CN207793898U - Steel truss arched bridge closure section temporary locking device - Google Patents
Steel truss arched bridge closure section temporary locking device Download PDFInfo
- Publication number
- CN207793898U CN207793898U CN201820109005.1U CN201820109005U CN207793898U CN 207793898 U CN207793898 U CN 207793898U CN 201820109005 U CN201820109005 U CN 201820109005U CN 207793898 U CN207793898 U CN 207793898U
- Authority
- CN
- China
- Prior art keywords
- case
- temporary locking
- utility
- steel plate
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 39
- 239000010959 steel Substances 0.000 title claims abstract description 39
- 239000000203 mixture Substances 0.000 claims description 5
- 230000000694 effects Effects 0.000 abstract description 3
- 238000003466 welding Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000003351 stiffener Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of steel truss arched bridge closure section temporary locking device, locked outside adjusting yoke and case by matching bracket in case, in case steel plate group at;Matching bracket is welded using steel plate in its raising middle flask, and 3 matching brackets are arranged in single chord member altogether;Adjusting yoke uses the high-strength pull rods of Φ 80mm in case, and respectively installs a nut in segment bracket both sides, to realize pull rod stress needs(Pulling force and pressure);The outer locking steel plate of case is formed using 30mm casees adding rib and 20mm connecting plates, and case adding rib and connecting plate are attached by 16 Φ 28mm high-strength bolts.After this patent is by above-mentioned improvement and implementing, have the following advantages that:(1)The utility model solves the problems, such as that position adjusts and is fixed temporarily when steel truss arched bridge closure;(2)The utility model execute-in-place is convenient, and the installment work of whole temporary locking devices can be completed in 1 hour;(3)The utility model is good by implementing temporary locking effect.
Description
Technical field
It is especially that a kind of steel truss arched bridge closure section is locked temporarily the utility model is related to a kind of closure section temporary locking device
Determine device.
Background technology
When steel truss arched bridge joins the two sections of a bridge, etc at present, usually welds horse plate or shaped steel carries out temporary locking, technique is asked there are following
Topic;
First, fusion length is longer, limited by steel truss space, overhead welding operation difficulty is big, and subregion can not apply
Weldering, weldquality are not easy to ensure;
Second, the welding procedure time is long, and it is affected by environment big, easily miss best closure opportunity;
Easily agent structure is caused to damage third, weld seam is welded and cut off, the processing such as later stage polishing, application trouble.
Utility model content
Therefore, in order to solve above-mentioned deficiency, the utility model provides a kind of steel truss arched bridge closure section temporary locking dress herein
It sets;Solve the problems, such as that position adjusts and is fixed temporarily when steel truss arched bridge closure.
The utility model is realized in this way constructing a kind of steel truss arched bridge closure section temporary locking device, it is characterised in that:
Temporary locking device locked outside adjusting yoke and case by matching bracket in case, in case steel plate group at;Matching bracket is adopted in its raising middle flask
It is welded with steel plate;Adjusting yoke uses high-strength pull rod in case, and respectively installs a nut in segment bracket both sides;Steel is locked outside case
Plate is formed using case adding rib and connecting plate, and case adding rib and connecting plate are attached by high-strength bolt.
According to steel truss arched bridge closure section temporary locking device described in the utility model, it is characterised in that:Matching in its raising middle flask
Bracket is welded using steel plate, and 3 matching brackets are arranged in single chord member altogether;Adjusting yoke uses the high-strength pull rods of Φ 80mm in case;
The outer locking steel plate of case is formed using 30mm casees adding rib and 20mm connecting plates, and case adding rib and connecting plate pass through 16 Φ
28mm high-strength bolts are attached.
The utility model has the following advantages that:The utility model provides a kind of steel truss arched bridge closure section and faces herein by improving
When locking device, locked outside adjusting yoke and case by matching bracket in case, in case steel plate group at;Matching bracket uses in its raising middle flask
Steel plate welds, and matching bracket is arranged in single chord member altogether;Adjusting yoke uses the high-strength pull rods of Φ 80mm in case, and in segment ox
A nut is respectively installed in leg both sides, to realize pull rod stress needs(Pulling force and pressure);The outer locking steel plate of case is using outside 30mm casees
Ribbed stiffener and 20mm connecting plates composition, case adding rib and connecting plate are attached by 16 Φ 28mm high-strength bolts.This is specially
After profit is by above-mentioned improvement and implementing, have the following advantages that:(1)Position is adjusted when the utility model solves steel truss arched bridge closure
And the problem of being fixed temporarily;(2)The utility model execute-in-place is convenient, and whole temporary locking devices can be completed in 1 hour
Installment work;(3)The utility model is good by implementing temporary locking effect.
Description of the drawings
Fig. 1-Fig. 2 is the implementation schematic diagram of the utility model steel truss arched bridge closure section temporary locking device;
Fig. 3 is schematic diagram at A in the utility model Fig. 2.
Specific implementation mode
The utility model is described in detail below in conjunction with attached drawing 1- Fig. 3, to the skill in the utility model embodiment
Art scheme is clearly and completely described, it is clear that and the described embodiments are only a part of the embodiments of the utility model, and
The embodiment being not all of.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness
The every other embodiment obtained under the premise of labour, shall fall within the protection scope of the present invention.
The utility model provides a kind of steel truss arched bridge closure section temporary locking device herein by improving, such as Fig. 1-Fig. 3 institutes
Show, can be practiced as follows;Temporary locking device is by matching bracket 1, adjusting yoke 2 and case external lock in case in case
Determine the composition of steel plate 3;Matching bracket 1 is welded using steel plate in its raising middle flask, and 3 matching brackets are arranged in single chord member altogether;It is adjusted in case
It saves pull rod 2 and uses the high-strength pull rods of Φ 80mm, and one nut 4 is respectively installed in segment bracket both sides, to realize pull rod stress needs
(Pulling force and pressure);The outer locking steel plate 3 of case is formed using 30mm casees adding rib 5 and 20mm connecting plates 6, case adding rib and company
Fishplate bar is attached by 16 Φ 28mm high-strength bolts.
Implementing operating procedure is:
(1)Arch rib erection segment before the installation of segment, will should match bracket in advance and be welded on the upper and lower chord member of arch rib in case;
(2)Arch rib line style is observed, related data is collected and arrange, is matched according to monitoring instruction and cuts closure section;
(3)Closure section is lifted using cable crane, first successive step closure section position, Φ 80mm adjusting yokes in installs case, and
One nut is respectively installed in bracket both sides.According to measurement data and monitoring instruction, by case adjusting yoke adjust closure section to
Design position.
(4)After fragment position of joining the two sections of a bridge, etc is adjusted in place, the outer locking steel plate of site welding case, and installation bolt completes closure section in time
Temporary locking.
(5)Closing construction is completed at the appointed time, removes temporary locking device.
After this patent is by above-mentioned improvement and implementing, have the following advantages that:
(1)The utility model solves the problems, such as that position adjusts and is fixed temporarily when steel truss arched bridge closure;
(2)The utility model execute-in-place is convenient, and the installment work of whole temporary locking devices can be completed in 1 hour;
(3)The utility model is good by implementing temporary locking effect.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or use this practicality new
Type.Various modifications to these embodiments will be apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest range consistent with features of novelty.
Claims (2)
1. a kind of steel truss arched bridge closure section temporary locking device, it is characterised in that:Temporary locking device in case by matching bracket
(1), adjusting yoke in case(2)With locking steel plate outside case(3)Composition;Bracket is matched in its raising middle flask(1)It is welded using steel plate;In case
Adjusting yoke(2)One nut is respectively installed using high-strength pull rod, and in segment bracket both sides(4);The outer locking steel plate of case(3)Using
Case adding rib(5)And connecting plate(6)Composition, case adding rib(5)And connecting plate(6)It is attached by high-strength bolt.
2. steel truss arched bridge closure section temporary locking device according to claim 1, it is characterised in that:Bracket is matched in its raising middle flask
(1)It is welded using steel plate, 3 matching brackets is set altogether in single chord member;Adjusting yoke in case(2)It is haled using Φ 80mm high
Bar;The outer locking steel plate of case(3)Using 30mm case adding ribs(5)With 20mm connecting plates(6)Composition, case adding rib and connecting plate
It is attached by 16 Φ 28mm high-strength bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820109005.1U CN207793898U (en) | 2018-01-23 | 2018-01-23 | Steel truss arched bridge closure section temporary locking device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820109005.1U CN207793898U (en) | 2018-01-23 | 2018-01-23 | Steel truss arched bridge closure section temporary locking device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207793898U true CN207793898U (en) | 2018-08-31 |
Family
ID=63270001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820109005.1U Expired - Fee Related CN207793898U (en) | 2018-01-23 | 2018-01-23 | Steel truss arched bridge closure section temporary locking device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207793898U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184943A (en) * | 2019-07-02 | 2019-08-30 | 中铁七局集团有限公司 | A kind of continuous beam on many supports pre-stress concrete bridge closure construction method |
-
2018
- 2018-01-23 CN CN201820109005.1U patent/CN207793898U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184943A (en) * | 2019-07-02 | 2019-08-30 | 中铁七局集团有限公司 | A kind of continuous beam on many supports pre-stress concrete bridge closure construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847123B (en) | Connect the building method of steel corridor | |
CN108240069A (en) | A kind of large span multi-section combined truss roof structure system and its construction method | |
CN103334374B (en) | PCSS shearing coupling arrangement | |
CN207793898U (en) | Steel truss arched bridge closure section temporary locking device | |
CN104179256A (en) | Rectangular concrete filled steel tube column and steel beam single-side bolt connecting joint and construction method thereof | |
CN108978499A (en) | A kind of oblique pull suspension cable co-operative system bridge erection method | |
CN105088971B (en) | Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge | |
CN103206075A (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN206360709U (en) | For end head formwork installation auxiliary device in Tunnel Second Lining Construction | |
CN206769195U (en) | Tension rib exempts from the shaped steel crossed and Steel Reinforced Concrete Beams | |
CN202899640U (en) | Collar flitch reinforced steel pipe joint | |
CN209488052U (en) | An a kind of transmission line of electricity leap point block device | |
CN204644878U (en) | A kind of transom pier steel truss girder lifting construction device | |
CN208917655U (en) | A kind of Railway Prestressed Concrete continuous bridge of precast segment pin-connected panel | |
CN105951574A (en) | Steel beam segment, continuous combined beam bridge and construction method of continuous combined beam bridge | |
CN109555021A (en) | It is a kind of without pre-buried, movable continuous beam 0# block bracket | |
CN109057331A (en) | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint | |
CN205295915U (en) | Wave form steel web nose girder | |
CN211447729U (en) | Super high-rise overhanging protection device | |
CN208363349U (en) | A kind of L-type node assembling steel plate concrete shear force wall | |
CN101701498A (en) | Construction method of spanning steel tube of the existing railway route to sheath protection shed | |
CN110017156A (en) | Steel pipe chip architecture and its construction method suitable for class rectangle shield tunnel | |
CN208502223U (en) | A kind of engineering construction different-diameter steel pipe dedicated fastener connected vertically | |
CN207331961U (en) | A kind of bolt connection node for single-layer lattice shell | |
CN107653785B (en) | High structural strength bailey truss section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180831 |