CN104368944B - Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method - Google Patents

Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method Download PDF

Info

Publication number
CN104368944B
CN104368944B CN201410596296.8A CN201410596296A CN104368944B CN 104368944 B CN104368944 B CN 104368944B CN 201410596296 A CN201410596296 A CN 201410596296A CN 104368944 B CN104368944 B CN 104368944B
Authority
CN
China
Prior art keywords
fastening
plate
repaired mouth
aeration zone
thermal insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410596296.8A
Other languages
Chinese (zh)
Other versions
CN104368944A (en
Inventor
张居山
赖贞澄
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201410596296.8A priority Critical patent/CN104368944B/en
Publication of CN104368944A publication Critical patent/CN104368944A/en
Application granted granted Critical
Publication of CN104368944B publication Critical patent/CN104368944B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/02Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

The present invention relates to a kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture.Prefabricated direct-buried thermal insulation pipe pipeline joint field joint construction at present, the intact time limit of the repaired mouth of the welding quality in underground is permanent without collateral security, along with the variation of the earth's crust is following it also occur that rupture in welding position or de-molten problem.A kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, its composition includes: fastening plate (1), described fastening plate becomes C-shaped banding, described fastening plate C-shaped banding opening stretches out one group of fastening riser (5), there is on described fastening riser fastening bolt holes (6), having one group of fastening support plate (3) between described fastening riser and fastening plate, described fastening plate inwall has one group of clamping tooth (4), described clamping tooth is connected with round aeration zone (2).The present invention is applied to prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture.

Description

Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method
Technical field:
The present invention relates to a kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method.
Background technology:
Prefabricated direct-buried thermal insulation pipe pipeline joint field joint construction at present, the state-of-the-art method used is to accomplish the outer seamless welding of pillar of repaired mouth plate and pipeline, ensure that soil moisture has no way of penetrating into heat-insulation layer, thus improve insulation, energy-conservation, the resultant effect of reduction of discharging, but the intact time limit of quality that the repaired mouth of welding is in underground is permanent without collateral security, along with the variation of the earth's crust is following it also occur that the fracture of welding position or de-molten problem, maintenance, maintenance costs is caused to occur increasing the design object effect making the effects of energy saving and emission reduction of pipeline can not reach pipeline future.
Summary of the invention:
It is an object of the invention to provide a kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method.
Above-mentioned purpose is realized by following technical scheme:
A kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, its composition includes: fastening plate, described fastening plate becomes C-shaped banding, the C-shaped banding opening of described fastening plate stretches out one group of fastening riser, on described fastening riser, there is fastening bolt holes, having one group of fastening support plate between described fastening riser and fastening plate, described fastening plate inwall has one group of clamping tooth, described clamping tooth is connected with round aeration zone.
Described prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, described round aeration zone is synthesized with rubber by high pressure fibrous material, described round aeration zone is in a tubular form, described fastening plate is synthesized metal manufacture by rustless steel, described fastening plate width is 5-15cm, thickness is 1-3mm, and described clamping dental length is 1-5cm.
The clamping method of described prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, when carrying out prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high pressure clamping, round aeration zone, inside can gassy, and the pressure of 5 kilograms can be born;When field joint construction, after repaired mouth plate is in being wrapped in the outer pillar of insulating tube closely, the aeration zone of round is centered around repaired mouth plate both sides, making round aeration zone is circle shape, then insufflation gas in aeration zone, reach tympanites shape, after being fixed on the posetionof weld of repaired mouth plate, the fastening plate of C-shaped banding is wrapped in outside round aeration zone, make clamping tooth consolidate and block round aeration zone, after the bolt clamping in the fastening bolt holes on fastening riser, inflate to aeration zone, and pressure reaches 0.1-0.5mpa in making aeration zone, after stable gas pressure, carry out repaired mouth plate welding work.
Beneficial effects of the present invention:
1. the present invention is compared with the fastening of current cassette tape, is by the equilibrium of air pressure, stablizes feature, enhances the degree of depth compactness of repaired mouth plate and outer pillar repaired mouth welding.
It is first-class that fixture quality is strengthened in the fastening of round aeration zone of the present invention, metal, and quickly, rapid feature is shifted in carrying, belongs to the replacement instrument of repaired mouth welding construction in operation.
The repaired mouth of the present invention is installed, the outer pillar of repaired mouth plate and insulating tube is made firmly to be combined completely, welding deeper, more abundant, repaired mouth plate and outer pillar is made to become more close integral pipe, thus during the earth's crust in 30 years slowly changes, do not have de-molten, the uneven fracture caused of fusing point and gap, it is ensured that heat-insulation layer penetrates into without moisture, keep consistent identical, stable insulation, energy-conservation, the effect of reduction of discharging with insulating tube, save huge maintenance cost.
Accompanying drawing illustrates:
Accompanying drawing 1 is the structural representation of the present invention.
Accompanying drawing 2 is the left view of the present invention.
Detailed description of the invention:
Embodiment 1:
A kind of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, its composition includes: fastening plate 1, described fastening plate becomes C-shaped banding, the C-shaped banding opening of described fastening plate stretches out one group of fastening riser 5, on described fastening riser, there is fastening bolt holes 6, having one group of fastening support plate 3 between described fastening riser and fastening plate, described fastening plate inwall has one group of clamping tooth 4, described clamping tooth is connected with round aeration zone 2.
Embodiment 2:
According to the prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture described in embodiment 1, described round aeration zone is synthesized with rubber by high pressure fibrous material, described round aeration zone is in a tubular form, described fastening plate is synthesized metal manufacture by rustless steel, described fastening plate width is 5-15cm, thickness is 1-3mm, and described clamping dental length is 1-5cm.
Embodiment 3:
Clamping method according to the prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture described in embodiment 1 or 2, when carrying out prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high pressure clamping, round aeration zone, inside can gassy, and the pressure of 5 kilograms can be born;When field joint construction, after repaired mouth plate is in being wrapped in the outer pillar of insulating tube closely, the aeration zone of round is centered around repaired mouth plate both sides, making round aeration zone is circle shape, then insufflation gas in aeration zone, reach tympanites shape, after being fixed on the posetionof weld of repaired mouth plate, the fastening plate of C-shaped banding is wrapped in outside round aeration zone, make clamping tooth consolidate and block round aeration zone, after the bolt clamping in the fastening bolt holes on fastening riser, inflate to aeration zone, and pressure reaches 0.1-0.5mpa in making aeration zone, after stable gas pressure, carry out repaired mouth plate welding work.

Claims (1)

1.A kind of clamping method of prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture, described fixture includes: fastening plate, described fastening plate becomes C-shaped banding, the C-shaped banding opening of described fastening plate stretches out one group of fastening riser, on described fastening riser, there is fastening bolt holes, having one group of fastening support plate between described fastening riser and fastening plate, described fastening plate inwall has one group of clamping tooth, described clamping tooth is connected with round aeration zone;Described round aeration zone is synthesized with rubber by high pressure fibrous material, described round aeration zone is in a tubular form, described fastening plate is synthesized metal manufacture by rustless steel, and described fastening plate width is 5-15cm, thickness is 1-3mm, and described clamping dental length is 1-5cm;It is characterized in that: when carrying out prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high pressure clamping, round aeration zone, inside can gassy, and the pressure of 5 kilograms can be born;When field joint construction, after repaired mouth plate is in being wrapped in the outer pillar of insulating tube closely, the aeration zone of round is centered around repaired mouth plate both sides, making round aeration zone is circle shape, then insufflation gas in aeration zone, reach tympanites shape, after being fixed on the posetionof weld of repaired mouth plate, the fastening plate of C-shaped banding is wrapped in outside round aeration zone, make clamping tooth consolidate and block round aeration zone, after the bolt clamping in the fastening bolt holes on fastening riser, inflate to aeration zone, and pressure reaches 0.1-0.5mpa in making aeration zone, after stable gas pressure, carry out repaired mouth plate welding work.
CN201410596296.8A 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method Expired - Fee Related CN104368944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410596296.8A CN104368944B (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410596296.8A CN104368944B (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method

Publications (2)

Publication Number Publication Date
CN104368944A CN104368944A (en) 2015-02-25
CN104368944B true CN104368944B (en) 2016-08-03

Family

ID=52548275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410596296.8A Expired - Fee Related CN104368944B (en) 2014-10-31 2014-10-31 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method

Country Status (1)

Country Link
CN (1) CN104368944B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107695605A (en) * 2017-09-01 2018-02-16 巢湖鹏远金属焊管有限公司 A kind of effective stationary fixture of metal welding
KR102567998B1 (en) * 2023-05-04 2023-08-16 이호 Pipe reinforcement cap for seat belt

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5323950A (en) * 1993-07-29 1994-06-28 General Dynamics Corporation, Space Systems Flexible, adjustable welding backup mandrel
CN2934844Y (en) * 2006-06-22 2007-08-15 游瑾庭 Improved structure of high pressure pipe clamp
CN102679517A (en) * 2011-03-16 2012-09-19 乐金电子(天津)电器有限公司 Fixing clamp
CN202656375U (en) * 2012-05-30 2013-01-09 北京豪特耐管道设备有限公司 External embedded type splicing foaming clamp for prefabricated direct embedded heat-insulating pipe
CN204171617U (en) * 2014-10-31 2015-02-25 哈尔滨朗格斯特节能科技有限公司 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009072795A (en) * 2007-09-18 2009-04-09 Sanki Eng Co Ltd Welding tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5323950A (en) * 1993-07-29 1994-06-28 General Dynamics Corporation, Space Systems Flexible, adjustable welding backup mandrel
CN2934844Y (en) * 2006-06-22 2007-08-15 游瑾庭 Improved structure of high pressure pipe clamp
CN102679517A (en) * 2011-03-16 2012-09-19 乐金电子(天津)电器有限公司 Fixing clamp
CN202656375U (en) * 2012-05-30 2013-01-09 北京豪特耐管道设备有限公司 External embedded type splicing foaming clamp for prefabricated direct embedded heat-insulating pipe
CN204171617U (en) * 2014-10-31 2015-02-25 哈尔滨朗格斯特节能科技有限公司 Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture

Also Published As

Publication number Publication date
CN104368944A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN107091093B (en) The device and method of Shield-bored tunnels has been deformed based on marmem reparation
WO2014173060A1 (en) Assembly welding method for stainless steel weldment and pad
CN104368944B (en) Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture and clamping method
WO2018161469A1 (en) Coal bulk permeability enhancing method using heat injection performed by combining microwaves and hot air
CN105252120B (en) A kind of stainless steel cylinder liner circular-seam welding method
CN104533433A (en) Starting method of small-radius curve tunnel
CN203978444U (en) Tunnel lining ruggedized construction
CN109707415A (en) A kind of joint construction method and its joint structure of Shield-bored tunnels and station
CN205026301U (en) Prestressing force steel cylinder concrete pipe repairs structure
CN109372521A (en) New pipe-roof method construction technology and construction pipe suspension device
WO2013155703A1 (en) Articulated joint type middle-high pressure pipeline connecting piece
CN102601552A (en) Heater for butt-welding steel tubes
CN204171617U (en) Prefabricated direct-buried thermal insulation pipe road system repaired mouth plate fusion welding high-voltage fixture
CN102927378A (en) Vacuum vertical burying heating pipe
CN204040043U (en) Adjustable support supporting movable end
CN108856971A (en) Penstock combines steel sleeve single side butt weld technologies for steel
CN106541252A (en) Subway ventilation engineering cold-rolled steel sheet wind pipe construction method
CN204175533U (en) A kind of tower door of wind-driven generator set hole and tower barrel of wind generating set
CN206329345U (en) A kind of Shield-bored tunnels service channel structure
CN204459597U (en) For the hydraulic press sealing head mechanism of composite bimetal pipe
CN105485432B (en) A kind of high-temperature pipe fixed support and high-temperature pipe fixing means
CN103008899B (en) Non-ferrous metal pipe circular-seam welding method and protective gas sealing device
CN205669654U (en) Interior anticorrosion pipeline joint connecting structure
CN204785307U (en) Anticorrosive plastic tubing pipeline of inside lining
CN204715427U (en) A kind of inclinometer pipe spreading casing protection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20211031