CN103696339A - Preparation method for partial water permeation floor tiles and partial water permeation floor tiles - Google Patents

Preparation method for partial water permeation floor tiles and partial water permeation floor tiles Download PDF

Info

Publication number
CN103696339A
CN103696339A CN201310751597.9A CN201310751597A CN103696339A CN 103696339 A CN103696339 A CN 103696339A CN 201310751597 A CN201310751597 A CN 201310751597A CN 103696339 A CN103696339 A CN 103696339A
Authority
CN
China
Prior art keywords
hollow out
floor tile
water permeation
preparation
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310751597.9A
Other languages
Chinese (zh)
Inventor
邓建国
王婉清
高彦波
翟鹏辉
樊蓓莉
谭德远
郭宏凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Orient Landscape Co Ltd
Original Assignee
Beijing Orient Landscape Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Orient Landscape Co Ltd filed Critical Beijing Orient Landscape Co Ltd
Priority to CN201310751597.9A priority Critical patent/CN103696339A/en
Publication of CN103696339A publication Critical patent/CN103696339A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a preparation method for partial water permeation floor tiles and the partial water permeation floor tiles. The preparation method comprises the following steps: A, preparing a hollow pattern mold according to a set hollow pattern; B, mutually embedding a floor tile brick mold of which the size is larger than that of the hollow pattern mold into the hollow pattern mold, putting the molds at a fixed position, then filling a region between the floor tile brick mold and the hollow pattern mold with a non water permeation material, and performing extruded forming; C, taking out the floor tile brick mold and the hollow pattern mold, ensuring that the hollow pattern is complete, and forming hollow tiles through maintenance; D, filling hollow parts of the hollow tiles with water permeation materials, enabling the water permeation material filling regions in the hollow parts and the whole hollow tiles to form an integrated structure through compaction or under the action of self-adhesion of the water permeation materials. A pavement paved by the partial water permeation floor tiles has certain bearing capacity and water permeation and ventilation ecological performance; meanwhile, the cost can be reduced, and the landscape effect is enhanced.

Description

A kind of preparation method of local pervious floor tile and local pervious floor tile
Technical field
The present invention relates to a kind of technology of preparing floor tile, particularly relate to a kind of preparation method and local pervious floor tile of local pervious floor tile.
Background technology
Causing one of major reason of urban ecological problem, is the unreasonable of urban planning and construction.In Process of Urban Development, use in a large number the material water-proof materials such as cement concrete and bituminous mixture to cover urban surface.
According to the ten metropolitan statistics such as Chicago,U.S, Los Angeles nineties in last century, the area sum of city factory, house, public building and artificial making road accounts for 72.7% of whole city's gross area, and this part area is all fluid-tight.Separately have data to show, main cities Permeable stratum area is in the world mostly more than 50%, and Shanghai City, China Permeable stratum area is up to 80%.
These fluid-tight urban surface overburdens, have cut off contacting between natural soils and atmosphere, cause the ecological environment in city and the greatest differences between natural ecological environment, and urban residential environment is constantly worsened.
But, use merely seepy material to carry out mating formation of ground as materials such as sandstone, gravels, load supporting ability of ground likely can not reach certain standard, brings road hidden danger.And if the masonry that all uses water-permeable brick etc. to have certain supporting capacity mats formation, moulding is single, high cost, and while likely using in certain areas, coefficient of permeability is too high causes certain wasting of resources.
Summary of the invention
The object of the invention is to propose a kind of preparation method that construction, cost are lower, can realize the local pervious floor tile of most optimum distribution of resources that is easy to.
For achieving the above object, the invention provides a kind of preparation method of local pervious floor tile, described preparation method comprises the steps: A, according to the hollow out pattern of setting, preparation hollow out pattern mould; B, floor tile brick die and hollow out pattern mould that size is greater than to described hollow out pattern mould are nested mutually, are placed on permanent position, then to the non-seepy material of area filling extrusion modling between floor tile brick die and hollow out pattern mould; C, described floor tile brick die and the hollow out pattern mould of taking-up, and guarantee that pierced pattern is complete, by maintenance, form hollow out brick; D, to the hollow out position of hollow out brick, fill seepy material, through the cementation of overcompaction or seepy material self, make the seepy material fill area at hollow out position and the integral body of hollow out brick formation integrative-structure.
Preferably, described non-seepy material is selected from concrete material, pottery or stone material.
Preferably, described seepy material is selected from cobble, haydite, gravel or queen closer.
Preferably, described hollow out pattern is plant pattern, geometrical pattern or animal pattern.
Another object of the present invention is to provide a kind of local pervious floor tile, the brick body of this part pervious floor tile comprises peripheral non-permeable region and the permeable region of inner side, described brick body is run through in described permeable region, described non-permeable region is made by non-seepy material, and described permeable region is made by seepy material.
Preferably, described non-seepy material is selected from concrete material, pottery or stone material.
Preferably, described seepy material is selected from cobble, haydite, gravel or queen closer.
Based on technique scheme, advantage of the present invention is:
The invention provides a kind of pervious ecological the mat formation preparation method of floor tile and the local pervious floor tile of preparation thereof, the road surface of using this part pervious floor tile to be paved into had both possessed certain supporting capacity, the ecological performance that possesses again water-permeable and air permeable, can also reduce costs simultaneously, improve landscape effect, reach the technique effects such as distributing rationally of resource.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, forms the application's a part, and schematic description and description of the present invention is used for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of a kind of embodiment of the local pervious floor tile of the present invention.
The specific embodiment
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Referring to Fig. 1, a kind of embodiment of the local pervious floor tile that shown in it prepared by the present invention.The preparation method of a kind of local pervious floor tile of the present invention comprises the steps:
A, according to the hollow out pattern of setting, preparation hollow out pattern mould; Can set as requested one or several hollow out patterns, then in brickmaking factory, make corresponding mould.
B, floor tile brick die and hollow out pattern mould that size is greater than to described hollow out pattern mould are nested mutually, are placed on permanent position, then to the non-seepy material of area filling extrusion modling between floor tile brick die and hollow out pattern mould; Conventionally hollow out pattern mould can be placed on to floor tile brick die middle position, then to the non-seepy material of area filling extrusion modling between hollow out pattern mould outside, floor tile brick die inboard, preferably, described non-seepy material is selected from concrete material, pottery or stone material.In the present embodiment, select concrete material.
C, described floor tile brick die and the hollow out pattern mould of taking-up, and guarantee that pierced pattern is complete, by maintenance, form hollow out brick;
D, to the hollow out position of hollow out brick, fill seepy material, through the cementation of overcompaction or seepy material self, make the seepy material fill area at hollow out position and the integral body of hollow out brick formation integrative-structure.Preferably, seepy material is selected from cobble, haydite, gravel or queen closer.
Hollow out pattern of the present invention is plant pattern, geometrical pattern or animal pattern, and in the embodiment shown in fig. 1, hollow out pattern is petal combination pattern.
Further, referring to Fig. 1, wherein also show the embodiment of a kind of local pervious floor tile of the present invention, the brick body of described local pervious floor tile comprises peripheral non-permeable region 1 and the permeable region 2 of inner side, described brick body is run through in described permeable region 2, can bring into play the permeable effect in permeable region completely thus, described non-permeable region 1 is made by non-seepy material, and described permeable region 2 is made by seepy material.Preferably, described non-seepy material is selected from concrete material, pottery or stone material.In the present embodiment, non-seepy material is selected concrete material.Described seepy material is selected from cobble, haydite, gravel or queen closer.
Work progress of the present invention is:
1) set first as requested one or several hollow out patterns, in brickmaking factory, make corresponding hollow out pattern mould;
2) while producing, floor tile brick die and hollow out pattern mould are placed into permanent position, then fill non-seepy material, by extrusion modling, then mould is taken out, guarantee that pierced pattern is complete;
3) seepy material is filled at the hollow out brick hollow out position that maintenance is had well to some strength, has certain cohesive between seepy material, by compacting or self bonding, makes seepy material fill area form integral body and forms overall structure with brick body;
4) to be filled completing, carries out maintenance to fragment of brick, and all the other techniques are all installed fragment of brick production standard and produced;
5), after fragment of brick has been produced, be transported to laying place and unify to mat formation.
Wherein, non-seepy material is preferably concrete material, and it also can replace with other non-seepy materials, as pottery, stone material etc.Cobble, haydite, gravel, queen closer etc. can be selected or replace with to seepy material.And the seepy material in technique scheme also can be filled at engineering site, such as filling cobble, haydite, gravel, queen closer, coarse sand etc.Filler of the present invention can bond also not bonded.
Operating principle of the present invention is:
The invention provides a kind of permeable pavement floor tile.The primary raw material of fragment of brick itself is concrete.Then hollow out operation is carried out at or other positions middle at fragment of brick, and pattern can design according to actual requirement.Then at hollow out position, fill pervious concrete, haydite etc., after fragment of brick moulding, unify to mat formation.Based on this technical scheme, the present invention also has following technique effect:
1) cost is lower
Than traditional, with water-permeable brick, carry out the ecological ground pavement method that integral body is mated formation, raw material sources of the present invention are extensive, easily obtain, and cost is lower.
2) reasonable disposition resource
This fragment of brick has utilized bi-material, drop into and reached maximum view and ecological effect, and raw material alternative scheme is more, can utilize engineering leftover pieces or other trade wastes that can again utilize to manufacture, and has optimized resource distribution with minimum resource.
3) functional, ecological property and view have been taken into account
Traditional paving method is comparatively single, does not often consider landscape factors.The fragment of brick that the present invention proposes can carry out the hollow out design of various patterns as requested, can cater to the theme in the place of mating formation.The effect of mating formation novelty, and there is certain trade function.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit; Although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the field are to be understood that: still can modify or part technical characterictic is equal to replacement the specific embodiment of the present invention; And not departing from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technical scheme scope that the present invention asks for protection.

Claims (7)

1. a preparation method for local pervious floor tile, is characterized in that: described preparation method comprises the steps:
A, according to the hollow out pattern of setting, preparation hollow out pattern mould;
B, floor tile brick die and hollow out pattern mould that size is greater than to described hollow out pattern mould are nested mutually, are placed on permanent position, then to the non-seepy material of area filling extrusion modling between floor tile brick die and hollow out pattern mould;
C, described floor tile brick die and the hollow out pattern mould of taking-up, and guarantee that pierced pattern is complete, by maintenance, form hollow out brick;
D, to the hollow out position of hollow out brick, fill seepy material, through the cementation of overcompaction or seepy material self, make the seepy material fill area at hollow out position and the integral body of hollow out brick formation integrative-structure.
2. preparation method according to claim 1, is characterized in that: described non-seepy material is selected from concrete material, pottery or stone material.
3. preparation method according to claim 1, is characterized in that: described seepy material is selected from cobble, haydite, gravel or queen closer.
4. preparation method according to claim 1, is characterized in that: described hollow out pattern is plant pattern, geometrical pattern or animal pattern.
5. a local pervious floor tile, it is characterized in that: the brick body of local pervious floor tile comprises peripheral non-permeable region (1) and the permeable region (2) of inner side, described brick body is run through in described permeable region (2), described non-permeable region (1) is made by non-seepy material, and described permeable region (2) is made by seepy material.
6. local pervious floor tile according to claim 4, is characterized in that: described non-seepy material is selected from concrete material, pottery or stone material.
7. local pervious floor tile according to claim 4, is characterized in that: described seepy material is selected from cobble, haydite, gravel or queen closer.
CN201310751597.9A 2013-12-31 2013-12-31 Preparation method for partial water permeation floor tiles and partial water permeation floor tiles Pending CN103696339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310751597.9A CN103696339A (en) 2013-12-31 2013-12-31 Preparation method for partial water permeation floor tiles and partial water permeation floor tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310751597.9A CN103696339A (en) 2013-12-31 2013-12-31 Preparation method for partial water permeation floor tiles and partial water permeation floor tiles

Publications (1)

Publication Number Publication Date
CN103696339A true CN103696339A (en) 2014-04-02

Family

ID=50357991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310751597.9A Pending CN103696339A (en) 2013-12-31 2013-12-31 Preparation method for partial water permeation floor tiles and partial water permeation floor tiles

Country Status (1)

Country Link
CN (1) CN103696339A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106696052A (en) * 2017-01-03 2017-05-24 佛山石湾鹰牌陶瓷有限公司 Preparation method of baking-free permeable brick having decorative pattern
CN106800397A (en) * 2016-12-29 2017-06-06 东莞市斯博锐高分子建筑材料科技有限公司 A kind of colored ecological permeable terrace and preparation method thereof
CN108316091A (en) * 2018-04-11 2018-07-24 陆大伟 A kind of modularization plastic coat and its production method
CN110042717A (en) * 2018-01-16 2019-07-23 江俊昇 Colour cement brick and its manufacturing method
CN114197264A (en) * 2021-12-20 2022-03-18 无锡荷清数字建筑科技有限公司 3D printing permeable floor tile and preparation method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1188090A (en) * 1997-01-13 1998-07-22 孔祥禄 Colour paving tile and its making method
CN1232738A (en) * 1999-05-10 1999-10-27 佛山市乐华陶瓷有限公司(中外合资) Permeable brick producing process
CN2402714Y (en) * 2000-01-24 2000-10-25 石家庄市园林建筑工程处 Ecological greening permeable brick
KR20060081184A (en) * 2005-01-07 2006-07-12 (주)치타타코리아 Stone tile floor structure and method of construction thereof
CN101451336A (en) * 2007-11-29 2009-06-10 虞选勇 Permeable pavement bricks
KR20090128215A (en) * 2008-06-10 2009-12-15 이태섭 Resilient floor structure with high permeability and paving method thereof
CN201459570U (en) * 2009-07-08 2010-05-12 廖加华 Concrete permeable floor tile
JP2012127098A (en) * 2010-12-15 2012-07-05 Chugoku Electric Power Co Inc:The Paving method, pavement block used in the same and pavement removal method
CN102587256A (en) * 2012-03-20 2012-07-18 厦门市闽长鹭科技发展有限公司 Water permeable stone paving block
CN103397767A (en) * 2013-08-07 2013-11-20 江显异 Water permeating and anti-skidding floor tile and manufacturing method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1188090A (en) * 1997-01-13 1998-07-22 孔祥禄 Colour paving tile and its making method
CN1232738A (en) * 1999-05-10 1999-10-27 佛山市乐华陶瓷有限公司(中外合资) Permeable brick producing process
CN2402714Y (en) * 2000-01-24 2000-10-25 石家庄市园林建筑工程处 Ecological greening permeable brick
KR20060081184A (en) * 2005-01-07 2006-07-12 (주)치타타코리아 Stone tile floor structure and method of construction thereof
CN101451336A (en) * 2007-11-29 2009-06-10 虞选勇 Permeable pavement bricks
KR20090128215A (en) * 2008-06-10 2009-12-15 이태섭 Resilient floor structure with high permeability and paving method thereof
CN201459570U (en) * 2009-07-08 2010-05-12 廖加华 Concrete permeable floor tile
JP2012127098A (en) * 2010-12-15 2012-07-05 Chugoku Electric Power Co Inc:The Paving method, pavement block used in the same and pavement removal method
CN102587256A (en) * 2012-03-20 2012-07-18 厦门市闽长鹭科技发展有限公司 Water permeable stone paving block
CN103397767A (en) * 2013-08-07 2013-11-20 江显异 Water permeating and anti-skidding floor tile and manufacturing method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106800397A (en) * 2016-12-29 2017-06-06 东莞市斯博锐高分子建筑材料科技有限公司 A kind of colored ecological permeable terrace and preparation method thereof
CN106696052A (en) * 2017-01-03 2017-05-24 佛山石湾鹰牌陶瓷有限公司 Preparation method of baking-free permeable brick having decorative pattern
CN106696052B (en) * 2017-01-03 2019-12-10 佛山石湾鹰牌陶瓷有限公司 preparation method of baking-free water permeable brick with decorative patterns
CN110042717A (en) * 2018-01-16 2019-07-23 江俊昇 Colour cement brick and its manufacturing method
CN108316091A (en) * 2018-04-11 2018-07-24 陆大伟 A kind of modularization plastic coat and its production method
CN114197264A (en) * 2021-12-20 2022-03-18 无锡荷清数字建筑科技有限公司 3D printing permeable floor tile and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102587243B (en) Urban road water permeability cement concrete pavement structure and construction process thereof
CN203295913U (en) Novel ecological permeable road structure
CN103696339A (en) Preparation method for partial water permeation floor tiles and partial water permeation floor tiles
CN103352407A (en) Construction process of roadbed structure with sand-based water-permeable bricks
CN105463967A (en) Water-permeable wear-resistant garden path and construction method thereof
CN107386047B (en) Water permeable brick pavement structure and construction method thereof
US10501935B2 (en) Layered architectural pervious concrete
CN103669147A (en) Pavement method of permeable ground and permeable pavement structure paved through pavement method
CN103866668A (en) Cement water-permeable concrete ground structure with water-permeable asphalt on surface and manufacturing method thereof
CN202482730U (en) Permeable brick
CN103758010A (en) Ecological pavement and construction method thereof
KR20190006233A (en) Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road
CN104404857B (en) A kind of permeable tile work ground and construction method
CN103485254A (en) Method for preparing environment-friendly, decorative and permeable concrete pavement
CN206189241U (en) Concrete permeable pavement
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN105484132A (en) Novel construction method of permeable pavement paving
CN112501976A (en) Construction method of high-strength permeable concrete for non-motor vehicle lane
CN211596259U (en) Sponge city structure of mating formation of permeating water
CN104911972A (en) Man-made permeable volcanic floor paving dressed stone and paving floor using the same
CN104911971B (en) A kind of preparation method of artificial permeable volcanic rock ground pavement work stone
KR101326113B1 (en) Gravity reinforced earth blocks and construction method thereof
CN110984181A (en) Method for backfilling groove of plastic pipeline
CN213115347U (en) Dampproof ground
KR101097120B1 (en) Method for manufacturing artificial stone

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140402