CN106593487B - Detachable steel tube section constructing method for construction freezing method at tunnel connection channel - Google Patents

Detachable steel tube section constructing method for construction freezing method at tunnel connection channel Download PDF

Info

Publication number
CN106593487B
CN106593487B CN201710063378.XA CN201710063378A CN106593487B CN 106593487 B CN106593487 B CN 106593487B CN 201710063378 A CN201710063378 A CN 201710063378A CN 106593487 B CN106593487 B CN 106593487B
Authority
CN
China
Prior art keywords
section
construction
freezing
detachable steel
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710063378.XA
Other languages
Chinese (zh)
Other versions
CN106593487A (en
Inventor
张稳军
喻国伦
张高乐
宋晓龙
张新新
张云旆
焦亚磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710063378.XA priority Critical patent/CN106593487B/en
Publication of CN106593487A publication Critical patent/CN106593487A/en
Application granted granted Critical
Publication of CN106593487B publication Critical patent/CN106593487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Abstract

The present invention relates to a kind of detachable steel tube section constructing methods for construction freezing method at tunnel connection channel, this method is in addition to using ordinary crossing section of jurisdiction part 3, also use non-disconnectable part 1 and free section 2, free section 2 is arranged at tunnel connection channel, non-disconnectable part 1 is arranged on 2 periphery of free section, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, to constitute complete detachable steel pipeline section;Non-disconnectable part 1 therein sets gradually three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction from outside to inside;Construction method is:Detachable steel pipeline section is installed as described above;Freezing hole and relief hole construction;Construction freezing method forms freezing curtain;Free section 2 is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.

Description

Detachable steel tube section constructing method for construction freezing method at tunnel connection channel
Technical field
The present invention relates to the steel pipe sheet construction methods at tunnel connection channel construction.
Technical background
Metro Connection Passage is normally at the centre position of running tunnel, be often equipped at this catchment, drainage pumping plant, play The effects that two tunnels connect, catchment, drain and prevent fires has the title of " escape route ".Metro Connected Passage-way Construction is generally in tunnel It is carried out again after the completion of agent structure, first makes service channel periphery freezing soil with freezing mostly in Practical Project, form intensity Then height, the good Frozen Soil Cylinder of closure use Mining Method to carry out the excavation construction of service channel, Freezing stratum as rapid and excavation Construction carries out in running tunnel.
The freezing consolidation soil body has nearly semicentennial engineering experience in China, mainly has the advantage that:Have compared with High safety can effectively completely cut off underground water;It is applicable in any loose Rock And Soil containing certain water, in complex hydrologic geology Under the conditions of freezing technology it is effective, feasible;Construction is flexible, can artificially control freezing body shape and spreading range, when necessary It can be freezed around underground obstacle, the consolidation by freezing soil body is uniformly, completely.
Different processes can lead to act on the external force on the section of jurisdiction closed on and be distributed in various degree during construction freezing method Change, causes uncertain segment deformation, influence the safety of tunnel structure.Therefore, it is necessary to be directed to service channel freezing process Construction is designed, and is reduced influence of the Freezing Method for Cross-passage Construction to tunnel agent structure with this, is reduced construction risk.
Invention content
It is an object of the invention to weaken the adverse effect of construction freezing method in Freezing Method for Cross-passage Construction to tunnel agent structure, A kind of detachable steel tube section constructing method suitable for construction freezing method at tunnel connection channel is provided.
The technical solution adopted in the present invention is:
A kind of detachable steel tube section constructing method for construction freezing method at tunnel connection channel, this method is for tunnel At road service channel in the detachable steel pipeline section of construction freezing method, in addition to using ordinary crossing section of jurisdiction part 3, also use non-disconnectable Part 1 and free section 2 arrange free section 2 at tunnel connection channel, and non-disconnectable part is arranged on 2 periphery of free section 1, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, to constitute complete detachable steel pipeline section; Non-disconnectable part 1 therein sets gradually three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction from outside to inside; It is respectively provided with freezing hole, relief hole and thermometer hole on non-disconnectable part 1 and free section, list is fixed at freezing hole and relief hole To valve;Construction method is:
1) detachable steel pipeline section is installed as described above;
2) freezing hole and relief hole construction;
3) construction freezing method forms freezing curtain;
4) free section 2 is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.
The flexible transition base is rubber spacer, and the mesh for penetrating rubber spacer is distributed on rubber spacer.Mesh is cut Area corresponds to the 20% of sectional area less than rubber spacer.
Special pipeline section is suitable for construction freezing method at the tunnel connection channel that the present invention uses, and Pass through above-mentioned technical proposal carries The high durability of section of jurisdiction, adverse effect of the soil body to tunnel structure is freezed in tunnel periphery when reducing construction freezing method, improves The safety of structure.Non-disconnectable part forms frozen soil curtain when reducing construction freezing method by the way that flexible transition base is cleverly arranged Curtain stress concentration effect caused by section of jurisdiction, improves safety and the durability of structure.
The design of the present invention is described further with concrete structure below with reference to attached drawing, to fully state the present invention's Feature.
Description of the drawings
The pipeline section of Fig. 1 present invention and tunnel other structures relation schematic diagram;
Fig. 2 technical solution of the present invention detail drawings;
Enlarged structure schematic diagram at A in Fig. 3 Fig. 1;
Fig. 4 one-way valve structures sectional views;
Reference numeral:
1, as the steel pipe sheet part of tunnel permanent structure (referred to as " non-disconnectable part 1 ") in the present invention;2, of the invention In quick-detachable steel pipe sheet part (referred to as " free section 2 ");3, ordinary crossing section of jurisdiction;4, service channel structure;1- 1, outer layer sheet metal;1-2, flexible transition base;1-3, internal layer steel construction section of jurisdiction;2-1, reserved relief hole;B, freezing hole is reserved;; B-1, steel ball;B-2, rubber gasket;B-3, orifice tube reserved opening.
Specific implementation mode
The present invention is further elaborated below in conjunction with the accompanying drawings.
As shown in Figure 1, the present invention provides a kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, Including non-disconnectable part 1 and free section 2.
As shown in figure 3, non-disconnectable part 1 includes outer layer sheet metal 1-1, flexible transition base 1-2 and internal layer steel construction section of jurisdiction 1-3.When Specific construction, outer layer sheet metal 1-1 is the steel plate of 6mm;Flexible transition base 1-2 is TR thin rubber bed course, on rubber spacer It is uniformly distributed same specification mesh, and penetrates TR thin rubber bed course;Internal layer steel construction section of jurisdiction 1-3 is according to ordinary steel Segment design. It is emphasized that mesh sectional area corresponds to the 20% of sectional area less than rubber spacer, 1-1,1-2 and 1-3 three pass through engineering Glue is securely pasted together.
Projection of the freezing curtain on tunnel structure is located in 1 region of non-disconnectable part when construction freezing method, Fig. 2 invention skills The non-disconnectable part 1 of art scheme detail drawing and free section 2 are bolted to form five pieces of sections of jurisdiction, are connected with bolt between adjacent section of jurisdiction It connects, is not drawn into figure;The steel members such as necessary ribbed stiffener, longitudinal rib require to be arranged according to ordinary steel section of jurisdiction in section of jurisdiction, in figure It is not drawn into.Duct piece connector bolt b is no different with ordinary couplings bolt.
There are reserved relief hole 2-1, reserved freezing hole B in the present invention, check valve knot shown in Fig. 4 is mounted in the two Structure.Steel ball B-1 constructs anteposition in filling up valve seal fat, right side rubber seal in left end, middle cavity in Fig. 4 one-way valve structures The through-hole for having a sectional area smaller in pad B-2.Soldered vias pipe uses when orifice tube reserved opening B-3 is for freezing pipe construction.
The present invention is mainly included the following steps that in Specific construction:
1) steel pipe sheet of the present invention is installed as described above;
2) freezing hole and relief hole construction;
3) construction freezing method forms freezing curtain;
4) free section 2 is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.
The preferred embodiment of the present invention has been described in detail above.For those of ordinary skill in the art, join Several modifications and improvements can be made by examining the present invention, these are all belonged to the scope of protection of the present invention.

Claims (2)

1. a kind of detachable steel tube section constructing method for construction freezing method at tunnel connection channel, this method is for tunnel At service channel in the detachable steel pipeline section of construction freezing method, in addition to using ordinary crossing section of jurisdiction part (3), also use non-disconnectable Partly (1) and free section (2) arrange free section (2) at tunnel connection channel, are arranged not on free section (2) periphery Free section (1), free section (2) is connected with ordinary crossing section of jurisdiction part (3) by non-disconnectable part (1), to constitute Whole detachable steel pipeline section;Non-disconnectable part (1) therein sets gradually outer layer sheet metal, flexible transition base and interior from outside to inside Three layers of layer steel construction section of jurisdiction;It is respectively provided with freezing hole, relief hole and thermometer hole on non-disconnectable part (1) and free section, is being frozen It is fixed with check valve at knot hole and relief hole;Construction method is:
1) detachable steel pipeline section is installed as described above;
2) freezing hole and relief hole construction;
3) construction freezing method forms freezing curtain;
4) free section (2) is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.
2. detachable steel pipeline section according to claim 1, which is characterized in that the flexible transition base is rubber spacer, The mesh for penetrating rubber spacer is distributed on rubber spacer.
CN201710063378.XA 2017-02-03 2017-02-03 Detachable steel tube section constructing method for construction freezing method at tunnel connection channel Active CN106593487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710063378.XA CN106593487B (en) 2017-02-03 2017-02-03 Detachable steel tube section constructing method for construction freezing method at tunnel connection channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710063378.XA CN106593487B (en) 2017-02-03 2017-02-03 Detachable steel tube section constructing method for construction freezing method at tunnel connection channel

Publications (2)

Publication Number Publication Date
CN106593487A CN106593487A (en) 2017-04-26
CN106593487B true CN106593487B (en) 2018-09-11

Family

ID=58586997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710063378.XA Active CN106593487B (en) 2017-02-03 2017-02-03 Detachable steel tube section constructing method for construction freezing method at tunnel connection channel

Country Status (1)

Country Link
CN (1) CN106593487B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005686A (en) * 2018-01-12 2018-05-08 中铁上海工程局集团有限公司 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method
CN109915159B (en) * 2019-04-28 2024-04-05 中铁隧道股份有限公司 Detachable shield body with easy-to-disassemble pipeline system
CN111173536A (en) * 2019-12-26 2020-05-19 中交一航局安装工程有限公司 Freezing construction method for tunnel connection channel
CN114109434A (en) * 2021-10-09 2022-03-01 长江勘测规划设计研究有限责任公司 Connection channel connection method for small-spacing shield tunnel mining method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457648A (en) * 2008-12-30 2009-06-17 中铁隧道勘测设计院有限公司 Full-ring steel tunnel segment structure with seal protection door
CN101463724A (en) * 2008-12-30 2009-06-24 上海隧道工程股份有限公司 Construction method for connection passage by double-row hole horizontal freezing method
CN201599039U (en) * 2009-12-23 2010-10-06 上海市城市建设设计研究院 Special duct piece for position of tunnel connecting passage
CN102619522A (en) * 2012-03-20 2012-08-01 天津城建隧道股份有限公司 Construction method for subway contact passage
CN103717836A (en) * 2011-09-12 2014-04-09 Sika技术股份公司 Tubing having a thermoplastic barrier layer
CN104500094A (en) * 2014-12-23 2015-04-08 上海市城市建设设计研究总院 Lining connecting structure applicable to jacking pipe for implementing connection passage

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101677017B1 (en) * 2016-02-16 2016-11-18 신원특수건설(주) construction methods of close-twin tunnel using tube hollow

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457648A (en) * 2008-12-30 2009-06-17 中铁隧道勘测设计院有限公司 Full-ring steel tunnel segment structure with seal protection door
CN101463724A (en) * 2008-12-30 2009-06-24 上海隧道工程股份有限公司 Construction method for connection passage by double-row hole horizontal freezing method
CN201599039U (en) * 2009-12-23 2010-10-06 上海市城市建设设计研究院 Special duct piece for position of tunnel connecting passage
CN103717836A (en) * 2011-09-12 2014-04-09 Sika技术股份公司 Tubing having a thermoplastic barrier layer
CN102619522A (en) * 2012-03-20 2012-08-01 天津城建隧道股份有限公司 Construction method for subway contact passage
CN104500094A (en) * 2014-12-23 2015-04-08 上海市城市建设设计研究总院 Lining connecting structure applicable to jacking pipe for implementing connection passage

Also Published As

Publication number Publication date
CN106593487A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106593487B (en) Detachable steel tube section constructing method for construction freezing method at tunnel connection channel
CN104213932B (en) A kind of projecting coal bed waterpower phase transformation fracturing coal uncovering method
CN205895312U (en) Be used for rich irrigated land section tunnel water handling system
CN205896550U (en) Two -way plugging device of pipeline
CN104213921B (en) Based on the freezing type coal uncovering method of hydraulic slotted liner technique
CN102678174B (en) Arrangement method of tunnel drainage system passing through permafrost region and non-frozen ground region
CN102644467A (en) Tunnel connecting passage construction method for directly cutting segment rings through pipe jacking machine
CN104832196B (en) Pipe curtain freezing process supporting construction and its construction method
CN206636586U (en) A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN107034874B (en) Double-screw type slip casting type freezing plant and construction method
CN109610504A (en) A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN207131404U (en) Railway tunnel ultra-deep shaft construction freezing method structural system
CN105649655B (en) Be used for following shield structure built-in toward peripheral stratum slip casting reinforcing apparatus
CN206468361U (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN205445634U (en) Be used for constructing built -in toward peripheral stratum slip casting reinforcing apparatus from shield
CN202690131U (en) Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN106640191B (en) A kind of double cabin rubber bag apparatus of self-locking aqueous vapor for tunnel flood-fighting
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN107255204A (en) A kind of non-stop plugging technique leaked for gas pipeline crack formula
CN105220700A (en) Foundation pit waterproof curtain reinforcement
CN208473893U (en) A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs
CN108643926B (en) Freezing water stop construction method for pilot tunnel of section tunnel
CN204783063U (en) Doubly -linked encircles tunnel mid -board prevents drainage structures
CN106837388A (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN109026062A (en) A kind of double lining shield tunnel and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 300350 Haijing garden, Haihe Education Park, Jinnan, Tianjin, 135, Tianjin University.

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CP02 Change in the address of a patent holder