CN108005686A - With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method - Google Patents

With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method Download PDF

Info

Publication number
CN108005686A
CN108005686A CN201810029088.8A CN201810029088A CN108005686A CN 108005686 A CN108005686 A CN 108005686A CN 201810029088 A CN201810029088 A CN 201810029088A CN 108005686 A CN108005686 A CN 108005686A
Authority
CN
China
Prior art keywords
section
jurisdiction
service channel
main tunnel
connecting position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810029088.8A
Other languages
Chinese (zh)
Inventor
丁修恒
文毅然
董子博
石雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Urban Rail Transit Engineering Branch of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Urban Rail Transit Engineering Branch of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Urban Rail Transit Engineering Branch of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201810029088.8A priority Critical patent/CN108005686A/en
Publication of CN108005686A publication Critical patent/CN108005686A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/155Laggings made of strips, slats, slabs or sheet piles

Abstract

The invention discloses a kind of service channel combined steel section of jurisdiction with main tunnel connecting position and construction method, it is to be directed to use combined steel section of jurisdiction with the service channel at main tunnel connecting position, combined steel section of jurisdiction refers to every steel pipe sheet being arranged to two parts by the radian split in the main tunnel of respective place circumferential location, a part is the fixing pipe fragment being located in service channel, and another part is the interim section of jurisdiction section for needing to remove;Implement to dismount using straight bolt between fixing pipe fragment and interim section of jurisdiction section.The present invention uses combined steel section of jurisdiction, implements to dismount using straight bolt, it is no longer necessary to is cut off at the scene, drastically increases site operation efficiency, is also greatly beneficial to ensure construction quality.

Description

With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method
Technical field
The present invention relates to applied in shield method Freezing Method for Cross-passage Construction with main tunnel connecting position at service channel steel pipe Piece and its construction method.
Background technology
One kind is disclosed in the application for a patent for invention file that application publication number is CN106948833A, and " pin-connected panel contact is logical Road structure and construction method ", its shield method get in touch with can road construction in, for the service channel at main tunnel connecting position Steel pipe sheet is using structure shape as shown in fig. 4 a, and every steel pipe sheet is the identical conventional cylindrical section steel pipe sheet 11 of structure, assembled Complete cycle is in cylindrical tube afterwards, and Fig. 4 c are shown using this cylindrical section steel pipe sheet in main tunnel 21 and the connecting position of service channel 22 The structure type at place;In order to make the structure of service channel 22 not invade main tunnel boundary, after the completion of the driving of service channel 22, need The part service channel steel pipe sheet in main tunnel and service channel joint area is cut off in the radian in hole Nei Anzhu tunnels 21, is such as schemed Cut-out 12 shown in 4c.But in site operation, since work surface is narrow and small, hole internal cutting process work efficiency is very low, operation wind Danger is big, it is difficult to ensures construction quality.
The content of the invention
The present invention is to avoid the deficiency present in the above-mentioned prior art, there is provided a kind of connection with main tunnel connecting position Network combination of channels formula steel pipe sheet and construction method, to improve construction efficiency, ensure construction quality.
The present invention adopts the following technical scheme that to solve technical problem:
The design feature of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position:For with main tunnel Service channel at connecting position uses combined steel section of jurisdiction, and the combined steel section of jurisdiction refers to every steel pipe sheet by respective institute Radian split in the main tunnel of circumferential location is arranged to two parts, and a part is to be located at fixing pipe fragment in service channel, Another part is the interim section of jurisdiction section for needing to remove;Implemented between the fixing pipe fragment and interim section of jurisdiction section using straight bolt Dismounting.
The design feature of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position is lain also in:By described in Seam in every steel pipe sheet between fixing pipe fragment and interim section of jurisdiction section is arranged to straightway so that by fixed in each steel pipe sheet Complete cycle after section of jurisdiction section is assembled is connected the polygonized structure to be formed with each straightway.
The characteristics of construction method of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position is:Construction During, it is fixedly connected first between the fixing pipe fragment and interim section of jurisdiction section using straight bolt, makes its entirety be in It is now conventional cylindrical section steel pipe sheet, assembly is carried out using usual manner for cylindrical section steel pipe sheet, when tunneling construction is completed, hole Door interface implements closure and joint weld by construction requirement, completes entrance construction;Then, chain block is hung in tunnel top, Interim section of jurisdiction section is tensed using chain block, the straight bolt in corresponding interim section of jurisdiction section is removed, completes the dismounting of combination section of jurisdiction, Ensure that service channel section of jurisdiction does not invade shield tunnel gauge.
Compared with the prior art, the present invention has the beneficial effect that:
1st, the present invention uses combined steel section of jurisdiction, implements to tear open using straight bolt between fixing pipe fragment and interim section of jurisdiction section Dress, it is no longer necessary to cut off at the scene, drastically increase site operation efficiency, be also greatly beneficial to ensure engineering matter Amount.
2nd, the present invention is for every steel pipe sheet, using straightway approximation circular arc, largely facilitates the processing system of steel pipe sheet Make.
Brief description of the drawings
Fig. 1 is site operation schematic diagram of the present invention;
Fig. 2 is fixing pipe fragment structure schematic diagram in the present invention;
Fig. 3 is interim section of jurisdiction segment structure schematic diagram in the present invention;
Fig. 4 a are conventional cylindrical section steel pipe sheet structure diagram in the prior art;
Fig. 4 b are cut-out schematic diagram in the prior art;
Figure label:11 conventional cylindrical section steel pipe sheets, 12 cut-outs, 21 main tunnels, 22 service channels, 23 fix section of jurisdiction Section, 24 interim section of jurisdiction sections.
Embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, in the present embodiment with the service channel combined steel section of jurisdiction at main tunnel connecting position Structure type is:Combined steel section of jurisdiction, combined steel section of jurisdiction are used for the service channel 22 at main 21 connecting position of tunnel Refer to every steel pipe sheet being arranged to two parts by the radian split in the main tunnel of respective place circumferential location, a part is position The fixing pipe fragment 23 in service channel, another part are the interim section of jurisdiction sections 24 for needing to remove;In fixing pipe fragment 23 with facing When section of jurisdiction section 24 between using straight bolt implement dismounting.
In specific implementation, the seam between fixing pipe fragment 23 in every steel pipe sheet and interim section of jurisdiction section 24 is pressed into two-end-point Position is arranged to straightway so that by the complete cycle after 23 assembly of fixing pipe fragment in each steel pipe sheet is to connect to being formed with each straightway Trisection line polygonized structure, using the circular arc in the close main tunnel of the polygon of proximal segment line, using trisection line than circular arc point From design, can be very big simplified making work section, reduce cost of manufacture, the machining accuracy of conventional steel pipe piece can be met the requirements.
The present invention can be greatly enhanced construction efficiency, reduce site operation amount, improve site operation environment, reduce operation Risk.
In work progress, it is attached, is made using straight bolt first between fixing pipe fragment 23 and interim section of jurisdiction section 24 Its entirety is rendered as conventional cylindrical section steel pipe sheet, and assembled, tunneling construction is carried out using usual manner for cylindrical section steel pipe sheet During completion, portal interface implements closure and joint weld by construction requirement, completes entrance construction;Then, hung in tunnel top Chain block, interim section of jurisdiction section 24 is tensed using chain block, removes the straight bolt in corresponding interim section of jurisdiction section 24, completion group The dismounting of section of jurisdiction is closed, ensures that service channel section of jurisdiction does not invade shield tunnel gauge.

Claims (3)

1. a kind of service channel combined steel section of jurisdiction with main tunnel connecting position, it is characterized in that:
Combined steel section of jurisdiction is used for the service channel at main tunnel connecting position, the combined steel section of jurisdiction refers to will be every Piece steel pipe sheet is arranged to two parts by the radian split in the main tunnel of respective place circumferential location, and a part is logical positioned at contact Fixing pipe fragment (23) in road (22), another part are the interim section of jurisdiction sections (24) for needing to remove;In the fixing pipe fragment (23) implement to dismount using straight bolt between interim section of jurisdiction section (24).
2. the service channel combined steel section of jurisdiction according to claim 1 with main tunnel connecting position, it is characterized in that:Will Seam in the every steel pipe sheet between fixing pipe fragment (23) and interim section of jurisdiction section (24) is arranged to straightway so that by each Complete cycle in steel pipe sheet after the assembly of fixing pipe fragment is connected the polygonized structure to be formed with each straightway.
3. the construction method with the service channel combined steel section of jurisdiction at main tunnel connecting position described in a kind of claim 1, It is characterized in that:In work progress, first the fixing pipe fragment (23) and interim section of jurisdiction section (24) between using straight bolt into Row is fixedly connected, and its entirety is rendered as conventional cylindrical section steel pipe sheet, is carried out for cylindrical section steel pipe sheet using usual manner Assembly, when tunneling construction is completed, portal interface implements closure and joint weld by construction requirement, completes entrance construction;Then, exist Tunnel top hangs chain block, and interim section of jurisdiction section (24) is tensed using chain block, removes corresponding interim section of jurisdiction section (24) In straight bolt, complete the dismounting of combination section of jurisdiction, ensure that service channel section of jurisdiction does not invade shield tunnel gauge.
CN201810029088.8A 2018-01-12 2018-01-12 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method Pending CN108005686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810029088.8A CN108005686A (en) 2018-01-12 2018-01-12 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810029088.8A CN108005686A (en) 2018-01-12 2018-01-12 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method

Publications (1)

Publication Number Publication Date
CN108005686A true CN108005686A (en) 2018-05-08

Family

ID=62050198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810029088.8A Pending CN108005686A (en) 2018-01-12 2018-01-12 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method

Country Status (1)

Country Link
CN (1) CN108005686A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184731A (en) * 2018-08-30 2019-01-11 上海隧道工程有限公司 Tube coupling structure and its construction method at combined type push pipe hole
CN109578015A (en) * 2018-12-07 2019-04-05 中铁上海工程局集团有限公司 The negative endless tube piece overall pulling down method of shield method service channel pin-connected panel
CN109611107A (en) * 2019-01-18 2019-04-12 中铁上海工程局集团有限公司 What can quickly be abolished in shield method Freezing Method for Cross-passage Construction originates portal
CN109653774A (en) * 2019-01-18 2019-04-19 中铁上海工程局集团有限公司 Shield method service channel originates portal steel bushing adapting structure for electric and its installation method
CN109854273A (en) * 2019-02-19 2019-06-07 中铁第一勘察设计院集团有限公司 The shield duct piece method for dismounting and its equipment of service channel in tunnel
CN111894605A (en) * 2020-08-06 2020-11-06 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111963211A (en) * 2020-08-21 2020-11-20 上海市隧道工程轨道交通设计研究院 Steel structure for connecting shield tunnel with external channel
CN112459805A (en) * 2020-12-30 2021-03-09 中铁二十五局集团有限公司 Shield segment dismounting construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201599039U (en) * 2009-12-23 2010-10-06 上海市城市建设设计研究院 Special duct piece for position of tunnel connecting passage
CN104500094A (en) * 2014-12-23 2015-04-08 上海市城市建设设计研究总院 Lining connecting structure applicable to jacking pipe for implementing connection passage
CN105927233A (en) * 2016-05-31 2016-09-07 中铁第四勘察设计院集团有限公司 Large-span cross aisle building method applied to segmental lining tunnels
CN106593487A (en) * 2017-02-03 2017-04-26 天津大学 Detachable steel tube section construction method used for freezing method construction in tunnel contact channel
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN207686736U (en) * 2018-01-12 2018-08-03 中铁上海工程局集团有限公司 With the service channel combined steel section of jurisdiction at main tunnel connecting position

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201599039U (en) * 2009-12-23 2010-10-06 上海市城市建设设计研究院 Special duct piece for position of tunnel connecting passage
CN104500094A (en) * 2014-12-23 2015-04-08 上海市城市建设设计研究总院 Lining connecting structure applicable to jacking pipe for implementing connection passage
CN105927233A (en) * 2016-05-31 2016-09-07 中铁第四勘察设计院集团有限公司 Large-span cross aisle building method applied to segmental lining tunnels
CN106593487A (en) * 2017-02-03 2017-04-26 天津大学 Detachable steel tube section construction method used for freezing method construction in tunnel contact channel
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN207686736U (en) * 2018-01-12 2018-08-03 中铁上海工程局集团有限公司 With the service channel combined steel section of jurisdiction at main tunnel connecting position

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184731A (en) * 2018-08-30 2019-01-11 上海隧道工程有限公司 Tube coupling structure and its construction method at combined type push pipe hole
CN109578015A (en) * 2018-12-07 2019-04-05 中铁上海工程局集团有限公司 The negative endless tube piece overall pulling down method of shield method service channel pin-connected panel
CN109611107A (en) * 2019-01-18 2019-04-12 中铁上海工程局集团有限公司 What can quickly be abolished in shield method Freezing Method for Cross-passage Construction originates portal
CN109653774A (en) * 2019-01-18 2019-04-19 中铁上海工程局集团有限公司 Shield method service channel originates portal steel bushing adapting structure for electric and its installation method
CN109653774B (en) * 2019-01-18 2023-11-21 中铁上海工程局集团有限公司 Shield method connection channel starting portal steel sleeve bearing structure and installation method thereof
CN109611107B (en) * 2019-01-18 2023-12-12 中铁上海工程局集团有限公司 Originating portal capable of being broken rapidly in shield method connection channel construction
CN109854273A (en) * 2019-02-19 2019-06-07 中铁第一勘察设计院集团有限公司 The shield duct piece method for dismounting and its equipment of service channel in tunnel
CN111894605A (en) * 2020-08-06 2020-11-06 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111894605B (en) * 2020-08-06 2022-08-30 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111963211A (en) * 2020-08-21 2020-11-20 上海市隧道工程轨道交通设计研究院 Steel structure for connecting shield tunnel with external channel
CN112459805A (en) * 2020-12-30 2021-03-09 中铁二十五局集团有限公司 Shield segment dismounting construction method
CN112459805B (en) * 2020-12-30 2022-05-20 中铁二十五局集团有限公司 Shield segment dismounting construction method

Similar Documents

Publication Publication Date Title
CN108005686A (en) With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method
CN100450688C (en) Thin-wall stainless steel double-layer and carbon steel base layer composite tube girth weld welding method
CN102554484A (en) Metal pipe welding method and metal pipe welding assembly
CN103551750B (en) Welded tube and manufacture method thereof
CN101927390A (en) Method for welding circumferential weld between metal thin-wall clad layer and base layer of clad pipe
CN103612001B (en) A kind of composite bimetal pipe pipe end sealing welding technique for extra based on R shape groove
CN105862589A (en) Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes
CN105507908A (en) Three-arch construction process for connecting tunnel of large cross-section tunnel
CN207686736U (en) With the service channel combined steel section of jurisdiction at main tunnel connecting position
CN102699639B (en) Technique for integrally manufacturing semi-structure of full-face tunneling machine shield
CN107552925B (en) method for processing fuel manifold of aircraft engine with split oil pipes
CN109339818A (en) A kind of compound tunnel segment structure of Mechanical Method service channel portal fringing
CN105195637B (en) Bimetal composite pipe liquid expansion forming feeding device and process
CN106001954B (en) A kind of rail crossbeam manufacture craft partially
CN105171261A (en) Welding method of large steel making converter body
CN104722938B (en) cylinder defect welding repair method
CN205776421U (en) Reinforced sound detecting pipe
CN109048180A (en) The method welded with locating piece
CN207110993U (en) A kind of attachment structure of wellfracturing pipeline
CN104594421B (en) A kind of installation method of cutter suction dredger reamer beam length axis hole twisted branch frame
CN211777462U (en) Light positioning die for assembling pipe pieces
CN104368944B (en) Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method
CN207793898U (en) Steel truss arched bridge closure section temporary locking device
CN103252590B (en) Butt welding method of column of steelmaking workshop
CN205660331U (en) Seamless steel pipe ring flange welding die set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination