CN106586908B - Stone Vertical transports hanging basket in exterior wall scaffold - Google Patents

Stone Vertical transports hanging basket in exterior wall scaffold Download PDF

Info

Publication number
CN106586908B
CN106586908B CN201611009652.7A CN201611009652A CN106586908B CN 106586908 B CN106586908 B CN 106586908B CN 201611009652 A CN201611009652 A CN 201611009652A CN 106586908 B CN106586908 B CN 106586908B
Authority
CN
China
Prior art keywords
vertical
hanging basket
square tube
exterior wall
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611009652.7A
Other languages
Chinese (zh)
Other versions
CN106586908A (en
Inventor
王辉平
王利雄
连珍
陈莹
马宇哲
郭佳俊
蒲聿聪
徐永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201611009652.7A priority Critical patent/CN106586908B/en
Publication of CN106586908A publication Critical patent/CN106586908A/en
Application granted granted Critical
Publication of CN106586908B publication Critical patent/CN106586908B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides Stone Verticals in a kind of exterior wall scaffold to transport hanging basket, the present invention is to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, vertical transport difficulty is big, safety is difficult to ensure, the problem of spending human and material resources, for the vertical transport of outer wall stone, provide a kind of innovation, efficiently, Stone Vertical transports hanging basket in the exterior wall scaffold of safety, pass through fast-assembling bolster, hoist engine, hanging basket, the cooperating of the components such as vertical dragline, so that the stone material transport in scaffold in vertical direction becomes simple, safety, reliably, and it installs, it dismantles simple and quick.In addition, vertical dragline one end is directly connected with the exterior wall scaffold by vertical dragline connection component, influence of the ground factor to vertical transport equipment is eliminated.

Description

Stone Vertical transports hanging basket in exterior wall scaffold
Technical field
The invention belongs to building decoration engineering construction field, in particular to Stone Vertical transport is hung in a kind of exterior wall scaffold Basket.
Background technique
Conventional outer wall stone material construction, after alien invasion builds scaffold, so that the transport of stone material is carried out in small space.Manpower It is big to carry difficulty, and safety is difficult to ensure, while easily causing the breakage of stone material.Goods lift is carried far from operation, and Need manpower rehandling, safety, integrality, it is difficult to guarantee.
Summary of the invention
The purpose of the present invention is to provide Stone Verticals in a kind of exterior wall scaffold to transport hanging basket, is able to solve traditional construction In, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, and vertical transport difficulty is big, is difficult to ensure safely, expends people The problem of power material resources.
To solve the above problems, the present invention provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, comprising:
Exterior wall scaffold is separated by pre-determined distance, the bottom of the exterior wall scaffold between the exterior wall scaffold and wall The vertical dragline connection component extended there are two being arranged to the wall;
The fast-assembling bolster being set on the wall, the fast-assembling bolster are opposite with the top of the exterior wall scaffold;
The top of two spaced vertical draglines, every vertical dragline is connect with the fast-assembling bolster, and every vertical The bottom end of dragline is connect with a vertical dragline connection component;
The hoist engine being set on the fast-assembling bolster, and the Operation switch being connect with the hoist engine;
It moves up and down in the exterior wall scaffold, wall, hoist engine and vertical the surrounded vertical space of dragline connection component Interior hanging basket, the hanging basket upper end are provided with lifting lug, and the lifting lug is connect with the rope rolling on the hoist engine, the hanging basket two sides Two groups of slide guide wheels are provided with, every group of slide guide wheel slides on a vertical dragline.
Further, in above-mentioned hanging basket, the fast-assembling bolster is by 9 square tubes and 2 blocks of steel plates, wherein first square tube and wall Body is arranged in parallel, and the both ends of the first square tube are vertical with one end of second square tube and third party tube respectively to be connect, and described first The centre of square tube is vertical with one end of the 4th square tube and the 5th square tube respectively to be connect, the second square tube, third party tube, four directions Pipe and the 5th square tube and the wall body vertical, the oblique other end with the 4th square tube in one end of the 6th square tube are connect, and the 6th The other end of square tube is connect with the first steel plate, first steel plate and the wall connecting, and one end of the 7th square tube is oblique and institute The other end connection of the 5th square tube is stated, the other end of the 7th square tube is connect with first steel plate, one end of eighth pipe and institute One end connection of the 4th square tube is stated, the other end of eighth pipe is connect with the second steel plate, one end of the 9th square tube and the described 5th One end of square tube connects, and the other end of the 9th square tube is connect with the second steel plate, and second steel plate is connected on the wall, institute Hoist engine is stated to be fixed in the 4th square tube and the 5th square tube, two vertical draglines respectively with second square tube and third party tube Other end connection.
Further, in above-mentioned hanging basket, shield is provided on the hoist engine.
Further, in above-mentioned hanging basket, the pre- of the exterior wall scaffold is arranged in by extended line in the Operation switch If in height.
Further, in above-mentioned hanging basket, mouth is additionally provided with limiting device, the limit dress under the rope rolling of the hoist engine It sets and is connected with the power supply of hoist engine.
Further, in above-mentioned hanging basket, every group of slide guide wheel is made of two pulleys, and every vertical dragline is from two It is passed through between pulley, described two pulleys slide on a vertical dragline simultaneously.
Further, in above-mentioned hanging basket, the hanging basket is L shape.
Further, in above-mentioned hanging basket, the hanging basket external coating has yellow black alternate striped.
Further, in above-mentioned hanging basket, safety belt is provided on the hanging basket.
Compared with prior art, the present invention is to solve in traditional construction, the stone material transport of external wall of high-rise building stone material construction The problem of narrow field, vertical transport difficulty is big, is difficult to ensure safely, spends human and material resources, for the vertical fortune of outer wall stone It is defeated, provide it is a kind of innovation, efficiently, safety exterior wall scaffold in Stone Vertical transport hanging basket, pass through fast-assembling bolster, elevator The cooperating of the components such as machine, hanging basket, vertical dragline, so that simple, peace that the stone material transport in scaffold in vertical direction becomes Entirely, reliably, and install, dismantle it is simple and quick.In addition, vertical dragline one end is directly and described by vertical dragline connection component Exterior wall scaffold connection, eliminates influence of the ground factor to vertical transport equipment.
Detailed description of the invention
Fig. 1 is the structure chart of Stone Vertical transport hanging basket in the exterior wall scaffold of one embodiment of the invention;
Fig. 2 is the Facad structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 3 is the backside structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 4 is the scheme of installation of the hoist engine of one embodiment of the invention;
Fig. 5 is the structure chart of the Operation switch of one embodiment of the invention;
Fig. 6 is the scheme of installation of the limiting device of one embodiment of the invention;
Fig. 7 is the connection schematic diagram of the hanging basket of one embodiment of the invention;
Fig. 8 is the schematic diagram of the slide guide wheel of one embodiment of the invention;
Fig. 9 is the schematic diagram of the hanging basket brushed with yellow black alternate striped of one embodiment of the invention;
Figure 10 is the structure chart of the hanging basket of one embodiment of the invention;
Figure 11 is the sectional view of the hanging basket of one embodiment of the invention;
Figure 12 is the connection schematic diagram of the vertical dragline connection component of one embodiment of the invention;
Figure 13 is the structure chart of the scaffold fastenings of one embodiment of the invention;
Figure 14 is the structure chart of the vertical dragline connector of one embodiment of the invention;
Figure 15 is the connection schematic diagram of the vertical dragline connector of one embodiment of the invention;
Figure 16 is the connection schematic diagram of the vertical dragline of one embodiment of the invention;
Figure 17 is the connection enlarged drawing of the vertical dragline of one embodiment of the invention;
Figure 18 be one embodiment of the invention can folding and unfolding load-bearing operating platform structure chart;
Figure 19 be one embodiment of the invention can folding and unfolding load-bearing operating platform scheme of installation;
Figure 20 is the connection schematic diagram of the platform connection component of one embodiment of the invention;
Figure 21 is the schematic diagram of the platform connection component of one embodiment of the invention;
Figure 22 be one embodiment of the invention can folding and unfolding hook pack up schematic diagram;
Figure 23 be one embodiment of the invention can folding and unfolding hook expanded schematic diagram;
Figure 24 be one embodiment of the invention can folding and unfolding load-bearing operating platform put down schematic diagram;
Figure 25 be one embodiment of the invention can folding and unfolding hook connection schematic diagram;
Figure 26 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up front elevation;
Figure 27 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up back view.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, comprising:
Exterior wall scaffold 1 is separated by pre-determined distance, the bottom of the exterior wall scaffold between the exterior wall scaffold 1 and wall 5 There are two the vertical dragline connection components 2 extended to the wall for portion's setting;
The fast-assembling bolster 3 being set on the wall 5, the top phase of the fast-assembling bolster 3 and the exterior wall scaffold 1 It is right;
Two spaced vertical draglines 4, the top of every vertical dragline 4 are connect with the fast-assembling bolster 3, and every hangs down The bottom end of straight dragline 4 is connect with a vertical dragline connection component 2;
The hoist engine 6 being set on the fast-assembling bolster 3, and the Operation switch 7 being connect with the hoist engine 6;Hoist engine 1~100 meter of hoisting depth of design;
Moving up and down, it is vertical to surround in the exterior wall scaffold 1, wall 5, hoist engine 6 and vertical dragline connection component 2 Hanging basket 8 in space, the hanging basket upper end are provided with lifting lug 9, and the lifting lug 9 is connect with the rope rolling 10 on the hoist engine 6, institute It states 8 two sides of hanging basket and is provided with two groups of slide guide wheels 11, every group of slide guide wheel 11 slides on a vertical dragline 4.Here, this hair Bright to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, and vertical transport difficulty is big, safety Be difficult to ensure, spend human and material resources, for the vertical transport of outer wall stone, provide a kind of innovation, efficiently, the outer foundation of safety Stone Vertical transports hanging basket in hand cradle, by the cooperating of the components such as fast-assembling bolster, hoist engine, hanging basket, vertical dragline, so that In scaffold in vertical direction stone material transport become it is simple, safe and reliable, and install, dismantle it is simple and quick, in addition, hang down Straight dragline one end is directly connected with the exterior wall scaffold by vertical dragline connection component, eliminates ground factor to vertical fortune The influence of transfer device, and install, dismantle quick and convenient, the other end is connected with fast-assembling bolster.As shown in figure 12, the vertical dragline Connection component 2 is described to prolong by including sequentially connected scaffold fastenings 21, extending frame 22, vertical dragline connector 23 It stretches frame 22 to connect by scaffold fastenings 21 with exterior wall scaffold 1, the extension frame 22 passes through vertical dragline connector 23 connect with the vertical dragline 4, and the component part of the scaffold fastenings 21 is as shown in figure 13, the vertical dragline connection The component part of part 23 is as shown in figure 14, and the extension frame 22 is connected by vertical dragline connector 23 with the vertical dragline 4 The enlarged drawing connect is as shown in figure 15.
In one embodiment of the invention, it may also include receiving in the preset height for being movably connected on the exterior wall scaffold 1 Put load-bearing operating platform 12, it is described can folding and unfolding load-bearing operating platform 12 guardrail of the exterior wall scaffold 1 is formed when packing up, it is described Can folding and unfolding load-bearing operating platform 12 extend the exterior wall scaffold 1 to the wall 5 when putting down.
In one embodiment of the invention, as shown in Figures 2 and 3, the fast-assembling bolster 3 is by 9 square tubes and 2 blocks of steel plates, wherein One square tube 31 is arranged in parallel with wall 5, the both ends of the first square tube 31 respectively with second square tube 32 and third party tube 33 one The vertical connection in end, the centre of the first square tube 31 is vertical with one end of the 4th square tube 34 and the 5th square tube 35 respectively to be connect, institute It is vertical with the wall 5 to state second square tube 32, third party tube 33, the 4th square tube 34 and the 5th square tube 35, the one of the 6th square tube 36 The oblique other end with the 4th square tube 34 is held to connect, the other end of the 6th square tube 36 is connect with the first steel plate 38, and described One steel plate 38 is connect with the wall 5, and the oblique other end with the 5th square tube 35 in one end of the 7th square tube 37 is connect, and the 7th The other end of square tube 37 is connect with first steel plate 38, and one end of one end of eighth pipe 38 and the 4th square tube 34 connects It connects, the other end of eighth pipe 39 is connect with the second steel plate 41, one end of one end of the 9th square tube 40 and the 5th square tube 35 Connection, the other end of the 9th square tube 40 are connect with the second steel plate 41, and second steel plate 41 is connected on the wall 5, described Hoist engine 6 is fixed in the 4th square tube 34 and the 5th square tube 35, as shown in FIG. 16 and 17, two vertical draglines 4 respectively with Second square tube 32 is connected with the other end of third party tube 33.Here, fast-assembling bolster by 9 square steel and two blocks of steel plates by welding, It is bolted composition, as shown in figure 4, hoist engine 6 is connect by 4 flat head bolts with the 4th square tube 34 and the 5th square tube 35, side By being welded to connect between steel and steel plate, by welding and being bolted between square steel and square steel, the first and second steel plates difference By 3 expansion bolts and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, as shown in figure 4, being provided with shield 13 on the hoist engine 6, hoist engine passes through 4 Flat head bolt and fast-assembling bolster are connected and fixed, and shield is arranged on hoist engine, play the role of sun-proof rain-proof.The present invention one is implemented In example, hoist engine maximum carries 1000KG, design carrying 500KG.
In one embodiment of the invention, as shown in figure 5, the Operation switch 7 is arranged by extended line 14 can folding and unfolding load-bearing Near operating platform 12, operator is facilitated to operate hoist engine according to field condition, the Operation switch includes up button 71 With past lower button 72.Here, pinning up button, hoist engine is up promoted, and hoist engine stops being promoted after the button that comes loose;Similarly, It pins toward lower button, hoist engine declines down, and hoist engine stops decline after the button that comes loose, and prevents the generation of maloperation event.It presses Firmly toward lower button, hoist engine declines down, and hoist engine stops decline after the button that comes loose, easy to operate to be illustrated, and prevents maloperation thing The generation of part.
In one embodiment of the invention, as shown in fig. 6, mouth is additionally provided with limiting device 15, institute under the rope rolling of the hoist engine 6 It states limiting device 15 to be connected with the power supply of hoist engine 6, here, setting limiting device is as Anti-over-hoisting device, hoist engine was promoted Cheng Zhong, when lifting lug rising bumps against lower mouth limiting device, then limiting device is connected with power supply can cut off the power supply of hoist engine at once, keep away Exempt from hoist engine to rush to summit damage.
In one embodiment of the invention, every group of slide guide wheel is made of two pulleys, and every vertical dragline is from two pulleys Between pass through, described two pulleys slide on a vertical dragline simultaneously.Here, double group slide guide wheels are respectively arranged in hanging basket two sides, Vertical dragline is passed through between two pulleys, and cooperating limits the motion profile of hanging basket, it is therefore prevented that hanging basket is in the horizontal direction On movement and topple.
In one embodiment of the invention, as shown in Fig. 7,8,9,10 and 11, the hanging basket 8 is L shape, convenient for loading stone material.? This, L shape hanging basket originally belongs to eccentric equipment, by increasing by 8 upper end lifting lug 9 of hanging basket as eccentric lifting lug, and by with hoist engine 6 Under the orientation works status condition that connection and every group of slide guide wheel 11 are made of two pulleys, the Influence from Eccentric of hanging basket is eliminated, is reached To antidumping effect.Hanging basket center of gravity and lifting lug, vertical dragline are in same vertical plane.When stone material is placed in hanging basket, tiltedly To placement, center of gravity and hanging basket center of gravity are in same vertical plane.
In one embodiment of the invention, as shown in figure 9,8 external coating of the hanging basket has yellow black alternate striped 82, it arrived Warning function guarantees the safety in operating process.
In one embodiment of the invention, as shown in Fig. 7,9,10 and 11, safety belt 81 is provided on the hanging basket 8.The present invention In one embodiment, hanging basket high 800-1000mm, long 1800mm, wide 300mm are made of steel frame and aluminium sheet, can load 2-3 simultaneously Two retractable safety bands are arranged on hanging basket for the high stone material of block 1600 wide 700, and fixing stone, limitation stone material is in the horizontal direction Displacement, guarantee transport hanging basket safety.
In one embodiment of the invention, as shown in Figure 18~27, it is described can folding and unfolding load-bearing operating platform 12, by steel frame and aluminium Board group at, while guaranteeing its rigidity, alleviate its weight, it is described can the side of folding and unfolding load-bearing operating platform 12 pass through platform and connect Connected components 121 and the exterior wall scaffold 1 are flexibly connected, while can be provided with can folding and unfolding the another two sides of folding and unfolding load-bearing operating platform Hook 122 and pulling plug 123, by can folding and unfolding hook 122, platform connection component 121 and pulling plug 123 so that can folding and unfolding load-bearing behaviour Make platform 12 and 1 hanging basket of the exterior wall scaffold is combined as a whole, when work, load-bearing operating platform can be received by putting down, such as Figure 19,24 Shown in 25, can folding and unfolding hook 122 and the exterior wall scaffold 1 connect, rise transfer stone material, load-bearing, active station people the effects of, this When can folding and unfolding hook 122 state it is as shown in figure 23.Can folding and unfolding hook 122 and can folding and unfolding load-bearing operating platform 12 frame weldering It connects.As shown in figures 26 and 27, when not working, pack up can folding and unfolding hook, load-bearing operating platform can be received by packing up, pulling plug and the exterior wall Scaffold connection, load-bearing operating platform can be used as scaffold guard rail use, at this time can folding and unfolding hook 122 state such as Figure 22 institute Show.And it is simple, quick to dismantle installation, rapidly installation and the working face for needing handling.Platform connection component and load-bearing operation are flat Platform welding, connects scaffold by flat head bolt.In addition, safety net can be arranged in lifting working face two sides, guarantee hoisting process In personnel safety.
As shown in Figure 1, Stone Vertical transports the installation and application of hanging basket in above-mentioned exterior wall scaffold, comprising:
Exterior wall scaffold 1 is set, is separated by pre-determined distance between the exterior wall scaffold 1 and wall 5, in the outer foundation hand Two vertical dragline connection components 2 extended to the wall 6 are arranged in the bottom of frame 1;Here, being determined outer according to construction speed Foundation hand cradle, fast-assembling bolster, can folding and unfolding load-bearing operating platform, vertical hoist cable installation site;In stone wall surface construction, it is desirable that under Supreme construction;
Indulge face according to stone material construction working, fix fast-assembling bolster 3 on the wall, the fast-assembling bolster 3 with it is described outer The top of foundation hand cradle is opposite, and hoist engine 6, and the Operation switch connecting with the hoist engine 6 are installed on the fast-assembling bolster 3 7, two vertical draglines 4 are installed, the top of every vertical dragline 4 is connect with the fast-assembling bolster 3, the bottom of every vertical dragline 4 End is connect with a vertical dragline connection component 2, and the Operation switch 7 is arranged by extended line in the outer foundation hand Near stone material construction height on frame;
Hanging basket 8 is installed from the bottom of exterior wall scaffold 1, lifting lug 9 is set in 8 upper end of hanging basket, by the lifting lug 9 and the volume The rope rolling 10 raised on machine 6 connects, and two groups of slide guide wheels 11 is arranged in 8 two sides of hanging basket, every group of slide guide wheel 11 is described vertical at one It is slided on straight dragline 4, the hanging basket 8 moves up and down in the exterior wall scaffold, wall, hoist engine and vertical dragline connection component In surrounded vertical space;
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting Full monitoring, the button that work surface operator operates the Operation switch make hanging basket to job platform, are responsible for the unloading of stone material, institute State ground and operation and operator respectively at lifting bottom and work surface can be absorbed in entire lifting by folding and unfolding load-bearing operating platform Process, timely correction of finding the problem, and keep in touch at any time, it is ensured that lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The ground handling operator notifies the work surface operator to pass through the Operation switch, control by intercom Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow for lifting, during lifting, at the uniform velocity carries out, during lifting, Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the work surface operator is stopped by the release Operation switch The hoist engine drives the hanging basket to continue lifting rising, and the work surface operator station unloads stone on the job platform After material, the hoist engine is controlled by the Operation switch, hanging basket is driven to continue to drop to ground floor.
In one embodiment of the invention, while installing two vertical draglines, also according to stone material construction height in the exterior wall Installation can folding and unfolding load-bearing operating platform 12 on scaffold 1.
In one embodiment of the invention,
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting Full monitoring, the button that work surface operator operates the Operation switch continue to put down hanging basket to job platform, are responsible for stone material Unloading, the ground and operation and operator can be absorbed in by folding and unfolding load-bearing operating platform whole respectively at lifting bottom and work surface A hoisting process, timely correction of finding the problem, and keep in touch at any time, it is ensured that lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The ground handling operator notifies the work surface operator to pass through the Operation switch, control by intercom Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow for lifting, during lifting, at the uniform velocity carries out, during lifting, Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the work surface operator is stopped by the release Operation switch The hoist engine drives the hanging basket to continue lifting rising, and the work surface operator station unloads stone on the job platform After material, the hoist engine is controlled by the Operation switch, hanging basket is driven to continue to drop to ground floor, comprising:
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting Full monitoring, after hanging basket is higher than job platform, work surface operator unclamps the button of the Operation switch, stops being promoted, put It is lower described can be after folding and unfolding load-bearing operating platform, the button that work surface operator operates the Operation switch continues to put down hanging basket extremely Can folding and unfolding load-bearing operating platform, be responsible for the unloading of stone material, the ground and operation and operator are respectively at lifting bottom and work Industry face can be absorbed in entire hoisting process by folding and unfolding load-bearing operating platform, timely correction of finding the problem, and keep in touch at any time, it is ensured that Lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The work surface operator will described in can the setting of folding and unfolding load-bearing operating platform be in collapsed state, the ground behaviour Make personnel and notify the work surface operator by the Operation switch by intercom, controls hoist engine and lift by crane the hanging basket In stone material, lifting at the beginning, speed is slow, during lifting, at the uniform velocity carry out, during lifting, lower work personnel forbid into Enter to lift working region;
When hanging basket rise to it is described can be 1 meter above folding and unfolding load-bearing operating platform when, the work surface operator passes through described Unclamp Operation switch, stop the hoist engine hanging basket is driven to continue lifting rising, put down it is described can folding and unfolding load-bearing operation it is flat After platform, fall hanging basket extremely can folding and unfolding load-bearing operating platform, work surface operator station it is described can folding and unfolding load-bearing operation it is flat After unloading stone material on platform, by the Operation switch control the hoist engine drive hanging basket rise to it is described can folding and unfolding load-bearing operate it is flat 1 meter of height above platform, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operating platform used as scaffold guard rail, Hanging basket continues to drop to ground floor.
In one embodiment of the invention, after the bottom of exterior wall scaffold installation hanging basket, further includes:
Within the scope of 1 meter of two sides of the vertical space, longitudinally disposed safety net, during guaranteeing vertical transport, under Side passes through without personnel, guarantees construction safety.
In one embodiment of the invention, fast-assembling bolster is fixed on the wall, and hoist engine is installed on the fast-assembling bolster, Include:
The fast-assembling bolster is by 9 square tubes and 2 blocks of steel plates, wherein first square tube and wall is arranged in parallel, by described The both ends of one square tube are vertical with one end of second square tube and third party tube respectively to be connect, by the centre of the first square tube respectively with One end of 4th square tube and the 5th square tube vertically connects, the second square tube, third party tube, the 4th square tube and the 5th square tube and institute Wall body vertical is stated, the oblique other end with the 4th square tube in one end of the 6th square tube is connect, by the other end of the 6th square tube It is connect with the first steel plate, it is by first steel plate and the wall connecting, one end of the 7th square tube is oblique with the 5th side The other end of pipe connects, and the other end of the 7th square tube is connect with the first steel plate, by one end of eighth pipe and the 4th square tube One end connection, the other end of eighth pipe is connect with the second steel plate, by one end of the 9th square tube and the 5th square tube One end connection, the other end of the 9th square tube is connect with the second steel plate, and the eighth pipe and the 9th square tube are parallel with wall, will Second steel plate is connected on the wall, the hoist engine is fixed in the 4th square tube and the 5th square tube, two Vertical dragline is connect with the other end of second square tube and third party tube respectively.Here, fast-assembling bolster is by 9 square steel and two blocks of steel plates By welding, being bolted composition, hoist engine is connect by 4 flat head bolts with the 4th square tube and the 5th square tube, square steel and steel By being welded to connect between plate, by welding and being bolted between square steel and square steel, the first and second steel plates pass through 3 respectively Expansion bolt and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, on the fast-assembling bolster after installation hoist engine, further includes:
Shield is set in the hoist engine, hoist engine is connected and fixed by 4 flat head bolts and fast-assembling bolster, hoist engine Upper setting shield, plays the role of sun-proof rain-proof.In one embodiment of the invention, hoist engine maximum carries 1000KG, and design is held Carry 500KG.
In one embodiment of the invention, the preset height of the exterior wall scaffold is arranged in by extended line for the Operation switch On, facilitate operator to operate hoist engine according to field condition, the Operation switch includes up button and past lower button.? This, pins up button, and hoist engine is up promoted, and hoist engine stops being promoted after the button that comes loose;Similarly, it pins toward lower button, volume It raises machine to decline down, hoist engine stops decline after the button that comes loose, and prevents the generation of maloperation event.It pins toward lower button, elevator Machine declines down, and hoist engine stops decline after the button that comes loose, easy to operate to be illustrated, and prevents the generation of maloperation event.
In one embodiment of the invention, on the fast-assembling bolster after installation hoist engine, further includes:
Limiting device is arranged in mouth under the rope rolling of the hoist engine, and the limiting device is connected with the power supply of hoist engine, Here, setting limiting device is used as Anti-over-hoisting device, in hoist engine lifting process, lower mouth limiting device is bumped against when lifting lug rises, Then limiting device is connected with power supply can cut off the power supply of hoist engine at once, and hoist engine is avoided to rush to summit damage.
In one embodiment of the invention, two groups of slide guide wheels are set in the hanging basket two sides, every group of slide guide wheel is described vertical at one It is slided on straight dragline, comprising:
Every group of slide guide wheel is set as being made of two pulleys, the vertical dragline is passed through between two pulleys, institute It states two pulleys while being slided on the vertical dragline.Here, hanging basket two sides are respectively arranged double group slide guide wheels, vertical dragline is from two It is passed through between a pulley, cooperating, limits the motion profile of hanging basket, it is therefore prevented that hanging basket movement in the horizontal direction and inclined It covers.
In one embodiment of the invention, the hanging basket is L shape, to facilitate loading stone material.Here, L shape hanging basket originally belongs to partially Heart design, by increasing hanging basket upper end lifting lug as eccentric lifting lug, and by being connect with hoist engine and every group of slide guide wheel is by two Under the orientation works status condition of pulley composition, the Influence from Eccentric of hanging basket is eliminated, antidumping effect is reached.It hanging basket center of gravity and hangs Ear, vertical dragline are in same vertical plane.When stone material is placed in hanging basket, oblique placement, center of gravity and hanging basket center of gravity In in same vertical plane.
In one embodiment of the invention, before hanging basket is installed from the bottom of exterior wall scaffold, further includes:
In the yellow black alternate striped of the hanging basket external coating, it arrived warning function, guarantee the safety in operating process.
In one embodiment of the invention, after the bottom of exterior wall scaffold installation hanging basket, further includes:
Safety belt is set on the hanging basket;
After stone material is placed on hanging basket, further includes:
Using safety belt fixing stone position.In one embodiment of the invention, hanging basket high 800-1000mm, long 1800mm is wide 300mm is made of steel frame and aluminium sheet, can load the high stone material of 2-3 block 1600 wide 700 simultaneously, and setting two can receive on hanging basket Contracting safety belt, fixing stone, the displacement of limitation stone material in the horizontal direction guarantee the safety of transport hanging basket.
In one embodiment of the invention, installation can folding and unfolding load-bearing operating platform on the exterior wall scaffold, comprising:
By it is described can folding and unfolding load-bearing operating platform be set as being made of steel frame and aluminium sheet, while guaranteeing its rigidity, subtract Its light weight, by it is described can the side of folding and unfolding load-bearing operating platform pass through platform connection component and exterior wall scaffold activity Connection, at the same can folding and unfolding load-bearing operating platform another two sides setting can folding and unfolding hook and pulling plug;
Put down it is described can folding and unfolding load-bearing operating platform, comprising:
Described in removing can folding and unfolding load-bearing operating platform connected with the pulling plug of the exterior wall scaffold, put down can folding and unfolding hook, Put down it is described can folding and unfolding load-bearing operating platform, here, lifting lug connect with the exterior wall scaffold at this time, load-bearing effect is subsequent Hanging basket can be fallen to load-bearing operating platform, stone material is unloaded, be transported to home;
Packing up can folding and unfolding load-bearing operating platform, comprising:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, will described in can folding and unfolding load-bearing operation it is flat Platform is connected by pulling plug with the exterior wall scaffold, and subsequent hanging basket of falling is to ground, transport of reloading.It is held specifically, removing Weight operating platform connect with the pulling plug of the exterior wall scaffold, put down can folding and unfolding link up with, put down can folding and unfolding load-bearing operating platform, this When can folding and unfolding hook connected with the exterior wall scaffold, load-bearing effect.Fall hanging basket extremely can folding and unfolding load-bearing operating platform, it is described Second operator station it is described can unload stone material on folding and unfolding load-bearing operating platform after, pass through the Operation switch and control the volume Raise machine drive hanging basket rise to it is described can 1 meter of height above folding and unfolding load-bearing operating platform, pack up can folding and unfolding load-bearing operating platform, pack up Can folding and unfolding hook, load-bearing operating platform connect by pulling plug with the exterior wall scaffold, can be used as scaffold guard rail and use.It falls Hanging basket is to ground, transport of reloading.Here, by can folding and unfolding hook, platform connection component and pulling plug so that load-bearing operation is flat Platform and the exterior wall scaffold hanging basket are combined as a whole, and when work, load-bearing operating platform can be received by putting down, can folding and unfolding hook and described Exterior wall scaffold connection, acts the effects of shifting stone material, load-bearing, active station people.Can folding and unfolding hook and platform framework welding, do not work When, pack up can folding and unfolding hook, load-bearing operating platform can be received by packing up, and pulling plug is connected with the exterior wall scaffold, load-bearing operating platform It can be used as scaffold guard rail use, and dismantle installation simply, quickly, rapidly installation and the working face for needing handling.Platform connects Connected components and the welding of load-bearing operating platform, connect scaffold by flat head bolt.In addition, can be arranged in lifting working face two sides Safety net guarantees the personnel safety in hoisting process.
In addition, in terms of hoist engine maintenance: (1) carrying out regular adjustment to the braking hanging basket of hoist engine, hold lotus situation Under, it slings after object is shut down without lower sliding phenomenon.(2) phenomena such as weld seam between bolster answers flawless, displacement.(3) hoist engine with The phenomenon that connection bolt of square steel answers non-loosening, is cut bending deformation.(4) the hand-held switch of hoist engine, it is necessary to keep dry Dry, the rainy day wraps using using Nylon Bag, prevents dampness from leaking electricity.(5) equipment is periodically checked weekly by full-time staff, is adjusted It is whole.Adjustment braking hanging basket process should be debugged with peak load, have no lower sliding phenomenon.
In conclusion the present invention is to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow Small, vertical transport difficulty is big, the problem of being difficult to ensure safely, spend human and material resources, for the vertical transport of outer wall stone, provides A kind of innovation, efficiently, Stone Vertical transports hanging basket in the exterior wall scaffold of safety, by fast-assembling bolster, hoist engine, hanging basket, The cooperating of the components such as vertical dragline, so that the stone material transport in scaffold in vertical direction becomes simple, safe and reliable, And install, dismantle it is simple and quick.In addition, vertical dragline one end by vertical dragline connection component directly and the outer foundation hand Frame connection, eliminates influence of the ground factor to vertical transport equipment.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (8)

1. Stone Vertical transports hanging basket in a kind of exterior wall scaffold characterized by comprising
Exterior wall scaffold is separated by pre-determined distance, the bottom setting of the exterior wall scaffold between the exterior wall scaffold and wall There are two the vertical dragline connection components extended to the wall;
The fast-assembling bolster being set on the wall, the fast-assembling bolster are opposite with the top of the exterior wall scaffold;
The top of two spaced vertical draglines, every vertical dragline is connect with the fast-assembling bolster, every vertical dragline Bottom end connect with a vertical dragline connection component;
The hoist engine being set on the fast-assembling bolster, and the Operation switch being connect with the hoist engine;
It moves up and down in the exterior wall scaffold, wall, hoist engine and vertical the surrounded vertical space of dragline connection component Hanging basket, the hanging basket upper end are provided with lifting lug, and the lifting lug is connect with the rope rolling on the hoist engine, the hanging basket two sides setting There are two groups of slide guide wheels, every group of slide guide wheel slides on a vertical dragline;
Wherein, the fast-assembling bolster has 9 square tubes and 2 blocks of steel plates, and wherein first square tube is arranged in parallel with wall, and described first The both ends of square tube are vertical with one end of second square tube and third party tube respectively to be connect, and the centre of the first square tube is respectively with the 4th One end of square tube and the 5th square tube vertically connects, the second square tube, third party tube, the 4th square tube and the 5th square tube and the wall Body is vertical, and the oblique other end with the 4th square tube in one end of the 6th square tube is connect, the other end and the first steel of the 6th square tube Plate connection, first steel plate and the wall connecting, the oblique other end with the 5th square tube in one end of the 7th square tube connect It connecing, the other end of the 7th square tube is connect with first steel plate, and one end of eighth pipe is connect with one end of the 4th square tube, The other end of eighth pipe is connect with the second steel plate, and one end of the 9th square tube is connect with one end of the 5th square tube, the 9th side The other end of pipe is connect with the second steel plate, and second steel plate is connected on the wall, and the hoist engine is fixed on described In four square tubes and the 5th square tube, two vertical draglines are connect with the other end of second square tube and third party tube respectively.
2. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that set on the hoist engine It is equipped with shield.
3. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the Operation switch is logical Extended line is crossed to be arranged in the preset height of the exterior wall scaffold.
4. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the volume of the hoist engine Lower mouth of restricting is additionally provided with limiting device, and the limiting device is connected with the power supply of hoist engine.
5. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that every group of slide guide wheel It is made of two pulleys, every vertical dragline is passed through between two pulleys, and described two pulleys are simultaneously in a vertical dragline Upper sliding.
6. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the hanging basket is L shape.
7. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the hanging basket surface applies Brushed with yellow black alternate striped.
8. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that be arranged on the hanging basket There is safety belt.
CN201611009652.7A 2016-11-16 2016-11-16 Stone Vertical transports hanging basket in exterior wall scaffold Active CN106586908B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611009652.7A CN106586908B (en) 2016-11-16 2016-11-16 Stone Vertical transports hanging basket in exterior wall scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611009652.7A CN106586908B (en) 2016-11-16 2016-11-16 Stone Vertical transports hanging basket in exterior wall scaffold

Publications (2)

Publication Number Publication Date
CN106586908A CN106586908A (en) 2017-04-26
CN106586908B true CN106586908B (en) 2019-07-12

Family

ID=58590082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611009652.7A Active CN106586908B (en) 2016-11-16 2016-11-16 Stone Vertical transports hanging basket in exterior wall scaffold

Country Status (1)

Country Link
CN (1) CN106586908B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116553440A (en) * 2023-04-14 2023-08-08 云南建源电力器材有限公司 Anti-falling device for overhead operation of power transmission line

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1260434A (en) * 1999-08-23 2000-07-19 陈胜坤 Multiple self-locked elevating scaffold
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
CN101696598A (en) * 2009-09-24 2010-04-21 中冶建工有限公司 Wholly lifted construction external frame
CN202467231U (en) * 2012-02-27 2012-10-03 成都嘉泽正达金属制造有限公司 Closed type vertical-surface protection system special for hanging basket construction
CN203514758U (en) * 2013-10-23 2014-04-02 江苏绿博低碳科技有限公司 Scaffold for energy-saving transformation of building external wall
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN204022201U (en) * 2014-06-28 2014-12-17 中铁建设集团设备安装有限公司 A kind of weight-lifting equipment for vertical transport
CN206266182U (en) * 2016-11-16 2017-06-20 上海市建筑装饰工程集团有限公司 Stone Vertical transport hanging basket in exterior wall scaffold

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6129810B2 (en) * 2014-11-17 2017-05-17 株式会社フジタ Groundwork stand for outer wall panel and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1260434A (en) * 1999-08-23 2000-07-19 陈胜坤 Multiple self-locked elevating scaffold
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
CN101696598A (en) * 2009-09-24 2010-04-21 中冶建工有限公司 Wholly lifted construction external frame
CN202467231U (en) * 2012-02-27 2012-10-03 成都嘉泽正达金属制造有限公司 Closed type vertical-surface protection system special for hanging basket construction
CN203514758U (en) * 2013-10-23 2014-04-02 江苏绿博低碳科技有限公司 Scaffold for energy-saving transformation of building external wall
CN103711301A (en) * 2013-12-30 2014-04-09 江河创建集团股份有限公司 Construction method and device for two-track movable electric basket and lifting hoist
CN204022201U (en) * 2014-06-28 2014-12-17 中铁建设集团设备安装有限公司 A kind of weight-lifting equipment for vertical transport
CN206266182U (en) * 2016-11-16 2017-06-20 上海市建筑装饰工程集团有限公司 Stone Vertical transport hanging basket in exterior wall scaffold

Also Published As

Publication number Publication date
CN106586908A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN204716124U (en) Portable removable level-sensing device inspection platform
KR20110137864A (en) Lift for construction work
CN106639287B (en) Stone Vertical transportation resources in exterior wall scaffold
CN106829781A (en) Mobile shipment crane and its operating method of one kind
CN208814562U (en) A kind of visualization formula glass curtain wall plate vertical transit system
CN107461023A (en) A kind of hoistway operation platform for being provided with safeguard structure
CN106586908B (en) Stone Vertical transports hanging basket in exterior wall scaffold
CN106586907B (en) The installation and application of Stone Vertical transport hanging basket in exterior wall scaffold
KR101068229B1 (en) Dismantled tower crane cargo handling system and cargo handling method using thereof
CN206266182U (en) Stone Vertical transport hanging basket in exterior wall scaffold
CN206309001U (en) Stone Vertical transportation system in exterior wall scaffold
CN206267514U (en) Stone Vertical shipping platform in exterior wall scaffold
CN106522537B (en) Stone Vertical transportation system in exterior wall scaffold
CN108946542A (en) A kind of small gun carriage and its construction method
CN106639288A (en) Installing using method of vertical transporting platform of stone in outer wall scaffold
CN106592955A (en) Platform for vertically conveying stone material in exterior wall scaffolding
CN206722431U (en) Discharging platform for high-rise building construction
CN203946779U (en) Loose steel pipe operation combined sling
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN214399682U (en) Hoisting device for building
CN111500298A (en) Coke tank inclination unhooking detection system of dry quenching hoister
CN214989697U (en) Masonry material hoisting guarantee device
RU120957U1 (en) INTERFACE TRAVERS
CN218323981U (en) Telescopic platform of unloading

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant