CN106638681A - Integrated pipe gallery - Google Patents

Integrated pipe gallery Download PDF

Info

Publication number
CN106638681A
CN106638681A CN201611180151.5A CN201611180151A CN106638681A CN 106638681 A CN106638681 A CN 106638681A CN 201611180151 A CN201611180151 A CN 201611180151A CN 106638681 A CN106638681 A CN 106638681A
Authority
CN
China
Prior art keywords
cabin
inspection
pipe gallery
layer
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611180151.5A
Other languages
Chinese (zh)
Other versions
CN106638681B (en
Inventor
王俊岭
魏江涛
张智贤
冯萃敏
汪长征
孙丽华
赵欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201611180151.5A priority Critical patent/CN106638681B/en
Publication of CN106638681A publication Critical patent/CN106638681A/en
Application granted granted Critical
Publication of CN106638681B publication Critical patent/CN106638681B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/105Accessories, e.g. flow regulators or cleaning devices

Abstract

The invention relates to the technical field of pipe gallery layouts and discloses an integrated pipe gallery. The pipe gallery includes a drainage cabin arranged under the ground, the drainage cabin includes an inspection layer and a drainage layer, the inspection layer is arranged above the drainage layer and allows an inspector to walk through, an inspection well is formed in the bottom surface of the inspection layer and used for inspecting drainage of the drainage layer, and an opening is formed in the side wall of the inspection layer and allows the inspector to enter or get out of the drainage cabin. The introduction of a drainage system in the integrated pipe gallery promotes the construction of city underground integrated pipe gallery; at the same time, the inspection layer and the drainage layer of the drainage cabin are both arranged under the ground, the upper space of the drainage layer of the drainage cabin is rationally used, the inspection well is not needed to be arranged in the ground, the water leakage situation caused by penetrating of the inspection well through a pipe gallery structure is avoided, and the waterproofness of the integrated pipe gallery is improved; at the same time, the inspection layer is arranged under the ground, and thus the situation that staff cause adverse effects on the ground traffic in inspection operation is avoided.

Description

A kind of pipe gallery
Technical field
The present invention relates to piping lane placement technique field, more particularly to a kind of pipe gallery.
Background technology
Pipe gallery (also referred to as common trench) is built in Urban Underground and accommodates two classes and above municipal pipeline in one Box culvert tunnel.The municipal engineering pipeline such as feedwater, rainwater, sewage, recycled water, natural gas, heating power, electric power, communication can be included it In, realize planning, build and manage three's unification.
House and town and country construction portion hold and require firmly to fall in the pipe gallery construction teleconference of propulsion Urban Underground Real pipeline all enters the requirement of corridor, must not be while build underground pipe gallery, while in the outer Buried pipe of piping lane.Each pilot city Rain sewer line is also all included pipe gallery by city, its moderate rain sewer line inspection shaft be set to pipe gallery design one The problem that individual emphasis need to be solved.Firmly build portion《With regard to improving what municipal drainage prevention waterlogging ability propulsion Urban Underground pipe gallery was built Notify》It is middle to require that, by municipal drainage prevention waterlogging and pipe gallery, sponge urban construction Coordinate development, treatment in accordance with local conditions determines storm sewer The paving for entering corridor penetrates mode, strictly implements pipeline and enters corridor system.
Current composite piping lane is included in the case of rain sewer line, and inspection shaft is often directly through the straight-through ground of Pipe rack Or build inspection shaft from piping lane side and lead to ground, on the one hand this design affects the integrity of Pipe rack, is unfavorable for piping lane Waterproof, next inspection shaft is arranged on outside piping lane, and maintainer need to arrive piping lane outside and Ground Operation, while increasing workload Also affect road traffic.
The content of the invention
(1) technical problem to be solved
The present invention provides a kind of pipe gallery, is unfavorable for that piping lane waterproof and maintenance activity affect road surface to solve inspection shaft The problem of traffic.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides a kind of pipe gallery, the piping lane includes being arranged on ground Under draining cabin, the piping lane includes being arranged on underground draining cabin, and the draining cabin includes inspection layer and drainage blanket, described Inspection layer is arranged on the top of the drainage blanket, and walks about for inspection personnel, is provided with for checking on the inspection layer bottom surface The inspection shaft of drainage blanket draining, is provided with the opening for inspection personnel's turnover on the side wall of the inspection layer, the opening can With other cabin connections of piping lane.
Further, the draining cabin is rainwater cabin and bilge tank or the bilge tank being separately provided or rainwater cabin, its moderate rain Water tank, bilge tank include inspection layer and drainage blanket.
Further, the piping lane also includes storm detention tank, water inlet and the ground rainwater mouth of the storm detention tank Connection, the outlet of the storm detention tank is connected with the drainage blanket in rainwater cabin.
Further, the floor height of the storm detention tank is highly consistent with the water inlet of the drainage blanket in rainwater cabin, institute The inspection layer and the storm detention tank for stating rainwater cabin is set up in parallel;
The storm detention tank is provided with overflow plate near the side in the rainwater cabin, the overflow plate and upper strata ground it Between and the inspection layer in the overflow plate and rainwater cabin between be reserved with overflow ducts, the storm detention tank and the rainwater cabin Drainage blanket water inlet connected by the overflow ducts.
Further, water pump is provided with the storm detention tank, the water pump can be by the water-retention in storm detention tank Extract out.
Further, it is provided with dmp filter component in the ground rainwater mouth.
Further, the drainage blanket cross sectional shape of the rainwater cabin and bilge tank is U-shaped, and the U-shaped bottom is semicircle Arc.
Further, the piping lane also includes spaced telecommunications cabin and supplies water tank, and the opening is adjacent with draining cabin Cabin connection.
Further, the leakage check lid being adapted to it is provided with the inspection shaft.
Further, the inspection layer is provided with light fixture.
(3) beneficial effect
The above-mentioned technical proposal of the present invention has the advantage that:A kind of pipe gallery that the present invention is provided, by drainage system In bringing pipe gallery into, the construction of Urban Underground pipe gallery is advanced;Simultaneously the inspection facility in draining cabin has been arranged on cabin It is interior, rationally make use of the space on the drainage blanket top in draining cabin, it is to avoid inspection shaft passes through the water leakage situation that Pipe rack causes Generation, improve the water proofing property of pipe gallery;Meanwhile, inspection shaft is arranged on below ground, it is to avoid work on hand personnel exist Traffic above-ground etc. is had undesirable effect when carrying out Inspection the occurrence of.
Except it is described above present invention solves the technical problem that, constitute technical scheme technical characteristic and have this Outside the advantage that the technical characteristic of a little technical schemes is brought, what other technical characteristics and these technical characteristics of the invention were brought Advantage, will combine accompanying drawing and further illustrate.
Description of the drawings
Fig. 1 is the schematic diagram of embodiment of the present invention pipe gallery;
Fig. 2 is the arrangement schematic diagram of the upper and lower layer form of embodiment of the present invention pipe gallery.
In figure:1:Rainwater cabin, 11:Rainwater module inspection layer, 12:Rainwater cabin drainage blanket, 13:Rainwater module inspection well;2:Sewage Cabin, 21:Bilge tank inspection layer, 22:Bilge tank drainage blanket;23:Bilge tank inspection shaft;3:Storm detention tank;4:Inlet for stom water;5:Rain Water filtration assemblies;6:Water pump;7:Overflow plate;8:Telecommunications cabin;9:For water tank, 10:Light fixture.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Additionally, in describing the invention, unless otherwise stated, " multiple ", " many ", " multigroup " be meant that two or Two or more, " several ", " some ", " some groups " are meant that one or more.
As shown in figure 1, the embodiment of the present invention provides a kind of pipe gallery, the piping lane includes being arranged on the draining of underground Cabin, telecommunications cabin 8 and for water tank 9.
Wherein, the draining cabin includes inspection layer and drainage blanket setting up and down, and on the inspection layer bottom surface use is provided with In the inspection shaft for checking drainage blanket draining, and the inspection layer and drainage blanket are arranged at underground, arrange on the side wall of inspection layer There is the opening for inspection personnel's turnover.Drainage blanket is drain line, is discharged from underground for current;Inspection layer is walked for inspection personnel It is dynamic, and the drainage blanket drainage situation in draining cabin is checked by inspection shaft.Telecommunications cabin and for water tank be non-draining cabin.Use in telecommunications cabin In the electric power telecommunication line that receiving is independent of each other, it is used to accommodate the pipelines such as feedwater, middle water for water tank.
Wherein, typically generally individually include non-draining cabin in pipe gallery kind, for inspection personnel turnover opening can Directly to connect with the cabin in the close draining cabin in non-draining cabin, such inspection personnel just can be by the cabin in non-draining cabin In entering into draining module inspection layer, and then drainage blanket draining is checked by inspection shaft.
The draining cabin can be single rainwater cabin 1 or single bilge tank 2, or spaced sewage Cabin 2 and rainwater cabin 1, namely either which kind of draining cabin, as long as it is protection of the present invention by the way of underground two-layer is arranged Scope.
As shown in figure 1, this gives a kind of including bilge tank 2 and the pipe gallery in rainwater cabin 1, bilge tank 2 with Telecommunications cabin 8 is arranged close to.Wherein, rainwater cabin 1 includes rainwater module inspection layer 11 and rainwater cabin drainage blanket 12 setting up and down, rainwater Rain module inspection well 13 is set on module inspection layer 11;Bilge tank 2 includes bilge tank inspection layer 21 and bilge tank setting up and down Drainage blanket 22, is provided with bilge tank inspection shaft 23 on bilge tank inspection layer 21.Bilge tank inspection layer 21 is entered for inspection personnel Opening is connected with telecommunications cabin, and rainwater module inspection layer 11 is connected for the opening that inspection personnel enters with bilge tank, such inspection personnel By telecommunications cabin 8 bilge tank drain layer can be checked into bilge tank inspection layer, it is also possible to further enter from bilge tank Enter rainwater module inspection layer 11, rainwater cabin drainage situation is checked.
The present embodiment pipe gallery sandwich establishment on rain, the drainage blanket of bilge tank, rain, bilge tank are built as double-deck knot Structure, sets inspection shaft in interlayer, will check that space is set in interlayer, and inspection personnel completes the inspection of pipeline, road in piping lane On inspection shaft need not be set, do not affect road traffic.Pipeline can be also arranged in interlayer, the use in piping lane space is not affected, it is ensured that The integrity of Pipe rack.
As shown in figure 1, the present embodiment pipe gallery also include storm detention tank 3, the water inlet of the storm detention tank 3 with Ground rainwater mouth 4 is connected, and the outlet of the storm detention tank 3 is connected with rainwater cabin drainage blanket 12.Wherein, ground rainwater mouth 4 The gradient of corresponding road surface A can be 5 ° or so, and the direction of arrow represents the incline direction of road surface A in Fig. 1.
The setting of storm detention tank 3, one is that, when amount of rainfall is less, rainwater is stored up by inlet for stom water into storm detention tank 3 Deposit standby, the storage for realizing rainwater is utilized;Two is that, when amount of rainfall is larger, rainwater enters rainwater after the storage of storm detention tank 3 is full Cabin 1 excludes, while amount of rainfall can be used as stagnant storage facility by the storm detention tank in piping lane avoid the peak hour discharge, reduction urban waterlogging Probability.
As shown in figure 1, being provided with water pump 6 in the storm detention tank 3, the water pump 6 can be by storm detention tank 3 Water-retention is extracted out, can be used for green land irrigation or as road surface spraying water.
As shown in figure 1, be set up in parallel as a kind of set-up mode, rainwater cabin 1 and bilge tank 2, and rainwater cabin 1 is near rainwater The side of storage pond 3 is arranged.The floor height of the storm detention tank 3 is highly consistent with the water inlet of rainwater cabin drainage blanket 12, institute State rainwater module inspection layer 11 to be set up in parallel with the storm detention tank 3.The storm detention tank 3 near the rainwater cabin 1 one Side is provided with overflow plate 7, between the overflow plate 7 and upper strata ground and between the overflow plate 7 and rainwater module inspection layer 11 Overflow ducts are reserved with, the storm detention tank 3 is connected with the rainwater cabin drainage blanket water inlet by the overflow ducts.
It is understood that rainwater cabin 1 is arranged near the side of storm detention tank 3, and such space structure connection and reasonable arrangement, rain Water directly can enter storm detention tank 3 by the inlet for stom water 4 on ground, directly can pass through after storm detention tank 3 stores full water Overflow ducts enter rainwater cabin drainage blanket 12, it is not necessary to complicated circuit design, it also avoid that pipeline arranged crosswise is loaded down with trivial details to ask Topic.Meanwhile, the rainwater module inspection layer 11 is set up in parallel with the storm detention tank 3, refers to setting for rainwater module inspection layer 11 Put height to be close to storm detention tank 3, and so most reasonably make use of rainwater cabin drainage blanket 12 into laid out in parallel in the horizontal Top idle space, the reservoir storage that in turn ensure that storm detention tank 3 and the draining for not interfering with rainwater cabin drainage blanket 12.
As shown in figure 1, being provided with dmp filter component 5 in the ground rainwater mouth 4.Filter assemblies can be by from ground Debris carry out inceptive filtering, it is to avoid debris be deposited in storm detention tank 3 and avoid debris affect water pump work and The discharge in rainwater downstream.
As shown in figure 1, being as a kind of cross sectional shape of the drainage blanket of preferred structure, the rainwater cabin 1 and bilge tank 3 U-shaped, the U-shaped bottom is semicircular arc.The rainwater cabin of this structure and the bottom surface of bilge tank are round and smooth, reduce outside water Impact, reduce resistance to water-flow, be conducive to the smooth discharge of rainwater and sewage, be difficult silting impurity.
As a kind of preferred embodiment, the leakage check lid being adapted to it is provided with the inspection shaft.Inspection cover is set Both the safety of inspection personnel had been can ensure that, while can also seal inspection socket when not checking, it is to avoid drainage blanket draining is excessive When spill on inspection layer.
As the preferred embodiment of the present embodiment pipe gallery, rainwater module inspection layer 11, bilge tank inspection layer 21 with And telecommunications cabin 8, for being provided with light fixture on water tank 9.It is understood that light fixture facilitates the work of inspection personnel Industry.
Rain, bilge tank drainage blanket and inspection layer inside the present embodiment pipe gallery is separately provided, and top is divided into inspection Area, bottom is divided into catchment, and centre is demarcation strip, and inspection shaft is set on demarcation strip, and workman can pass through in test zone when needing to check Open manhole cover to be checked, inspection personnel is not used in being checked on surface road, and rain sewage inspection well is no longer arranged on ground. Such structure design, one be to include inspection shaft offering question after rain sewer line to solve piping lane, it is to avoid inspection shaft from Pipe rack is passed through, destroys piping lane integrity, reduces section utilization ratio, namely the design of the inspection shaft of the present invention, is enhanced The water resistance of piping lane, improves the safety of structure and management.Two is independent rain bilge tank inspection shaft easy to set up, is easy to The inspection of pipeline, the rain being independently arranged, bilge tank can not affect laying for other cabin pipelines, reduce pipe gallery into This, improves the utilization rate of piping lane section.Road traffic is not affected during inspection, checks that work is directly completed inside piping lane, reduced Inspection personnel's workload, keeps the integrity of Pipe rack, takes full advantage of the space inside piping lane.
During the present embodiment pipe gallery rainfall, rainwater flows into following storm detention tank 3 through roads rain inlet 4, works as rainfall Hour, storm detention tank 3 can store whole water yields, and this storage rainwater can be promoted to ground and spill and greening for pouring with water pump 6 Deng.When rainfall is big, the water of storm detention tank 3 is expired, and then overflow enters rainwater cabin drainage blanket 12, will be overflow by rainwater cabin drainage blanket 12 Stream rainwater is drained.
It can be seen that the present embodiment pipe gallery solves process of construction of the city integrated piping lane with the rainwater storage in sponge city In each self planning, the problem of individually construction, namely the present embodiment pipe gallery is with road construction, by itself and the rain with road construction Water conservancy is combined with facility and built, and is accomplished the two unified planning, design and is constructed, shadow while reduces cost construction to city Sound is preferably minimized.Rainwater storage in pipe gallery and sponge city is combined and is built, beneficial to pipe gallery and sponge city system One planning, unified layout, unified construction, can prevent waterlogging draining, increase rainwater utilization, can avoid again because embedded line is anti-to road It is multiple to excavate, contribute to the sustainable development of urban underground space.Compared with current composite piping lane section, either in design still Cost is more or less the same in construction, but considers the environmental benefit and economic benefit of this kind of section, with good engineering application value.
It should be noted that the present embodiment pipe gallery is not limited under the form be given in above-described embodiment, inspection layer Rain, bilge tank do not utilize drainage blanket to exclude but exclude using pipeline, and either piping lane only includes rainwater or sewer line or bag More cabins, the change in location of Huo Zheyu, bilge tank in whole piping lane system are included, as long as arrange inspection layer to be used for realizing checking The scheme of well is all protection scope of the present invention.The arrangement of pipe gallery simultaneously is also not necessarily limited to the shape provided in embodiment accompanying drawing 1 Formula, as shown in Fig. 2 the top of rainwater cabin 1 (or bilge tank) will be arranged on for other cabins of the grade of water tank 9, now equivalent to water supply Cabin has been arranged on inspection layer, and Fig. 2 moderate rains water tank 1 (or bilge tank) is equivalent to the rainwater cabin drainage blanket 12 in Fig. 1, so only will Rain, the drainage blanket of bilge tank are disposed therein one layer as rain, bilge tank, and its rain, the upper strata inspection layer of bilge tank are laid the line As use and arranging in the cabin mode of inspection shaft for water tank, electric cabin or other cabins, guarantor of the invention is fallen within Shield scope.
Finally it should be noted that:Above example only to illustrate technical scheme, rather than a limitation;Although The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To modify to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. a kind of pipe gallery, it is characterised in that:The piping lane includes being arranged on underground draining cabin, and the draining cabin includes Inspection layer and drainage blanket, the inspection layer is arranged on the top of the drainage blanket, and walks about for inspection personnel, the inspection layer bottom The inspection shaft for checking drainage blanket draining is provided with face, is provided with the side wall of the inspection layer for inspection personnel's turnover Opening, the opening can be connected with other cabins of piping lane.
2. pipe gallery according to claim 1, it is characterised in that:The draining cabin is rainwater cabin and bilge tank or independent The bilge tank of setting or rainwater cabin, wherein rainwater cabin, bilge tank include inspection layer and drainage blanket.
3. pipe gallery according to claim 2, it is characterised in that:The piping lane also includes storm detention tank, the rain The water inlet of water storage pond is connected with ground rainwater mouth, and the outlet of the storm detention tank is connected with the drainage blanket in rainwater cabin.
4. pipe gallery according to claim 3, it is characterised in that:The floor height of the storm detention tank and rainwater cabin Drainage blanket water inlet it is highly consistent, inspection layer and the storm detention tank in the rainwater cabin are set up in parallel;
The storm detention tank is provided with overflow plate near the side in the rainwater cabin, between the overflow plate and upper strata ground with And it is reserved with overflow ducts between the inspection layer in the overflow plate and rainwater cabin, the row in the storm detention tank and the rainwater cabin Water layer water inlet is connected by the overflow ducts.
5. pipe gallery according to claim 3, it is characterised in that:Water pump is provided with the storm detention tank, it is described Water pump can extract out the water-retention in storm detention tank.
6. pipe gallery according to claim 3, it is characterised in that:Dmp filter group is provided with the ground rainwater mouth Part.
7. pipe gallery according to claim 2, it is characterised in that:The rainwater cabin and the draining layer cross section shape of bilge tank Shape is U-shaped, and the U-shaped bottom is semicircular arc.
8. pipe gallery according to claim 1, it is characterised in that:The piping lane also include spaced telecommunications cabin and For water tank, the opening is connected with the cabin adjacent with draining cabin.
9. the pipe gallery according to any one of claim 1-8, it is characterised in that:It is provided with the inspection shaft suitable with it The leakage check lid matched somebody with somebody.
10. the pipe gallery according to any one of claim 1-8, it is characterised in that:The inspection layer is provided with illumination group Part.
CN201611180151.5A 2016-12-19 2016-12-19 A kind of pipe gallery Expired - Fee Related CN106638681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611180151.5A CN106638681B (en) 2016-12-19 2016-12-19 A kind of pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611180151.5A CN106638681B (en) 2016-12-19 2016-12-19 A kind of pipe gallery

Publications (2)

Publication Number Publication Date
CN106638681A true CN106638681A (en) 2017-05-10
CN106638681B CN106638681B (en) 2019-07-19

Family

ID=58833788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611180151.5A Expired - Fee Related CN106638681B (en) 2016-12-19 2016-12-19 A kind of pipe gallery

Country Status (1)

Country Link
CN (1) CN106638681B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988341A (en) * 2017-05-11 2017-07-28 广东首汇蓝天工程科技有限公司 Multifunctional shield piping lane integrates well
CN107268677A (en) * 2017-07-18 2017-10-20 厦门精图信息技术有限公司 A kind of Novel underground pipe gallery drainage system
CN107653907A (en) * 2017-10-31 2018-02-02 江苏金贸科技发展有限公司 A kind of multifunctional fabricated underground pipe gallery
CN107653906A (en) * 2017-10-31 2018-02-02 中国冶集团有限公司 A kind of vertically arranged underground pipe gallery and construction method
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN107975065A (en) * 2017-12-07 2018-05-01 中国市政工程西北设计研究院有限公司 A kind of pipe gallery in more cabins
CN108360646A (en) * 2018-04-12 2018-08-03 宁夏大学 Pipe gallery dmp filter blowdown is regulated and stored device
CN109339097A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 It is a kind of with waterproof, the underground pipe gallery structure of drain function
CN107162238B (en) * 2017-05-19 2019-09-10 中冶南方城市建设工程技术有限公司 Gravity stream sewage enters corridor system
CN110565691A (en) * 2019-10-11 2019-12-13 中冶赛迪工程技术股份有限公司 Double-deck utility tunnel of sharing personnel access & exit

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133631A (en) * 1993-11-10 1995-05-23 Shigeo Morimoto Block for common channel and side channel
CN202969415U (en) * 2012-09-29 2013-06-05 何江 Multifunctional assembled comprehensive pipe gallery
CN203878609U (en) * 2014-05-19 2014-10-15 上海市城市建设设计研究总院 Comprehensive pipe corridor structure
CN204982941U (en) * 2015-09-24 2016-01-20 杭州创博科技有限公司 Utility tunnel identity recognition cell
CN105821904A (en) * 2016-04-07 2016-08-03 上海市政工程设计研究总院(集团)有限公司 Feeding hole structure of underground comprehensive pipe gallery and construction method
CN105887924A (en) * 2016-04-25 2016-08-24 安徽砼宇特构科技有限公司 Underground pipe gallery
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN105971012A (en) * 2016-07-05 2016-09-28 宏大国源(芜湖)资源环境治理有限公司 Prefabricated pipe gallery
CN105971092A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Integrated pipe network and drainage system under for pavement

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07133631A (en) * 1993-11-10 1995-05-23 Shigeo Morimoto Block for common channel and side channel
CN202969415U (en) * 2012-09-29 2013-06-05 何江 Multifunctional assembled comprehensive pipe gallery
CN203878609U (en) * 2014-05-19 2014-10-15 上海市城市建设设计研究总院 Comprehensive pipe corridor structure
CN204982941U (en) * 2015-09-24 2016-01-20 杭州创博科技有限公司 Utility tunnel identity recognition cell
CN105821904A (en) * 2016-04-07 2016-08-03 上海市政工程设计研究总院(集团)有限公司 Feeding hole structure of underground comprehensive pipe gallery and construction method
CN105887924A (en) * 2016-04-25 2016-08-24 安徽砼宇特构科技有限公司 Underground pipe gallery
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN105971092A (en) * 2016-06-28 2016-09-28 衡阳市金泓建筑装饰设计有限公司 Integrated pipe network and drainage system under for pavement
CN105971012A (en) * 2016-07-05 2016-09-28 宏大国源(芜湖)资源环境治理有限公司 Prefabricated pipe gallery

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988341A (en) * 2017-05-11 2017-07-28 广东首汇蓝天工程科技有限公司 Multifunctional shield piping lane integrates well
CN107162238B (en) * 2017-05-19 2019-09-10 中冶南方城市建设工程技术有限公司 Gravity stream sewage enters corridor system
CN107268677A (en) * 2017-07-18 2017-10-20 厦门精图信息技术有限公司 A kind of Novel underground pipe gallery drainage system
CN107761763A (en) * 2017-10-18 2018-03-06 西安交通大学 A kind of pipe gallery and its application method
CN107653907A (en) * 2017-10-31 2018-02-02 江苏金贸科技发展有限公司 A kind of multifunctional fabricated underground pipe gallery
CN107653906A (en) * 2017-10-31 2018-02-02 中国冶集团有限公司 A kind of vertically arranged underground pipe gallery and construction method
CN107653906B (en) * 2017-10-31 2020-10-20 中国一冶集团有限公司 Vertically-arranged underground comprehensive pipe gallery and construction method
CN107975065A (en) * 2017-12-07 2018-05-01 中国市政工程西北设计研究院有限公司 A kind of pipe gallery in more cabins
CN108360646A (en) * 2018-04-12 2018-08-03 宁夏大学 Pipe gallery dmp filter blowdown is regulated and stored device
CN109339097A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 It is a kind of with waterproof, the underground pipe gallery structure of drain function
CN110565691A (en) * 2019-10-11 2019-12-13 中冶赛迪工程技术股份有限公司 Double-deck utility tunnel of sharing personnel access & exit

Also Published As

Publication number Publication date
CN106638681B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN106638681B (en) A kind of pipe gallery
US11326325B2 (en) Regional rainwater allocation method
CN205688461U (en) Pipe gallery section structure
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN105735406B (en) A kind of public building rain water on roof utilizes collection and storage device
CN106978820A (en) A kind of pipe gallery reveals water utilization system
CN107630464A (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN207062994U (en) A kind of Urban Storm Flood joint utilizes system
CN104532907B (en) pump station structure
CN107761763A (en) A kind of pipe gallery and its application method
CN103161192B (en) A kind of Power-free rainwater collection device
CN109024673A (en) A kind of sponge road surface-underground pipe gallery system and construction technology
CN211285694U (en) Utility tunnel structure
CN207211190U (en) A kind of pipe gallery
CN208578071U (en) A kind of underground pipe gallery structure that band rain sewage becomes a mandarin
CN106437842B (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN206052769U (en) A kind of prefabricated pipe gallery with drainage function
CN113833016A (en) Comprehensive structure for preventing flood, draining waterlogging and laying underground pipeline
CN103362341A (en) Oil-water separation type emergency oil storage pool for transformer of 66kV substation
CN207988089U (en) A kind of rain water collecting system and rainwater recycle recycle equipment
CN207597427U (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN218292032U (en) Utility tunnel co-constructed with basement
CN215166174U (en) Drainage device and drainage system for stand pipe
CN220117278U (en) Underground comprehensive pipe rack rainwater drainage cabin suitable for mountain area shore topography
CN209778336U (en) sewage treatment system for building construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190719

Termination date: 20191219

CF01 Termination of patent right due to non-payment of annual fee