CN109057331A - A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint - Google Patents

A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint Download PDF

Info

Publication number
CN109057331A
CN109057331A CN201810882933.6A CN201810882933A CN109057331A CN 109057331 A CN109057331 A CN 109057331A CN 201810882933 A CN201810882933 A CN 201810882933A CN 109057331 A CN109057331 A CN 109057331A
Authority
CN
China
Prior art keywords
construction
interim
constructional column
column
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810882933.6A
Other languages
Chinese (zh)
Inventor
耿为为
张天文
周叙伦
邹运
李跃杰
孔令斌
王宪平
张泽辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201810882933.6A priority Critical patent/CN109057331A/en
Publication of CN109057331A publication Critical patent/CN109057331A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/342Structures covering a large free area, whether open-sided or not, e.g. hangars, halls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, include the following steps: 1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is configured by formal structure column and lintel or wall waist rail reinforcing bar and is calculated by bearing capacity, and three takes large values;2. being laid with one layer of separation layer in temporarily construction column bottom;3. carrying out the examination of interim constructional column reinforcing bar, progress formwork erection and template to check and accept and pour together with the frame beam plate of upper layer;4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for the constructional column that secondary structure wall utilizes will not remove, and wall lacing wire bar planting is carried out when formally building.Construction cost of the present invention is low and can carry out the utilization again of secondary structure.

Description

A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
Technical field
The invention belongs to building engineering fields, are a kind of full construction parties for disconnecting Long-span Cantilever system support at construction joint Method.
Background technique
In building field, for traditional substantially quantifier mesh, typically subregion piecemeal is constructed, and each subregion re-forms Respective flowing water section.Using this usage mode first is that the reason of designing itself, mainly from the angle of structure sediment the considerations of, two It is unit in charge of construction's self reason, from the aspect of the investment for reducing turnover material tool, saves cost.Sometimes and construction field The reason of ground itself, construction site is narrow, can not large area development construction.
But found after the summary of traditional construction joint can be generated by this construction method, traditional construction seam is divided into complete It disconnects and part disconnects, complete disconnect refers to that reinforcing bar at construction joint, template, concrete all disconnect, and part, which disconnects, refers to concrete broken It opens, reinforcing bar is disconnected or continuous, and template does not turn off.At present for disconnect full type construction joint mainly use steel pipe scaffold or steel column into Row support, construction cost is high and can not carry out the utilization again of secondary structure.
Summary of the invention
The object of the invention is that overcome above-mentioned the deficiencies in the prior art, and provide a kind of construction cost it is low and It can carry out the construction method that Long-span Cantilever system supports at the full disconnection construction joint of secondary structure utilized again.
As above design, the technical scheme is that a kind of complete disconnect applying for Long-span Cantilever system support at construction joint Work method, characterized by the following steps:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is by just Formula constructional column and lintel or wall waist rail reinforcing bar are configured and are calculated by bearing capacity, and three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carry out the examination of interim constructional column reinforcing bar, carry out formwork erection and template check and accept and with upper layer frame beam plate one It rises and pours;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary The constructional column that structure wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
The separation layer uses one layer of malthoid or Polypropylene.
The present invention has the advantage that and good effect: 1, the present invention changes conventionally employed steel pipe scaffold or steel column Support, has saved construction cost.2, the present invention carries out interim structure according to the size of secondary structure thickness of wall body, lintel and waist rail It makes the design of column cross-section size and arrangement of reinforcement and carries out the accounting of interim construction columns bearing capacity, and in the arrangement side of interim constructional column Face, takes into account the position of secondary structure wall, and these two aspects ensure that the utilization again of secondary structure.3, for the construction of dismounting Column is cut using toothless saw, is used as later period wall waist rail and lintel.Can secondary use, and can save and be constructed into This.Calculated thus much one just cost-saved 1,200,000 yuan.
Detailed description of the invention
Fig. 1 is the arrangement schematic diagram of interim constructional column;
Fig. 2 is the A direction view of Fig. 1;
Fig. 3 is the schematic diagram of interim constructional column;
Fig. 4 is the side view of Fig. 3.
In figure: the interim constructional column of 1-;2- Vierendeel girder;3- frame column;4- shear wall;5- separation layer.
Specific embodiment
It is as shown in Figs 1-4: a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, including walk as follows It is rapid:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement is by just Formula constructional column and lintel or wall waist rail reinforcing bar are configured and are calculated by bearing capacity, and three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carry out the examination of interim constructional column reinforcing bar, carry out formwork erection and template check and accept and with upper layer frame beam plate one It rises and pours;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary The constructional column that structure wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
5. carrying out concentration stacking for removing pillar, the later period uses as doorway lintel or wall waist rail.
The separation layer uses one layer of malthoid or Polypropylene.The interim constructional column position, which is arranged, will take into account secondary knot The position of structure wall.
The above embodiment is used for illustrative purposes only, rather than limitation of the present invention, the technology in relation to technical field Personnel can also make various transformation or variation without departing from the spirit and scope of the present invention.Therefore, all etc. Same technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (2)

1. a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint, characterized by the following steps:
1. along construction joint be arranged interim constructional column and with its integrally formed frame beam plate;Interim constructional column arrangement of reinforcement presses formal structure It makes column and lintel or wall waist rail reinforcing bar is configured and calculated by bearing capacity, three takes large values;
2. being laid with one layer of separation layer in temporarily construction column bottom;
3. carrying out the examination of interim constructional column reinforcing bar, progress formwork erection and template to check and accept and pour together with the frame beam plate of upper layer It builds;
4. being connect with the construction of opposite subregion, interim constructional column is removed after reaching design strength, can be used for secondary structure The constructional column that wall utilizes will not be removed, and wall lacing wire bar planting is carried out when formally building.
2. a kind of full construction method for disconnecting Long-span Cantilever system support at construction joint according to claim 1, special Sign is: the separation layer uses one layer of malthoid or Polypropylene.
CN201810882933.6A 2018-08-06 2018-08-06 A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint Pending CN109057331A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810882933.6A CN109057331A (en) 2018-08-06 2018-08-06 A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810882933.6A CN109057331A (en) 2018-08-06 2018-08-06 A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint

Publications (1)

Publication Number Publication Date
CN109057331A true CN109057331A (en) 2018-12-21

Family

ID=64833056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810882933.6A Pending CN109057331A (en) 2018-08-06 2018-08-06 A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint

Country Status (1)

Country Link
CN (1) CN109057331A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344612A (en) * 2019-07-26 2019-10-18 中国五冶集团有限公司 A kind of coke oven booth constructing structure and construction method
CN110388096A (en) * 2019-07-26 2019-10-29 中国五冶集团有限公司 A kind of structure and construction method flexibly constructed about coke oven booth
CN116254999A (en) * 2023-03-21 2023-06-13 中国江西国际经济技术合作有限公司 Construction method for temporary support of large-span post-pouring belt of shallow foundation multi-layer frame structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201495772U (en) * 2009-03-13 2010-06-02 南通建筑工程总承包有限公司 Post-poured band formwork supporting device
CN101871262A (en) * 2010-06-25 2010-10-27 中天建设集团有限公司天津分公司 Method for constructing beam plate supporting system having post-cast strip
CN105350719A (en) * 2015-09-28 2016-02-24 黄坤坤 Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201495772U (en) * 2009-03-13 2010-06-02 南通建筑工程总承包有限公司 Post-poured band formwork supporting device
CN101871262A (en) * 2010-06-25 2010-10-27 中天建设集团有限公司天津分公司 Method for constructing beam plate supporting system having post-cast strip
CN105350719A (en) * 2015-09-28 2016-02-24 黄坤坤 Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344612A (en) * 2019-07-26 2019-10-18 中国五冶集团有限公司 A kind of coke oven booth constructing structure and construction method
CN110388096A (en) * 2019-07-26 2019-10-29 中国五冶集团有限公司 A kind of structure and construction method flexibly constructed about coke oven booth
CN116254999A (en) * 2023-03-21 2023-06-13 中国江西国际经济技术合作有限公司 Construction method for temporary support of large-span post-pouring belt of shallow foundation multi-layer frame structure

Similar Documents

Publication Publication Date Title
CN106760619B (en) A kind of building translation apparatus and its construction method
CN105256713B (en) Semi-assembly type steel concrete composite beam and construction method thereof
CN204551483U (en) A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN109057331A (en) A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
CN105134009B (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN208486404U (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN108678417A (en) A kind of floor of steel structure transformation node
CN207111108U (en) A kind of rapid-maintenance structure damaged for Tunnel Second Lining
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN205259072U (en) Hollow mound of railway formwork support system that binds
CN110219232B (en) Concrete pouring method for deck type arch bridge
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN103741857B (en) U-shaped girder steel and steel bar truss floor support plate floor system
CN207630230U (en) Precast beam combined steel structure mortar leakage prevention pedestal
CN105937248B (en) Agent structure section construction and temporary plugging wall joint processing method
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN214459542U (en) Rib plate wet joint structure of back-loading cantilever arm of spine beam bridge without detaching template
CN204676560U (en) The support changing structure for use of foundation ditch mid-board
CN208792806U (en) A kind of floor of steel structure transformation node
CN208168087U (en) A kind of dismountable floor plates system
CN205399827U (en) Concrete column, roof beam, board handing -over department are with prefabricated unit -installment reinforced frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221