CN206468361U - Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel - Google Patents

Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel Download PDF

Info

Publication number
CN206468361U
CN206468361U CN201720106157.1U CN201720106157U CN206468361U CN 206468361 U CN206468361 U CN 206468361U CN 201720106157 U CN201720106157 U CN 201720106157U CN 206468361 U CN206468361 U CN 206468361U
Authority
CN
China
Prior art keywords
section
jurisdiction
construction
steel pipeline
detachable steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720106157.1U
Other languages
Chinese (zh)
Inventor
张稳军
喻国伦
张高乐
焦亚磊
杨鹏博
张云旆
张新新
宋晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201720106157.1U priority Critical patent/CN206468361U/en
Application granted granted Critical
Publication of CN206468361U publication Critical patent/CN206468361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model is related to a kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part 3, non-disconnectable part 1 and free section 2, it is characterized in that, free section 2 is disposed with tunnel connection channel, non-disconnectable part 1 is disposed with the periphery of free section 2, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, so as to constitute complete detachable steel pipeline section;Non-disconnectable part 1 therein sets gradually three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction from outside to inside.

Description

Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
Technical field
The utility model is related to the steel-tube construction at tunnel connection channel construction.
Background technology
Metro Connection Passage is normally at the centre position of running tunnel, at this often provided with catchmenting, drainage pumping plant, play The effects such as two tunnels are connected, catchmented, draining and fire prevention, there is the title of " passway for escaping ".Metro Connected Passage-way Construction is general in tunnel Carried out again after the completion of agent structure, first make the peripheral freezing soil of service channel with freezing mostly in Practical Project, form intensity Then height, the good Frozen Soil Cylinder of closure carries out the excavation construction of service channel, Freezing stratum as rapid and excavation using Mining Method Construction is carried out in running tunnel.
The freezing consolidation soil body has nearly semicentennial engineering experience in China, mainly has the advantage that:Have compared with High security, can effectively completely cut off underground water;Any loose Rock And Soil containing certain water is applicable, in complex hydrologic geology Under the conditions of freezing technology it is effective, feasible;Construction is flexible, can artificially control freezing body shape and spreading range, if necessary Underground obstacle can be bypassed to be freezed, the consolidation by freezing soil body is uniform, complete.
The external force that different processes can cause to act on the section of jurisdiction closed on during construction freezing method is distributed different degrees of Change, cause uncertain segment deformation, influence the safety of tunnel structure.Therefore, it is necessary to be directed to service channel freezing process The corresponding structure of detail design, influence of the Freezing Method for Cross-passage Construction to tunnel agent structure is reduced with this, reduces construction risk.
Utility model content
The utility model for weaken in Freezing Method for Cross-passage Construction construction freezing method to the adverse effect of tunnel agent structure there is provided A kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel.
The technical scheme that the utility model is used is:
A kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part 3rd, non-disconnectable part 1 and free section 2, it is characterised in that free section 2 is disposed with tunnel connection channel, in removable portion 2 peripheries are divided to be disposed with non-disconnectable part 1, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, so that Constitute complete detachable steel pipeline section;Non-disconnectable part 1 therein sets gradually outer layer sheet metal, flexible transition base from outside to inside With three layers of internal layer steel construction section of jurisdiction.
Preferably, described flexible transition base is that the mesh for penetrating rubber spacer is distributed with rubber spacer, rubber spacer. Mesh sectional area is less than the 20% of rubber spacer correspondence sectional area.
Freezing hole, relief hole and thermometer hole are equipped with non-disconnectable part 1 and free section 2, in freezing hole and pressure release Check valve is fixed with hole.
Special pipeline section is applied to construction freezing method at the utility model tunnel connection channel, is improved by above-mentioned technical proposal The durability of section of jurisdiction, adverse effect of the soil body to tunnel structure is freezed in tunnel periphery when reducing construction freezing method, improve The security of structure.Non-disconnectable part is by cleverly setting flexible transition base to form Frozen Soil Cylinder when reducing construction freezing method The stress concentration effect caused to section of jurisdiction, improves the security and durability of structure.
Design of the present utility model is described further with concrete structure below with reference to accompanying drawing, to throw a flood of light on this reality With new feature.
Brief description of the drawings
Fig. 1 the utility model structure and tunnel other structures relation schematic diagram;
Fig. 2 technical solutions of the utility model detail drawings;
Mplifying structure schematic diagram at A in Fig. 3 Fig. 1;
Fig. 4 one-way valve structures sectional views;
Reference:
1st, in the utility model as tunnel permanent structure steel pipe sheet part (referred to as " non-disconnectable part 1 ");2nd, originally Quick-detachable steel pipe sheet part in utility model (referred to as " free section 2 ");3rd, ordinary crossing section of jurisdiction part;4th, get in touch with Channel design;1-1, outer layer sheet metal;1-2, flexible transition base;1-3, internal layer steel construction section of jurisdiction;2-1, reserved relief hole;It is B, pre- Stay freezing hole;B-1, steel ball;B-2, rubber gasket;B-3, orifice tube reserved opening.
Embodiment
The utility model is further elaborated below in conjunction with the accompanying drawings.
As shown in figure 1, the utility model provide it is a kind of suitable at tunnel connection channel construction freezing method it is detachable Lengths of steel pipes, including non-disconnectable part 1 and free section 2 and ordinary crossing section of jurisdiction part 4.
As shown in figure 3, non-disconnectable part 1 includes outer layer sheet metal 1-1, flexible transition base 1-2 and internal layer steel construction section of jurisdiction 1-3.During Specific construction, outer layer sheet metal 1-1 is 6mm steel plate;Flexible transition base 1-2 is on TR thin rubber bed course, rubber spacer Same specification mesh is uniformly distributed, and penetrates TR thin rubber bed course;Internal layer steel construction section of jurisdiction 1-3 is according to ordinary steel Segment design. It is emphasized that mesh sectional area is less than the 20% of rubber spacer correspondence sectional area, 1-1,1-2 and 1-3 three pass through engineering Glue is firmly pasted together.
Projection of the freezing curtain on tunnel structure is located in the non-disconnectable region of part 1 during construction freezing method, and Fig. 2 is practical new The non-disconnectable part 1 of type technical scheme detail drawing and free section 2, which are bolted to be formed between five pieces of sections of jurisdiction, adjacent section of jurisdiction, uses spiral shell Tether and connect, be not drawn into figure;The steel member such as necessary ribbed stiffener, longitudinal rib requires to set according to ordinary steel section of jurisdiction in section of jurisdiction, It is not drawn into figure.Duct piece connector bolt b is as good as with ordinary couplings bolt.
There are reserved relief hole 2-1, reserved freezing hole B on the utility model, the check valve shown in Fig. 4 is mounted in both Structure.Steel ball B-1 constructions anteposition is close in filling up valve seal fat, right side rubber in left end, middle cavity in Fig. 4 one-way valve structures There is the less through-hole of a sectional area in packing B-2.Orifice tube reserved opening B-3 is used for freezing soldered vias pipe during pipe construction.
The utility model is mainly included the following steps that in Specific construction:
1) the utility model steel pipe sheet is installed as described above;
2) freezing hole and relief hole construction;
3) construction freezing method, forms freezing curtain;
4) free section 2 is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.
Preferred embodiment of the present utility model described in detail above.Come for one of ordinary skill in the art Say, can make several modifications and improvements with reference to the utility model, these belong to protection domain of the present utility model.

Claims (4)

1. a kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part (3), non-disconnectable part (1) and free section (2), it is characterised in that free section (2) is disposed with tunnel connection channel, It is disposed with non-disconnectable part (1) on free section (2) periphery, free section (2) and ordinary crossing section of jurisdiction part (3) are by can not Tear part (1) open to be connected, so as to constitute complete detachable steel pipeline section;Non-disconnectable part (1) therein sets gradually from outside to inside Three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction.
2. detachable steel pipeline section according to claim 1, it is characterised in that described flexible transition base is rubber spacer, The mesh for penetrating rubber spacer is distributed with rubber spacer.
3. detachable steel pipeline section according to claim 2, it is characterised in that mesh sectional area is less than rubber spacer correspondence and cut The 20% of area.
4. detachable steel pipeline section according to claim 2, it is characterised in that be all provided with non-disconnectable part and free section There are freezing hole, relief hole and thermometer hole, check valve is fixed with freezing hole and relief hole.
CN201720106157.1U 2017-02-03 2017-02-03 Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel Active CN206468361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720106157.1U CN206468361U (en) 2017-02-03 2017-02-03 Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720106157.1U CN206468361U (en) 2017-02-03 2017-02-03 Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel

Publications (1)

Publication Number Publication Date
CN206468361U true CN206468361U (en) 2017-09-05

Family

ID=59704160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720106157.1U Active CN206468361U (en) 2017-02-03 2017-02-03 Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel

Country Status (1)

Country Link
CN (1) CN206468361U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590695A (en) * 2018-05-30 2018-09-28 中山大学 Service channel shield construction method and service channel
CN113187491A (en) * 2021-05-17 2021-07-30 中铁十二局集团第四工程有限公司 Subway tunnel transverse passage small shield construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590695A (en) * 2018-05-30 2018-09-28 中山大学 Service channel shield construction method and service channel
CN108590695B (en) * 2018-05-30 2023-05-23 中山大学 Communication channel shield construction method and communication channel
CN113187491A (en) * 2021-05-17 2021-07-30 中铁十二局集团第四工程有限公司 Subway tunnel transverse passage small shield construction process

Similar Documents

Publication Publication Date Title
CN106593487B (en) Detachable steel tube section constructing method for construction freezing method at tunnel connection channel
CN104213932B (en) A kind of projecting coal bed waterpower phase transformation fracturing coal uncovering method
CN105697034B (en) Backfill the grouting system and grouting method of slip casting behind for composite lining structure
CN206636586U (en) A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN102678174A (en) Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
CN104213921A (en) Freezing-type stone door cross-measure coal uncovering method based on hydraulic seam cutting
CN206468361U (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN110056355A (en) Rush that Frozen-thawed cycled is anti-reflection takes out safe and efficient coal uncovering method
CN107034874B (en) Double-screw type slip casting type freezing plant and construction method
CN106640191B (en) A kind of double cabin rubber bag apparatus of self-locking aqueous vapor for tunnel flood-fighting
CN202690131U (en) Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN205445634U (en) Be used for constructing built -in toward peripheral stratum slip casting reinforcing apparatus from shield
CN107816361A (en) Tunnel rich water section partitioning waterproofing system
CN107255204A (en) A kind of non-stop plugging technique leaked for gas pipeline crack formula
CN207513619U (en) Tunnel rich water section partitioning waterproofing system
CN106837388A (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN206784322U (en) A kind of reservoir exhaust apparatus
CN205025499U (en) Subway contact passageway freezes to excavate guard gate
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN109487808A (en) A kind of leak stopping system of composite paster slip casting
CN109630130A (en) A kind of tunnel active preventing control method based on constructing pilot tunnel
CN209780896U (en) freezing device for tunnel excavation by freezing method
CN209722910U (en) Device for temporarily plugging gate shaft of tunnel body of diversion tunnel
CN109538793B (en) Unidirectional water-stop grouting device for vertical shaft duct piece
CN106988279A (en) A kind of application method of the sluice with hydraulic lock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CP02 Change in the address of a patent holder