CN208473893U - A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs - Google Patents

A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs Download PDF

Info

Publication number
CN208473893U
CN208473893U CN201820768951.7U CN201820768951U CN208473893U CN 208473893 U CN208473893 U CN 208473893U CN 201820768951 U CN201820768951 U CN 201820768951U CN 208473893 U CN208473893 U CN 208473893U
Authority
CN
China
Prior art keywords
blind pipe
longitudinal
drainage
liner
close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820768951.7U
Other languages
Chinese (zh)
Inventor
黄华
巩江峰
唐进才
朱勇
张瑞明
赖钧炜
刘志刚
张慧玲
王加
王加一
曾琦
黄立恒
宋洪江
钟昌桂
王若晨
胥宝华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201820768951.7U priority Critical patent/CN208473893U/en
Application granted granted Critical
Publication of CN208473893U publication Critical patent/CN208473893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs, and to ensure that drainage system is unimpeded, prevents lining cutting from occurring water pressure behind, guarantees the safety of liner structure.Including circumferential blind pipe, longitudinal blind pipe, non-woven fabrics and the splash guard being set between preliminary bracing structure and secondary liner structure, wherein splash guard leans on country rock side close to secondary liner structure, circumferential blind pipe, longitudinal blind pipe are close to preliminary bracing structure, longitudinal blind pipe is set to abutment wall foot and lower than longitudinal construction joint, and is connected with lateral sulcus of the short abutment wall of secondary liner structure by side of driving a vehicle is set to.Drainable waterproofing plate is set within the scope of certain altitude above and below longitudinal construction joint, the drainable waterproofing plate outer plate surface and non-woven fabrics close to, the inner plate surface with groove-like structure is then with preliminary bracing structure close to the lower edges that groove-like structure is connected to drainable waterproofing plate form vertical drainage channel thereon.

Description

A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs
Technical field
The utility model technology category railway tunnel, vcehicular tunnel, municipal tunnel engineering field, in particular to one kind can be kept The tunnel-liner guarded drainage of longitudinal blind pipe drainage performance constructs.
Background technique
Currently, Tunnel Engineering is to reduce lining cutting behind water pressure, built mostly according to the waterproof principles of " based on arranging ", Longitudinal blind pipe, circumferential blind pipe, non-woven fabrics and splash guard are set between supporting construction and secondary liner structure in the early stage, to reach row The purpose of secondary liner structure behind underground water out.But in recent years, the longitudinal blind pipe of discovery part tunnel appearance, circumferential direction are blind successively Phenomena such as pipe is not discharged, lining cutting pucking, cracking, the water for adding ejectment after drain hole is larger, and analysis reason is lining cutting draining system There is blocking, impeded drainage in system, cannot effective ejectment underground water.
When current mining method construction tunnel, preliminary bracing structure applies from top to bottom, secondary liner structure first apply inverted arch/ Bottom plate (including short abutment wall) applies arch wall again.Preliminary bracing structure is sequentially arranged longitudinal blind pipe, short abutment wall and centainly takes after applying Circumferential blind pipe, non-woven fabrics and the splash guard in length range are connect, inverted arch or bottom plate and short abutment wall is then applied, finally applies arch wall Part.Underground water within the scope of arch wall will enter the drainage system of Tunnel Design, it is necessary to pass through the circumferential direction at longitudinal construction joint Blind pipe and non-woven fabrics, the discharge capacity at longitudinal construction joint become the weak link of whole system.Pressure from surrounding rock acts on lower initial stage Biggish deformation occurs for supporting construction, constantly squeezes, causes between the two between preliminary bracing structure and secondary liner structure Splash guard and non-woven fabrics dense extrusion weaken the ability for even losing water guide, cannot be effectively by the underground water ejectment of arch wall part To longitudinal blind pipe, or circumferential blind pipe is squeezed at longitudinal construction joint, cannot effectively by the underground water ejectment in pipe to lateral sulcus, Cause lining cutting drainage system to fail, threatens liner structure safety.
Utility model content
The technical problem to be solved by the utility model is to provide one kind, and the tunnel of longitudinal blind pipe drainage performance can be kept to serve as a contrast Guarded drainage construction is built, to ensure that drainage system is unimpeded, prevents lining cutting from occurring water pressure behind, guarantees the safety of liner structure.
It is as follows that the utility model solves technical solution used by its technical problem:
The utility model one kind can keep the tunnel-liner guarded drainage of longitudinal blind pipe drainage performance to construct, including be set to just Circumferential blind pipe between phase supporting construction and secondary liner structure, longitudinal blind pipe, non-woven fabrics and splash guard, wherein splash guard close to Secondary liner structure leans on country rock side, circumferential blind pipe, longitudinal blind pipe close to preliminary bracing structure, longitudinal blind pipe be set to abutment wall foot and It is connected lower than longitudinal construction joint, and with lateral sulcus of the short abutment wall of secondary liner structure by side of driving a vehicle is set to, it is characterized in that: described Longitudinal construction joint up and down in certain altitude setting drainable waterproofing plate, the drainable waterproofing plate outer plate surface and non-woven fabrics close to having thereon There is the inner plate surface of groove-like structure then with preliminary bracing structure close to the lower edges of groove-like structure connection drainable waterproofing plate are formed vertically Drainage channel.
The utility model has the beneficial effects that under conditions of existing lining cutting drainage system, it is logical in longitudinal construction joint position It crosses setting drainable waterproofing plate and forms vertical drainage channel between supporting construction and secondary liner structure in the early stage, in the early stage supporting construction Occur to still ensure that the underground water energy at arch wall position can smoothly enter into longitudinal blind pipe and protection is circumferential blind in the case where larger extruding Pipe, it is ensured that drainage system is unimpeded, prevents lining cutting from occurring water pressure behind, guarantees the safety of liner structure;Drain bar has waterproof Ability will enhance the waterproof ability of secondary liner structure longitudinal direction construction joint;Construction technology difficulty is low, and investment is small, and process is simple, and Advantageously ensure that construction quality.
Detailed description of the invention
This specification includes following three width attached drawing:
Fig. 1 is that the utility model one kind can keep the tunnel-liner guarded drainage of longitudinal blind pipe drainage performance to construct;
Fig. 2 is the sectional view of the line A-A along Fig. 1;
Fig. 3 is that the utility model one kind can keep guarded drainage in the tunnel-liner guarded drainage construction of longitudinal blind pipe drainage performance The cross-section diagram of plate.
Component, toponym and corresponding label: preliminary bracing structure 10, secondary liner structure 20, lateral sulcus are shown in figure 21, longitudinal construction joint 22, circumferential blind pipe 31, non-woven fabrics 32, splash guard 33, longitudinal blind pipe 34, drainable waterproofing plate 35, vertical groove 36。
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
Referring to figs. 1 to Fig. 3, one kind of the utility model can keep the tunnel-liner guarded drainage structure of longitudinal blind pipe drainage performance It makes, including circumferential blind pipe 31, the longitudinal blind pipe 34, non-woven fabrics being set between preliminary bracing structure 10 and secondary liner structure 20 32 and splash guard 33, wherein splash guard 33 leans on country rock side close to secondary liner structure 20, circumferential blind pipe 31, longitudinal blind pipe 34 close to Preliminary bracing structure 10, longitudinal blind pipe 34 are set to abutment wall foot and lower than longitudinal construction joints 22, and be set to secondary lining knot Lateral sulcus 21 of the short abutment wall of structure 20 by side of driving a vehicle is connected.Guarded drainage is set within the scope of longitudinal direction about 22 certain altitude of construction joint Plate, 35 outer plate surface of drainable waterproofing plate and non-woven fabrics 32 close to, thereon the inner plate surface with groove-like structure then with preliminary bracing structure 10 close to the lower edges that groove-like structure is connected to drainable waterproofing plate 35 form vertical drainage channel.
Referring to 1 and Fig. 2, drainable waterproofing plate 35 has enough rigidity, even if the coagulation soil pressure when constructing secondary liner structure It remains to form effective vertical drainage channel under power or later period squeezing action, while can effectively prevent preliminary bracing structure and secondary lining It builds after structure squeezes and forms gap between drainable waterproofing plate 35 and non-woven fabrics 32 and splash guard 33.35 pairs of longitudinal directions of drainable waterproofing plate are blind Protection is formed at the lower part of pipe 34 and circumferential blind pipe 31, on inner plate surface vertical drainage channel by the water ejectment within the scope of arch wall extremely Longitudinal blind pipe 34, supporting construction 10 occurs to still ensure that the underground water energy at arch wall position is smooth in the case where larger extruding in the early stage Enter longitudinal blind pipe 34, it is ensured that drainage system is unimpeded, prevents lining cutting from occurring water pressure behind, guarantees the safety of liner structure.
Referring to Fig. 3, the groove-like structure is the vertical groove 36 of the longitudinally spaced setting on 35 inner plate surface of drainable waterproofing plate.
The utility model one kind described above that only explains through diagrams can keep the tunnel-liner of longitudinal blind pipe drainage performance Some principles of guarded drainage construction, are not intended to shown in being confined to the utility model and described specific structure and the scope of application It is interior, therefore all corresponding modifications that may be utilized and equivalent, belong to the applied the scope of the patents of the utility model.

Claims (2)

1. one kind can keep the tunnel-liner guarded drainage of longitudinal blind pipe drainage performance to construct, including be set to preliminary bracing structure (10) the circumferential blind pipe (31) between secondary liner structure (20), longitudinal blind pipe (34), non-woven fabrics (32) and splash guard (33), Wherein splash guard (33) leans on country rock side close to secondary liner structure (20), and circumferential blind pipe (31), longitudinal blind pipe (34) are close to initial stage Supporting construction (10), longitudinal blind pipe (34) are set to abutment wall foot and lower than longitudinal construction joints (22), and be set to secondary lining Lateral sulcus (21) of structure (20) the short abutment wall by side of driving a vehicle is connected, it is characterized in that: the longitudinal direction construction joint (22) is certain high up and down It spends drainable waterproofing plate is set in range, drainable waterproofing plate (35) outer plate surface and non-woven fabrics (32) are close to thereon with groove-like structure Inner plate surface is then with preliminary bracing structure (10) close to the lower edges that groove-like structure is connected to drainable waterproofing plate (35) form vertical drainage Channel.
2. one kind as described in claim 1 can keep the tunnel-liner guarded drainage of longitudinal blind pipe drainage performance to construct, feature Be: the groove-like structure is the vertical groove (36) of the longitudinally spaced setting on drainable waterproofing plate (35) inner plate surface.
CN201820768951.7U 2018-05-22 2018-05-22 A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs Active CN208473893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820768951.7U CN208473893U (en) 2018-05-22 2018-05-22 A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820768951.7U CN208473893U (en) 2018-05-22 2018-05-22 A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs

Publications (1)

Publication Number Publication Date
CN208473893U true CN208473893U (en) 2019-02-05

Family

ID=65218525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820768951.7U Active CN208473893U (en) 2018-05-22 2018-05-22 A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs

Country Status (1)

Country Link
CN (1) CN208473893U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734457A (en) * 2020-07-02 2020-10-02 青岛理工大学 Construction method of tunnel water-drainage-preventing system
CN112431615A (en) * 2020-11-27 2021-03-02 中铁四局集团有限公司 Permanent single-layer lining drainage method for underground tank room of hyperboloid dome

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734457A (en) * 2020-07-02 2020-10-02 青岛理工大学 Construction method of tunnel water-drainage-preventing system
CN112431615A (en) * 2020-11-27 2021-03-02 中铁四局集团有限公司 Permanent single-layer lining drainage method for underground tank room of hyperboloid dome

Similar Documents

Publication Publication Date Title
CN204716291U (en) Dewatering installation is drawn in tunnel pressure release
CN208473893U (en) A kind of tunnel-liner guarded drainage keeping longitudinal blind pipe drainage performance constructs
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN207419439U (en) The buried anti-shear concrete structure drainage system of side slope
CN110513130A (en) A kind of tunnel waterproof and water drainage system
CN208501642U (en) A kind of water conservancy irrigation water channel with dredging function
CN203383854U (en) Buffering system for solving problem of tunnel local sudden water burst
CN209129624U (en) A kind of high pre-buried maintenance grouting device of hydraulic pressure tunnel sluicing voltage-dropping type
CN205917593U (en) Bridge expansion joint drainage device
CN108661674A (en) A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN206111211U (en) A regular polygon prestressing force support for preventing circular tunnel deformation of side opening
CN208885728U (en) The expansion bolt of function is filled up with gap
CN209168539U (en) A kind of Tunneling by mining method drainage model apparatus for demonstrating for teaching
CN110130980A (en) A kind of tunnel drainage device, system and its construction method
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN206723635U (en) The composite drainage pipe of municipal works
CN205618199U (en) Prefabricated cable pipe and prefabricated drain pipe structure in tunnel
CN204753503U (en) Seam face drainage structures of big dam structure seam or induced seam
CN201598619U (en) Dam body water draining structure
CN204343251U (en) Horizontal connection structure between a kind of concrete cut and concrete structure
CN207701170U (en) Repair system is drained after a kind of underdrain formula tunnel-liner
CN103382853B (en) Buffer system for draining local burst gushing water of tunnel and control method
CN209353308U (en) A kind of construction of water conservancy works U-type groove
CN206408636U (en) A kind of sealing discharge structure
CN206607597U (en) Water-bag-type riverway cofferdam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant