CN105862589A - Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes - Google Patents

Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes Download PDF

Info

Publication number
CN105862589A
CN105862589A CN201610106421.1A CN201610106421A CN105862589A CN 105862589 A CN105862589 A CN 105862589A CN 201610106421 A CN201610106421 A CN 201610106421A CN 105862589 A CN105862589 A CN 105862589A
Authority
CN
China
Prior art keywords
unit
line
broken line
plate
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610106421.1A
Other languages
Chinese (zh)
Other versions
CN105862589B (en
Inventor
王建国
冯志敏
曹东威
关勇
陈朝军
郑毅
刘柯
王悦程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanqiao Nantong Co ltd
Original Assignee
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd filed Critical Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority to CN201610106421.1A priority Critical patent/CN105862589B/en
Publication of CN105862589A publication Critical patent/CN105862589A/en
Application granted granted Critical
Publication of CN105862589B publication Critical patent/CN105862589B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention relates to a manufacturing method for a broken-line-shaped double-joint stud welded chord member with anchor boxes. The broken-line-shaped double-joint stud welded chord member with the anchor boxes is manufactured according to the sequence of manufacturing of elements, manufacturing of box bodies, installation and welding of cross beam connector plates, drilling of stud holes, and installation and welding of the anchor boxes. The broken-line-shaped double-joint stud welded chord member with the anchor boxes is applied to the Shanghai-to-Nantong Bridge. Broken-line-shaped double-joint chord members are arranged in the positions, where stay cables are installed, of the Shanghai-to-Nantong Bridge to meet the requirement for setting the pre-camber. In the past, stud welded single-joint chord members are adopted to achieve arch cambering by relying on connection of staggered holes and deformation of the chord members. The double-joint chord members are applied to the Shanghai-to-Nantong Bridge, and break points are arranged at joints, so that the cambering requirement is met more easily.

Description

A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method
Technical field
The present invention relates to bridge field, particularly to a kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method.
Background technology
The research of this bridge is that Shanghai leads to bridge, and in the middle of the manufacture of bridge, this Shanghai leads to bridge part-structure and uses suspension cable, Thus needing to process some band anchor case truss and fix suspension cable, anchor case is arranged on the chord member of truss, common band anchor case Bolt weldering chord member manufacture method all use the bolt to level weldering chord member make, and Shanghai lead to bridge install suspension cable position adopt Be the binodal chord member of fold-line-shaped, this is the demand in order to arrange camber, used in the past bolt weldering form single node Chord member relies on and connects wrong hole and chord member deformation arch camber, and Shanghai leads to bridge and uses binode form chord member, arranges folding at node Point makes it be more easy to the demand reaching to arch upward, and the production method of common chord member cannot meet band anchor case fold-line-shaped binode bolt weldering chord member Making requirement.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method, energy Enough lead to the band anchor case fold-line-shaped binode bolt weldering chord member used on bridge bridge to producing Shanghai.
For solving above-mentioned technical problem, the technical scheme is that
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method, its innovative point is: this band anchor case fold-line-shaped binode Bolt weldering chord member according to unit piece making, casing making, assembly welding beam joint plate, keyhole drill, the order of assembly welding anchor case is carried out, its Specifically comprise the following steps that
S1. unit piece makes and includes that band broken line riser unit makes, upper cover plate unit makes, lower cover unit makes;
S1.1 band broken line riser unit makes: first by the broken line unit needed for band broken line riser, gusset plate unit, connecting plate list Unit uses Numerical control cutting will cut down, then by broken line unit, gusset plate unit and connecting plate unit from raw steel Carry out leveling process, secondly carry out, on broken line unit, gusset plate unit, connecting plate unit, the model as region to be processed of ruling Contain system, the slope needing welding is carried out the PROCESS FOR TREATMENT of machine milling the most again, then by broken line riser unit according to from left to right Broken line unit a, gusset plate unit a, connecting plate unit, gusset plate unit b, broken line unit b edge and groove are docked and weld Get up, then is detected a flaw in welding position, it is to avoid weld defective, subsequently the band broken line riser unit welded is rectified Flat process, carries out machine miller sequence to top margin and groove according to drawn line, the most again finally along on band broken line riser unit Bearing of trend assembly welding floor a, then the floor a to assembly welding repairs the making being achieved that band broken line riser unit;
S1.2 upper cover plate unit makes: first used from raw steel by upper cover plate unit under the method cutting of accurate cutting Come, then the upper cover plate unit cut down is carried out leveling process, secondly rule as work area to be added on upper cover plate unit The scope control in territory, carries out machine milling process to the groove and slope needing welding according to drawn line, then by floor b along upper cover Bearing of trend on Slab element welds, and finally the floor b welded is repairing the system being achieved that upper cover plate unit Make;
The making of S1.3 lower cover unit: first lower cover unit is used from raw steel under the method cutting of accurate cutting Come, then the lower cover unit cut down is carried out leveling process, secondly the both sides and groove needing welding are carried out machine Milling, welds floor c along the bearing of trend of lower cover unit the most again, finally repairs the floor c of welding just Achieve the making of lower cover unit;
S2. the making of casing: the making of casing uses fetalism inversion to assemble, and first upper cover plate unit is placed on fetalism platform On, on the basis of the longitudinal rib keyhole of the above cover plate unit of bearing of trend of the floor b installed along upper cover plate unit and longitudinal axis Line carries out the assembling of dividing plate, and the riser unit of band broken line is arranged on the both sides of upper cover plate unit, and the riser list of band broken line Floor a in unit is embedded in groove one trench structure of interior formation that the both sides of dividing plate are opened, then is welded by this trench structure and repair Whole, finally lower cover unit cover and is welded on the breach of cell body, form body structure;
S3. assembly welding beam joint plate: beam joint plate includes cantilever diaphragm adapter plate, crossbeam edge of a wing adapter plate, first by crossbeam Web plate joint plate is the most assembled, by the centre of cantilever diaphragm adapter plate along the bearing of trend of floor a on band broken line riser unit Position is welded on floor a, and its one end is welded on adapter plate upper surface, the crossbeam edge of a wing, and the other end is welded on the rib of upper cover plate unit On plate b;
S4. keyhole drills: drilling of keyhole uses double gantry Three-dimensional numerical control driller, utilizes the precise linkage at double gantry the most once Property completes the keyhole at chord member two ends and drills, and two band broken line riser unit can be avoided longitudinally, laterally to misplace, it is ensured that two band broken line risers The concentricity of unit keyhole, each unit head of double gantry numerical control drilling machine all uses high speed drill and can be with accurate linkage, thus effectively Ensure relative positional accuracy and the drilling efficiency of variant Kong Qun, after rod member utilizes the numerical control drilling machine boring of double gantry, it is no longer necessary to Large-scale cover type connects brill model, significantly simplifies the bore process of integrated node member;
S5. assembly welding anchor case: on the basis of above, lower cover unit and riser unit keyhole, mark vertical at upper cover plate cell surface To axis and node center line, inside anchor slab, then mark anchor case system line assembly welding anchor tie plate, the most again bond pads anchor case Part, controls the position of anchor case anchor point, anchor plate and anchor tube angle, the welding quality of anchor case melt-through weld, and anchor case assembly welding completes After, line flame cuts upper cover plate unit and bridge floor butt joint edge and butting grooves thereof, it is ensured that the width of upper cover plate unit, and line flame cuts joint The web member joint of some Slab element and butting grooves thereof.
Further, described gusset plate cell width is relatively big, entirety journey cut blanking again after first completing steel plate splicing and detecting a flaw To ensure gusset plate unit profile, filling position notes avoiding rod member principal weld position.
Further, precise scoring lines after blanking leveling, including oblique montant axis, put more energy into string center line of the bar, horizontal center line And butt end machining line.
Further, the outer all kinds of adapter plates of case can complete assembly welding before casing is holed, thus thoroughly avoids welding point During plate on casing linearity and keyhole the most lateral opening away from impact.
Further, the when of casing welding in the making of casing, four main weld balanced weldings on platform Connect, prevent torsional deformation.
It is an advantage of the current invention that: this band anchor case fold-line-shaped binode bolt weldering chord member is applied to Shanghai and leads to bridge, and Shanghai leads to bridge Using the binodal chord member of fold-line-shaped in the position installing suspension cable, this is the demand in order to arrange camber, adopts in the past Be that bolt weldering form single node chord member relies on and connects wrong hole and chord member deformation arch camber, Shanghai leads to bridge and uses binode form Chord member, arranges break at node and makes it be more easy to the demand reaching to arch upward, and reduces original employing linear type single node and arranges pre- The difficulty of camber, the band anchor case fold-line-shaped binode bolt weldering chord member of the present invention compared with the technology that existing bridge arranges camber Manufacture method complies fully with design requirement, uses the manufacture method of the present invention, can more easily arrange the camber of bridge, it is possible to Reduction of erection time.
Accompanying drawing explanation
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 band anchor case fold-line-shaped binode bolt weldering chord member integral installation figure.
Fig. 2 band anchor case broken line binode bolt weldering chord member entirety master regards view.
The manufacture schematic flow diagram of Fig. 3 riser unit.
Fig. 4 riser cellular construction figure.
The manufacture schematic flow diagram of Fig. 5 upper cover plate unit.
The manufacture schematic flow diagram of Fig. 6 lower cover unit.
Fig. 7 diaphragm structure figure.
The schematic diagram that Fig. 8 casing makes.
Fig. 9 keyhole drills flow chart.
Figure 10 is groove type and the dimensional drawings such as anchor case bearing plate and anchor tie plate penetration angle welding.
Figure 11 is anchor case weld seam welding variables figure.
As shown in Figures 1 to 9: 1, riser unit;11, broken line unit;12, gusset plate unit;13, connecting plate unit;14、 Floor a;2, upper cover plate unit;21, floor b;3, lower cover unit;31, floor c;4, casing;41, dividing plate;5, beam joint Plate;51, cantilever diaphragm adapter plate;52, crossbeam edge of a wing adapter plate;6, anchor case.
Detailed description of the invention
The following examples can make professional and technical personnel that the present invention is more fully understood, but the most therefore by this Bright it is limited among described scope of embodiments.
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method as shown in Figures 1 to 9, this band anchor case fold-line-shaped Binode bolt weldering chord member according to unit piece make, casing 4 makes, assembly welding beam joint plate 5, keyhole drill, assembly welding anchor case 6 suitable Sequence is carried out, and it specifically comprises the following steps that
S1. unit piece makes and includes that band broken line riser unit 1 makes, upper cover plate unit 2 makes, lower cover unit 3 makes;
S1.1 band broken line riser unit 1 makes: first by the broken line unit 11 needed for band broken line riser, gusset plate unit 12, company Fishplate bar unit 13 uses Numerical control cutting to cut down from raw steel, then by broken line unit 11, gusset plate unit 12 with And connecting plate unit 13 carries out leveling process, secondly carry out drawing on broken line unit 11, gusset plate unit 12, connecting plate unit 13 Line, as the scope control in region to be processed, carries out the PROCESS FOR TREATMENT of machine milling the most again to the slope needing welding, then by broken line Riser unit 1 according to from left to right by broken line unit 11a, gusset plate unit 12a, connecting plate unit 13, gusset plate unit 12b, Broken line unit 11b edge and groove dock and weld, then detect a flaw welding position, it is to avoid weld defective, subsequently The band broken line riser unit 1 welded is carried out leveling process, the most again top margin and groove is carried out machine according to drawn line Miller sequence, finally along the bearing of trend assembly welding floor 14a on band broken line riser unit 1, then enters the floor 14a of assembly welding Row finishing is achieved that the making of band broken line riser unit 1.
S1.2 upper cover plate unit 2 makes: first upper cover plate unit 2 uses from raw steel the method for accurate cutting cut Cutting off, then the upper cover plate unit 2 cut down is carried out leveling process, secondly on upper cover plate unit 2, line conduct is treated The scope control of machining area, carries out machine milling process to the groove and slope needing welding according to drawn line, then by floor 21b Weld along the bearing of trend on upper cover plate unit 2, finally the floor 21b of welding is being carried out finishing is achieved that upper cover The making of Slab element 2.
The making of S1.3 lower cover unit 3: the method that first lower cover unit 3 is used from raw steel accurate cutting Cut down, then the lower cover unit 3 cut down is carried out leveling process, secondly to both sides and the groove needing welding Carry out machine milling, the most again floor 31c is welded along the bearing of trend of lower cover unit 3, finally the floor 31c to welding Carry out repairing the making being achieved that lower cover unit 31.
S2. the making of casing 4: the making of casing 4 uses fetalism inversion to assemble, and first upper cover plate unit 2 is placed on tire On type platform, the longitudinal rib keyhole of the above cover plate unit of bearing of trend 2 of the floor 21b installed along upper cover plate unit 2 and longitudinal direction On the basis of axis, line carries out the assembling of dividing plate 41, and the riser unit 1 of band broken line is arranged on the both sides of upper cover plate unit 2, and It is embedded in groove one trench structure of interior formation that the both sides of dividing plate 41 are opened with the floor 14a on the riser unit 1 of broken line, then will The welding of this trench structure and finishing, finally cover on the breach of cell body by lower cover unit 3 and weld, and forms casing knot Structure.
S3. assembly welding beam joint plate 5: beam joint plate 5 includes cantilever diaphragm adapter plate 51, crossbeam edge of a wing adapter plate 52, First cantilever diaphragm adapter plate 51 is the most assembled, by crossbeam abdomen along the bearing of trend of floor 14a on band broken line riser unit 1 The centre position of plate adapter plate 51 is welded on floor 14a, and its one end is welded on adapter plate 52 upper surface, the crossbeam edge of a wing, the other end It is welded on the floor 21b of upper cover plate unit 2.
S4. keyhole drills: drilling of keyhole uses double gantry Three-dimensional numerical control driller, utilizes the precise linkage at double gantry simultaneously The keyhole disposably completing chord member two ends drills, and two band broken line riser unit 1 can be avoided longitudinally, laterally to misplace, it is ensured that two band foldings The concentricity of line riser unit keyhole, each unit head of double gantry numerical control drilling machine all use high speed drill and can with accurate linkage, from And relative positional accuracy and the drilling efficiency of variant Kong Qun is effectively ensured, after rod member utilizes the numerical control drilling machine boring of double gantry, no Need large-scale cover type to connect brill model again, significantly simplify the bore process of integrated node member.
S5. assembly welding anchor case 6: on the basis of above, lower cover unit and riser unit 1 keyhole, on upper cover plate unit 2 surface Mark longitudinal axis and node center line, inside anchor slab, then mark anchor case system line assembly welding anchor tie plate, assembly welding the most again Connect anchor case part, control the position of anchor case anchor point, anchor plate and anchor tube angle, the welding quality of anchor case melt-through weld, anchor case group After being soldered into, line flame cuts upper cover plate unit and bridge floor butt joint edge and butting grooves thereof, it is ensured that the width of upper cover plate Slab element 2, Line flame cuts web member joint and the butting grooves thereof of gusset plate unit 12.
Gusset plate unit 12 width is relatively big, after first completing steel plate splicing and detecting a flaw again entirety journey cut blanking to ensure gusset plate Unit profile, filling position notes avoiding rod member principal weld position.
Precise scoring lines after blanking leveling, including oblique montant axis, string center line of the bar of putting more energy into, horizontal center line and docking terminal Processing line.
The outer all kinds of adapter plates of casing 4 can complete assembly welding before casing is holed, thus when thoroughly avoiding welding point plate pair Casing 4 linearity and keyhole the most lateral opening away from impact.
The when of welding casing in the making of casing 4, four main welds are symmetrically welded on platform, prevent from turning round Bent deformation.
As shown in Figure 10, groove type and the size such as anchor case bearing plate and anchor tie plate penetration angle welding.Unit: mm is due to anchor Case position weld groove is deep, and loading is relatively big, should use little heat input, and coordinate flame to repair, to reduce welding during welding Deformation, it is ensured that the position of anchor case and angle accurate.
As shown in figure 11, in anchor case weld seam welding variables figure:
1.WH70Q welding wire uses rich argon shield weldering, and other welding wire uses CO2 gas shield;
The most first welding backside angle weld seam, then from groove side back chipping, is careful not to leak clearly, welds, groove after polishing is clean After weldering is full, cover plate side is even is not less than 8mm leg along welding.
Skilled person will appreciate that of the industry, the present invention is not restricted to the described embodiments, in above-described embodiment and description The principle that the present invention is simply described described, without departing from the spirit and scope of the present invention, the present invention also has various Changes and improvements, these changes and improvements both fall within scope of the claimed invention.Claimed scope is by institute Attached claims and equivalent thereof define.

Claims (5)

1. a band anchor case fold-line-shaped binode bolt weldering chord member manufacture method, it is characterised in that: this band anchor case fold-line-shaped binode Bolt weldering chord member according to unit piece making, casing making, assembly welding beam joint plate, keyhole drill, the order of assembly welding anchor case is carried out, its Specifically comprise the following steps that
S1. unit piece makes and includes that band broken line riser unit makes, upper cover plate unit makes, lower cover unit makes;
S1.1 band broken line riser unit makes: first by the broken line unit needed for band broken line riser, gusset plate unit, connecting plate list Unit uses Numerical control cutting will cut down, then by broken line unit, gusset plate unit and connecting plate unit from raw steel Carry out leveling process, secondly carry out, on broken line unit, gusset plate unit, connecting plate unit, the model as region to be processed of ruling Contain system, the slope needing welding is carried out the PROCESS FOR TREATMENT of machine milling the most again, then by broken line riser unit according to from left to right Broken line unit a, gusset plate unit a, connecting plate unit, gusset plate unit b, broken line unit b edge and groove are docked and weld Get up, then is detected a flaw in welding position, it is to avoid weld defective, subsequently the band broken line riser unit welded is rectified Flat process, carries out machine miller sequence to top margin and groove according to drawn line, the most again finally along on band broken line riser unit Bearing of trend assembly welding floor a, then the floor a to assembly welding repairs the making being achieved that band broken line riser unit;
S1.2 upper cover plate unit makes: first used from raw steel by upper cover plate unit under the method cutting of accurate cutting Come, then the upper cover plate unit cut down is carried out leveling process, secondly rule as work area to be added on upper cover plate unit The scope control in territory, carries out machine milling process to the groove and slope needing welding according to drawn line, then by floor b along upper cover Bearing of trend on Slab element welds, and finally the floor b welded is repairing the system being achieved that upper cover plate unit Make;
The making of S1.3 lower cover unit: first lower cover unit is used from raw steel under the method cutting of accurate cutting Come, then the lower cover unit cut down is carried out leveling process, secondly the both sides and groove needing welding are carried out machine Milling, welds floor c along the bearing of trend of lower cover unit the most again, finally repairs the floor c of welding just Achieve the making of lower cover unit;
S2. the making of casing: the making of casing uses fetalism inversion to assemble, and first upper cover plate unit is placed on fetalism platform On, on the basis of the longitudinal rib keyhole of the above cover plate unit of bearing of trend of the floor b installed along upper cover plate unit and longitudinal axis Line carries out the assembling of dividing plate, and the riser unit of band broken line is arranged on the both sides of upper cover plate unit, and the riser list of band broken line Floor a in unit is embedded in groove one trench structure of interior formation that the both sides of dividing plate are opened, then is welded by this trench structure and repair Whole, finally lower cover unit cover and is welded on the breach of cell body, form body structure;
S3. assembly welding beam joint plate: beam joint plate includes cantilever diaphragm adapter plate, crossbeam edge of a wing adapter plate, first by crossbeam Web plate joint plate is the most assembled, by the centre of cantilever diaphragm adapter plate along the bearing of trend of floor a on band broken line riser unit Position is welded on floor a, and its one end is welded on adapter plate upper surface, the crossbeam edge of a wing, and the other end is welded on the rib of upper cover plate unit On plate b;
S4. keyhole drills: drilling of keyhole uses double gantry Three-dimensional numerical control driller, utilizes the precise linkage at double gantry the most once Property completes the keyhole at chord member two ends and drills, and two band broken line riser unit can be avoided longitudinally, laterally to misplace, it is ensured that two band broken line risers The concentricity of unit keyhole, each unit head of double gantry numerical control drilling machine all uses high speed drill and can be with accurate linkage, thus effectively Ensure relative positional accuracy and the drilling efficiency of variant Kong Qun, after rod member utilizes the numerical control drilling machine boring of double gantry, it is no longer necessary to Large-scale cover type connects brill model, significantly simplifies the bore process of integrated node member;
S5. assembly welding anchor case: on the basis of above, lower cover unit and riser unit keyhole, mark vertical at upper cover plate cell surface To axis and node center line, inside anchor slab, then mark anchor case system line assembly welding anchor tie plate, the most again bond pads anchor case Part, controls the position of anchor case anchor point, anchor plate and anchor tube angle, the welding quality of anchor case melt-through weld, and anchor case assembly welding completes After, line flame cuts upper cover plate unit and bridge floor butt joint edge and butting grooves thereof, it is ensured that the width of upper upper cover plate unit, and line flame is cut The web member joint of gusset plate unit and butting grooves thereof.
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method the most according to claim 1, it is characterised in that: institute State gusset plate cell width relatively big, outside overall journey cut blanking is with guarantee gusset plate unit again after first completing steel plate splicing and detecting a flaw Shape, filling position notes avoiding rod member principal weld position.
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method the most according to claim 1, it is characterised in that under: Precise scoring lines after material leveling, machines line including oblique montant axis, string center line of the bar of putting more energy into, horizontal center line and butt end.
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method the most according to claim 1, it is characterised in that: case Outer all kinds of adapter plate can complete assembly welding before casing is holed, thus to casing linearity and bolt when thoroughly avoiding welding point plate Hole the most lateral opening away from impact.
A kind of band anchor case fold-line-shaped binode bolt weldering chord member manufacture method the most according to claim 1, it is characterised in that: The when of in the making of casing welding casing, four main welds are symmetrically welded on platform, prevent torsional deformation.
CN201610106421.1A 2016-02-26 2016-02-26 A kind of band anchor case fold-line-shaped binode bolt weldering chord member preparation method Active CN105862589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610106421.1A CN105862589B (en) 2016-02-26 2016-02-26 A kind of band anchor case fold-line-shaped binode bolt weldering chord member preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610106421.1A CN105862589B (en) 2016-02-26 2016-02-26 A kind of band anchor case fold-line-shaped binode bolt weldering chord member preparation method

Publications (2)

Publication Number Publication Date
CN105862589A true CN105862589A (en) 2016-08-17
CN105862589B CN105862589B (en) 2017-08-25

Family

ID=56625464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610106421.1A Active CN105862589B (en) 2016-02-26 2016-02-26 A kind of band anchor case fold-line-shaped binode bolt weldering chord member preparation method

Country Status (1)

Country Link
CN (1) CN105862589B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253026A (en) * 2017-06-23 2017-10-17 江苏中铁山桥重工有限公司 A kind of multidirectional four anchor heads overall steel anchor beam preparation method
CN108797361A (en) * 2018-06-28 2018-11-13 中铁山桥集团有限公司 A kind of stock method of steel truss girder bridge gusset plate
CN109024217A (en) * 2018-07-17 2018-12-18 中铁大桥勘测设计院集团有限公司 The connection structure and welding method of web member and chord member
CN109208454A (en) * 2018-10-19 2019-01-15 江苏京沪重工有限公司 Joining section structure between a kind of Steel Bridge top plate
CN109972492A (en) * 2019-04-26 2019-07-05 江苏京沪重工有限公司 A kind of bridge floor segmentation module and joining section module assembled system
CN111119051A (en) * 2019-12-24 2020-05-08 江苏中铁山桥重工有限公司 Novel penetrating type chord structure
CN112605620A (en) * 2020-12-31 2021-04-06 江苏京沪重工有限公司 Method for machining upper chord of Hualun-shaped truss with vertical rods
CN114211150A (en) * 2021-12-30 2022-03-22 武船重型工程股份有限公司 Node welding method for double-layer truss bridge
CN114434105A (en) * 2022-01-28 2022-05-06 中铁宝桥(扬州)有限公司 Method for manufacturing hyperbolic chord member of bridge bolted steel truss girder
CN115351447A (en) * 2022-09-15 2022-11-18 中国五冶集团有限公司 Welding forming method for cable tower steel anchor box

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2178037C1 (en) * 2001-03-21 2002-01-10 Закрытое акционерное общество "Интертрансстрой" Span (alternatives)
KR100965750B1 (en) * 2009-05-29 2010-06-24 안경수 Joint unit structure of pipe truss for temporary assembly and method constructing the truss bridge with it
CN201924271U (en) * 2010-12-30 2011-08-10 上海市城市建设设计研究院 Fully-welded integral node
CN102704395A (en) * 2012-06-01 2012-10-03 中铁大桥勘测设计院集团有限公司 Internal inhaul cable and steel anchor box anchoring structure
CN102966033A (en) * 2012-12-12 2013-03-13 中铁山桥集团有限公司 Multi-joint chord member of all-welded railway continuous steel truss girder, and manufacturing method of multi-joint chord member
CN103397593A (en) * 2013-08-12 2013-11-20 中铁大桥勘测设计院集团有限公司 Web member intersecting and split joint connector structure in positions of steel truss girder bridge nodes
CN203603022U (en) * 2013-11-25 2014-05-21 中铁第四勘察设计院集团有限公司 Butt joint type joint of railway steel truss girder
CN104878699A (en) * 2015-06-18 2015-09-02 上海振华重工(集团)股份有限公司 Pitching type truss bridge manufacturing method
CN204644873U (en) * 2015-01-23 2015-09-16 中铁四局集团钢结构有限公司 A kind of novel box type rod piece assembly jig

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2178037C1 (en) * 2001-03-21 2002-01-10 Закрытое акционерное общество "Интертрансстрой" Span (alternatives)
KR100965750B1 (en) * 2009-05-29 2010-06-24 안경수 Joint unit structure of pipe truss for temporary assembly and method constructing the truss bridge with it
CN201924271U (en) * 2010-12-30 2011-08-10 上海市城市建设设计研究院 Fully-welded integral node
CN102704395A (en) * 2012-06-01 2012-10-03 中铁大桥勘测设计院集团有限公司 Internal inhaul cable and steel anchor box anchoring structure
CN102966033A (en) * 2012-12-12 2013-03-13 中铁山桥集团有限公司 Multi-joint chord member of all-welded railway continuous steel truss girder, and manufacturing method of multi-joint chord member
CN103397593A (en) * 2013-08-12 2013-11-20 中铁大桥勘测设计院集团有限公司 Web member intersecting and split joint connector structure in positions of steel truss girder bridge nodes
CN203603022U (en) * 2013-11-25 2014-05-21 中铁第四勘察设计院集团有限公司 Butt joint type joint of railway steel truss girder
CN204644873U (en) * 2015-01-23 2015-09-16 中铁四局集团钢结构有限公司 A kind of novel box type rod piece assembly jig
CN104878699A (en) * 2015-06-18 2015-09-02 上海振华重工(集团)股份有限公司 Pitching type truss bridge manufacturing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘洋: "重庆新白沙沱长江特大桥主桁钢梁制作方法", 《钢结构》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253026B (en) * 2017-06-23 2019-03-19 江苏中铁山桥重工有限公司 A kind of multidirectional four anchor heads overall steel anchor beam production method
CN107253026A (en) * 2017-06-23 2017-10-17 江苏中铁山桥重工有限公司 A kind of multidirectional four anchor heads overall steel anchor beam preparation method
CN108797361A (en) * 2018-06-28 2018-11-13 中铁山桥集团有限公司 A kind of stock method of steel truss girder bridge gusset plate
CN109024217A (en) * 2018-07-17 2018-12-18 中铁大桥勘测设计院集团有限公司 The connection structure and welding method of web member and chord member
CN109208454B (en) * 2018-10-19 2023-12-22 江苏京沪重工有限公司 Inlaid segmented structure between steel bridge roof
CN109208454A (en) * 2018-10-19 2019-01-15 江苏京沪重工有限公司 Joining section structure between a kind of Steel Bridge top plate
CN109972492A (en) * 2019-04-26 2019-07-05 江苏京沪重工有限公司 A kind of bridge floor segmentation module and joining section module assembled system
CN111119051A (en) * 2019-12-24 2020-05-08 江苏中铁山桥重工有限公司 Novel penetrating type chord structure
CN112605620A (en) * 2020-12-31 2021-04-06 江苏京沪重工有限公司 Method for machining upper chord of Hualun-shaped truss with vertical rods
CN114211150A (en) * 2021-12-30 2022-03-22 武船重型工程股份有限公司 Node welding method for double-layer truss bridge
CN114211150B (en) * 2021-12-30 2023-06-27 武船重型工程股份有限公司 Node welding method for double-layer truss bridge
CN114434105A (en) * 2022-01-28 2022-05-06 中铁宝桥(扬州)有限公司 Method for manufacturing hyperbolic chord member of bridge bolted steel truss girder
CN114434105B (en) * 2022-01-28 2023-08-22 中铁宝桥(扬州)有限公司 Manufacturing method of bridge bolt welded steel truss girder hyperbolic chord member
CN115351447A (en) * 2022-09-15 2022-11-18 中国五冶集团有限公司 Welding forming method for cable tower steel anchor box
CN115351447B (en) * 2022-09-15 2024-01-23 中国五冶集团有限公司 Welding forming method for cable tower steel anchor box

Also Published As

Publication number Publication date
CN105862589B (en) 2017-08-25

Similar Documents

Publication Publication Date Title
CN105862589A (en) Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes
CN102277825B (en) Steel truss bridge and method for fabricating same
CN108049302B (en) A kind of manufacturing method of full welding steel case and full bolt truss combined bridge lower edge steel box-girder
CN107498269B (en) A kind of large-scale ship reception chamber manufacturing method suitable for dry type ship compartment room
CN106884498A (en) A kind of special-shaped box column and its processing technology
CN107199437B (en) A kind of steel anchor beam segment preparation method
CN105421586B (en) A kind of profile steel concrete column at urban rail transit elevated station and preparation method thereof
CN108103938B (en) A kind of double deck module solid trial assembly method of large steel girder
CN105735129A (en) Full-welding truss section modularized splicing method
CN105081595A (en) Fillet weld welding structure for K-type grooves of moderately-thick plate without back chipping and welding technology of fillet weld welding structure
CN102839747A (en) Construction method for steel structure truss of super high-rise special structure
CN105171354B (en) A kind of pipe turns box column and its processing method
CN104695624A (en) Large-cross-section box column and processing technology thereof
CN105290724B (en) A kind of bridge lower boom manufacture craft
CN101186003A (en) Firstly hole drilling construction method in girder steel hole-drilling
CN104110069B (en) Box-type section X-type cross node, jig frame special, fixture and processing method thereof
CN103711066B (en) Novel steel box girder top plate unit structure and preparation method
CN202099719U (en) Steel truss bridge
JP2018053626A (en) Welding method of building steel pipe column
CN106760195A (en) A kind of preparation method of large span, the wide-angle tower hat huge post of connection
CN103418994A (en) Method for equal-strength butt joint of steel tubes
CN103495793A (en) Improved construction method for hoisting and welding large-tonnage cast steel component complex joints
CN212793489U (en) Composite cushion block for butt joint of U-shaped rib embedding sections
CN102936963A (en) GRC (Glass-fiber Reinforced Cement) member mounting method and mounting structure thereof
CN101812856B (en) Production process of steel pile structure of cutter suction dredger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee after: China Railway Shanqiao (Nantong) Co.,Ltd.

Address before: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee before: JIANGSU CHINA RAILWAY SHANHAIGUAN BRIDGE HEAVY INDUSTRY Co.,Ltd.