CN108005686A - With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method - Google Patents
With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method Download PDFInfo
- Publication number
- CN108005686A CN108005686A CN201810029088.8A CN201810029088A CN108005686A CN 108005686 A CN108005686 A CN 108005686A CN 201810029088 A CN201810029088 A CN 201810029088A CN 108005686 A CN108005686 A CN 108005686A
- Authority
- CN
- China
- Prior art keywords
- section
- jurisdiction
- service channel
- main tunnel
- connecting position
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/155—Laggings made of strips, slats, slabs or sheet piles
Abstract
The invention discloses a kind of service channel combined steel section of jurisdiction with main tunnel connecting position and construction method, it is to be directed to use combined steel section of jurisdiction with the service channel at main tunnel connecting position, combined steel section of jurisdiction refers to every steel pipe sheet being arranged to two parts by the radian split in the main tunnel of respective place circumferential location, a part is the fixing pipe fragment being located in service channel, and another part is the interim section of jurisdiction section for needing to remove;Implement to dismount using straight bolt between fixing pipe fragment and interim section of jurisdiction section.The present invention uses combined steel section of jurisdiction, implements to dismount using straight bolt, it is no longer necessary to is cut off at the scene, drastically increases site operation efficiency, is also greatly beneficial to ensure construction quality.
Description
Technical field
The present invention relates to applied in shield method Freezing Method for Cross-passage Construction with main tunnel connecting position at service channel steel pipe
Piece and its construction method.
Background technology
One kind is disclosed in the application for a patent for invention file that application publication number is CN106948833A, and " pin-connected panel contact is logical
Road structure and construction method ", its shield method get in touch with can road construction in, for the service channel at main tunnel connecting position
Steel pipe sheet is using structure shape as shown in fig. 4 a, and every steel pipe sheet is the identical conventional cylindrical section steel pipe sheet 11 of structure, assembled
Complete cycle is in cylindrical tube afterwards, and Fig. 4 c are shown using this cylindrical section steel pipe sheet in main tunnel 21 and the connecting position of service channel 22
The structure type at place;In order to make the structure of service channel 22 not invade main tunnel boundary, after the completion of the driving of service channel 22, need
The part service channel steel pipe sheet in main tunnel and service channel joint area is cut off in the radian in hole Nei Anzhu tunnels 21, is such as schemed
Cut-out 12 shown in 4c.But in site operation, since work surface is narrow and small, hole internal cutting process work efficiency is very low, operation wind
Danger is big, it is difficult to ensures construction quality.
The content of the invention
The present invention is to avoid the deficiency present in the above-mentioned prior art, there is provided a kind of connection with main tunnel connecting position
Network combination of channels formula steel pipe sheet and construction method, to improve construction efficiency, ensure construction quality.
The present invention adopts the following technical scheme that to solve technical problem:
The design feature of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position:For with main tunnel
Service channel at connecting position uses combined steel section of jurisdiction, and the combined steel section of jurisdiction refers to every steel pipe sheet by respective institute
Radian split in the main tunnel of circumferential location is arranged to two parts, and a part is to be located at fixing pipe fragment in service channel,
Another part is the interim section of jurisdiction section for needing to remove;Implemented between the fixing pipe fragment and interim section of jurisdiction section using straight bolt
Dismounting.
The design feature of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position is lain also in:By described in
Seam in every steel pipe sheet between fixing pipe fragment and interim section of jurisdiction section is arranged to straightway so that by fixed in each steel pipe sheet
Complete cycle after section of jurisdiction section is assembled is connected the polygonized structure to be formed with each straightway.
The characteristics of construction method of service channel combined steel section of jurisdiction of the invention with main tunnel connecting position is:Construction
During, it is fixedly connected first between the fixing pipe fragment and interim section of jurisdiction section using straight bolt, makes its entirety be in
It is now conventional cylindrical section steel pipe sheet, assembly is carried out using usual manner for cylindrical section steel pipe sheet, when tunneling construction is completed, hole
Door interface implements closure and joint weld by construction requirement, completes entrance construction;Then, chain block is hung in tunnel top,
Interim section of jurisdiction section is tensed using chain block, the straight bolt in corresponding interim section of jurisdiction section is removed, completes the dismounting of combination section of jurisdiction,
Ensure that service channel section of jurisdiction does not invade shield tunnel gauge.
Compared with the prior art, the present invention has the beneficial effect that:
1st, the present invention uses combined steel section of jurisdiction, implements to tear open using straight bolt between fixing pipe fragment and interim section of jurisdiction section
Dress, it is no longer necessary to cut off at the scene, drastically increase site operation efficiency, be also greatly beneficial to ensure engineering matter
Amount.
2nd, the present invention is for every steel pipe sheet, using straightway approximation circular arc, largely facilitates the processing system of steel pipe sheet
Make.
Brief description of the drawings
Fig. 1 is site operation schematic diagram of the present invention;
Fig. 2 is fixing pipe fragment structure schematic diagram in the present invention;
Fig. 3 is interim section of jurisdiction segment structure schematic diagram in the present invention;
Fig. 4 a are conventional cylindrical section steel pipe sheet structure diagram in the prior art;
Fig. 4 b are cut-out schematic diagram in the prior art;
Figure label:11 conventional cylindrical section steel pipe sheets, 12 cut-outs, 21 main tunnels, 22 service channels, 23 fix section of jurisdiction
Section, 24 interim section of jurisdiction sections.
Embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, in the present embodiment with the service channel combined steel section of jurisdiction at main tunnel connecting position
Structure type is:Combined steel section of jurisdiction, combined steel section of jurisdiction are used for the service channel 22 at main 21 connecting position of tunnel
Refer to every steel pipe sheet being arranged to two parts by the radian split in the main tunnel of respective place circumferential location, a part is position
The fixing pipe fragment 23 in service channel, another part are the interim section of jurisdiction sections 24 for needing to remove;In fixing pipe fragment 23 with facing
When section of jurisdiction section 24 between using straight bolt implement dismounting.
In specific implementation, the seam between fixing pipe fragment 23 in every steel pipe sheet and interim section of jurisdiction section 24 is pressed into two-end-point
Position is arranged to straightway so that by the complete cycle after 23 assembly of fixing pipe fragment in each steel pipe sheet is to connect to being formed with each straightway
Trisection line polygonized structure, using the circular arc in the close main tunnel of the polygon of proximal segment line, using trisection line than circular arc point
From design, can be very big simplified making work section, reduce cost of manufacture, the machining accuracy of conventional steel pipe piece can be met the requirements.
The present invention can be greatly enhanced construction efficiency, reduce site operation amount, improve site operation environment, reduce operation
Risk.
In work progress, it is attached, is made using straight bolt first between fixing pipe fragment 23 and interim section of jurisdiction section 24
Its entirety is rendered as conventional cylindrical section steel pipe sheet, and assembled, tunneling construction is carried out using usual manner for cylindrical section steel pipe sheet
During completion, portal interface implements closure and joint weld by construction requirement, completes entrance construction;Then, hung in tunnel top
Chain block, interim section of jurisdiction section 24 is tensed using chain block, removes the straight bolt in corresponding interim section of jurisdiction section 24, completion group
The dismounting of section of jurisdiction is closed, ensures that service channel section of jurisdiction does not invade shield tunnel gauge.
Claims (3)
1. a kind of service channel combined steel section of jurisdiction with main tunnel connecting position, it is characterized in that:
Combined steel section of jurisdiction is used for the service channel at main tunnel connecting position, the combined steel section of jurisdiction refers to will be every
Piece steel pipe sheet is arranged to two parts by the radian split in the main tunnel of respective place circumferential location, and a part is logical positioned at contact
Fixing pipe fragment (23) in road (22), another part are the interim section of jurisdiction sections (24) for needing to remove;In the fixing pipe fragment
(23) implement to dismount using straight bolt between interim section of jurisdiction section (24).
2. the service channel combined steel section of jurisdiction according to claim 1 with main tunnel connecting position, it is characterized in that:Will
Seam in the every steel pipe sheet between fixing pipe fragment (23) and interim section of jurisdiction section (24) is arranged to straightway so that by each
Complete cycle in steel pipe sheet after the assembly of fixing pipe fragment is connected the polygonized structure to be formed with each straightway.
3. the construction method with the service channel combined steel section of jurisdiction at main tunnel connecting position described in a kind of claim 1,
It is characterized in that:In work progress, first the fixing pipe fragment (23) and interim section of jurisdiction section (24) between using straight bolt into
Row is fixedly connected, and its entirety is rendered as conventional cylindrical section steel pipe sheet, is carried out for cylindrical section steel pipe sheet using usual manner
Assembly, when tunneling construction is completed, portal interface implements closure and joint weld by construction requirement, completes entrance construction;Then, exist
Tunnel top hangs chain block, and interim section of jurisdiction section (24) is tensed using chain block, removes corresponding interim section of jurisdiction section (24)
In straight bolt, complete the dismounting of combination section of jurisdiction, ensure that service channel section of jurisdiction does not invade shield tunnel gauge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810029088.8A CN108005686A (en) | 2018-01-12 | 2018-01-12 | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810029088.8A CN108005686A (en) | 2018-01-12 | 2018-01-12 | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108005686A true CN108005686A (en) | 2018-05-08 |
Family
ID=62050198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810029088.8A Pending CN108005686A (en) | 2018-01-12 | 2018-01-12 | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005686A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184731A (en) * | 2018-08-30 | 2019-01-11 | 上海隧道工程有限公司 | Tube coupling structure and its construction method at combined type push pipe hole |
CN109578015A (en) * | 2018-12-07 | 2019-04-05 | 中铁上海工程局集团有限公司 | The negative endless tube piece overall pulling down method of shield method service channel pin-connected panel |
CN109611107A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | What can quickly be abolished in shield method Freezing Method for Cross-passage Construction originates portal |
CN109653774A (en) * | 2019-01-18 | 2019-04-19 | 中铁上海工程局集团有限公司 | Shield method service channel originates portal steel bushing adapting structure for electric and its installation method |
CN109854273A (en) * | 2019-02-19 | 2019-06-07 | 中铁第一勘察设计院集团有限公司 | The shield duct piece method for dismounting and its equipment of service channel in tunnel |
CN111894605A (en) * | 2020-08-06 | 2020-11-06 | 中铁隆工程集团有限公司 | Structural design method of tunnel contact channel suitable for soft soil stratum |
CN111963211A (en) * | 2020-08-21 | 2020-11-20 | 上海市隧道工程轨道交通设计研究院 | Steel structure for connecting shield tunnel with external channel |
CN112459805A (en) * | 2020-12-30 | 2021-03-09 | 中铁二十五局集团有限公司 | Shield segment dismounting construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201599039U (en) * | 2009-12-23 | 2010-10-06 | 上海市城市建设设计研究院 | Special duct piece for position of tunnel connecting passage |
CN104500094A (en) * | 2014-12-23 | 2015-04-08 | 上海市城市建设设计研究总院 | Lining connecting structure applicable to jacking pipe for implementing connection passage |
CN105927233A (en) * | 2016-05-31 | 2016-09-07 | 中铁第四勘察设计院集团有限公司 | Large-span cross aisle building method applied to segmental lining tunnels |
CN106593487A (en) * | 2017-02-03 | 2017-04-26 | 天津大学 | Detachable steel tube section construction method used for freezing method construction in tunnel contact channel |
CN106948833A (en) * | 2017-04-05 | 2017-07-14 | 宁波大学 | Pin-connected panel service channel structure and its construction method |
CN207686736U (en) * | 2018-01-12 | 2018-08-03 | 中铁上海工程局集团有限公司 | With the service channel combined steel section of jurisdiction at main tunnel connecting position |
-
2018
- 2018-01-12 CN CN201810029088.8A patent/CN108005686A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201599039U (en) * | 2009-12-23 | 2010-10-06 | 上海市城市建设设计研究院 | Special duct piece for position of tunnel connecting passage |
CN104500094A (en) * | 2014-12-23 | 2015-04-08 | 上海市城市建设设计研究总院 | Lining connecting structure applicable to jacking pipe for implementing connection passage |
CN105927233A (en) * | 2016-05-31 | 2016-09-07 | 中铁第四勘察设计院集团有限公司 | Large-span cross aisle building method applied to segmental lining tunnels |
CN106593487A (en) * | 2017-02-03 | 2017-04-26 | 天津大学 | Detachable steel tube section construction method used for freezing method construction in tunnel contact channel |
CN106948833A (en) * | 2017-04-05 | 2017-07-14 | 宁波大学 | Pin-connected panel service channel structure and its construction method |
CN207686736U (en) * | 2018-01-12 | 2018-08-03 | 中铁上海工程局集团有限公司 | With the service channel combined steel section of jurisdiction at main tunnel connecting position |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184731A (en) * | 2018-08-30 | 2019-01-11 | 上海隧道工程有限公司 | Tube coupling structure and its construction method at combined type push pipe hole |
CN109578015A (en) * | 2018-12-07 | 2019-04-05 | 中铁上海工程局集团有限公司 | The negative endless tube piece overall pulling down method of shield method service channel pin-connected panel |
CN109611107A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | What can quickly be abolished in shield method Freezing Method for Cross-passage Construction originates portal |
CN109653774A (en) * | 2019-01-18 | 2019-04-19 | 中铁上海工程局集团有限公司 | Shield method service channel originates portal steel bushing adapting structure for electric and its installation method |
CN109653774B (en) * | 2019-01-18 | 2023-11-21 | 中铁上海工程局集团有限公司 | Shield method connection channel starting portal steel sleeve bearing structure and installation method thereof |
CN109611107B (en) * | 2019-01-18 | 2023-12-12 | 中铁上海工程局集团有限公司 | Originating portal capable of being broken rapidly in shield method connection channel construction |
CN109854273A (en) * | 2019-02-19 | 2019-06-07 | 中铁第一勘察设计院集团有限公司 | The shield duct piece method for dismounting and its equipment of service channel in tunnel |
CN111894605A (en) * | 2020-08-06 | 2020-11-06 | 中铁隆工程集团有限公司 | Structural design method of tunnel contact channel suitable for soft soil stratum |
CN111894605B (en) * | 2020-08-06 | 2022-08-30 | 中铁隆工程集团有限公司 | Structural design method of tunnel contact channel suitable for soft soil stratum |
CN111963211A (en) * | 2020-08-21 | 2020-11-20 | 上海市隧道工程轨道交通设计研究院 | Steel structure for connecting shield tunnel with external channel |
CN112459805A (en) * | 2020-12-30 | 2021-03-09 | 中铁二十五局集团有限公司 | Shield segment dismounting construction method |
CN112459805B (en) * | 2020-12-30 | 2022-05-20 | 中铁二十五局集团有限公司 | Shield segment dismounting construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108005686A (en) | With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method | |
CN100450688C (en) | Thin-wall stainless steel double-layer and carbon steel base layer composite tube girth weld welding method | |
CN102554484A (en) | Metal pipe welding method and metal pipe welding assembly | |
CN103551750B (en) | Welded tube and manufacture method thereof | |
CN101927390A (en) | Method for welding circumferential weld between metal thin-wall clad layer and base layer of clad pipe | |
CN103612001B (en) | A kind of composite bimetal pipe pipe end sealing welding technique for extra based on R shape groove | |
CN105862589A (en) | Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes | |
CN105507908A (en) | Three-arch construction process for connecting tunnel of large cross-section tunnel | |
CN207686736U (en) | With the service channel combined steel section of jurisdiction at main tunnel connecting position | |
CN102699639B (en) | Technique for integrally manufacturing semi-structure of full-face tunneling machine shield | |
CN107552925B (en) | method for processing fuel manifold of aircraft engine with split oil pipes | |
CN109339818A (en) | A kind of compound tunnel segment structure of Mechanical Method service channel portal fringing | |
CN105195637B (en) | Bimetal composite pipe liquid expansion forming feeding device and process | |
CN106001954B (en) | A kind of rail crossbeam manufacture craft partially | |
CN105171261A (en) | Welding method of large steel making converter body | |
CN104722938B (en) | cylinder defect welding repair method | |
CN205776421U (en) | Reinforced sound detecting pipe | |
CN109048180A (en) | The method welded with locating piece | |
CN207110993U (en) | A kind of attachment structure of wellfracturing pipeline | |
CN104594421B (en) | A kind of installation method of cutter suction dredger reamer beam length axis hole twisted branch frame | |
CN211777462U (en) | Light positioning die for assembling pipe pieces | |
CN104368944B (en) | Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method | |
CN207793898U (en) | Steel truss arched bridge closure section temporary locking device | |
CN103252590B (en) | Butt welding method of column of steelmaking workshop | |
CN205660331U (en) | Seamless steel pipe ring flange welding die set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|