A kind of quick tile work device in toilet warterproof ground |
CN207177235U (en) * | 2017-08-24 | 2018-04-03 | 南京佰居艺装饰工程有限公司 | Modular tile lays mould |
-
2017
- 2017-08-24 CN CN201710736275.5A patent/CN107476550A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201202525A (en) * | 2010-07-09 | 2012-01-16 | Kuen Ting Construction Co Ltd | Tile positioning device |
CN104153535A (en) * | 2014-06-24 | 2014-11-19 | 上海市建筑装饰工程集团有限公司 | Method for splicing and laying flexible hinged face brick units |
CN204126226U (en) * | 2014-08-15 | 2015-01-28 | 天津贝利泰陶瓷有限公司 | Tile laying lattice plate |
CN105672635A (en) * | 2015-12-31 | 2016-06-15 | 浙江亚厦装饰股份有限公司 | Brick laying device, veneer assembly and brick laying method |
CN205713009U (en) * | 2016-03-11 | 2016-11-23 | 浙江培苗装饰材料有限公司 | Ceramic tile cross |
CN206091190U (en) * | 2016-10-14 | 2017-04-12 | 青岛有屋科技有限公司 | Ground fixing system |
CN206346466U (en) * | 2016-12-14 | 2017-07-21 | 浙江亚厦装饰股份有限公司 | A kind of quick tile work device in toilet warterproof ground |
CN207177235U (en) * | 2017-08-24 | 2018-04-03 | 南京佰居艺装饰工程有限公司 | Modular tile lays mould |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083381A (en) * | 2018-09-20 | 2018-12-25 | 刘爱民 | The quick patch block machine of construction |
CN109441077A (en) * | 2018-12-13 | 2019-03-08 | 张幸 | Patch block method and its patch block system, storage medium |
CN109989551A (en) * | 2019-04-12 | 2019-07-09 | 中国建筑设计研究院有限公司 | A kind of standard earth module and house body |
CN109989551B (en) * | 2019-04-12 | 2024-02-02 | 中国建筑设计研究院有限公司 | Standard ground module and house body |
CN111364308A (en) * | 2020-03-24 | 2020-07-03 | 绵阳西康新材料有限公司 | Preparation and laying method of composite stone for municipal road surface laying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107476550A (en) | Modular tile laying method and its ceramic tile laying mould | |
CN113047137A (en) | Layered slip-form paving construction method for road shoulder | |
CN207177235U (en) | Modular tile lays mould | |
CN108487016B (en) | Construction method for irregular and accurate elevation concrete pavement of test field | |
EP3635176B1 (en) | Method for producing a paving area | |
CN103696339A (en) | Preparation method for partial water permeation floor tiles and partial water permeation floor tiles | |
CN206551178U (en) | It is a kind of can batch making lintel and prefabricated section adjustable steel die worker tool | |
CN111779226A (en) | Large stone parquet floor and construction method thereof | |
CN105088914A (en) | Prefabricating and mounting method for pebble-pattern prefabricated slab | |
CN112412008A (en) | Seamless construction method for accurate slope finding of super-large concrete flat roof structure | |
CN206941968U (en) | Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other | |
CN210766280U (en) | Curb prefabricated assembly side form | |
CN107700305A (en) | A kind of ecological parking lot floor tile and laying method | |
CN104818826B (en) | Adjustable mortar-free floor tile and laying method thereof | |
CN108409264B (en) | Preparation method of L-shaped prefabricated terrazzo decorative hanging plate | |
CN102756421A (en) | Manufacturing method for building base material attached with decorative sheets | |
CN207091886U (en) | A kind of water-permeable brick herringbone is mated formation instrument | |
CN206201185U (en) | For the soil pressure cell prefabricated mould of friction pile pile body stress strain measurement | |
CN212000520U (en) | Road paver | |
CN109736484B (en) | Parametric brick splicing and building method for clean water bricks | |
CN116856219A (en) | Rapid installation and construction method for precast concrete curb | |
CN103643781B (en) | Indoor wall, ground decoration keel connecting member | |
CN210589857U (en) | Adjustable rocking arm formula automatic material conveying device of concrete equipment | |
CN209429129U (en) | Abnormal concrete quick jack device | |
CN211340262U (en) | Inorganic artificial stone structure paved in overhead manner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171215 |