CN106638681A - Integrated pipe gallery - Google Patents
Integrated pipe gallery Download PDFInfo
- Publication number
- CN106638681A CN106638681A CN201611180151.5A CN201611180151A CN106638681A CN 106638681 A CN106638681 A CN 106638681A CN 201611180151 A CN201611180151 A CN 201611180151A CN 106638681 A CN106638681 A CN 106638681A
- Authority
- CN
- China
- Prior art keywords
- cabin
- inspection
- pipe gallery
- layer
- rainwater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
- E03F5/105—Accessories, e.g. flow regulators or cleaning devices
Abstract
The invention relates to the technical field of pipe gallery layouts and discloses an integrated pipe gallery. The pipe gallery includes a drainage cabin arranged under the ground, the drainage cabin includes an inspection layer and a drainage layer, the inspection layer is arranged above the drainage layer and allows an inspector to walk through, an inspection well is formed in the bottom surface of the inspection layer and used for inspecting drainage of the drainage layer, and an opening is formed in the side wall of the inspection layer and allows the inspector to enter or get out of the drainage cabin. The introduction of a drainage system in the integrated pipe gallery promotes the construction of city underground integrated pipe gallery; at the same time, the inspection layer and the drainage layer of the drainage cabin are both arranged under the ground, the upper space of the drainage layer of the drainage cabin is rationally used, the inspection well is not needed to be arranged in the ground, the water leakage situation caused by penetrating of the inspection well through a pipe gallery structure is avoided, and the waterproofness of the integrated pipe gallery is improved; at the same time, the inspection layer is arranged under the ground, and thus the situation that staff cause adverse effects on the ground traffic in inspection operation is avoided.
Description
Technical field
The present invention relates to piping lane placement technique field, more particularly to a kind of pipe gallery.
Background technology
Pipe gallery (also referred to as common trench) is built in Urban Underground and accommodates two classes and above municipal pipeline in one
Box culvert tunnel.The municipal engineering pipeline such as feedwater, rainwater, sewage, recycled water, natural gas, heating power, electric power, communication can be included it
In, realize planning, build and manage three's unification.
House and town and country construction portion hold and require firmly to fall in the pipe gallery construction teleconference of propulsion Urban Underground
Real pipeline all enters the requirement of corridor, must not be while build underground pipe gallery, while in the outer Buried pipe of piping lane.Each pilot city
Rain sewer line is also all included pipe gallery by city, its moderate rain sewer line inspection shaft be set to pipe gallery design one
The problem that individual emphasis need to be solved.Firmly build portion《With regard to improving what municipal drainage prevention waterlogging ability propulsion Urban Underground pipe gallery was built
Notify》It is middle to require that, by municipal drainage prevention waterlogging and pipe gallery, sponge urban construction Coordinate development, treatment in accordance with local conditions determines storm sewer
The paving for entering corridor penetrates mode, strictly implements pipeline and enters corridor system.
Current composite piping lane is included in the case of rain sewer line, and inspection shaft is often directly through the straight-through ground of Pipe rack
Or build inspection shaft from piping lane side and lead to ground, on the one hand this design affects the integrity of Pipe rack, is unfavorable for piping lane
Waterproof, next inspection shaft is arranged on outside piping lane, and maintainer need to arrive piping lane outside and Ground Operation, while increasing workload
Also affect road traffic.
The content of the invention
(1) technical problem to be solved
The present invention provides a kind of pipe gallery, is unfavorable for that piping lane waterproof and maintenance activity affect road surface to solve inspection shaft
The problem of traffic.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides a kind of pipe gallery, the piping lane includes being arranged on ground
Under draining cabin, the piping lane includes being arranged on underground draining cabin, and the draining cabin includes inspection layer and drainage blanket, described
Inspection layer is arranged on the top of the drainage blanket, and walks about for inspection personnel, is provided with for checking on the inspection layer bottom surface
The inspection shaft of drainage blanket draining, is provided with the opening for inspection personnel's turnover on the side wall of the inspection layer, the opening can
With other cabin connections of piping lane.
Further, the draining cabin is rainwater cabin and bilge tank or the bilge tank being separately provided or rainwater cabin, its moderate rain
Water tank, bilge tank include inspection layer and drainage blanket.
Further, the piping lane also includes storm detention tank, water inlet and the ground rainwater mouth of the storm detention tank
Connection, the outlet of the storm detention tank is connected with the drainage blanket in rainwater cabin.
Further, the floor height of the storm detention tank is highly consistent with the water inlet of the drainage blanket in rainwater cabin, institute
The inspection layer and the storm detention tank for stating rainwater cabin is set up in parallel;
The storm detention tank is provided with overflow plate near the side in the rainwater cabin, the overflow plate and upper strata ground it
Between and the inspection layer in the overflow plate and rainwater cabin between be reserved with overflow ducts, the storm detention tank and the rainwater cabin
Drainage blanket water inlet connected by the overflow ducts.
Further, water pump is provided with the storm detention tank, the water pump can be by the water-retention in storm detention tank
Extract out.
Further, it is provided with dmp filter component in the ground rainwater mouth.
Further, the drainage blanket cross sectional shape of the rainwater cabin and bilge tank is U-shaped, and the U-shaped bottom is semicircle
Arc.
Further, the piping lane also includes spaced telecommunications cabin and supplies water tank, and the opening is adjacent with draining cabin
Cabin connection.
Further, the leakage check lid being adapted to it is provided with the inspection shaft.
Further, the inspection layer is provided with light fixture.
(3) beneficial effect
The above-mentioned technical proposal of the present invention has the advantage that:A kind of pipe gallery that the present invention is provided, by drainage system
In bringing pipe gallery into, the construction of Urban Underground pipe gallery is advanced;Simultaneously the inspection facility in draining cabin has been arranged on cabin
It is interior, rationally make use of the space on the drainage blanket top in draining cabin, it is to avoid inspection shaft passes through the water leakage situation that Pipe rack causes
Generation, improve the water proofing property of pipe gallery;Meanwhile, inspection shaft is arranged on below ground, it is to avoid work on hand personnel exist
Traffic above-ground etc. is had undesirable effect when carrying out Inspection the occurrence of.
Except it is described above present invention solves the technical problem that, constitute technical scheme technical characteristic and have this
Outside the advantage that the technical characteristic of a little technical schemes is brought, what other technical characteristics and these technical characteristics of the invention were brought
Advantage, will combine accompanying drawing and further illustrate.
Description of the drawings
Fig. 1 is the schematic diagram of embodiment of the present invention pipe gallery;
Fig. 2 is the arrangement schematic diagram of the upper and lower layer form of embodiment of the present invention pipe gallery.
In figure:1:Rainwater cabin, 11:Rainwater module inspection layer, 12:Rainwater cabin drainage blanket, 13:Rainwater module inspection well;2:Sewage
Cabin, 21:Bilge tank inspection layer, 22:Bilge tank drainage blanket;23:Bilge tank inspection shaft;3:Storm detention tank;4:Inlet for stom water;5:Rain
Water filtration assemblies;6:Water pump;7:Overflow plate;8:Telecommunications cabin;9:For water tank, 10:Light fixture.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can
Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
Additionally, in describing the invention, unless otherwise stated, " multiple ", " many ", " multigroup " be meant that two or
Two or more, " several ", " some ", " some groups " are meant that one or more.
As shown in figure 1, the embodiment of the present invention provides a kind of pipe gallery, the piping lane includes being arranged on the draining of underground
Cabin, telecommunications cabin 8 and for water tank 9.
Wherein, the draining cabin includes inspection layer and drainage blanket setting up and down, and on the inspection layer bottom surface use is provided with
In the inspection shaft for checking drainage blanket draining, and the inspection layer and drainage blanket are arranged at underground, arrange on the side wall of inspection layer
There is the opening for inspection personnel's turnover.Drainage blanket is drain line, is discharged from underground for current;Inspection layer is walked for inspection personnel
It is dynamic, and the drainage blanket drainage situation in draining cabin is checked by inspection shaft.Telecommunications cabin and for water tank be non-draining cabin.Use in telecommunications cabin
In the electric power telecommunication line that receiving is independent of each other, it is used to accommodate the pipelines such as feedwater, middle water for water tank.
Wherein, typically generally individually include non-draining cabin in pipe gallery kind, for inspection personnel turnover opening can
Directly to connect with the cabin in the close draining cabin in non-draining cabin, such inspection personnel just can be by the cabin in non-draining cabin
In entering into draining module inspection layer, and then drainage blanket draining is checked by inspection shaft.
The draining cabin can be single rainwater cabin 1 or single bilge tank 2, or spaced sewage
Cabin 2 and rainwater cabin 1, namely either which kind of draining cabin, as long as it is protection of the present invention by the way of underground two-layer is arranged
Scope.
As shown in figure 1, this gives a kind of including bilge tank 2 and the pipe gallery in rainwater cabin 1, bilge tank 2 with
Telecommunications cabin 8 is arranged close to.Wherein, rainwater cabin 1 includes rainwater module inspection layer 11 and rainwater cabin drainage blanket 12 setting up and down, rainwater
Rain module inspection well 13 is set on module inspection layer 11;Bilge tank 2 includes bilge tank inspection layer 21 and bilge tank setting up and down
Drainage blanket 22, is provided with bilge tank inspection shaft 23 on bilge tank inspection layer 21.Bilge tank inspection layer 21 is entered for inspection personnel
Opening is connected with telecommunications cabin, and rainwater module inspection layer 11 is connected for the opening that inspection personnel enters with bilge tank, such inspection personnel
By telecommunications cabin 8 bilge tank drain layer can be checked into bilge tank inspection layer, it is also possible to further enter from bilge tank
Enter rainwater module inspection layer 11, rainwater cabin drainage situation is checked.
The present embodiment pipe gallery sandwich establishment on rain, the drainage blanket of bilge tank, rain, bilge tank are built as double-deck knot
Structure, sets inspection shaft in interlayer, will check that space is set in interlayer, and inspection personnel completes the inspection of pipeline, road in piping lane
On inspection shaft need not be set, do not affect road traffic.Pipeline can be also arranged in interlayer, the use in piping lane space is not affected, it is ensured that
The integrity of Pipe rack.
As shown in figure 1, the present embodiment pipe gallery also include storm detention tank 3, the water inlet of the storm detention tank 3 with
Ground rainwater mouth 4 is connected, and the outlet of the storm detention tank 3 is connected with rainwater cabin drainage blanket 12.Wherein, ground rainwater mouth 4
The gradient of corresponding road surface A can be 5 ° or so, and the direction of arrow represents the incline direction of road surface A in Fig. 1.
The setting of storm detention tank 3, one is that, when amount of rainfall is less, rainwater is stored up by inlet for stom water into storm detention tank 3
Deposit standby, the storage for realizing rainwater is utilized;Two is that, when amount of rainfall is larger, rainwater enters rainwater after the storage of storm detention tank 3 is full
Cabin 1 excludes, while amount of rainfall can be used as stagnant storage facility by the storm detention tank in piping lane avoid the peak hour discharge, reduction urban waterlogging
Probability.
As shown in figure 1, being provided with water pump 6 in the storm detention tank 3, the water pump 6 can be by storm detention tank 3
Water-retention is extracted out, can be used for green land irrigation or as road surface spraying water.
As shown in figure 1, be set up in parallel as a kind of set-up mode, rainwater cabin 1 and bilge tank 2, and rainwater cabin 1 is near rainwater
The side of storage pond 3 is arranged.The floor height of the storm detention tank 3 is highly consistent with the water inlet of rainwater cabin drainage blanket 12, institute
State rainwater module inspection layer 11 to be set up in parallel with the storm detention tank 3.The storm detention tank 3 near the rainwater cabin 1 one
Side is provided with overflow plate 7, between the overflow plate 7 and upper strata ground and between the overflow plate 7 and rainwater module inspection layer 11
Overflow ducts are reserved with, the storm detention tank 3 is connected with the rainwater cabin drainage blanket water inlet by the overflow ducts.
It is understood that rainwater cabin 1 is arranged near the side of storm detention tank 3, and such space structure connection and reasonable arrangement, rain
Water directly can enter storm detention tank 3 by the inlet for stom water 4 on ground, directly can pass through after storm detention tank 3 stores full water
Overflow ducts enter rainwater cabin drainage blanket 12, it is not necessary to complicated circuit design, it also avoid that pipeline arranged crosswise is loaded down with trivial details to ask
Topic.Meanwhile, the rainwater module inspection layer 11 is set up in parallel with the storm detention tank 3, refers to setting for rainwater module inspection layer 11
Put height to be close to storm detention tank 3, and so most reasonably make use of rainwater cabin drainage blanket 12 into laid out in parallel in the horizontal
Top idle space, the reservoir storage that in turn ensure that storm detention tank 3 and the draining for not interfering with rainwater cabin drainage blanket 12.
As shown in figure 1, being provided with dmp filter component 5 in the ground rainwater mouth 4.Filter assemblies can be by from ground
Debris carry out inceptive filtering, it is to avoid debris be deposited in storm detention tank 3 and avoid debris affect water pump work and
The discharge in rainwater downstream.
As shown in figure 1, being as a kind of cross sectional shape of the drainage blanket of preferred structure, the rainwater cabin 1 and bilge tank 3
U-shaped, the U-shaped bottom is semicircular arc.The rainwater cabin of this structure and the bottom surface of bilge tank are round and smooth, reduce outside water
Impact, reduce resistance to water-flow, be conducive to the smooth discharge of rainwater and sewage, be difficult silting impurity.
As a kind of preferred embodiment, the leakage check lid being adapted to it is provided with the inspection shaft.Inspection cover is set
Both the safety of inspection personnel had been can ensure that, while can also seal inspection socket when not checking, it is to avoid drainage blanket draining is excessive
When spill on inspection layer.
As the preferred embodiment of the present embodiment pipe gallery, rainwater module inspection layer 11, bilge tank inspection layer 21 with
And telecommunications cabin 8, for being provided with light fixture on water tank 9.It is understood that light fixture facilitates the work of inspection personnel
Industry.
Rain, bilge tank drainage blanket and inspection layer inside the present embodiment pipe gallery is separately provided, and top is divided into inspection
Area, bottom is divided into catchment, and centre is demarcation strip, and inspection shaft is set on demarcation strip, and workman can pass through in test zone when needing to check
Open manhole cover to be checked, inspection personnel is not used in being checked on surface road, and rain sewage inspection well is no longer arranged on ground.
Such structure design, one be to include inspection shaft offering question after rain sewer line to solve piping lane, it is to avoid inspection shaft from
Pipe rack is passed through, destroys piping lane integrity, reduces section utilization ratio, namely the design of the inspection shaft of the present invention, is enhanced
The water resistance of piping lane, improves the safety of structure and management.Two is independent rain bilge tank inspection shaft easy to set up, is easy to
The inspection of pipeline, the rain being independently arranged, bilge tank can not affect laying for other cabin pipelines, reduce pipe gallery into
This, improves the utilization rate of piping lane section.Road traffic is not affected during inspection, checks that work is directly completed inside piping lane, reduced
Inspection personnel's workload, keeps the integrity of Pipe rack, takes full advantage of the space inside piping lane.
During the present embodiment pipe gallery rainfall, rainwater flows into following storm detention tank 3 through roads rain inlet 4, works as rainfall
Hour, storm detention tank 3 can store whole water yields, and this storage rainwater can be promoted to ground and spill and greening for pouring with water pump 6
Deng.When rainfall is big, the water of storm detention tank 3 is expired, and then overflow enters rainwater cabin drainage blanket 12, will be overflow by rainwater cabin drainage blanket 12
Stream rainwater is drained.
It can be seen that the present embodiment pipe gallery solves process of construction of the city integrated piping lane with the rainwater storage in sponge city
In each self planning, the problem of individually construction, namely the present embodiment pipe gallery is with road construction, by itself and the rain with road construction
Water conservancy is combined with facility and built, and is accomplished the two unified planning, design and is constructed, shadow while reduces cost construction to city
Sound is preferably minimized.Rainwater storage in pipe gallery and sponge city is combined and is built, beneficial to pipe gallery and sponge city system
One planning, unified layout, unified construction, can prevent waterlogging draining, increase rainwater utilization, can avoid again because embedded line is anti-to road
It is multiple to excavate, contribute to the sustainable development of urban underground space.Compared with current composite piping lane section, either in design still
Cost is more or less the same in construction, but considers the environmental benefit and economic benefit of this kind of section, with good engineering application value.
It should be noted that the present embodiment pipe gallery is not limited under the form be given in above-described embodiment, inspection layer
Rain, bilge tank do not utilize drainage blanket to exclude but exclude using pipeline, and either piping lane only includes rainwater or sewer line or bag
More cabins, the change in location of Huo Zheyu, bilge tank in whole piping lane system are included, as long as arrange inspection layer to be used for realizing checking
The scheme of well is all protection scope of the present invention.The arrangement of pipe gallery simultaneously is also not necessarily limited to the shape provided in embodiment accompanying drawing 1
Formula, as shown in Fig. 2 the top of rainwater cabin 1 (or bilge tank) will be arranged on for other cabins of the grade of water tank 9, now equivalent to water supply
Cabin has been arranged on inspection layer, and Fig. 2 moderate rains water tank 1 (or bilge tank) is equivalent to the rainwater cabin drainage blanket 12 in Fig. 1, so only will
Rain, the drainage blanket of bilge tank are disposed therein one layer as rain, bilge tank, and its rain, the upper strata inspection layer of bilge tank are laid the line
As use and arranging in the cabin mode of inspection shaft for water tank, electric cabin or other cabins, guarantor of the invention is fallen within
Shield scope.
Finally it should be noted that:Above example only to illustrate technical scheme, rather than a limitation;Although
The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used
To modify to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic;
And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and
Scope.
Claims (10)
1. a kind of pipe gallery, it is characterised in that:The piping lane includes being arranged on underground draining cabin, and the draining cabin includes
Inspection layer and drainage blanket, the inspection layer is arranged on the top of the drainage blanket, and walks about for inspection personnel, the inspection layer bottom
The inspection shaft for checking drainage blanket draining is provided with face, is provided with the side wall of the inspection layer for inspection personnel's turnover
Opening, the opening can be connected with other cabins of piping lane.
2. pipe gallery according to claim 1, it is characterised in that:The draining cabin is rainwater cabin and bilge tank or independent
The bilge tank of setting or rainwater cabin, wherein rainwater cabin, bilge tank include inspection layer and drainage blanket.
3. pipe gallery according to claim 2, it is characterised in that:The piping lane also includes storm detention tank, the rain
The water inlet of water storage pond is connected with ground rainwater mouth, and the outlet of the storm detention tank is connected with the drainage blanket in rainwater cabin.
4. pipe gallery according to claim 3, it is characterised in that:The floor height of the storm detention tank and rainwater cabin
Drainage blanket water inlet it is highly consistent, inspection layer and the storm detention tank in the rainwater cabin are set up in parallel;
The storm detention tank is provided with overflow plate near the side in the rainwater cabin, between the overflow plate and upper strata ground with
And it is reserved with overflow ducts between the inspection layer in the overflow plate and rainwater cabin, the row in the storm detention tank and the rainwater cabin
Water layer water inlet is connected by the overflow ducts.
5. pipe gallery according to claim 3, it is characterised in that:Water pump is provided with the storm detention tank, it is described
Water pump can extract out the water-retention in storm detention tank.
6. pipe gallery according to claim 3, it is characterised in that:Dmp filter group is provided with the ground rainwater mouth
Part.
7. pipe gallery according to claim 2, it is characterised in that:The rainwater cabin and the draining layer cross section shape of bilge tank
Shape is U-shaped, and the U-shaped bottom is semicircular arc.
8. pipe gallery according to claim 1, it is characterised in that:The piping lane also include spaced telecommunications cabin and
For water tank, the opening is connected with the cabin adjacent with draining cabin.
9. the pipe gallery according to any one of claim 1-8, it is characterised in that:It is provided with the inspection shaft suitable with it
The leakage check lid matched somebody with somebody.
10. the pipe gallery according to any one of claim 1-8, it is characterised in that:The inspection layer is provided with illumination group
Part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611180151.5A CN106638681B (en) | 2016-12-19 | 2016-12-19 | A kind of pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611180151.5A CN106638681B (en) | 2016-12-19 | 2016-12-19 | A kind of pipe gallery |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638681A true CN106638681A (en) | 2017-05-10 |
CN106638681B CN106638681B (en) | 2019-07-19 |
Family
ID=58833788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611180151.5A Expired - Fee Related CN106638681B (en) | 2016-12-19 | 2016-12-19 | A kind of pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638681B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988341A (en) * | 2017-05-11 | 2017-07-28 | 广东首汇蓝天工程科技有限公司 | Multifunctional shield piping lane integrates well |
CN107268677A (en) * | 2017-07-18 | 2017-10-20 | 厦门精图信息技术有限公司 | A kind of Novel underground pipe gallery drainage system |
CN107653907A (en) * | 2017-10-31 | 2018-02-02 | 江苏金贸科技发展有限公司 | A kind of multifunctional fabricated underground pipe gallery |
CN107653906A (en) * | 2017-10-31 | 2018-02-02 | 中国冶集团有限公司 | A kind of vertically arranged underground pipe gallery and construction method |
CN107761763A (en) * | 2017-10-18 | 2018-03-06 | 西安交通大学 | A kind of pipe gallery and its application method |
CN107975065A (en) * | 2017-12-07 | 2018-05-01 | 中国市政工程西北设计研究院有限公司 | A kind of pipe gallery in more cabins |
CN108360646A (en) * | 2018-04-12 | 2018-08-03 | 宁夏大学 | Pipe gallery dmp filter blowdown is regulated and stored device |
CN109339097A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | It is a kind of with waterproof, the underground pipe gallery structure of drain function |
CN107162238B (en) * | 2017-05-19 | 2019-09-10 | 中冶南方城市建设工程技术有限公司 | Gravity stream sewage enters corridor system |
CN110565691A (en) * | 2019-10-11 | 2019-12-13 | 中冶赛迪工程技术股份有限公司 | Double-deck utility tunnel of sharing personnel access & exit |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07133631A (en) * | 1993-11-10 | 1995-05-23 | Shigeo Morimoto | Block for common channel and side channel |
CN202969415U (en) * | 2012-09-29 | 2013-06-05 | 何江 | Multifunctional assembled comprehensive pipe gallery |
CN203878609U (en) * | 2014-05-19 | 2014-10-15 | 上海市城市建设设计研究总院 | Comprehensive pipe corridor structure |
CN204982941U (en) * | 2015-09-24 | 2016-01-20 | 杭州创博科技有限公司 | Utility tunnel identity recognition cell |
CN105821904A (en) * | 2016-04-07 | 2016-08-03 | 上海市政工程设计研究总院(集团)有限公司 | Feeding hole structure of underground comprehensive pipe gallery and construction method |
CN105887924A (en) * | 2016-04-25 | 2016-08-24 | 安徽砼宇特构科技有限公司 | Underground pipe gallery |
CN105926676A (en) * | 2016-06-23 | 2016-09-07 | 上海市城市建设设计研究总院 | Comprehensive pipe rack system with sponge urban function |
CN105971012A (en) * | 2016-07-05 | 2016-09-28 | 宏大国源(芜湖)资源环境治理有限公司 | Prefabricated pipe gallery |
CN105971092A (en) * | 2016-06-28 | 2016-09-28 | 衡阳市金泓建筑装饰设计有限公司 | Integrated pipe network and drainage system under for pavement |
-
2016
- 2016-12-19 CN CN201611180151.5A patent/CN106638681B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07133631A (en) * | 1993-11-10 | 1995-05-23 | Shigeo Morimoto | Block for common channel and side channel |
CN202969415U (en) * | 2012-09-29 | 2013-06-05 | 何江 | Multifunctional assembled comprehensive pipe gallery |
CN203878609U (en) * | 2014-05-19 | 2014-10-15 | 上海市城市建设设计研究总院 | Comprehensive pipe corridor structure |
CN204982941U (en) * | 2015-09-24 | 2016-01-20 | 杭州创博科技有限公司 | Utility tunnel identity recognition cell |
CN105821904A (en) * | 2016-04-07 | 2016-08-03 | 上海市政工程设计研究总院(集团)有限公司 | Feeding hole structure of underground comprehensive pipe gallery and construction method |
CN105887924A (en) * | 2016-04-25 | 2016-08-24 | 安徽砼宇特构科技有限公司 | Underground pipe gallery |
CN105926676A (en) * | 2016-06-23 | 2016-09-07 | 上海市城市建设设计研究总院 | Comprehensive pipe rack system with sponge urban function |
CN105971092A (en) * | 2016-06-28 | 2016-09-28 | 衡阳市金泓建筑装饰设计有限公司 | Integrated pipe network and drainage system under for pavement |
CN105971012A (en) * | 2016-07-05 | 2016-09-28 | 宏大国源(芜湖)资源环境治理有限公司 | Prefabricated pipe gallery |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988341A (en) * | 2017-05-11 | 2017-07-28 | 广东首汇蓝天工程科技有限公司 | Multifunctional shield piping lane integrates well |
CN107162238B (en) * | 2017-05-19 | 2019-09-10 | 中冶南方城市建设工程技术有限公司 | Gravity stream sewage enters corridor system |
CN107268677A (en) * | 2017-07-18 | 2017-10-20 | 厦门精图信息技术有限公司 | A kind of Novel underground pipe gallery drainage system |
CN107761763A (en) * | 2017-10-18 | 2018-03-06 | 西安交通大学 | A kind of pipe gallery and its application method |
CN107653907A (en) * | 2017-10-31 | 2018-02-02 | 江苏金贸科技发展有限公司 | A kind of multifunctional fabricated underground pipe gallery |
CN107653906A (en) * | 2017-10-31 | 2018-02-02 | 中国冶集团有限公司 | A kind of vertically arranged underground pipe gallery and construction method |
CN107653906B (en) * | 2017-10-31 | 2020-10-20 | 中国一冶集团有限公司 | Vertically-arranged underground comprehensive pipe gallery and construction method |
CN107975065A (en) * | 2017-12-07 | 2018-05-01 | 中国市政工程西北设计研究院有限公司 | A kind of pipe gallery in more cabins |
CN108360646A (en) * | 2018-04-12 | 2018-08-03 | 宁夏大学 | Pipe gallery dmp filter blowdown is regulated and stored device |
CN109339097A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | It is a kind of with waterproof, the underground pipe gallery structure of drain function |
CN110565691A (en) * | 2019-10-11 | 2019-12-13 | 中冶赛迪工程技术股份有限公司 | Double-deck utility tunnel of sharing personnel access & exit |
Also Published As
Publication number | Publication date |
---|---|
CN106638681B (en) | 2019-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638681B (en) | A kind of pipe gallery | |
US11326325B2 (en) | Regional rainwater allocation method | |
CN205688461U (en) | Pipe gallery section structure | |
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN105735406B (en) | A kind of public building rain water on roof utilizes collection and storage device | |
CN106978820A (en) | A kind of pipe gallery reveals water utilization system | |
CN107630464A (en) | Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function | |
CN207062994U (en) | A kind of Urban Storm Flood joint utilizes system | |
CN104532907B (en) | pump station structure | |
CN107761763A (en) | A kind of pipe gallery and its application method | |
CN103161192B (en) | A kind of Power-free rainwater collection device | |
CN109024673A (en) | A kind of sponge road surface-underground pipe gallery system and construction technology | |
CN211285694U (en) | Utility tunnel structure | |
CN207211190U (en) | A kind of pipe gallery | |
CN208578071U (en) | A kind of underground pipe gallery structure that band rain sewage becomes a mandarin | |
CN106437842B (en) | The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant | |
CN206052769U (en) | A kind of prefabricated pipe gallery with drainage function | |
CN113833016A (en) | Comprehensive structure for preventing flood, draining waterlogging and laying underground pipeline | |
CN103362341A (en) | Oil-water separation type emergency oil storage pool for transformer of 66kV substation | |
CN207988089U (en) | A kind of rain water collecting system and rainwater recycle recycle equipment | |
CN207597427U (en) | Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function | |
CN218292032U (en) | Utility tunnel co-constructed with basement | |
CN215166174U (en) | Drainage device and drainage system for stand pipe | |
CN220117278U (en) | Underground comprehensive pipe rack rainwater drainage cabin suitable for mountain area shore topography | |
CN209778336U (en) | sewage treatment system for building construction site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190719 Termination date: 20191219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |