CN109057331A - A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint - Google Patents
A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint Download PDFInfo
- Publication number
- CN109057331A CN109057331A CN201810882933.6A CN201810882933A CN109057331A CN 109057331 A CN109057331 A CN 109057331A CN 201810882933 A CN201810882933 A CN 201810882933A CN 109057331 A CN109057331 A CN 109057331A
- Authority
- CN
- China
- Prior art keywords
- construction
- interim
- constructional column
- column
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/342—Structures covering a large free area, whether open-sided or not, e.g. hangars, halls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, include the following steps: 1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is configured by formal structure column and lintel or wall waist rail reinforcing bar and is calculated by bearing capacity, and three takes large values;2. being laid with one layer of separation layer in temporarily construction column bottom;3. carrying out the examination of interim constructional column reinforcing bar, progress formwork erection and template to check and accept and pour together with the frame beam plate of upper layer;4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for the constructional column that secondary structure wall utilizes will not remove, and wall lacing wire bar planting is carried out when formally building.Construction cost of the present invention is low and can carry out the utilization again of secondary structure.
Description
Technical field
The invention belongs to building engineering fields, are a kind of full construction parties for disconnecting Long-span Cantilever system support at construction joint
Method.
Background technique
In building field, for traditional substantially quantifier mesh, typically subregion piecemeal is constructed, and each subregion re-forms
Respective flowing water section.Using this usage mode first is that the reason of designing itself, mainly from the angle of structure sediment the considerations of, two
It is unit in charge of construction's self reason, from the aspect of the investment for reducing turnover material tool, saves cost.Sometimes and construction field
The reason of ground itself, construction site is narrow, can not large area development construction.
But found after the summary of traditional construction joint can be generated by this construction method, traditional construction seam is divided into complete
It disconnects and part disconnects, complete disconnect refers to that reinforcing bar at construction joint, template, concrete all disconnect, and part, which disconnects, refers to concrete broken
It opens, reinforcing bar is disconnected or continuous, and template does not turn off.At present for disconnect full type construction joint mainly use steel pipe scaffold or steel column into
Row support, construction cost is high and can not carry out the utilization again of secondary structure.
Summary of the invention
The object of the invention is that overcome above-mentioned the deficiencies in the prior art, and provide a kind of construction cost it is low and
It can carry out the construction method that Long-span Cantilever system supports at the full disconnection construction joint of secondary structure utilized again.
As above design, the technical scheme is that a kind of complete disconnect applying for Long-span Cantilever system support at construction joint
Work method, characterized by the following steps:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is by just
Formula constructional column and lintel or wall waist rail reinforcing bar are configured and are calculated by bearing capacity, and three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carry out the examination of interim constructional column reinforcing bar, carry out formwork erection and template check and accept and with upper layer frame beam plate one
It rises and pours;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary
The constructional column that structure wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
The separation layer uses one layer of malthoid or Polypropylene.
The present invention has the advantage that and good effect: 1, the present invention changes conventionally employed steel pipe scaffold or steel column
Support, has saved construction cost.2, the present invention carries out interim structure according to the size of secondary structure thickness of wall body, lintel and waist rail
It makes the design of column cross-section size and arrangement of reinforcement and carries out the accounting of interim construction columns bearing capacity, and in the arrangement side of interim constructional column
Face, takes into account the position of secondary structure wall, and these two aspects ensure that the utilization again of secondary structure.3, for the construction of dismounting
Column is cut using toothless saw, is used as later period wall waist rail and lintel.Can secondary use, and can save and be constructed into
This.Calculated thus much one just cost-saved 1,200,000 yuan.
Detailed description of the invention
Fig. 1 is the arrangement schematic diagram of interim constructional column;
Fig. 2 is the A direction view of Fig. 1;
Fig. 3 is the schematic diagram of interim constructional column;
Fig. 4 is the side view of Fig. 3.
In figure: the interim constructional column of 1-;2- Vierendeel girder;3- frame column;4- shear wall;5- separation layer.
Specific embodiment
It is as shown in Figs 1-4: a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, including walk as follows
It is rapid:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is by just
Formula constructional column and lintel or wall waist rail reinforcing bar are configured and are calculated by bearing capacity, and three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carry out the examination of interim constructional column reinforcing bar, carry out formwork erection and template check and accept and with upper layer frame beam plate one
It rises and pours;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary
The constructional column that structure wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
5. carrying out concentration stacking for removing pillar, the later period uses as doorway lintel or wall waist rail.
The separation layer uses one layer of malthoid or Polypropylene.The interim constructional column position, which is arranged, will take into account secondary knot
The position of structure wall.
The above embodiment is used for illustrative purposes only, rather than limitation of the present invention, the technology in relation to technical field
Personnel can also make various transformation or variation without departing from the spirit and scope of the present invention.Therefore, all etc.
Same technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (2)
1. a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, characterized by the following steps:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement presses formal structure
It makes column and lintel or wall waist rail reinforcing bar is configured and calculated by bearing capacity, three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carrying out the examination of interim constructional column reinforcing bar, progress formwork erection and template to check and accept and pour together with the frame beam plate of upper layer
It builds;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary structure
The constructional column that wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
2. a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint according to claim 1, special
Sign is: the separation layer uses one layer of malthoid or Polypropylene.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810882933.6A CN109057331A (en) | 2018-08-06 | 2018-08-06 | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810882933.6A CN109057331A (en) | 2018-08-06 | 2018-08-06 | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109057331A true CN109057331A (en) | 2018-12-21 |
Family
ID=64833056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810882933.6A Pending CN109057331A (en) | 2018-08-06 | 2018-08-06 | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109057331A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110344612A (en) * | 2019-07-26 | 2019-10-18 | 中国五冶集团有限公司 | A kind of coke oven booth constructing structure and construction method |
CN110388096A (en) * | 2019-07-26 | 2019-10-29 | 中国五冶集团有限公司 | A kind of structure and construction method flexibly constructed about coke oven booth |
CN116254999A (en) * | 2023-03-21 | 2023-06-13 | 中国江西国际经济技术合作有限公司 | Construction method for temporary support of large-span post-pouring belt of shallow foundation multi-layer frame structure |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201495772U (en) * | 2009-03-13 | 2010-06-02 | 南通建筑工程总承包有限公司 | Post-poured band formwork supporting device |
CN101871262A (en) * | 2010-06-25 | 2010-10-27 | 中天建设集团有限公司天津分公司 | Method for constructing beam plate supporting system having post-cast strip |
CN105350719A (en) * | 2015-09-28 | 2016-02-24 | 黄坤坤 | Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method |
-
2018
- 2018-08-06 CN CN201810882933.6A patent/CN109057331A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201495772U (en) * | 2009-03-13 | 2010-06-02 | 南通建筑工程总承包有限公司 | Post-poured band formwork supporting device |
CN101871262A (en) * | 2010-06-25 | 2010-10-27 | 中天建设集团有限公司天津分公司 | Method for constructing beam plate supporting system having post-cast strip |
CN105350719A (en) * | 2015-09-28 | 2016-02-24 | 黄坤坤 | Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110344612A (en) * | 2019-07-26 | 2019-10-18 | 中国五冶集团有限公司 | A kind of coke oven booth constructing structure and construction method |
CN110388096A (en) * | 2019-07-26 | 2019-10-29 | 中国五冶集团有限公司 | A kind of structure and construction method flexibly constructed about coke oven booth |
CN116254999A (en) * | 2023-03-21 | 2023-06-13 | 中国江西国际经济技术合作有限公司 | Construction method for temporary support of large-span post-pouring belt of shallow foundation multi-layer frame structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760619B (en) | A kind of building translation apparatus and its construction method | |
CN105256713B (en) | Semi-assembly type steel concrete composite beam and construction method thereof | |
CN204551483U (en) | A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication | |
CN109057331A (en) | A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint | |
CN105134009B (en) | Sill coping concrete structure of frame structure infilled wall and construction method | |
CN101768916A (en) | Lower flange improved corrugated steel web plate composite box girder and construction method thereof | |
CN102926504A (en) | Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof | |
CN208486404U (en) | A kind of concrete shear force wall of steel bar template integrative installation technology | |
CN108678417A (en) | A kind of floor of steel structure transformation node | |
CN207111108U (en) | A kind of rapid-maintenance structure damaged for Tunnel Second Lining | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN105040810B (en) | Suitable for the connecting node of frame supported shear wall structure reverse construction | |
CN203835403U (en) | Clearance strengthening system for serious cracking of existing tunnel lining arch | |
CN205259072U (en) | Hollow mound of railway formwork support system that binds | |
CN110219232B (en) | Concrete pouring method for deck type arch bridge | |
CN204298836U (en) | A kind of pile film cofferdam skeleton structure | |
CN103741857B (en) | U-shaped girder steel and steel bar truss floor support plate floor system | |
CN207630230U (en) | Precast beam combined steel structure mortar leakage prevention pedestal | |
CN105937248B (en) | Agent structure section construction and temporary plugging wall joint processing method | |
CN215052265U (en) | Reinforced concrete thin wall body reinforced structure | |
CN214459542U (en) | Rib plate wet joint structure of back-loading cantilever arm of spine beam bridge without detaching template | |
CN204676560U (en) | The support changing structure for use of foundation ditch mid-board | |
CN208792806U (en) | A kind of floor of steel structure transformation node | |
CN208168087U (en) | A kind of dismountable floor plates system | |
CN205399827U (en) | Concrete column, roof beam, board handing -over department are with prefabricated unit -installment reinforced frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |