CN110130980A - A kind of tunnel drainage device, system and its construction method - Google Patents

A kind of tunnel drainage device, system and its construction method Download PDF

Info

Publication number
CN110130980A
CN110130980A CN201910287010.0A CN201910287010A CN110130980A CN 110130980 A CN110130980 A CN 110130980A CN 201910287010 A CN201910287010 A CN 201910287010A CN 110130980 A CN110130980 A CN 110130980A
Authority
CN
China
Prior art keywords
tunnel
pipe
blind pipe
draining
permeable blind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910287010.0A
Other languages
Chinese (zh)
Inventor
丁然
王能学
王尚书
梁文雨
陈鸿
付立丽
寇建
宋新宇
王永龙
杨骞
李博
栾志鹏
赵伟
陈豫霆
杨正雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201910287010.0A priority Critical patent/CN110130980A/en
Publication of CN110130980A publication Critical patent/CN110130980A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

It includes: circumferential Permeable blind pipe that the present invention, which discloses a kind of tunnel drainage device, system and its construction method, the drainage arrangement,;Longitudinal Permeable blind pipe;Tunnel waterproofing layer;Tunnel drainage main pipe;The system comprises tunnel drainage devices described in several sets;The construction method includes: fixed setting longitudinal drainage blind pipe, and the circle draining blind pipe is fixedly installed;Step 2: the first draining maintenance pipe is connected to longitudinal Permeable blind pipe, and the second draining maintenance pipe is connected to circumferential Permeable blind pipe;Step 3: longitudinal Permeable blind pipe and circumferential Permeable blind pipe are connected to branch drain by three-way connection;Step 4: the tunnel being spread and hangs tunnel waterproofing layer;Step 5: moulded lining construction is carried out to the tunnel;Step 6: the first draining maintenance pipe and the second draining maintenance pipe are blocked.Tunnel drainage device, system and its construction method of the present invention realize the maintenance to entire drainage arrangement by setting the first draining maintenance pipe and the second draining maintenance pipe.

Description

A kind of tunnel drainage device, system and its construction method
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a kind of tunnel drainage device, system and its construction method.
Background technique
Currently, the lining cutting system of draining behind is through frequently with circumferential, longitudinal drainage blind pipe construction method, draining blind pipe passes through center Ditch is discharged outside tunnel, but such drainage system is located at tunnel-liner behind, does not have maintainability, especially positioned at severe cold The tunnel in area once enters freezing season, and lined internal drainage system is caused to freeze since temperature is too low, generates frost heave, blocking now As influencing tunnel internal drainage system normal work, to influence lining concrete entity quality, causing shadow to construction and operation It rings.And it safeguards that unit needs to put into a large amount of manpower and material resources and handled, increases the difficulty and maintenance cost of operation management.
For example, application No. is the Patent Application Publications of CN201821048142.5 to disclose one kind for Chinese utility model patent The discharge structure that tunnel bottom hydraulic pressure can be reduced, including the row being set between preliminary bracing structure and secondary liner structure (50) Water system, drainage system include the longitudinal drainage blind pipe (20) for being set to two sides arch springing position, and are arranged along tunnel longitudinal gap Circle draining blind pipe (10), the both ends of circle draining blind pipe (10) are connected with ipsilateral longitudinal drainage blind pipe (20), and inverted arch is filled out It fills in layer (52) and centre drain (40) is set, it is characterized in that: the inverted arch (51) of the secondary liner structure (50) is arranged below Tunnel bottom drainage system, the tunnel bottom drainage system is from tunnel bottom longitudinal drainage blind pipe (31), reverse aqueduct (33) and tunnel base ring to row Water blind pipe (34) is constituted, and tunnel bottom longitudinal drainage blind pipe (31) is embedded in the longitudinal groove below centre drain (40), inversely Aqueduct (33) is arranged along tunnel longitudinal gap, and lower end is connected to tunnel bottom longitudinal drainage blind pipe (31), and upper end side stretches out center Gutter (40) bottom wall certain altitude;The tunnel bottom circle draining blind pipe (34) is arranged along tunnel longitudinal gap, both ends and same Side longitudinal drainage blind pipe (20) is connected.
I.e. there are technical problems as described above for the above-mentioned prior art.
Based on above-mentioned technical problem of the existing technology, the present invention proposes a kind of tunnel drainage device, system and its applies Work method.
Summary of the invention
The present invention provides a kind of tunnel drainage device, system and its construction method, by setting the first draining maintenance pipe and Second drains maintenance of the maintenance pipe realization to entire drainage arrangement, solves drainage arrangement internal pipeline and generates frost heave, blocking now As.
In order to achieve the above objectives, the invention adopts the following technical scheme:
A kind of tunnel drainage device, comprising:
Circumferential Permeable blind pipe, on the cyclic annular abutment wall wall for being attached to tunnel;
Longitudinal Permeable blind pipe is installed at the corner at the tunnel side wall both ends, the setting side of the longitudinal direction Permeable blind pipe To parallel with tunnel axis;
Tunnel waterproofing layer is fitted on the abutment wall in the tunnel and the circumferential Permeable blind pipe and the longitudinal direction is permeable blind Pipe package;
Tunnel drainage main pipe is connected to the circumferential Permeable blind pipe and longitudinal Permeable blind pipe will flow into the tunnel The water seepage of tunnel of arterial drainage is discharged.
Further, it is communicated with the first draining maintenance on the high one end in longitudinal Permeable blind pipe position to manage, described first Dismountable maintenance pipe plug is communicated on draining maintenance pipe;The low one end in the longitudinal direction Permeable blind pipe position is connected to the row Water branch pipe, the branch drain are connected to the tunnel drainage main pipe.
Further, the both ends of the circumferential Permeable blind pipe are respectively communicated in the branch drain, and the circumferential direction is permeable blind Pipe is also connected to the second draining maintenance pipe, is communicated with dismountable maintenance pipe plug on the second draining maintenance pipe.
Further, the low one end in longitudinal Permeable blind pipe position, the both ends of the circumferential Permeable blind pipe and the row It is connected between water branch pipe by three-way connection.
Further, longitudinal Permeable blind pipe is outsourcing geotextilesPunch bellows;The circumferential direction is permeable blind Pipe is outsourcing geotextilesPunch bellows, wherein punching is for making water seepage of tunnel flow into the branch drain.
Further, the circumferential direction that the cyclic annular abutment wall wall in the tunnel is additionally provided with for being embedded the circumferential Permeable blind pipe is reserved Slot.
The present invention also provides a kind of tunnel drainage systems, including tunnel drainage device described in several sets, several set tunnels Drainage arrangement is disposed side by side in the tunnel.
The present invention separately provides a kind of construction method of tunnel drainage device, includes the following steps:
Step 1: longitudinal drainage blind pipe is fixedly installed in the corner position of tunnel side wall two sides, fixation is set at tunnel side wall Set the circle draining blind pipe;
Step 2: the first draining maintenance pipe being connected to the high one end in longitudinal Permeable blind pipe position, the second draining is tieed up Pillar is connected to the two sides of the circumferential Permeable blind pipe;
Step 3: one end of the low one end in longitudinal Permeable blind pipe position and the circumferential Permeable blind pipe is passed through into threeway Connector is connected to branch drain, and branch drain is connected to tunnel drainage main pipe;
Step 4: the tunnel being spread and hangs tunnel waterproofing layer, is opened up on the tunnel waterproofing layer by the first draining maintenance The hole that the extension end of pipe and the extension end of the second draining maintenance pipe are stretched out;
Step 5: moulded lining construction is carried out to the tunnel;
Step 6: by the first draining maintenance pipe and the outer cable groove sidewall for being extended down to tunnel of the second draining maintenance pipe On, and the first draining maintenance pipe and the second draining maintenance pipe are blocked.
Further, if the circumferential direction Permeable blind pipe and longitudinal Permeable blind pipe are because of frost blocking, using high steam It is passed through the first draining maintenance pipe and the second draining maintenance is managed so that frost is melted, then is rinsed and dredged by high pressure water.
Preferably, tunnel waterproofing layer described in step 4 uses 400g/m2Geotextiles be bonded with EVA splash guard.
Preferably, tunnel waterproofing layer described in step 4 include the first geotextile layer successively glued together, it is first high Molecule waterproof lamellar, EVA waterproof lamellar, the second macromolecule waterproof lamellar and the second geotextile layer composition, wherein described first is high Molecule waterproof lamellar and the second macromolecule waterproof lamellar are PVC splash guard, the first macromolecule waterproof lamellar, described The both side surface of EVA waterproof lamellar and the second macromolecule waterproof lamellar is equipped with self-adhesive glue layer.
Compared with prior art, superior effect of the invention is:
1, tunnel drainage device of the present invention, it is real by being equipped with the first draining maintenance pipe and the second draining maintenance pipe Now to the maintenance of entire drainage arrangement, solves drainage arrangement internal pipeline and generate frost heave, clogging.
2, the construction method of tunnel drainage device of the present invention, by the way that the tunnel drainage device is embedded in tunnel In, so that the tunnel drainage device is combined together with tunnel, is not easy to send failure and damage.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of tunnel drainage device in the embodiment of the present invention 1;
Fig. 2 is the structural schematic diagram that tunnel drainage device is connected with tunnel in the embodiment of the present invention 1;
In figure: 1- circumferential direction Permeable blind pipe, the longitudinal direction 2- Permeable blind pipe, 3- tunnel waterproofing layer, 4- tunnel drainage main pipe, 5- first Draining maintenance pipe, 6- branch drain, 8- second draining maintenance pipe.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real Applying mode, the present invention is further described in detail, it should be noted that in the absence of conflict, the implementation of the application Feature in example and embodiment can be combined with each other.
Embodiment 1
As shown in Figs. 1-2, a kind of tunnel drainage device, comprising:
Circumferential Permeable blind pipe 1, on the cyclic annular abutment wall wall for being attached to tunnel;
Longitudinal Permeable blind pipe 2 is installed at the corner at the tunnel side wall both ends, the setting of the longitudinal direction Permeable blind pipe 2 Direction is parallel with tunnel axis;
Tunnel waterproofing layer 3 is fitted on the abutment wall in the tunnel and the circumferential Permeable blind pipe 1 and the longitudinal direction is permeable Blind pipe 2 wraps up;
Tunnel drainage main pipe 4 is connected to the circumferential Permeable blind pipe 1 and longitudinal Permeable blind pipe 2 with described in flowing into The water seepage of tunnel of tunnel drainage main pipe 4 is discharged.
It is using clip that circumferential Permeable blind pipe 1 is fixed for the ease of fixation of the circumferential Permeable blind pipe 1 on cyclic annular abutment wall wall On the cyclic annular abutment wall in tunnel.
Wherein, in the present embodiment, the tunnel drainage main pipe 4 is usedPvc pipe, the tunnel drainage main pipe 4 with The drainage system in tunnel is connected to, in order to be conducive to the discharge of water seepage of tunnel, it should be ensured that in the laying of the tunnel drainage main pipe 4 Possess certain gradient in journey, for example, the gradient is 2-6 °.
The first draining maintenance pipe 5, the first draining maintenance are communicated on the high one end in longitudinal direction 2 position of Permeable blind pipe Dismountable maintenance pipe plug is communicated on pipe 5;The low one end in longitudinal direction 2 position of Permeable blind pipe is connected to the branch drain 6, the branch drain 6 is connected to the tunnel drainage main pipe 4.
In the present embodiment, one end by an elbow with certain angle that 2 position of longitudinal Permeable blind pipe is high It is connected with the first draining maintenance pipe 5.Introduced contaminants, which are avoided, by the maintenance pipe plug enters the first row Water is safeguarded within pipe 5, in use, the maintenance pipe plug is opened, it is saturating to the longitudinal direction by the first draining maintenance pipe 5 Water blind pipe 2 is safeguarded.
The both ends of the circumferential direction Permeable blind pipe 1 are respectively communicated with the branch drain that the tunnel lower part is arranged in two 6, two branch drains 6 are connected to the tunnel drainage main pipe 4, and the circumferential direction Permeable blind pipe 1 is also connected to the second draining It safeguards pipe 8, is communicated with dismountable maintenance pipe plug on the second draining maintenance pipe 8.
The setting height of the second draining maintenance pipe 8 should be conducive to make to be extended down to tunnel outside the second draining maintenance pipe 8 In cable groove sidewall.In the present embodiment, keep the second draining maintenance pipe 8 and the circumferential direction permeable blind using a three-way connection Pipe 1 is connected to.
The low one end in longitudinal direction 2 position of Permeable blind pipe, the both ends of the circumferential Permeable blind pipe 1 and the branch drain 6 Between pass through three-way connection be connected to.
The longitudinal direction Permeable blind pipe 2 is outsourcing geotextilesPunch bellows;The circumferential direction Permeable blind pipe 1 is outer Packet geotextilesPunch bellows, wherein punching is for making water seepage of tunnel flow into the branch drain 6.
It is provided on the punching bellows severalCircular hole, the punching bellows can also offer slotted eye, Direction hole or strip-shaped hole.
The present invention also provides a kind of tunnel drainage systems, including tunnel drainage device described in several sets, several set tunnels Drainage arrangement is disposed side by side in the tunnel.
A kind of construction method of tunnel drainage device, includes the following steps:
Step 1: longitudinal drainage blind pipe 2 is fixedly installed in the corner position of tunnel side wall two sides, is fixed at tunnel side wall The circle draining blind pipe 2 is set;
Step 2: the first draining maintenance pipe 5 being connected to the high one end in 2 position of longitudinal Permeable blind pipe, by the second draining Maintenance pipe 8 is connected to the two sides of the circumferential Permeable blind pipe 1;
Step 3: one end of the low one end in 2 position of longitudinal Permeable blind pipe and the circumferential Permeable blind pipe 1 is passed through three Pass joint is connected to branch drain 6, and branch drain 6 is connected to tunnel drainage main pipe 4;
Step 4: the tunnel being spread and hangs tunnel waterproofing layer 3, is opened up on the tunnel waterproofing layer 3 by the first draining dimension The hole that the extension end of pillar 5 and the extension end of the second draining maintenance pipe 8 are stretched out;
Step 5: moulded lining construction is carried out to the tunnel;
Step 6: the cable trough side in tunnel will be extended down to outside the first draining maintenance pipe 5 and the second draining maintenance pipe 8 On wall, and the first draining maintenance pipe 5 and the second draining maintenance pipe 8 are blocked.
Tunnel waterproofing layer 3 described in step 4 uses 400g/m2Geotextiles be bonded with EVA splash guard.
Embodiment 2
The cyclic annular abutment wall wall in the tunnel is additionally provided with the circumferential preformed groove for being embedded the circumferential Permeable blind pipe 1.At this Only circumferential preformed groove is defined in embodiment, it is in addition to this, in the same manner as in Example 1.
Embodiment 3
When winter, temperature is low, if the circumferential direction Permeable blind pipe 1 and longitudinal Permeable blind pipe 2 are blocked because freezing, using height Pressure steam is passed through the first draining maintenance pipe 5 and the second draining maintenance pipe 8 so that frost is melted, then passes through high pressure water flushing Wash dredging.Only the opposite first draining maintenance pipe 5 and the second draining maintenance pipe 8 are passed through high steam in the present embodiment It is rinsed the step of dredging with by high pressure water, it is in the same manner as in Example 1 in addition to above-mentioned restriction.
Technical solution as above also can be used in the tunnel drainage main pipe 4 frost blocking do the tunnel drainage The dredging of pipe 4.
Embodiment 4
In the step 4 of the present embodiment, the tunnel waterproofing layer include the first geotextile layer successively glued together, First macromolecule waterproof lamellar, EVA waterproof lamellar, the second macromolecule waterproof lamellar and the second geotextile layer composition, wherein described First macromolecule waterproof lamellar and the second macromolecule waterproof lamellar are PVC splash guard, the first macromolecule splash guard The both side surface of layer, the EVA waterproof lamellar and the second macromolecule waterproof lamellar is equipped with self-adhesive glue layer, removes above-mentioned restriction Except, it is in the same manner as in Example 1.
The present invention is not limited to the above embodiments, and the above embodiments and description only describe of the invention Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these change and change Into all fall within the protetion scope of the claimed invention.The claimed scope of the invention is defined by the following claims.

Claims (9)

1. a kind of tunnel drainage device characterized by comprising
Circumferential Permeable blind pipe, on the cyclic annular abutment wall wall for being attached to tunnel;
Longitudinal Permeable blind pipe is installed at the corner at the tunnel side wall both ends, it is described longitudinal direction Permeable blind pipe setting direction with Tunnel axis is parallel;
Tunnel waterproofing layer is fitted on the abutment wall in the tunnel and by the circumferential Permeable blind pipe and longitudinal Permeable blind pipe packet It wraps up in;
Tunnel drainage main pipe is connected to the circumferential Permeable blind pipe and longitudinal Permeable blind pipe will flow into the tunnel drainage The water seepage of tunnel of main pipe is discharged;It is communicated with the first draining maintenance pipe on the high one end in the longitudinal direction Permeable blind pipe position, described the Dismountable maintenance pipe plug is communicated on one draining maintenance pipe;The one end at the longitudinal direction Permeable blind pipe position bottom is connected to described Branch drain, the branch drain are connected to the tunnel drainage main pipe.
2. tunnel drainage device according to claim 1, which is characterized in that the both ends of the circumferential direction Permeable blind pipe connect respectively The branch drain is passed through, the circumferential direction Permeable blind pipe is also connected to the second draining maintenance pipe, and second draining is safeguarded on pipe It is communicated with detachable maintenance pipe plug.
3. tunnel drainage device according to claim 2, which is characterized in that the one of the longitudinal direction Permeable blind pipe position bottom It holds, pass through three-way connection connection between the both ends and the branch drain of the circumferential Permeable blind pipe.
4. tunnel drainage device according to claim 1, which is characterized in that the longitudinal direction Permeable blind pipe is outsourcing geotextiles φ 100 punch bellows;The circumferential direction Permeable blind pipe is that the φ 80 of outsourcing geotextiles punches bellows, wherein punching is used for Water seepage of tunnel is set to flow into the branch drain.
5. tunnel drainage device according to claim 1, which is characterized in that the cyclic annular abutment wall wall in the tunnel is additionally provided with use In the circumferential preformed groove for being embedded the circumferential Permeable blind pipe.
6. a kind of tunnel drainage system, which is characterized in that including the described in any item tunnel drainage dresses of several set claim 1-5 It sets, several set tunnel drainage devices are disposed side by side in the tunnel.
7. a kind of construction method of tunnel drainage device, which comprises the steps of:
Step 1: longitudinal drainage blind pipe is fixedly installed in the corner position of tunnel side wall two sides, institute is fixedly installed at tunnel side wall State circle draining blind pipe;
Step 2: the first draining maintenance pipe being connected to the high one end in longitudinal Permeable blind pipe position, by the second draining maintenance pipe It is connected to the two sides of the circumferential Permeable blind pipe;
Step 3: one end of the low one end in longitudinal Permeable blind pipe position and the circumferential Permeable blind pipe is passed through into three-way connection It is connected to branch drain, branch drain is connected to tunnel drainage main pipe;
Step 4: the tunnel being spread and hangs tunnel waterproofing layer, is opened up on the tunnel waterproofing layer by the first draining maintenance pipe The hole that extension end and the extension end of the second draining maintenance pipe are stretched out;
Step 5: moulded lining construction is carried out to the tunnel;
Step 6: the first draining maintenance is managed and is extended down in the cable groove sidewall in tunnel with outside the second draining maintenance pipe, and The first draining maintenance pipe and the second draining maintenance pipe are blocked.
Step 7: if the tunnel drainage blind pipe is melted in blind pipe using high steam because frost is blocked and freezes blocking position, and Dredging lining cutting draining blind pipe behind is rinsed using high pressure water.
8. the construction method of tunnel drainage device according to claim 7, which is characterized in that tunnel described in step 4 Waterproof layer uses 400g/m2Geotextiles be bonded with EVA splash guard.
9. the construction method of tunnel drainage device according to claim 7, which is characterized in that tunnel described in step 4 Waterproof layer includes the first geotextile layer successively glued together, the first macromolecule waterproof lamellar, EVA waterproof lamellar, second high Molecule waterproof lamellar and the second geotextile layer composition, wherein the first macromolecule waterproof lamellar and second macromolecule are anti- Water plate layer is PVC splash guard, and the first macromolecule waterproof lamellar, the EVA waterproof lamellar and second macromolecule are anti- The both side surface of water plate layer is equipped with self-adhesive glue layer.
CN201910287010.0A 2019-04-11 2019-04-11 A kind of tunnel drainage device, system and its construction method Pending CN110130980A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910287010.0A CN110130980A (en) 2019-04-11 2019-04-11 A kind of tunnel drainage device, system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910287010.0A CN110130980A (en) 2019-04-11 2019-04-11 A kind of tunnel drainage device, system and its construction method

Publications (1)

Publication Number Publication Date
CN110130980A true CN110130980A (en) 2019-08-16

Family

ID=67569625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910287010.0A Pending CN110130980A (en) 2019-04-11 2019-04-11 A kind of tunnel drainage device, system and its construction method

Country Status (1)

Country Link
CN (1) CN110130980A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469365A (en) * 2019-08-22 2019-11-19 西南交通大学 A kind of tunnel-liner large area percolating water ejectment device and construction method
CN111022071A (en) * 2020-01-10 2020-04-17 中交第二公路勘察设计研究院有限公司 Construction method for full-section lining of medium-slightly weathered granite section drilling-blasting tunnel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9911288D0 (en) * 1999-05-14 1999-07-14 Ayres Douglas J Maintainable drain
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN202325681U (en) * 2011-12-02 2012-07-11 中铁第四勘察设计院集团有限公司 Maintainable drainage system in tunnel
CN202937304U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Maintainable drainage system used for tunnel
CN204703956U (en) * 2015-06-15 2015-10-14 中交第一公路勘察设计研究院有限公司 A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain
CN204703954U (en) * 2015-03-19 2015-10-14 中铁十九局集团第七工程有限公司 Tunnel draining blind pipe
CN105840215A (en) * 2016-04-12 2016-08-10 四川皓德斯新材料科技有限公司 Tunnel waterproof board bonding and laying process
CN208073550U (en) * 2018-03-26 2018-11-09 华东交通大学 A kind of rich water soil rock interface loess tunnel drainage facility
CN208236461U (en) * 2018-05-22 2018-12-14 四川睿铁科技有限责任公司 A kind of anti-clogging can safeguard tunnel drainage system
CN208330415U (en) * 2018-05-22 2019-01-04 中铁二院工程集团有限责任公司 A kind of tunnel-liner waterproof and water drainage system effectivelying prevent draining blind pipe blocking

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9911288D0 (en) * 1999-05-14 1999-07-14 Ayres Douglas J Maintainable drain
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN202325681U (en) * 2011-12-02 2012-07-11 中铁第四勘察设计院集团有限公司 Maintainable drainage system in tunnel
CN202937304U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Maintainable drainage system used for tunnel
CN204703954U (en) * 2015-03-19 2015-10-14 中铁十九局集团第七工程有限公司 Tunnel draining blind pipe
CN204703956U (en) * 2015-06-15 2015-10-14 中交第一公路勘察设计研究院有限公司 A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain
CN105840215A (en) * 2016-04-12 2016-08-10 四川皓德斯新材料科技有限公司 Tunnel waterproof board bonding and laying process
CN208073550U (en) * 2018-03-26 2018-11-09 华东交通大学 A kind of rich water soil rock interface loess tunnel drainage facility
CN208236461U (en) * 2018-05-22 2018-12-14 四川睿铁科技有限责任公司 A kind of anti-clogging can safeguard tunnel drainage system
CN208330415U (en) * 2018-05-22 2019-01-04 中铁二院工程集团有限责任公司 A kind of tunnel-liner waterproof and water drainage system effectivelying prevent draining blind pipe blocking

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469365A (en) * 2019-08-22 2019-11-19 西南交通大学 A kind of tunnel-liner large area percolating water ejectment device and construction method
CN111022071A (en) * 2020-01-10 2020-04-17 中交第二公路勘察设计研究院有限公司 Construction method for full-section lining of medium-slightly weathered granite section drilling-blasting tunnel
CN111022071B (en) * 2020-01-10 2021-11-02 中交第二公路勘察设计研究院有限公司 Construction method for full-section lining of medium-slightly weathered granite section drilling-blasting tunnel

Similar Documents

Publication Publication Date Title
CN107131001B (en) High-speed railway tunnel with water delivery and traffic functions
CN106194255A (en) Tunnel waterproof and water drainage system and method for construction thereof
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN208441890U (en) Long-distance reverse slope drainage system for construction tunnel
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN104879164A (en) Tunnel annular drain structure
CN109707117A (en) A kind of construction technology of siphon type rainwater discharging system
CN207177967U (en) A kind of tunnel pressure release ejectment water installations
CN215562824U (en) Bottom plate U type deformation seam structure
CN110130980A (en) A kind of tunnel drainage device, system and its construction method
CN205617426U (en) Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure
CN108757027B (en) Multifunctional drainage system in tunnel
CN207004570U (en) A kind of tunnel longitudinal drainage blind pipe fixed structure
CN204982789U (en) A dam body prevention of seepage drainage system for roller compacted concrete dam
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN208594459U (en) A kind of novel town road discharge structure
CN112228151A (en) Tunnel open cut tunnel water drainage system
CN206220998U (en) A kind of discharge structure on the outside of tunnel inverted arch
CN208858401U (en) A kind of tunnel drainage structure
CN108590752A (en) Draining repair system and its construction method after a kind of underdrain formula tunnel-liner
CN208266612U (en) A kind of town road structure
CN110017166A (en) The storehouse internal drainage device and construction method of rich water hole section concrete lining cutting
CN212130548U (en) Tunnel drainage system capable of preventing and treating karst water crystallization

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816