CN110513130A - A tunnel waterproof and drainage system - Google Patents

A tunnel waterproof and drainage system Download PDF

Info

Publication number
CN110513130A
CN110513130A CN201910927899.4A CN201910927899A CN110513130A CN 110513130 A CN110513130 A CN 110513130A CN 201910927899 A CN201910927899 A CN 201910927899A CN 110513130 A CN110513130 A CN 110513130A
Authority
CN
China
Prior art keywords
drainage
tunnel
gap
section
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910927899.4A
Other languages
Chinese (zh)
Other versions
CN110513130B (en
Inventor
王亚琼
彭兴彬
刘宝平
杨武策
张卫东
王志丰
任锐
王程昱
李嘉琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Luqiao Group Co Ltd
Changan University
Original Assignee
Shaanxi Luqiao Group Co Ltd
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Luqiao Group Co Ltd, Changan University filed Critical Shaanxi Luqiao Group Co Ltd
Priority to CN201910927899.4A priority Critical patent/CN110513130B/en
Publication of CN110513130A publication Critical patent/CN110513130A/en
Application granted granted Critical
Publication of CN110513130B publication Critical patent/CN110513130B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种隧道防排水系统,包括排水缝隙,排水缝隙设置在隧道二次衬砌的前施工衬砌段与后施工衬砌段之间,排水缝隙沿隧道拱面环向设置;可排水止水带嵌入设置在排水缝隙的背水面,可排水止水带沿排水缝隙环向布设,可排水止水带的两端延伸至隧道边沟内;横向排水管的两端分别与排水缝隙的两端连通,中央排水管与横向横向排水管连通;本发明在排水区段中地下渗水通过排水缝隙排出,降低了隧道二次衬砌的水压力,提高了防水区段的防水能力;通过可排水止水带将地下渗水限制在排水缝隙内,避免了地下渗水的窜流或进入隧道内部;本发明能够对排水缝隙中的沉积物及时方便清除;可排水止水带外贴设置隧道衬砌表面,便于检修及更换。

The invention discloses a tunnel waterproof and drainage system, which includes a drainage gap, which is arranged between the front construction lining section and the rear construction lining section of the secondary lining of the tunnel, and the drainage gap is arranged along the tunnel arch surface; The belt is embedded in the backwater surface of the drainage gap, and the drainable waterstop is arranged along the circular direction of the drainage gap, and the two ends of the drainable waterstop extend into the side ditch of the tunnel; Connected, the central drainage pipe is connected with the horizontal lateral drainage pipe; the present invention discharges underground seepage water through the drainage gap in the drainage section, reduces the water pressure of the secondary lining of the tunnel, and improves the waterproof ability of the waterproof section; The belt restricts the underground water seepage in the drainage gap, avoiding the channeling of underground water seepage or entering the tunnel; the invention can timely and conveniently remove the sediment in the drainage gap; the drainage waterstop is attached to the surface of the tunnel lining, which is convenient for maintenance and replace.

Description

一种隧道防排水系统A tunnel waterproof and drainage system

技术领域technical field

本发明涉及隧道防排水技术领域,特别涉及一种隧道防排水系统。The invention relates to the technical field of tunnel waterproofing and drainage, in particular to a tunnel waterproofing and drainage system.

背景技术Background technique

随着交通运输路网规模不断扩大,隧道工程的数量也随之不断增长;隧道修建于地表之下,处于各种地下水的包围之中,而地下水无孔不入;隧道勘测、设计、施工及运营过程中各环节工作都有可能存在不到位的情况,从而造成隧道防排水体系的任何缺陷,均可能引起隧道的渗漏水。现在我国虽然具备修建长大隧道等地下工程的能力和经验,然而,从地下结构防水的角度看,尽管设计有所考虑,但是总的防水效果不是很理想。到目前为止,国内已通车运营的绝大多数隧道都存在衬砌结构渗漏水的问题,有些隧道渗漏水状况相当严重,所以渗漏水已经成了公路隧道运营期间的常见病害问题之一。With the continuous expansion of the transportation road network, the number of tunnel projects is also increasing; tunnels are built under the surface and surrounded by various groundwater, and groundwater is pervasive; tunnel survey, design, construction and operation process The work of each link may not be in place, resulting in any defect in the tunnel waterproof and drainage system, which may cause water leakage in the tunnel. Although our country has the ability and experience to build underground projects such as long tunnels, however, from the perspective of waterproofing underground structures, although the design has been considered, the overall waterproofing effect is not very satisfactory. So far, most of the tunnels that have been opened to traffic in China have the problem of water leakage in the lining structure, and some tunnels have serious water leakage, so water leakage has become one of the common problems during the operation of road tunnels.

目前,隧道排水主要为:水从围岩裂隙进入衬砌背后的环向排水盲沟,环向排水管下接设置在衬砌边墙下部的纵向排水管,然后纵向排水管中的水经过横向导水管导入中央排水管,最后中央排水沟将水排出洞外。当前隧道中使用的排水系统存在不少问题:首先,对已运营隧道的调查表明,防排水系统在应用几年后均会出现不同程度的渗漏水问题,使隧道结构产生恶化,影响隧道的长期安全性;其二,隧道渗漏水中可能夹杂着带腐蚀性的成分,长期作用于隧道二次衬砌,会对其强度造成严重危害,从而影响隧道结构的正常使用寿命;此外,隧道渗漏水也会影响隧道的行车安全,比如路面积水或者结冰都会使车轮与地面之间的摩擦系数减少,可能使车辆发生侧滑,汽车在这样的隧道内行驶不仅影响行车速度,还会产生严重的安全隐患。隧道的渗漏水也会也会对隧道内的通风设备、通讯设备、供电照明设备、消防管线设备等造成一定的侵蚀,最后造成运营设备出现故障甚至损坏;就目前的隧道防排水系统施工工艺,如若隧道防排水系统出现渗漏水问题,将很难对隧道渗漏水的地方进行清堵,或者更换防排水构件,无法实现“可维可达”的防排水系统,进而增加了隧道运营期间的维修养护的难度和维修费用。At present, the tunnel drainage is mainly as follows: water enters the circular drainage blind ditch behind the lining from the cracks in the surrounding rock, the circumferential drainage pipe is connected to the longitudinal drainage pipe arranged at the lower part of the lining side wall, and then the water in the longitudinal drainage pipe passes through the horizontal aqueduct Into the central drain, and finally the central drain drains the water out of the hole. There are many problems in the drainage system currently used in tunnels: First, the investigation of the tunnels in operation shows that after several years of application of the waterproof and drainage system, there will be water leakage to varying degrees, which will deteriorate the tunnel structure and affect the tunnel performance. Long-term safety; second, the tunnel seepage water may be mixed with corrosive components, which will act on the secondary lining of the tunnel for a long time, which will seriously damage its strength and affect the normal service life of the tunnel structure; in addition, the tunnel seepage Water will also affect the driving safety of the tunnel. For example, water or ice on the road will reduce the friction coefficient between the wheels and the ground, which may cause the vehicle to slip. Driving in such a tunnel will not only affect the driving speed, but also cause Serious safety hazard. Leakage in the tunnel will also cause certain erosion to the ventilation equipment, communication equipment, power supply and lighting equipment, fire pipeline equipment, etc. in the tunnel, and finally cause the operation equipment to malfunction or even be damaged; the current construction technology of the tunnel waterproof and drainage system , if there is water leakage in the tunnel waterproof and drainage system, it will be difficult to clear the water leakage in the tunnel, or replace the waterproof and drainage components. The difficulty of maintenance and maintenance costs during the period.

发明内容Contents of the invention

针对现有技术中存在的技术问题,本发明的目的在于提供一种隧道防排水系统,解决了现有隧道防排水系统内部排水管易堵塞,不便于检查或者更换的问题;防排水效果好,使用期限较长。In view of the technical problems existing in the prior art, the purpose of the present invention is to provide a tunnel waterproof and drainage system, which solves the problem that the internal drainage pipes of the existing tunnel waterproof and drainage system are easily blocked and inconvenient for inspection or replacement; the waterproof and drainage effect is good, Long service life.

为达到实现上述目的,本发明采用如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

本发明提供了一种隧道防排水系统,包括排水缝隙、可排水止水带、横向排水管及中央排水管,排水缝隙设置在隧道二次衬砌中的前施工衬砌和后施工衬砌段之间,通过排水缝隙将隧道二次衬砌划分为防水区段和排水区段;排水缝隙沿隧道拱面环向设置;可排水止水带嵌入设置在排水缝隙的背水面,可排水止水带沿排水缝隙环向布设,可排水止水带的两端延伸至隧道两侧边沟内;横向排水管横向设置在隧道仰拱内,横向排水管的两端分别与隧道两侧边沟;中央排水管沿隧道长度方向设置,中央排水管与横向排水管连通。The invention provides a tunnel waterproof and drainage system, which includes a drainage gap, a drainable waterstop, a horizontal drainage pipe and a central drainage pipe. The drainage gap is arranged between the front construction lining and the rear construction lining section in the secondary lining of the tunnel. The secondary lining of the tunnel is divided into a waterproof section and a drainage section through the drainage gap; the drainage gap is arranged along the tunnel arch surface; the drainage waterstop is embedded in the back surface of the drainage gap, and the drainage waterstop is arranged Circumferential layout, the two ends of the drainage waterstop extend to the side ditches on both sides of the tunnel; the horizontal drainage pipes are arranged horizontally in the tunnel invert, and the two ends of the horizontal drainage pipes are respectively connected to the side ditches on both sides of the tunnel; the central drainage pipe is The length direction of the tunnel is set, and the central drainage pipe is connected with the horizontal drainage pipe.

进一步的,隧道两侧边沟内分别设置有汇水槽,汇水槽的上部与排水缝隙连通;汇水槽的底部与横向排水管连通。Further, catchment tanks are respectively arranged in side ditches on both sides of the tunnel, and the upper part of the catchment tanks communicates with drainage gaps; the bottom of the catchment tanks communicates with horizontal drainage pipes.

进一步的,横向排水管采用弧形排水管,弧形排水管的最低点设置在隧道底板的中心线上,中央排水管置于横向排水管的最低点处,中央排水管长度方向上设置倾斜设置,倾斜方向与隧道底板纵坡方向相适应。Further, the horizontal drainage pipe adopts an arc-shaped drainage pipe, the lowest point of the arc-shaped drainage pipe is set on the center line of the tunnel floor, the central drainage pipe is placed at the lowest point of the horizontal drainage pipe, and the length direction of the central drainage pipe is provided with inclined settings. , the direction of inclination is compatible with the longitudinal slope direction of the tunnel floor.

进一步的,排水缝隙为隧道二次衬砌的施工缝、沉降缝或变形缝。Further, the drainage gaps are construction joints, settlement joints or deformation joints of the secondary lining of the tunnel.

进一步的,隧道二次衬砌的迎水面上依次设置有防水板及土工布;防水板在排水缝隙处分段设置,排水缝隙两侧的两块防水板均伸入排水缝隙内,并分别与排水缝隙的两侧的缝隙壁贴合,两块防水板之间预留有排水通道;土工布设置在防水板的迎水面,且紧贴初期支护设置。Further, waterproof boards and geotextiles are arranged in turn on the water-facing surface of the secondary lining of the tunnel; the waterproof boards are installed in sections at the drainage gaps, and the two waterproof boards on both sides of the drainage gaps extend into the drainage gaps and are connected with the drainage gaps respectively. The gap walls on both sides of the waterproof board are attached, and a drainage channel is reserved between the two waterproof boards; the geotextile is set on the water-facing surface of the waterproof board, and it is set close to the initial support.

进一步的,可排水止水带包括排水盒及排水槽,排水盒固定设置在排水缝隙的背水面,排水盒为凹形槽结构;排水盒的凹面为迎水面,排水槽固定设置在排水盒的迎水面上;排水槽的一端与排水盒固定连接,另一端与嵌入排水缝隙中,排水槽的两个侧壁分别与排水缝隙的两侧缝隙壁紧密贴合。Further, the drainable waterstop includes a drainage box and a drainage groove, the drainage box is fixedly arranged on the backwater surface of the drainage gap, the drainage box is a concave groove structure; the concave surface of the drainage box is the facing surface, and the drainage groove is fixedly arranged on On the water facing surface; one end of the drainage groove is fixedly connected with the drainage box, and the other end is embedded in the drainage gap, and the two side walls of the drainage groove are respectively closely attached to the gap walls on both sides of the drainage gap.

进一步的,排水槽的截面为半圆弧形或V型结构;其中,半圆弧形结构的底部圆弧面与排水盒固定连接,半圆弧形结构的两个侧壁分别与排水缝隙的两侧缝隙壁紧密贴合;V型结构的底部与排水盒固定连接,V型结构的两个侧壁端分别与排水缝隙的两侧缝隙壁紧密贴合。Further, the cross-section of the drainage groove is a semi-circular or V-shaped structure; wherein, the bottom circular surface of the semi-circular structure is fixedly connected with the drainage box, and the two side walls of the semi-circular structure are respectively connected to the gaps on both sides of the drainage gap. The walls are tightly fitted; the bottom of the V-shaped structure is fixedly connected to the drainage box, and the two side wall ends of the V-shaped structure are respectively closely fitted to the slit walls on both sides of the drainage slit.

进一步的,排水槽的两个侧壁末端分别设置有卡接段,卡接段与排水缝隙紧密贴合;两个卡接段之间的距离大于排水缝隙的缝宽;卡接段采用楔形结构,卡接段与排水槽的连接端为大端,卡接段的自由端为小端。Further, the ends of the two side walls of the drainage groove are respectively provided with clamping sections, which closely fit the drainage gap; the distance between the two clamping sections is greater than the width of the drainage gap; the clamping section adopts a wedge-shaped structure , the connecting end of the clamping section and the drainage groove is the big end, and the free end of the clamping section is the small end.

进一步的,排水盒的两个侧壁分别设置有翼缘板;其中,一个翼缘板与前施工衬砌段固定连接,另一个翼缘板与后施工衬砌段固定连接。Further, the two side walls of the drainage box are respectively provided with flange plates; wherein, one flange plate is fixedly connected with the front construction lining section, and the other flange plate is fixedly connected with the rear construction lining section.

进一步的,前施工衬砌段和后施工衬砌段表面均设置有安装槽,翼缘板嵌入安装槽内;并通过螺栓将翼缘板与安装槽固定连接;安装槽内设置有密封体,用于将翼缘板密封设置在安装槽内;密封体为化学密封胶,化学密封胶采用丙烯酸酯密封胶或聚硫密封胶。Further, the surfaces of the front construction lining section and the rear construction lining section are provided with installation grooves, and the flange plates are embedded in the installation grooves; the flange plates are fixedly connected to the installation grooves by bolts; The flange plate is sealed and arranged in the installation groove; the sealing body is a chemical sealant, and the chemical sealant is an acrylic sealant or a polysulfide sealant.

与现有技术比,本发明的有益效果有:Compared with prior art, the beneficial effect of the present invention has:

本发明提供了一种隧道防排水系统,通过在隧道二次衬砌中的前施工衬砌与后施工衬砌段之间设置排水缝隙,将隧道二次衬砌划分为排水区段和防水区段,在排水区段中地下渗水通过排水缝隙排出,降低了隧道二次衬砌的水压力,提高了防水区段的防水能力;通过设置可排水止水带,实现了将地下渗水限制在排水缝隙内,避免了地下渗水的窜流或进入隧道内部,影响隧道正常使用;本发明能够对排水缝隙中的沉积物及时方便清除,避免了隧道排水系统的堵塞;防排水效果好,使用期限较长;可排水止水带外贴设置隧道衬砌表面,便于检修及更换。The invention provides a tunnel waterproof and drainage system. By setting a drainage gap between the front construction lining and the rear construction lining section in the tunnel secondary lining, the tunnel secondary lining is divided into a drainage section and a waterproof section. The underground water seepage in the section is discharged through the drainage gap, which reduces the water pressure of the secondary lining of the tunnel and improves the waterproof capacity of the waterproof section; by setting the drainable waterstop, the underground water seepage is limited in the drainage gap, avoiding The channeling of underground seepage water or entering the tunnel will affect the normal use of the tunnel; the invention can timely and conveniently remove the sediment in the drainage gap, avoiding the blockage of the tunnel drainage system; the waterproof and drainage effect is good, and the service life is long; The outside of the hose is attached to the surface of the tunnel lining, which is convenient for maintenance and replacement.

进一步的,通过在隧道两侧边沟内设置汇水槽,实现了对隧道拱顶经可排水止水带汇集后的地下渗水以及对隧道腰部经排水缝隙流出的地下渗水的汇集,确保排水区段处地下渗水的完全汇集后排出隧道。Furthermore, by setting catchment tanks in the side ditches on both sides of the tunnel, the underground water seepage collected by the tunnel vault through the drainable waterstop and the underground seepage water flowing out of the tunnel waist through the drainage gap are realized, ensuring that the drainage section After the complete collection of underground seepage water, it will be discharged from the tunnel.

进一步的,横向排水管采用弧形排水管,横向排水管的进水口和出水口之间设置高差,确保了经地下渗水能够顺利经过横向排水管排出,避免了地下渗水倒灌至隧道内。Further, the horizontal drainage pipe adopts an arc-shaped drainage pipe, and a height difference is set between the water inlet and the water outlet of the horizontal drainage pipe to ensure that the underground seepage water can be smoothly discharged through the horizontal drainage pipe, and avoid the underground seepage water from being poured into the tunnel.

进一步的,排水缝隙为施工缝、沉降缝或变形缝,施工方便,不占用施工周期,施工成本低。Further, the drainage gaps are construction joints, settlement joints or deformation joints, which are convenient for construction, do not occupy the construction period, and have low construction cost.

进一步的,通过设置土工布,实现了对隧道围岩渗水的过滤,避免了杂质进入排水缝隙内,堵塞排水缝隙;通过分段设置防水板,在防水区段内,防水板完整铺设,起到了防水的作用,限制了水的排放;在排水区段,防水板之间形成排水通道,实现了对水的限量排放,保证隧道防排水系统完整性和密闭性便,同时满足防水及排水要求。Further, by installing geotextiles, the filtration of water seepage in the surrounding rock of the tunnel is realized, preventing impurities from entering the drainage gap and blocking the drainage gap; by setting waterproof boards in sections, the waterproof boards are completely laid in the waterproof section, which plays a role The function of waterproofing restricts the discharge of water; in the drainage section, drainage channels are formed between the waterproof plates, which realizes the limited discharge of water, ensures the integrity and airtightness of the tunnel waterproof and drainage system, and meets the waterproof and drainage requirements at the same time.

进一步的,通过将排水槽嵌入在排水缝隙内,通过排水槽汇集从排水缝隙流出的地下渗水,并将汇集的地下水排入横向排水管,再流入中央排水管,直至排出隧洞;排水盒作为二次防排水的屏障,当排水槽与排水缝隙之间存在少量渗漏水时,渗漏水通过排水槽与排水缝隙之间的缝隙进入排水盒内,利用排水盒对渗漏水二次汇集,并将其排出,避免了渗漏水浸入隧道内。Further, by embedding the drainage groove in the drainage gap, the underground seepage water flowing out of the drainage gap is collected through the drainage groove, and the collected groundwater is discharged into the horizontal drainage pipe, and then flows into the central drainage pipe until it is discharged into the tunnel; the drainage box serves as the second Secondary waterproof and drainage barrier, when there is a small amount of leakage water between the drainage groove and the drainage gap, the leakage water enters the drainage box through the gap between the drainage groove and the drainage gap, and uses the drainage box to collect the leakage water twice, And drain it, avoiding the seepage water immersion in the tunnel.

进一步的,通过将排水槽设置为半圆弧形结构或V型结构,确保了可排水止水带与排水缝隙的密封连接,避免了排水区段内地下渗水的窜流。Further, by setting the drainage groove as a semi-circular arc structure or a V-shaped structure, the sealed connection between the drainable waterstop and the drainage gap is ensured, and the channeling of underground seepage in the drainage section is avoided.

进一步的,通过设置卡接段,提高了排水槽与排水缝隙之间密封性,确保了通过排水缝隙中流出的地下渗水,全部汇集在排水槽内,进而将地下渗水排出;将卡接段设置为楔形结构,提高了卡接段与排水缝隙之间平顺连接,确保了地下水的汇集。Further, by setting the clamping section, the sealing between the drainage groove and the drainage gap is improved, ensuring that the underground seepage water flowing out of the drainage gap is all collected in the drainage groove, and then the underground seepage water is discharged; the clamping section is set It is a wedge-shaped structure, which improves the smooth connection between the clamping section and the drainage gap, and ensures the collection of groundwater.

进一步的,通过设置翼缘板,提高了排水盒与衬砌的密封,避免了地下渗水进入隧道内。Further, by setting the flange plate, the sealing between the drainage box and the lining is improved, and underground water seepage is prevented from entering the tunnel.

进一步的,通过采用密封体对翼缘板的密封,实现了对可排水止水带的二次密封;采用化学密封胶进行密封时,密封性能好;在需要维修更换时,只需要采用机械或化学方式凿除后,拆除螺栓,即可实现对可排水止水带的拆除,维修更换方式简单。Further, by using the sealing body to seal the flange plate, the secondary sealing of the drainable waterstop is realized; when the chemical sealant is used for sealing, the sealing performance is good; when maintenance and replacement are required, only mechanical or After the chemical method is removed, the bolts can be removed to realize the removal of the drainable waterstop, and the maintenance and replacement method is simple.

附图说明Description of drawings

图1为本发明所述的一种隧道防排水系统整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of a tunnel waterproof and drainage system according to the present invention;

图2为本发明所述的一种隧道防排水系统的局部断面示意图;Fig. 2 is a partial cross-sectional schematic diagram of a tunnel waterproof and drainage system according to the present invention;

图3为本发明所述的一种隧道防排水系统中的可排水止水带的整体结构示意图;3 is a schematic diagram of the overall structure of a drainable waterstop in a tunnel waterproof and drainage system according to the present invention;

图4为本发明所述的一种隧道防排水系统中的可排水止水带的横断面示意图;Fig. 4 is a schematic cross-sectional view of a drainable waterstop in a tunnel waterproof and drainage system according to the present invention;

图5为本发明所述的一种隧道防排水系统中的可排水止水带的安装结构示意图;Fig. 5 is a schematic diagram of the installation structure of a drainable waterstop in a tunnel waterproof and drainage system according to the present invention;

图6为本发明所述的一种隧道防排水系统中的汇水槽结构放大示意图。Fig. 6 is an enlarged schematic diagram of the structure of a water collection tank in a tunnel waterproof and drainage system according to the present invention.

其中,1排水缝隙,2可排水止水带,3横向排水管,4中央排水管,5汇水槽,6防水板,7土工布,8前施工衬砌段,9后施工衬砌段,10隧道围岩,11隧道仰拱,12初期支护;21排水盒,22排水槽,23卡接段,24翼缘板,25螺栓,26密封体。Among them, 1 drainage gap, 2 drainage waterstop, 3 horizontal drainage pipe, 4 central drainage pipe, 5 sink, 6 waterproof board, 7 geotextile, 8 front construction lining section, 9 rear construction lining section, 10 tunnel enclosure rock, 11 tunnel inverted arch, 12 primary support; 21 drainage box, 22 drainage groove, 23 clamping section, 24 flange plate, 25 bolt, 26 sealing body.

具体实施方式Detailed ways

下面结合本发明实施例的附图对本发明实施例的技术方案进行解释和说明,但下述实施例仅为本发明的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其他实施例,都属于本发明的保护范围。The technical solutions of the embodiments of the present invention will be explained and described below in conjunction with the accompanying drawings of the embodiments of the present invention, but the following embodiments are only preferred embodiments of the present invention, not all of them. Based on the examples in the implementation manners, other examples obtained by those skilled in the art without making creative efforts all belong to the protection scope of the present invention.

如附图1-2、6所示,本发明提供了一种隧道防排水系统,包括排水缝隙1、可排水止水带2、横向排水管3、中央排水管4、汇水槽5、防水板6及土工布7;排水缝隙1设置在隧道二次衬砌中的前施工衬砌段8与后施工衬砌段9之间,通过排水缝隙1将隧道二次衬砌划分为防水区段和排水区段,排水缝隙1沿隧道拱面环向设置;可排水止水带2嵌入设置在排水缝隙1的背水面,可排水止水带2沿排水缝隙1环向布设;可排水止水带2的两端延伸至隧道两侧边沟内,隧道两侧边沟内分别设置有汇水槽5,汇水槽5的上部与排水缝隙1连通;横向排水管3横向设置在隧道仰拱11内,横向排水管3的位置与排水缝隙1的位置相适应;横向排水管3采用弧形排水管,弧形排水管的最低点设置在隧道底板的中心线上,弧形排水管的两端分别与两侧的汇水槽5连通;中央排水管4沿隧道长度方向设置,且置于横向排水管3的最低点处,中央排水管4与横向排水管3连通;隧道围岩10内的渗水流入排水缝隙1后,经可排水止水带2的汇集后,排入汇水槽5内,然后经横向排水管3流入中央排水管4排出隧道外;中央排水管4长度方向上设置倾斜设置,中央排水管4的倾斜角度与隧道底板坡度相适应,便于水通过中央排水管4排出隧道外。As shown in Figures 1-2 and 6, the present invention provides a tunnel waterproof and drainage system, including a drainage gap 1, a drainable waterstop 2, a horizontal drainage pipe 3, a central drainage pipe 4, a water collection tank 5, and a waterproof board 6 and geotextile 7; the drainage gap 1 is set between the front construction lining section 8 and the rear construction lining section 9 in the tunnel secondary lining, and the tunnel secondary lining is divided into a waterproof section and a drainage section through the drainage gap 1. Drainage gap 1 is set along the tunnel arch in the circumferential direction; drainable waterstop 2 is embedded in the back surface of drainage gap 1, and drainable waterstop 2 is arranged along the circumference of drainage gap 1; both ends of drainable waterstop 2 Extending to the side ditches on both sides of the tunnel, the side ditches on both sides of the tunnel are respectively provided with catchment tanks 5, and the upper part of the catchment tanks 5 communicates with the drainage gap 1; The position of the horizontal drain pipe 3 adopts an arc-shaped drain pipe, and the lowest point of the arc-shaped drain pipe is set on the center line of the tunnel floor. The water tank 5 is connected; the central drainage pipe 4 is arranged along the length of the tunnel and placed at the lowest point of the horizontal drainage pipe 3, and the central drainage pipe 4 is connected to the horizontal drainage pipe 3; after the seepage water in the tunnel surrounding rock 10 flows into the drainage gap 1, After being collected by the drainable waterstop 2, it is discharged into the sump 5, and then flows into the central drain pipe 4 through the horizontal drain pipe 3 and is discharged out of the tunnel; The angle adapts to the slope of the tunnel bottom plate, so that water is discharged outside the tunnel through the central drainage pipe 4 .

排水缝隙1为隧道二次衬砌的施工缝、沉降缝或变形缝,有排水缝隙1的位置形成排水区段,无排水缝隙1的位置为防水区段,隧道二次衬砌的迎水面上依次设置有防水板6及土工布7;在设置防水板6时,根据每个防排水分区长度分区段布设;在防水区段,防水板按照规范进行正常搭接铺设;在排水区段,防水板6在排水缝隙1处分段设置,排水缝隙1两侧的两块防水板6均伸入排水缝隙1内,相邻两段施工衬砌段上的防水板6分别贴合在排水缝隙1的两侧缝隙壁上,并在两块防水板6之间预留有排水通道,便于隧道围岩渗水透过土工布,进入排水通道内,形成防排水分区;土工布7紧贴初期支护12设置,通过设置土工布7,实现了对隧道围岩渗水的过滤,避免了杂质进入排水缝隙1内,堵塞排水缝隙1。Drainage gap 1 is the construction joint, settlement joint or deformation joint of the secondary lining of the tunnel. The position with drainage gap 1 forms a drainage section, and the position without drainage gap 1 is a waterproof section. There are waterproof boards 6 and geotextiles 7; when installing waterproof boards 6, they are laid out in sections according to the length of each waterproof and drainage partition; The drainage gap 1 is arranged in sections, and the two waterproof boards 6 on both sides of the drainage gap 1 extend into the drainage gap 1, and the waterproof boards 6 on the two adjacent construction lining sections are respectively attached to the gaps on both sides of the drainage gap 1 On the wall, and a drainage channel is reserved between the two waterproof boards 6, so that the surrounding rock of the tunnel seeps through the geotextile and enters the drainage channel to form a waterproof and drainage partition; The geotextile 7 is provided to filter the seepage of the surrounding rock of the tunnel, and prevent impurities from entering the drainage gap 1 and blocking the drainage gap 1 .

如附图3-5所示,本发明中所述的可排水止水带2,包括排水盒21、排水槽22、卡接段23、翼缘板24、螺栓25及密封体26;排水盒21设置在排水缝隙1的背水面,排水盒21为凹型槽结构,排水盒21的凹面为迎水面;排水槽22固定设置在排水盒21的迎水面上,排水槽22的一端与排水盒21固定连接,排水槽22的另一端嵌入排水缝隙1中;排水槽22的截面为半圆弧形结构或V型结构;采用半圆弧形结构时,半圆弧形结构的底部圆弧面与排水盒21固定连接,半圆弧形结构的两个端侧壁分别与排水缝隙1的缝隙壁紧密贴合,且将防水板6置于排水槽21与排水缝隙1之间;半圆弧形结构的两个侧壁末端分别设置有卡接段23,两个卡接段23分别与排水缝隙1的缝隙壁紧密贴合,并将防水板6固定夹设在可排水止水带2与隧道二次衬砌之间;卡接段23为楔形结构,且卡接段23与排水槽22的连接端为大端,卡接段23的自由端为小端,实现了排水缝隙1的缝隙壁与排水槽22平顺连接;两个卡接段23远离半圆弧形结构的圆心倾斜设置,两个卡接段23之间的距离大于排水缝隙1的缝宽,保证了排水槽21与排水缝隙1之间的密封性。当采用V型结构时,V型结构的底部与排水盒21固定连接,V型结构的两个侧壁分别与排水缝隙1的两侧缝隙壁紧密贴合;V型结构的两个侧壁的末端之间的距离大于排水缝隙1的缝宽,确保了排水槽22与排水缝隙1之间的密封性。As shown in accompanying drawings 3-5, the drainable waterstop 2 described in the present invention includes a drainage box 21, a drainage groove 22, a clamping section 23, a flange plate 24, bolts 25 and a sealing body 26; the drainage box 21 is arranged on the backwater surface of the drainage gap 1, the drainage box 21 is a concave groove structure, and the concave surface of the drainage box 21 is the facing surface; Fixed connection, the other end of the drainage groove 22 is embedded in the drainage gap 1; the cross section of the drainage groove 22 is a semicircular arc structure or a V-shaped structure; Fixed connection, the two end side walls of the semicircular arc structure are closely attached to the slit wall of the drainage gap 1, and the waterproof board 6 is placed between the drainage groove 21 and the drainage gap 1; the two sides of the semicircular arc structure The end of the wall is respectively provided with clamping sections 23, and the two clamping sections 23 are respectively closely attached to the gap wall of the drainage gap 1, and the waterproof board 6 is fixedly sandwiched between the drainable waterstop 2 and the secondary lining of the tunnel The clamping section 23 is a wedge-shaped structure, and the connecting end of the clamping section 23 and the drainage groove 22 is a large end, and the free end of the clamping section 23 is a small end, so that the slit wall of the drainage gap 1 is connected smoothly with the drainage groove 22 The two clamping sections 23 are inclined away from the center of the semicircular arc structure, and the distance between the two clamping sections 23 is greater than the width of the drainage gap 1, which ensures the sealing between the drainage groove 21 and the drainage gap 1. When the V-shaped structure is adopted, the bottom of the V-shaped structure is fixedly connected to the drainage box 21, and the two side walls of the V-shaped structure are closely attached to the slit walls on both sides of the drainage gap 1; the two side walls of the V-shaped structure The distance between the ends is greater than the width of the drainage slit 1 , which ensures the tightness between the drainage groove 22 and the drainage slit 1 .

排水盒21的两个侧壁分别设置有翼缘板24,其中一个翼缘板24与前施工衬砌段8固定连接,另一个翼缘板24与后施工衬砌段9固定连接;前施工衬砌段8及后施工衬砌段9表面均设置有安装槽;翼缘板24嵌入安装槽内,并通过螺栓25与安装槽固定连接;安装槽内设置密封体26进行密封,实现翼缘板24与安装槽之间的密封连接;密封体26为化学密封胶,翼缘板24安装完成后,采用将化学密封胶浇注在安装槽内,确保了翼缘板24与安装槽之间的密封连接,实现了对可排水止水带的二次密封固定;化学密封胶采用丙烯酸酯密封胶或聚硫密封胶。The two side walls of the drainage box 21 are respectively provided with flange plates 24, wherein one flange plate 24 is fixedly connected with the front construction lining section 8, and the other flange plate 24 is fixedly connected with the rear construction lining section 9; the front construction lining section 8 and the surface of the rear construction lining section 9 are provided with installation grooves; the flange plate 24 is embedded in the installation groove, and is fixedly connected with the installation groove by bolts 25; The sealing connection between the grooves; the sealing body 26 is a chemical sealant. After the flange plate 24 is installed, the chemical sealant is poured in the installation groove to ensure the sealing connection between the flange plate 24 and the installation groove. The secondary sealing and fixing of the drainable waterstop is ensured; the chemical sealant adopts acrylic sealant or polysulfide sealant.

排水盒21、排水槽22、卡接段23及翼缘板24均采用橡胶制作,排水槽22及卡接段23内设置有钢丝网,提高了排水槽22及卡接段23的刚度,确保了排水槽22及卡接段23与排水缝隙1之间的密封连接。优选的,排水盒21、排水槽22、卡接段23及翼缘板24采用一体式结构。Drain box 21, drain groove 22, clamping section 23 and flange plate 24 are all made of rubber, and steel wire mesh is arranged in drain groove 22 and clamping section 23, which improves the rigidity of drain groove 22 and clamping section 23, ensures The sealing connection between the drainage groove 22 and the clamping section 23 and the drainage gap 1 is ensured. Preferably, the drainage box 21 , the drainage groove 22 , the clamping section 23 and the flange plate 24 adopt an integrated structure.

施工方案及防排水原理Construction plan and principle of waterproof and drainage

本发明所述的一种隧道方排水系统的施工方法,包括以下步骤:A construction method of a tunnel side drainage system according to the present invention comprises the following steps:

步骤1、立模,装配二衬台车并浇筑隧道二次衬砌;当一个排水区段前施工衬砌段浇筑至最后一模衬砌时,在二衬台车靠近待施工的排水缝隙1的一侧内部,距离排水缝隙1的端部1-2cm处安装固定一根环向钢条或橡胶条,环向钢条或橡胶条的截面为边长1cm的正方形,前施工衬砌段浇筑完成后,拆除环向钢条或橡胶条,在前施工衬砌段的背水面上形成安装槽;Step 1. Set up the formwork, assemble the second lining trolley and pour the secondary lining of the tunnel; when the construction lining section before a drainage section is poured to the last mold lining, the side of the second lining trolley close to the drainage gap 1 to be constructed Inside, install and fix a hoop steel bar or rubber strip at a distance of 1-2cm from the end of the drainage gap 1. The section of the hoop steel bar or rubber strip is a square with a side length of 1cm. After the pouring of the front construction lining section is completed, remove it Circumferential steel strips or rubber strips form installation grooves on the backwater surface of the front construction lining section;

步骤2、待前施工衬砌段养护工作完成后,弯折前施工衬砌段一侧的防水板6,并使其与前施工衬砌段的衬砌壁贴合;Step 2. After the maintenance work of the front construction lining section is completed, bend the waterproof board 6 on one side of the front construction lining section, and make it fit the lining wall of the front construction lining section;

步骤3、重复步骤1、2,浇筑后施工衬砌段;具体的,在后施工衬砌段施工前,在后施工衬砌段与前施工衬砌段之间预留出2cm的排水缝隙,在后施工衬砌段的端面弯折与步骤2中相同长度的防水板,并将防水板与后施工衬砌段的衬砌壁贴合,在两个防水板之间预留排水通道;在后施工衬砌段的第一模衬砌前,同样在二衬台车靠近排水缝隙的一侧内部,距离排水缝隙1的端部1-2cm处安装固定一根环向钢条或橡胶条,环向钢条或橡胶条的截面为边长1cm的正方形,前施工衬砌段浇筑完成后,拆除环向钢条或橡胶条,在后施工衬砌段的背水面上形成安装槽;Step 3, repeat steps 1 and 2, and construct the lining section after pouring; specifically, before the construction of the rear construction lining section, reserve a drainage gap of 2 cm between the rear construction lining section and the front construction lining section. The end face of the section bends the waterproof board with the same length as in step 2, and the waterproof board is attached to the lining wall of the rear construction lining section, and a drainage channel is reserved between the two waterproof boards; Before the mold lining, also install and fix a hoop steel bar or rubber strip on the side of the second lining trolley close to the drainage gap, 1-2cm away from the end of the drainage gap 1, and the cross section of the hoop steel bar or rubber strip It is a square with a side length of 1cm. After the pouring of the front construction lining section is completed, the circumferential steel strip or rubber strip is removed, and an installation groove is formed on the back water surface of the rear construction lining section;

步骤4、在前、后施工衬砌段养护完成后,开始安装可排水止水带;具体的,首先将可排水止水带的卡接段用力向中间挤压,使两个卡接段的间距小于排水缝隙的缝宽;然后将卡接段嵌入排水缝隙中,用力推动可排水止水带,使卡接段与排水缝隙的缝隙壁密切贴合,并将防水板固定夹设在可排水止水带与二次衬砌之间;继续用力推动可排水止水带,使翼缘板嵌入在安装槽内,通过螺栓将翼缘板与安装槽固定连接,实现对整条可排水止水带的预固定,最后采用化学密封胶对安装槽进行填补密封,实现对可排水止水带的二次密封固定。Step 4. After the maintenance of the front and rear construction lining sections is completed, start to install the drainable waterstop; specifically, first squeeze the clamping section of the drainable waterstop to the middle to make the distance between the two clamping sections less than the width of the drainage gap; then insert the clamping section into the drainage gap, push the drainable waterstop firmly so that the clamping section fits closely with the gap wall of the drainage gap, and fix the waterproof board on the drainable stop Between the water belt and the secondary lining; continue to push the drainable waterstop hard, so that the flange plate is embedded in the installation groove, and the flange plate and the installation groove are fixedly connected by bolts to realize the protection of the entire drainable waterstop Pre-fix, and finally use chemical sealant to fill and seal the installation groove to realize the secondary sealing and fixing of the drainable waterstop.

使用时,当地下水通过隧道围岩中缝隙渗透到土工布,经过土工布过滤作用,过滤掉其中的杂质,较清澈的水通过防水板汇入防水板与排水缝隙形成的排水通道,然后经过排水槽汇集作用,沿着排水通道流入汇水槽中,在通过横向排水管进入中央排水管内,最终导出隧道。When in use, when the groundwater penetrates into the geotextile through the gaps in the surrounding rock of the tunnel, the impurities in it are filtered out through the filtration of the geotextile, and the clearer water flows into the drainage channel formed by the waterproof board and the drainage gap through the waterproof board, and then passes through the drainage channel. The pooling function of the water tank flows into the sump along the drainage channel, enters the central drainage pipe through the horizontal drainage pipe, and finally leads out to the tunnel.

本发明中所述的可排水止水带在需要维修更换时,通过化学或物理凿除的方式,除去密封体,然后拆除螺栓,最后,将可排水止水带从排水缝隙中抽除;待检查修复完成后,将修复后的或新的可排水止水带重新安装在排水缝隙中,便实现了对可排水止水带的维修更换,其检修更换方式简单,操作方便。When the drainable waterstop described in the present invention needs maintenance and replacement, the sealing body is removed by chemical or physical chiseling, and then the bolts are removed, and finally, the drainable waterstop is extracted from the drainage gap; After the inspection and repair is completed, the repaired or new drainable waterstop is reinstalled in the drainage gap, and the maintenance and replacement of the drainable waterstop is realized. The maintenance and replacement method is simple and easy to operate.

本发明所述的一种隧道防排水系统,在施工时土工布正常搭接铺设,采用土工布过滤掉地下水中的杂质,保证较清澈的水通过环向排水缝隙位置流入可排水止水带并导入隧道内的横向排水管,再由横向排水管流入中央排水管,最终将地下水导出隧道外。In the tunnel waterproof and drainage system described in the present invention, the geotextile is normally lapped and laid during construction, and the impurities in the groundwater are filtered out by using the geotextile to ensure that relatively clear water flows into the drainable waterstop through the circumferential drainage gap and The horizontal drainage pipes are introduced into the tunnel, and then flow into the central drainage pipes from the horizontal drainage pipes, and finally the groundwater is led out of the tunnel.

本发明所述的一种隧道防排水系统中,防水板不再是一个整体,防水板在排水缝隙的端头,排水板位置折向排水缝隙内,使其与衬砌壁贴合并固定,使两块防水板中间留出排水通道。防水板折向施工缝的长度应比隧道二次衬砌的厚度稍大,以便于防水板的固定,以及和外排水构件结合成整体,保证整个防排水系统的密闭性。In the tunnel waterproof and drainage system described in the present invention, the waterproof board is no longer a whole, the waterproof board is at the end of the drainage gap, and the position of the drainage board is folded into the drainage gap, so that it is attached and fixed to the lining wall, so that the two Leave a drainage channel in the middle of the waterproof board. The length of the waterproof board folded to the construction joint should be slightly larger than the thickness of the secondary lining of the tunnel, so as to facilitate the fixing of the waterproof board and integrate it with the external drainage components to ensure the airtightness of the entire waterproof and drainage system.

本发明所述的一种隧道防排水系统中,可排水止水带采用一种带翼缘板的外排水橡胶带。该橡胶带排水部分呈半圆弧形或V型结构,排水部分的卡接段比排水缝隙的缝宽略宽,可排水止水带的卡接段及排水槽内部设有金属钢丝网,增加其自身的张力,使其在安装的时候与防水板贴合的更好。可排水止水带中的排水盒能够实现二次防排水,排水盒的翼缘板确保了可排水止水带的固定连接In the tunnel waterproof and drainage system described in the present invention, the drainable waterstop adopts an outer drainage rubber belt with a flange plate. The drainage part of the rubber belt has a semi-circular arc or V-shaped structure. The clamping section of the drainage part is slightly wider than the width of the drainage gap. Its own tension makes it fit better with the waterproof board during installation. The drainage box in the drainable waterstop can realize secondary waterproofing and drainage, and the flange plate of the drainage box ensures the fixed connection of the drainable waterstop

本发明所述的一种隧道防排水系统,通过对隧道二次衬砌的水压力、渗水量及隧道围岩级别,并结合水压力和渗水量的控制标准以及隧道的设计指标参数,确定隧道的防排水分区长度,通过设置排水缝隙,将隧道二次衬砌划分不同长度的防水区段和排水区段,在防水区段以防水为主,限制水的排放;在排水区段,地下渗水通过排水缝隙排出,实现限量排放,最大限度地保护水资源生态环境,尽量减少水土流失,从而做到了排水量和渗水量的匹配,修建时合理利用资源,降低了施工成本。本发明中可排水止水带能够方便更换,可主动维护各区段的排水设施,便于后期清除排水沉积物,解决了运营期间隧道渗漏水问题难度大的问题,从而实现了隧道防排水系统的“可维可达”。本发明对隧道的渗漏水现象有极大的改善作用,可提高隧道整体结构的安全性和耐久性,并能极大提高隧道内的行车安全性能,减少因渗漏水对行车速度的限制。本发明具有节约建设投资与运营投资,具有明显的实用价值,经济与社会效益显著。本发明的防排水体系采用限量排放模式,防水区段以防水为主限制水的排放,排水区段以限量排放为主,减少了地下水对隧道衬砌的危害,还能尽量减少水土流失,保证隧道周边区域的生态环境免受破坏。A tunnel waterproof and drainage system according to the present invention determines the water pressure of the secondary lining of the tunnel, the amount of seepage and the level of the surrounding rock of the tunnel, and combines the control standards of the water pressure and the amount of water seepage and the design index parameters of the tunnel to determine the The length of waterproof and drainage partitions. By setting drainage gaps, the secondary lining of the tunnel is divided into waterproof sections and drainage sections of different lengths. In the waterproof section, water is mainly used to limit the discharge of water; in the drainage section, underground water seepage through drainage Gap discharge, realize limited discharge, protect the ecological environment of water resources to the greatest extent, and minimize soil erosion, so as to achieve the matching of drainage and water seepage, rational use of resources during construction, and reduce construction costs. In the present invention, the drainable waterstop can be easily replaced, and the drainage facilities in each section can be actively maintained, which facilitates the removal of drainage sediments in the later stage, and solves the difficult problem of tunnel water leakage during operation, thereby realizing the waterproof and drainage system of the tunnel. "Vida". The invention can greatly improve the water leakage phenomenon of the tunnel, can improve the safety and durability of the overall structure of the tunnel, can greatly improve the driving safety performance in the tunnel, and reduce the limitation of the driving speed due to water leakage . The invention has the advantages of saving construction investment and operating investment, has obvious practical value, and has remarkable economic and social benefits. The waterproof and drainage system of the present invention adopts a limited discharge mode. The waterproof section is mainly waterproof to limit the discharge of water, and the drainage section is mainly limited to discharge, which reduces the damage of groundwater to the tunnel lining, and can also minimize water and soil loss, ensuring that the tunnel The ecological environment of the surrounding area is protected from damage.

本发明所述的一种隧道防排水系统,基于分区防排水理念,在隧道二次衬砌的施工缝、变形缝或沉降缝处设置可排水止水带,可排水止水带具有破损老化可更换的特点,并取消了现有排水系统中的纵向排水管,取代了目前在防水板上安装止水带的分区方式,也解决了防排水系统内部排水管堵塞不便于检查或者更换的问题。The tunnel waterproof and drainage system described in the present invention is based on the concept of partition waterproof and drainage, and a drainable waterstop is set at the construction joint, deformation joint or settlement joint of the secondary lining of the tunnel. The drainable waterstop has the characteristics of damage and aging and can be replaced It also eliminates the vertical drainage pipes in the existing drainage system, replaces the current partition method of installing waterstops on the waterproof board, and also solves the problem that the internal drainage pipes of the waterproof drainage system are blocked and difficult to check or replace.

Claims (10)

1. a kind of tunnel waterproof and water drainage system, which is characterized in that including draining gap (1), can drainage water stop (2), transverse drainage (3) and central drain (4) are managed, preceding construction lining cutting (8) and rear construction lining in Tunnel Second Lining is arranged in draining gap (1) It builds between section (9), Tunnel Second Lining is divided by waterproof section and draining section by draining gap (1);It drains gap (1) Along tunnel, arch face is arranged circumferentially;Can drainage water stop (2) insertion setting draining gap (1) back side, can drainage water stop (2) lay along draining gap (1) is circumferential, can the both ends of drainage water stop (2) extend in the gutter of tunnel two sides;Transverse drain (3) be horizontally installed in tunnel inverted arch (11), the both ends of transverse drain (3) respectively with tunnel two sides gutter;Central drain (4) it is arranged along length of tunnel direction, central drain (4) is connected to transverse drain (3).
2. a kind of tunnel waterproof and water drainage system according to claim 1, which is characterized in that be respectively set in the gutter of tunnel two sides Have catchment tray (5), the top of catchment tray (5) is connected to draining gap (1);The bottom and transverse drain (3) of catchment tray (5) are even It is logical.
3. a kind of tunnel waterproof and water drainage system according to claim 1, which is characterized in that transverse drain (3) uses arc The minimum point of drainpipe, arc drainpipe is arranged on the center line of tunnel floor, and central drain (4) is placed in transverse drain (3) at minimum point, it is arranged on central drain (4) length direction and is obliquely installed, inclined direction and tunnel floor longitudinal slope direction It is adapted.
4. a kind of tunnel waterproof and water drainage system according to claim 1, which is characterized in that draining gap (1) is that tunnel is secondary Construction joint, subsiding crack or the deformation joint of lining cutting.
5. a kind of tunnel waterproof and water drainage system according to claim 1, which is characterized in that on the upstream face of Tunnel Second Lining It is disposed with splash guard (6) and geotextiles (7);Splash guard (6) subsection setup at draining gap (1), drains gap (1) two Two pieces of splash guards (6) of side are protruded into draining gap (1), and are bonded respectively with the gap wall of the two sides of draining gap (1), two Block splash guard is reserved with drainage channel between (6);The upstream face in splash guard (6) is arranged in geotextiles (7), and is close to preliminary bracing (12) it is arranged.
6. a kind of tunnel waterproof and water drainage system according to claim 1, which is characterized in that can drainage water stop (2) include row Water box (21) and rhone (22), drainage box (21) are fixed at the back side of draining gap (1), and drainage box (21) is spill Slot structure;The concave surface of drainage box (21) is upstream face, and rhone (22) is fixed on the upstream face of drainage box (21);Draining One end of slot (22) is fixedly connected with drainage box (21), in the other end and insertion draining gap (1), two sides of rhone (22) Two sides gap wall of the wall respectively with draining gap (1) fits closely.
7. a kind of tunnel waterproof and water drainage system according to claim 6, which is characterized in that the section of rhone (22) is semicircle Arc or V-structure;Wherein, the bottom arc surface of semicircular arc structure is fixedly connected with drainage box (21), semicircular arc structure Two side walls respectively with draining gap (1) two sides gap wall fit closely;The bottom and drainage box (21) of V-structure are fixed Connection, two sides gap wall of the two side walls end of V-structure respectively with draining gap (1) fit closely.
8. a kind of tunnel waterproof and water drainage system according to claim 6, which is characterized in that the two side walls end of rhone (22) End is respectively arranged with clamping section (23), and clamping section (23) is fitted closely with draining gap (1);Two clamping section (23) between away from From the slit width for being greater than draining gap (1);It is clamped section (23) and uses wedge structure, be clamped the connecting pin of section (23) and rhone (22) For big end, the free end for being clamped section (23) is small end.
9. a kind of tunnel waterproof and water drainage system according to claim 6, which is characterized in that the two side walls of drainage box (21) point It is not provided with flange plate (24);Wherein, a flange plate (24) is fixedly connected with preceding construction lining cutting section (8), another flange plate (24) it is fixedly connected with rear construction lining cutting section (9).
10. a kind of tunnel waterproof and water drainage system according to claim 9, which is characterized in that preceding construction lining cutting section (8) and after apply Work lining cutting section (9) surface is provided with mounting groove, and flange plate (24) is embedded in mounting groove;And pass through bolt (25) for flange plate (24) it is fixedly connected with mounting groove;Seal (26) are provided in mounting groove, for flange plate (24) to be sealingly disposed in installation In slot;Seal (26) is chemical seal glue, and chemical seal glue uses acrylic sealant or polysulfide sealant.
CN201910927899.4A 2019-09-27 2019-09-27 Tunnel waterproof and drainage system Active CN110513130B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910927899.4A CN110513130B (en) 2019-09-27 2019-09-27 Tunnel waterproof and drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910927899.4A CN110513130B (en) 2019-09-27 2019-09-27 Tunnel waterproof and drainage system

Publications (2)

Publication Number Publication Date
CN110513130A true CN110513130A (en) 2019-11-29
CN110513130B CN110513130B (en) 2024-05-28

Family

ID=68632774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910927899.4A Active CN110513130B (en) 2019-09-27 2019-09-27 Tunnel waterproof and drainage system

Country Status (1)

Country Link
CN (1) CN110513130B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387160A (en) * 2017-08-07 2017-11-24 北京市市政工程设计研究总院有限公司 A kind of half permeable drainpipe of Ω types
CN110748359A (en) * 2019-12-06 2020-02-04 中铁十八局集团建筑安装工程有限公司 Tunnel water-proof and drainage construction process
CN111305881A (en) * 2020-04-17 2020-06-19 河北恒洋工程装备有限公司 A kind of self-adhesive water stop belt and its use method
CN111365030A (en) * 2020-04-02 2020-07-03 中铁工程设计咨询集团有限公司 Tunnel concrete lining structure gap water leakage treatment device and treatment method
CN111719344A (en) * 2020-06-30 2020-09-29 南阳理工学院 A kind of ballast bed waterproof and drainage structure
CN112943358A (en) * 2021-03-02 2021-06-11 中交隧道工程局有限公司 Drainage guiding method comprehensively considering underground water protection and reducing tunnel lining damage
CN112983539A (en) * 2021-04-19 2021-06-18 江西省交通科学研究院有限公司 Tunnel surrounding rock drainage support structure and construction method
CN113153379A (en) * 2021-04-27 2021-07-23 重庆永昂实业有限公司 Tunnel water-proof and drainage system and construction process
CN113863964A (en) * 2021-10-19 2021-12-31 中铁隧道局集团有限公司 Waterproof facility for subway operation
CN114837693A (en) * 2022-04-21 2022-08-02 青岛理工大学 A kind of subsea tunnel annular self-draining segment
CN114876507A (en) * 2022-05-10 2022-08-09 中交第二公路勘察设计研究院有限公司 Tunnel flexible joint structure suitable for active fracture and mounting method thereof
CN115199306A (en) * 2022-07-06 2022-10-18 中铁二十一局集团第二工程有限公司 Waterproof equipment and application method for water leakage in tunnel construction stage
CN116411977A (en) * 2022-12-30 2023-07-11 济南城建集团有限公司 Tunnel expansion joint glue injection sealing structure and tunnel expansion joint sealing construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0828195A (en) * 1994-07-12 1996-01-30 Okumura Corp Tunnel lining method
JP2006200141A (en) * 2005-01-18 2006-08-03 Kajima Corp Tunnel spring water treatment method and spring water treatment structure
CN102434175A (en) * 2012-01-12 2012-05-02 中国市政工程西北设计研究院有限公司 Tunnel lining self waterproof drainage system
CN106522990A (en) * 2016-11-03 2017-03-22 铁道第三勘察设计院集团有限公司 Tunnel lining end template structure with waterproofing and drainage functions
CN206571506U (en) * 2017-01-10 2017-10-20 西南交通大学 A kind of tunnel water proofing subregion construction using spraying waterproof technique
CN107816361A (en) * 2017-12-08 2018-03-20 四川省交通运输厅公路规划勘察设计研究院 Tunnel rich water section partitioning waterproofing system
CN210637090U (en) * 2019-09-27 2020-05-29 长安大学 Tunnel water-proof and drainage system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0828195A (en) * 1994-07-12 1996-01-30 Okumura Corp Tunnel lining method
JP2006200141A (en) * 2005-01-18 2006-08-03 Kajima Corp Tunnel spring water treatment method and spring water treatment structure
CN102434175A (en) * 2012-01-12 2012-05-02 中国市政工程西北设计研究院有限公司 Tunnel lining self waterproof drainage system
CN106522990A (en) * 2016-11-03 2017-03-22 铁道第三勘察设计院集团有限公司 Tunnel lining end template structure with waterproofing and drainage functions
CN206571506U (en) * 2017-01-10 2017-10-20 西南交通大学 A kind of tunnel water proofing subregion construction using spraying waterproof technique
CN107816361A (en) * 2017-12-08 2018-03-20 四川省交通运输厅公路规划勘察设计研究院 Tunnel rich water section partitioning waterproofing system
CN210637090U (en) * 2019-09-27 2020-05-29 长安大学 Tunnel water-proof and drainage system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吕康成;吉哲;马超超;许鹏;: "寒区隧道冻害成因与若干防治新技术", 公路, no. 07 *
吕康成;马超超;吉哲;许鹏;: "隧道衬砌施工缝蝶形可排水止水带研制", 现代隧道技术, no. 06 *
宁静, 王非, 冯若谦: "黄泥川隧道防排水设计", 辽宁交通科技, no. 04 *
张永平;: "浅谈公路隧道结构防排水施工及防治措施", 青海交通科技, no. 01 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387160A (en) * 2017-08-07 2017-11-24 北京市市政工程设计研究总院有限公司 A kind of half permeable drainpipe of Ω types
CN110748359A (en) * 2019-12-06 2020-02-04 中铁十八局集团建筑安装工程有限公司 Tunnel water-proof and drainage construction process
CN111365030A (en) * 2020-04-02 2020-07-03 中铁工程设计咨询集团有限公司 Tunnel concrete lining structure gap water leakage treatment device and treatment method
CN111305881A (en) * 2020-04-17 2020-06-19 河北恒洋工程装备有限公司 A kind of self-adhesive water stop belt and its use method
CN111719344A (en) * 2020-06-30 2020-09-29 南阳理工学院 A kind of ballast bed waterproof and drainage structure
CN112943358A (en) * 2021-03-02 2021-06-11 中交隧道工程局有限公司 Drainage guiding method comprehensively considering underground water protection and reducing tunnel lining damage
CN112983539A (en) * 2021-04-19 2021-06-18 江西省交通科学研究院有限公司 Tunnel surrounding rock drainage support structure and construction method
CN113153379A (en) * 2021-04-27 2021-07-23 重庆永昂实业有限公司 Tunnel water-proof and drainage system and construction process
CN113153379B (en) * 2021-04-27 2024-01-09 重庆永昂实业有限公司 Tunnel waterproof and drainage system and construction process
CN113863964A (en) * 2021-10-19 2021-12-31 中铁隧道局集团有限公司 Waterproof facility for subway operation
CN114837693A (en) * 2022-04-21 2022-08-02 青岛理工大学 A kind of subsea tunnel annular self-draining segment
CN114876507A (en) * 2022-05-10 2022-08-09 中交第二公路勘察设计研究院有限公司 Tunnel flexible joint structure suitable for active fracture and mounting method thereof
CN115199306A (en) * 2022-07-06 2022-10-18 中铁二十一局集团第二工程有限公司 Waterproof equipment and application method for water leakage in tunnel construction stage
CN116411977A (en) * 2022-12-30 2023-07-11 济南城建集团有限公司 Tunnel expansion joint glue injection sealing structure and tunnel expansion joint sealing construction method

Also Published As

Publication number Publication date
CN110513130B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN110513130A (en) A tunnel waterproof and drainage system
CN106968712B (en) Drainage Structure and Construction Method of Tunnel Bottom in Water-rich Stratum
CN104806272A (en) Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof
CN111005761B (en) Water collecting and draining structure of mine tunnel and construction method thereof
CN106368239B (en) Water sealing structure and its construction method at Urban Underground pipe gallery expansion joint
CN106638337A (en) Prefabricated concrete culvert pipe, prefabricated comprehensive pipe gallery and maintenance method of comprehensive pipe gallery
CN215329049U (en) A track structure with a drainage pump station in an integral track bed
CN108757027A (en) Multi-functional lobby water system in a kind of tunnel
CN210637090U (en) Tunnel water-proof and drainage system
CN215669957U (en) Basement car ramp antiseep structure
CN110629667B (en) Bridge floor transverse drainage structure and drainage system thereof
CN116677452B (en) A method for cleaning, separating and draining sewage at a bifurcation point in an overpass tunnel
CN110513145B (en) Drainable water stop
CN210637110U (en) Water stop capable of draining water
CN114837693B (en) A kind of annular self-draining pipe segment for submarine tunnel
CN213928445U (en) Anti-blocking device for tunnel drainage
CN116254862A (en) A Foundation Pit Drainage System Combining with Internal Support of Deep and Large Foundation Pit
CN111119994B (en) A water collection and drainage structure for a mining tunnel and a construction method thereof
CN219570146U (en) Tunnel drainage structure
CN220247157U (en) Water intercepting ditch structure
CN113700115A (en) Suspension protection construction method for municipal drainage closed conduit steel pipe transformation
CN222333862U (en) A high-strength concrete drainage ditch with integrated open and dark ditches in highway tunnels
CN223675484U (en) A recyclable drainage ditch around the foundation pit
KR200423906Y1 (en) Double Side Spiral Curved Oval Precast Drainage Structure
CN222227348U (en) Urban pipe gallery comprehensive waterproof structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant