CN205025499U - Subway contact passageway freezes to excavate guard gate - Google Patents

Subway contact passageway freezes to excavate guard gate Download PDF

Info

Publication number
CN205025499U
CN205025499U CN201520797305.XU CN201520797305U CN205025499U CN 205025499 U CN205025499 U CN 205025499U CN 201520797305 U CN201520797305 U CN 201520797305U CN 205025499 U CN205025499 U CN 205025499U
Authority
CN
China
Prior art keywords
door
excavate
plate
door body
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520797305.XU
Other languages
Chinese (zh)
Inventor
罗富荣
赵元根
张昊
刘遍红
韩玉福
姬伟
张瑜
黄齐武
张金亮
王玉龙
崔兵兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing China Coal Mine Engineering Co ltd
Beijing MTR Construction Administration Corp
Original Assignee
Beijing China Coal Mine Engineering Co ltd
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing China Coal Mine Engineering Co ltd, Beijing MTR Construction Administration Corp filed Critical Beijing China Coal Mine Engineering Co ltd
Priority to CN201520797305.XU priority Critical patent/CN205025499U/en
Application granted granted Critical
Publication of CN205025499U publication Critical patent/CN205025499U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a subway contact passageway freezes to excavate guard gate, includes door plant and door frame, one side pin joint of door plant is in the door frame so that open, the door frame is fixed in tunnel segment, the door plant contains the rectangular door body and follows the door body flange of outside extension all around, is equipped with the handle of the operation of being convenient for on the door body, the door frame contains rectangular framework, it is effectual sealed that door body flange all around can paste by realizing when thereby the framework just is equipped with joint strip in the closure, the framework ranging back is equipped with the connecting plate that can weld to tunnel segment, the terminal outer fringe of connecting plate still is fixed with waterproof steel sheet in order to prevent to gush water, from this, the utility model discloses when the frozen wall takes place severe deformation, unstability or harm out -of -control such as permeates water in excavation process, can adopt to close the guard gate, avoid secret muddy water to pour in the tunnel, cause ground large tracts of land thaw collapse and tunnel to bury harm, can resume again to freeze, effectively reduce the loss, reduce the construction risk.

Description

Metro Connection Passage is freezed to excavate protective door
Technical field
The utility model relates to the safety protection field of artificial Freezing stratum as rapid, particularly relates to a kind of Metro Connection Passage and freezes to excavate protective door.
Background technology
Artificial stratum freezing process (ArtificialGroundFreezingMethod; AGFM) be utilize artificial cooling technology; water-bearing rock soil layer around underground construction to be onstructed in certain limit is frozen; form the frost wall closed; to improve the strength and stability of ground; isolated underground water contacts with underground construction, and then carries out a kind of construction method of structure pick block operation under the protective effect of frost wall.
Artificial stratum freezing process has been widely used in municipal freezing engineering at present, in the slips process of service channel construction freezing method, miss once there is freezing pipe salt solution, run into and stop for a long time to freeze, or reach designing requirement far away because excavation frost wall is formed, the situation of frost wall Lack of support and gross distortion just likely occurs.Particularly near the interface of frost wall and tunnel duct piece, due to tunnel duct piece heat radiation, often there is the problem that partial freezing's wall temperature is too high, thickness is too small, cause partial freezing's wall gross distortion in digging process, or there is weak soil to extrude, even the permeable dangerous situation of frost wall occurs.Once frost wall generation gross distortion, unstability or permeable, by the safety of serious threat engineering, must take emergency measures and process fast and effectively.Therefore, solve excavation pick in municipal shallow earthing freezing engineering and build the harm brought, be extremely necessary.
Prior art is mainly before the excavation of Metro Connection Passage freezing engineering is constructed, scope and the intensity of frost wall is estimated by the mode of inspecting hole and thermometric, because ground environment is complicated, there is certain unreliability, construct in process for excavation, what frost wall occurred emits water, fracture of freezing pipe, power failure etc., needs to take control measure timely and effectively, uncontrollable once this type of dangerous situation, tunnel and above ground structure bring very large harm.
For this reason, designer of the present utility model is because above-mentioned defect, and by concentrating on studies and designing, comprehensive experience and the achievement being engaged in related industry for a long time for many years, research and design goes out a kind of Metro Connection Passage and freezes to excavate protective door, to overcome above-mentioned defect.
Utility model content
The purpose of this utility model is to provide a kind of Metro Connection Passage to freeze to excavate protective door, and its structure is simple, easy to operate,
For solving the problem, the utility model discloses a kind of Metro Connection Passage and freezing to excavate protective door, comprising door-plate and doorframe, it is characterized in that:
The side of described door-plate is articulated in doorframe so that open, described doorframe is fixed on tunnel duct piece, described door-plate comprises rectangular door body and from the outward extending flange of door body surrounding, door body is provided with the handle of convenient operation, described doorframe comprises rectangular framework, the flange of described door body surrounding can be posted by framework and is provided with sealing joint strip thus when closed, realize effective sealing, described framework extends back the junction plate being provided with and can being soldered to tunnel duct piece, and the end outer rim of described junction plate is also fixed with waterproof steel plate to prevent water burst.
Wherein: the top of described door-plate is provided with the first through hole, and bottom is provided with the second through hole, described first through hole is provided with multi-functional tube, and described second through hole is provided with gutter.
Wherein: described multi-functional tube and gutter are equipped with valve.
Wherein: there is multiple reinforcing rib the periphery of described junction plate, and the side of described reinforcing rib is soldered to junction plate, and opposite side is soldered to waterproof steel plate.
Wherein: described door body is formed by multiple rectangle framework of welding successively up and down.
Known by said structure, Metro Connection Passage of the present utility model is freezed excavation protective door and is had following effect:
1, structure is simple, easy to operate;
2, when frost wall generation gross distortion, unstability or the harm such as permeable are uncontrollable in digging process, can take to close protective door, invariably descend muddy water to pour in tunnel, cause surface large area thaw collapse and tunnel bury harm;
3, can again recover to freeze, effectively can play to reduce in digging process and endanger the loss brought, reduce construction risk.
Detailed content of the present utility model obtains by explanation described later and institute's accompanying drawing.
Accompanying drawing explanation
Fig. 1 shows the elevation that Metro Connection Passage of the present utility model freezes to excavate protective door.
Fig. 2 shows top view of the present utility model.
Fig. 3 shows the structural representation of door-plate of the present utility model.
Fig. 4 shows the scheme of installation of doorframe of the present utility model.
Fig. 5 shows integral installation schematic diagram of the present utility model.
Reference numeral:
10, door-plate; 11, Men Ti; 12, flange; 13, handle; 14, the first through hole; 15, the second through hole; 16, multi-functional tube; 17, gutter; 18, sealing joint strip; 20, doorframe; 21, framework; 22, junction plate; 23, waterproof steel plate; 24, reinforcing rib; 30, tunnel duct piece.
Detailed description of the invention
See Fig. 1 to Fig. 5, show Metro Connection Passage of the present utility model and freeze to excavate protective door.
Described Metro Connection Passage is freezed excavation protective door and is comprised door-plate 10 and doorframe 20, and the side of described door-plate 10 is articulated in doorframe 20 so that open, and described doorframe 20 is fixed on tunnel duct piece 30 to realize the use that door-plate 10 is connected with tunnel duct piece 30.
Wherein, see Fig. 1-3, described door-plate 10 comprises rectangular door body 11 and from the outward extending flange 12 of door body surrounding, door body 11 is provided with the handle 13 of convenient operation, and top is provided with the first through hole 14, bottom is provided with the second through hole 15, and described first through hole 14 is provided with multi-functional tube 16 so that pressure wind, slip casting etc., described second through hole 15 is provided with gutter 17, and described multi-functional tube 16 and gutter 17 are equipped with valve.
Wherein, described door body 11 is formed by multiple rectangle framework of welding successively up and down, this structure and cost-saving, has again better intensity.
Described doorframe 20 comprises rectangular framework 21, the flange 12 of described door body 11 surrounding is posted by framework 21, and flange 12 is provided with sealing joint strip 18, thus when closed, realize effective sealing, described framework 21 extends back the junction plate 22 being provided with and can being soldered to tunnel duct piece 30, the end outer rim of described junction plate 22 is also by being welded with waterproof steel plate 23, described waterproof steel plate 23 also can be soldered on tunnel duct piece 30, after closing to prevent protective door, silt particle and water are from doorframe and section of jurisdiction connecting portion water burst.
For improving bonding strength, the periphery of described junction plate 22 is welded with multiple reinforcing rib 24, and the side of described reinforcing rib 24 is soldered to junction plate 22, and opposite side is soldered to waterproof steel plate 23, effectively to improve intensity.
Wherein, connected by bearing between the side of described door-plate 10 and doorframe 20, the free switch of protective door can be ensured.
After installing protective door, should air tight test being carried out, requiring that testing air pressure when not stopping air compressor machine can remain on design load.
Thus, when Specific construction, occur when by-pass is excavated permeable, emit sand accident, should close protective door immediately, and calm the anger in protective door, make protective door internal gas pressure maintain design pressure, passage is dug through and i.e. dismountable protective door after During Initial Stage Construction supporting.
To sum up, the utility model has the advantage of:
1, structure is simple, easy to operate;
2, when frost wall generation gross distortion, unstability or the harm such as permeable are uncontrollable in digging process, can take to close protective door, invariably descend muddy water to pour in tunnel, cause surface large area thaw collapse and tunnel bury harm;
3, can again recover to freeze, effectively can play to reduce in digging process and endanger the loss brought, reduce construction risk.
It is evident that, above description and record be only citing instead of in order to limit disclosure of the present utility model, application or use.Although described in an embodiment and be described in the drawings embodiment, but the utility model do not limit by accompanying drawing example and describe in an embodiment as the optimal mode thought at present to implement the specific examples of instruction of the present utility model, scope of the present utility model will comprise any embodiment of manual and the appended claim fallen into above.

Claims (5)

1. Metro Connection Passage is freezed to excavate a protective door, comprises door-plate and doorframe, it is characterized in that:
The side of described door-plate is articulated in doorframe so that open, described doorframe is fixed on tunnel duct piece, described door-plate comprises rectangular door body and from the outward extending flange of door body surrounding, door body is provided with the handle of convenient operation, described doorframe comprises rectangular framework, the flange of described door body surrounding can be posted by framework and is provided with sealing joint strip thus when closed, realize effective sealing, described framework extends back the junction plate being provided with and can being soldered to tunnel duct piece, and the end outer rim of described junction plate is also fixed with waterproof steel plate to prevent water burst.
2. Metro Connection Passage as claimed in claim 1 is freezed to excavate protective door, and it is characterized in that: the top of described door-plate is provided with the first through hole, and bottom is provided with the second through hole, described first through hole is provided with multi-functional tube, and described second through hole is provided with gutter.
3. Metro Connection Passage as claimed in claim 2 is freezed to excavate protective door, it is characterized in that: described multi-functional tube and gutter are equipped with valve.
4. Metro Connection Passage as claimed in claim 1 is freezed to excavate protective door, it is characterized in that: there is multiple reinforcing rib the periphery of described junction plate, and the side of described reinforcing rib is soldered to junction plate, and opposite side is soldered to waterproof steel plate.
5. Metro Connection Passage as claimed in claim 1 is freezed to excavate protective door, it is characterized in that: described door body is formed by multiple rectangle framework of welding successively up and down.
CN201520797305.XU 2015-10-15 2015-10-15 Subway contact passageway freezes to excavate guard gate Expired - Fee Related CN205025499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520797305.XU CN205025499U (en) 2015-10-15 2015-10-15 Subway contact passageway freezes to excavate guard gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520797305.XU CN205025499U (en) 2015-10-15 2015-10-15 Subway contact passageway freezes to excavate guard gate

Publications (1)

Publication Number Publication Date
CN205025499U true CN205025499U (en) 2016-02-10

Family

ID=55258040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520797305.XU Expired - Fee Related CN205025499U (en) 2015-10-15 2015-10-15 Subway contact passageway freezes to excavate guard gate

Country Status (1)

Country Link
CN (1) CN205025499U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162760A (en) * 2018-09-12 2019-01-08 中交第二航务工程局有限公司 A kind of constructing metro tunnel safety-door device and its construction method
CN109281710A (en) * 2018-08-13 2019-01-29 中铁七局集团西安铁路工程有限公司 Shield service channel protects gate-type device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281710A (en) * 2018-08-13 2019-01-29 中铁七局集团西安铁路工程有限公司 Shield service channel protects gate-type device
CN109162760A (en) * 2018-09-12 2019-01-08 中交第二航务工程局有限公司 A kind of constructing metro tunnel safety-door device and its construction method
CN109162760B (en) * 2018-09-12 2024-02-27 中交第二航务工程局有限公司 Safety door device for subway tunnel construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN104213932B (en) A kind of projecting coal bed waterpower phase transformation fracturing coal uncovering method
CN104213921B (en) Based on the freezing type coal uncovering method of hydraulic slotted liner technique
CN206053969U (en) A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure
WO2016019825A1 (en) Enhanced phase-change fracking gas extraction method for low-permeability coal bed
CN106812540B (en) Shield initial plain wall sealing water-stopping reinforcing structure and construction process
CN206636586U (en) A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN103161172B (en) Elevator shaft bottom precipitation construction method
CN102337897A (en) Shield integral type arrival receiving device and construction method employing same
CN205025499U (en) Subway contact passageway freezes to excavate guard gate
CN103133821B (en) A kind of freezing pipe heat-proof device
CN103088810B (en) Freezing pipe capable of exhausting air
CN103527205A (en) Shield underwater oblique crossing hole entering construction method
CN204492745U (en) Between monitoring two-layer compound Shaft Linings, hydraulic pressure is to determine the device of best time for injecting
CN101696572A (en) Freezer with gas guide structure
CN112412422A (en) Freezing fracturing cooperated coal seam hydraulic cavitation permeability increasing and pumping promoting method
CN205077502U (en) A blowout preventer for holing gush sand and emit water
CN103307810A (en) Wellhead sealing structure of mining and irrigating system of underground water source heat pump, and detection method thereof
CN102635365B (en) Construction method for holing of shield machine
CN208396715U (en) A kind of leading pilot tunnel of running tunnel freezes water sealing structure
CN206468361U (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN104018858A (en) Novel water stopping structure for tunneling seam in permafrost region
CN208564570U (en) A kind of section of jurisdiction with freezing function
CN204039979U (en) A kind of spilled water hole plugging device
CN209780896U (en) freezing device for tunnel excavation by freezing method
CN102758443B (en) Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20161015

CF01 Termination of patent right due to non-payment of annual fee