CN206468361U - Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel - Google Patents
Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel Download PDFInfo
- Publication number
- CN206468361U CN206468361U CN201720106157.1U CN201720106157U CN206468361U CN 206468361 U CN206468361 U CN 206468361U CN 201720106157 U CN201720106157 U CN 201720106157U CN 206468361 U CN206468361 U CN 206468361U
- Authority
- CN
- China
- Prior art keywords
- section
- jurisdiction
- construction
- steel pipeline
- detachable steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model is related to a kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part 3, non-disconnectable part 1 and free section 2, it is characterized in that, free section 2 is disposed with tunnel connection channel, non-disconnectable part 1 is disposed with the periphery of free section 2, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, so as to constitute complete detachable steel pipeline section;Non-disconnectable part 1 therein sets gradually three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction from outside to inside.
Description
Technical field
The utility model is related to the steel-tube construction at tunnel connection channel construction.
Background technology
Metro Connection Passage is normally at the centre position of running tunnel, at this often provided with catchmenting, drainage pumping plant, play
The effects such as two tunnels are connected, catchmented, draining and fire prevention, there is the title of " passway for escaping ".Metro Connected Passage-way Construction is general in tunnel
Carried out again after the completion of agent structure, first make the peripheral freezing soil of service channel with freezing mostly in Practical Project, form intensity
Then height, the good Frozen Soil Cylinder of closure carries out the excavation construction of service channel, Freezing stratum as rapid and excavation using Mining Method
Construction is carried out in running tunnel.
The freezing consolidation soil body has nearly semicentennial engineering experience in China, mainly has the advantage that:Have compared with
High security, can effectively completely cut off underground water;Any loose Rock And Soil containing certain water is applicable, in complex hydrologic geology
Under the conditions of freezing technology it is effective, feasible;Construction is flexible, can artificially control freezing body shape and spreading range, if necessary
Underground obstacle can be bypassed to be freezed, the consolidation by freezing soil body is uniform, complete.
The external force that different processes can cause to act on the section of jurisdiction closed on during construction freezing method is distributed different degrees of
Change, cause uncertain segment deformation, influence the safety of tunnel structure.Therefore, it is necessary to be directed to service channel freezing process
The corresponding structure of detail design, influence of the Freezing Method for Cross-passage Construction to tunnel agent structure is reduced with this, reduces construction risk.
Utility model content
The utility model for weaken in Freezing Method for Cross-passage Construction construction freezing method to the adverse effect of tunnel agent structure there is provided
A kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel.
The technical scheme that the utility model is used is:
A kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part
3rd, non-disconnectable part 1 and free section 2, it is characterised in that free section 2 is disposed with tunnel connection channel, in removable portion
2 peripheries are divided to be disposed with non-disconnectable part 1, free section 2 is connected with ordinary crossing section of jurisdiction part 3 by non-disconnectable part 1, so that
Constitute complete detachable steel pipeline section;Non-disconnectable part 1 therein sets gradually outer layer sheet metal, flexible transition base from outside to inside
With three layers of internal layer steel construction section of jurisdiction.
Preferably, described flexible transition base is that the mesh for penetrating rubber spacer is distributed with rubber spacer, rubber spacer.
Mesh sectional area is less than the 20% of rubber spacer correspondence sectional area.
Freezing hole, relief hole and thermometer hole are equipped with non-disconnectable part 1 and free section 2, in freezing hole and pressure release
Check valve is fixed with hole.
Special pipeline section is applied to construction freezing method at the utility model tunnel connection channel, is improved by above-mentioned technical proposal
The durability of section of jurisdiction, adverse effect of the soil body to tunnel structure is freezed in tunnel periphery when reducing construction freezing method, improve
The security of structure.Non-disconnectable part is by cleverly setting flexible transition base to form Frozen Soil Cylinder when reducing construction freezing method
The stress concentration effect caused to section of jurisdiction, improves the security and durability of structure.
Design of the present utility model is described further with concrete structure below with reference to accompanying drawing, to throw a flood of light on this reality
With new feature.
Brief description of the drawings
Fig. 1 the utility model structure and tunnel other structures relation schematic diagram;
Fig. 2 technical solutions of the utility model detail drawings;
Mplifying structure schematic diagram at A in Fig. 3 Fig. 1;
Fig. 4 one-way valve structures sectional views;
Reference:
1st, in the utility model as tunnel permanent structure steel pipe sheet part (referred to as " non-disconnectable part 1 ");2nd, originally
Quick-detachable steel pipe sheet part in utility model (referred to as " free section 2 ");3rd, ordinary crossing section of jurisdiction part;4th, get in touch with
Channel design;1-1, outer layer sheet metal;1-2, flexible transition base;1-3, internal layer steel construction section of jurisdiction;2-1, reserved relief hole;It is B, pre-
Stay freezing hole;B-1, steel ball;B-2, rubber gasket;B-3, orifice tube reserved opening.
Embodiment
The utility model is further elaborated below in conjunction with the accompanying drawings.
As shown in figure 1, the utility model provide it is a kind of suitable at tunnel connection channel construction freezing method it is detachable
Lengths of steel pipes, including non-disconnectable part 1 and free section 2 and ordinary crossing section of jurisdiction part 4.
As shown in figure 3, non-disconnectable part 1 includes outer layer sheet metal 1-1, flexible transition base 1-2 and internal layer steel construction section of jurisdiction
1-3.During Specific construction, outer layer sheet metal 1-1 is 6mm steel plate;Flexible transition base 1-2 is on TR thin rubber bed course, rubber spacer
Same specification mesh is uniformly distributed, and penetrates TR thin rubber bed course;Internal layer steel construction section of jurisdiction 1-3 is according to ordinary steel Segment design.
It is emphasized that mesh sectional area is less than the 20% of rubber spacer correspondence sectional area, 1-1,1-2 and 1-3 three pass through engineering
Glue is firmly pasted together.
Projection of the freezing curtain on tunnel structure is located in the non-disconnectable region of part 1 during construction freezing method, and Fig. 2 is practical new
The non-disconnectable part 1 of type technical scheme detail drawing and free section 2, which are bolted to be formed between five pieces of sections of jurisdiction, adjacent section of jurisdiction, uses spiral shell
Tether and connect, be not drawn into figure;The steel member such as necessary ribbed stiffener, longitudinal rib requires to set according to ordinary steel section of jurisdiction in section of jurisdiction,
It is not drawn into figure.Duct piece connector bolt b is as good as with ordinary couplings bolt.
There are reserved relief hole 2-1, reserved freezing hole B on the utility model, the check valve shown in Fig. 4 is mounted in both
Structure.Steel ball B-1 constructions anteposition is close in filling up valve seal fat, right side rubber in left end, middle cavity in Fig. 4 one-way valve structures
There is the less through-hole of a sectional area in packing B-2.Orifice tube reserved opening B-3 is used for freezing soldered vias pipe during pipe construction.
The utility model is mainly included the following steps that in Specific construction:
1) the utility model steel pipe sheet is installed as described above;
2) freezing hole and relief hole construction;
3) construction freezing method, forms freezing curtain;
4) free section 2 is removed, and then carries out Mining Method Freezing Method for Cross-passage Construction.
Preferred embodiment of the present utility model described in detail above.Come for one of ordinary skill in the art
Say, can make several modifications and improvements with reference to the utility model, these belong to protection domain of the present utility model.
Claims (4)
1. a kind of detachable steel pipeline section suitable for construction freezing method at tunnel connection channel, including ordinary crossing section of jurisdiction part
(3), non-disconnectable part (1) and free section (2), it is characterised in that free section (2) is disposed with tunnel connection channel,
It is disposed with non-disconnectable part (1) on free section (2) periphery, free section (2) and ordinary crossing section of jurisdiction part (3) are by can not
Tear part (1) open to be connected, so as to constitute complete detachable steel pipeline section;Non-disconnectable part (1) therein sets gradually from outside to inside
Three layers of outer layer sheet metal, flexible transition base and internal layer steel construction section of jurisdiction.
2. detachable steel pipeline section according to claim 1, it is characterised in that described flexible transition base is rubber spacer,
The mesh for penetrating rubber spacer is distributed with rubber spacer.
3. detachable steel pipeline section according to claim 2, it is characterised in that mesh sectional area is less than rubber spacer correspondence and cut
The 20% of area.
4. detachable steel pipeline section according to claim 2, it is characterised in that be all provided with non-disconnectable part and free section
There are freezing hole, relief hole and thermometer hole, check valve is fixed with freezing hole and relief hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720106157.1U CN206468361U (en) | 2017-02-03 | 2017-02-03 | Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720106157.1U CN206468361U (en) | 2017-02-03 | 2017-02-03 | Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206468361U true CN206468361U (en) | 2017-09-05 |
Family
ID=59704160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720106157.1U Active CN206468361U (en) | 2017-02-03 | 2017-02-03 | Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206468361U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590695A (en) * | 2018-05-30 | 2018-09-28 | 中山大学 | Service channel shield construction method and service channel |
CN113187491A (en) * | 2021-05-17 | 2021-07-30 | 中铁十二局集团第四工程有限公司 | Subway tunnel transverse passage small shield construction process |
-
2017
- 2017-02-03 CN CN201720106157.1U patent/CN206468361U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590695A (en) * | 2018-05-30 | 2018-09-28 | 中山大学 | Service channel shield construction method and service channel |
CN108590695B (en) * | 2018-05-30 | 2023-05-23 | 中山大学 | Communication channel shield construction method and communication channel |
CN113187491A (en) * | 2021-05-17 | 2021-07-30 | 中铁十二局集团第四工程有限公司 | Subway tunnel transverse passage small shield construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205896550U (en) | Two -way plugging device of pipeline | |
CN106593487B (en) | Detachable steel tube section constructing method for construction freezing method at tunnel connection channel | |
CN104213932B (en) | A kind of projecting coal bed waterpower phase transformation fracturing coal uncovering method | |
CN105697034B (en) | Backfill the grouting system and grouting method of slip casting behind for composite lining structure | |
CN206636586U (en) | A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device | |
CN102678174A (en) | Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof | |
CN104213921A (en) | Freezing-type stone door cross-measure coal uncovering method based on hydraulic seam cutting | |
CN206468361U (en) | Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel | |
CN110056355A (en) | Rush that Frozen-thawed cycled is anti-reflection takes out safe and efficient coal uncovering method | |
CN107034874B (en) | Double-screw type slip casting type freezing plant and construction method | |
CN107816361A (en) | Tunnel rich water section partitioning waterproofing system | |
CN108825247B (en) | External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method | |
CN106640191B (en) | A kind of double cabin rubber bag apparatus of self-locking aqueous vapor for tunnel flood-fighting | |
CN205445634U (en) | Be used for constructing built -in toward peripheral stratum slip casting reinforcing apparatus from shield | |
CN107255204A (en) | A kind of non-stop plugging technique leaked for gas pipeline crack formula | |
CN207513619U (en) | Tunnel rich water section partitioning waterproofing system | |
CN106837388A (en) | Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel | |
CN206784322U (en) | A kind of reservoir exhaust apparatus | |
CN205025499U (en) | Subway contact passageway freezes to excavate guard gate | |
CN205477669U (en) | A slip casting system that is used for combined type lining cutting structure to backfill slip casting behind one's back | |
CN109487808A (en) | A kind of leak stopping system of composite paster slip casting | |
CN109630130A (en) | A kind of tunnel active preventing control method based on constructing pilot tunnel | |
CN209780896U (en) | freezing device for tunnel excavation by freezing method | |
CN209722910U (en) | Device for temporarily plugging gate shaft of tunnel body of diversion tunnel | |
CN109538793B (en) | Unidirectional water-stop grouting device for vertical shaft duct piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University Patentee after: Tianjin University Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92 Patentee before: Tianjin University |
|
CP02 | Change in the address of a patent holder |