CN106586908B - Stone Vertical transports hanging basket in exterior wall scaffold - Google Patents
Stone Vertical transports hanging basket in exterior wall scaffold Download PDFInfo
- Publication number
- CN106586908B CN106586908B CN201611009652.7A CN201611009652A CN106586908B CN 106586908 B CN106586908 B CN 106586908B CN 201611009652 A CN201611009652 A CN 201611009652A CN 106586908 B CN106586908 B CN 106586908B
- Authority
- CN
- China
- Prior art keywords
- vertical
- hanging basket
- square tube
- exterior wall
- connect
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides Stone Verticals in a kind of exterior wall scaffold to transport hanging basket, the present invention is to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, vertical transport difficulty is big, safety is difficult to ensure, the problem of spending human and material resources, for the vertical transport of outer wall stone, provide a kind of innovation, efficiently, Stone Vertical transports hanging basket in the exterior wall scaffold of safety, pass through fast-assembling bolster, hoist engine, hanging basket, the cooperating of the components such as vertical dragline, so that the stone material transport in scaffold in vertical direction becomes simple, safety, reliably, and it installs, it dismantles simple and quick.In addition, vertical dragline one end is directly connected with the exterior wall scaffold by vertical dragline connection component, influence of the ground factor to vertical transport equipment is eliminated.
Description
Technical field
The invention belongs to building decoration engineering construction field, in particular to Stone Vertical transport is hung in a kind of exterior wall scaffold
Basket.
Background technique
Conventional outer wall stone material construction, after alien invasion builds scaffold, so that the transport of stone material is carried out in small space.Manpower
It is big to carry difficulty, and safety is difficult to ensure, while easily causing the breakage of stone material.Goods lift is carried far from operation, and
Need manpower rehandling, safety, integrality, it is difficult to guarantee.
Summary of the invention
The purpose of the present invention is to provide Stone Verticals in a kind of exterior wall scaffold to transport hanging basket, is able to solve traditional construction
In, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, and vertical transport difficulty is big, is difficult to ensure safely, expends people
The problem of power material resources.
To solve the above problems, the present invention provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, comprising:
Exterior wall scaffold is separated by pre-determined distance, the bottom of the exterior wall scaffold between the exterior wall scaffold and wall
The vertical dragline connection component extended there are two being arranged to the wall;
The fast-assembling bolster being set on the wall, the fast-assembling bolster are opposite with the top of the exterior wall scaffold;
The top of two spaced vertical draglines, every vertical dragline is connect with the fast-assembling bolster, and every vertical
The bottom end of dragline is connect with a vertical dragline connection component;
The hoist engine being set on the fast-assembling bolster, and the Operation switch being connect with the hoist engine;
It moves up and down in the exterior wall scaffold, wall, hoist engine and vertical the surrounded vertical space of dragline connection component
Interior hanging basket, the hanging basket upper end are provided with lifting lug, and the lifting lug is connect with the rope rolling on the hoist engine, the hanging basket two sides
Two groups of slide guide wheels are provided with, every group of slide guide wheel slides on a vertical dragline.
Further, in above-mentioned hanging basket, the fast-assembling bolster is by 9 square tubes and 2 blocks of steel plates, wherein first square tube and wall
Body is arranged in parallel, and the both ends of the first square tube are vertical with one end of second square tube and third party tube respectively to be connect, and described first
The centre of square tube is vertical with one end of the 4th square tube and the 5th square tube respectively to be connect, the second square tube, third party tube, four directions
Pipe and the 5th square tube and the wall body vertical, the oblique other end with the 4th square tube in one end of the 6th square tube are connect, and the 6th
The other end of square tube is connect with the first steel plate, first steel plate and the wall connecting, and one end of the 7th square tube is oblique and institute
The other end connection of the 5th square tube is stated, the other end of the 7th square tube is connect with first steel plate, one end of eighth pipe and institute
One end connection of the 4th square tube is stated, the other end of eighth pipe is connect with the second steel plate, one end of the 9th square tube and the described 5th
One end of square tube connects, and the other end of the 9th square tube is connect with the second steel plate, and second steel plate is connected on the wall, institute
Hoist engine is stated to be fixed in the 4th square tube and the 5th square tube, two vertical draglines respectively with second square tube and third party tube
Other end connection.
Further, in above-mentioned hanging basket, shield is provided on the hoist engine.
Further, in above-mentioned hanging basket, the pre- of the exterior wall scaffold is arranged in by extended line in the Operation switch
If in height.
Further, in above-mentioned hanging basket, mouth is additionally provided with limiting device, the limit dress under the rope rolling of the hoist engine
It sets and is connected with the power supply of hoist engine.
Further, in above-mentioned hanging basket, every group of slide guide wheel is made of two pulleys, and every vertical dragline is from two
It is passed through between pulley, described two pulleys slide on a vertical dragline simultaneously.
Further, in above-mentioned hanging basket, the hanging basket is L shape.
Further, in above-mentioned hanging basket, the hanging basket external coating has yellow black alternate striped.
Further, in above-mentioned hanging basket, safety belt is provided on the hanging basket.
Compared with prior art, the present invention is to solve in traditional construction, the stone material transport of external wall of high-rise building stone material construction
The problem of narrow field, vertical transport difficulty is big, is difficult to ensure safely, spends human and material resources, for the vertical fortune of outer wall stone
It is defeated, provide it is a kind of innovation, efficiently, safety exterior wall scaffold in Stone Vertical transport hanging basket, pass through fast-assembling bolster, elevator
The cooperating of the components such as machine, hanging basket, vertical dragline, so that simple, peace that the stone material transport in scaffold in vertical direction becomes
Entirely, reliably, and install, dismantle it is simple and quick.In addition, vertical dragline one end is directly and described by vertical dragline connection component
Exterior wall scaffold connection, eliminates influence of the ground factor to vertical transport equipment.
Detailed description of the invention
Fig. 1 is the structure chart of Stone Vertical transport hanging basket in the exterior wall scaffold of one embodiment of the invention;
Fig. 2 is the Facad structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 3 is the backside structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 4 is the scheme of installation of the hoist engine of one embodiment of the invention;
Fig. 5 is the structure chart of the Operation switch of one embodiment of the invention;
Fig. 6 is the scheme of installation of the limiting device of one embodiment of the invention;
Fig. 7 is the connection schematic diagram of the hanging basket of one embodiment of the invention;
Fig. 8 is the schematic diagram of the slide guide wheel of one embodiment of the invention;
Fig. 9 is the schematic diagram of the hanging basket brushed with yellow black alternate striped of one embodiment of the invention;
Figure 10 is the structure chart of the hanging basket of one embodiment of the invention;
Figure 11 is the sectional view of the hanging basket of one embodiment of the invention;
Figure 12 is the connection schematic diagram of the vertical dragline connection component of one embodiment of the invention;
Figure 13 is the structure chart of the scaffold fastenings of one embodiment of the invention;
Figure 14 is the structure chart of the vertical dragline connector of one embodiment of the invention;
Figure 15 is the connection schematic diagram of the vertical dragline connector of one embodiment of the invention;
Figure 16 is the connection schematic diagram of the vertical dragline of one embodiment of the invention;
Figure 17 is the connection enlarged drawing of the vertical dragline of one embodiment of the invention;
Figure 18 be one embodiment of the invention can folding and unfolding load-bearing operating platform structure chart;
Figure 19 be one embodiment of the invention can folding and unfolding load-bearing operating platform scheme of installation;
Figure 20 is the connection schematic diagram of the platform connection component of one embodiment of the invention;
Figure 21 is the schematic diagram of the platform connection component of one embodiment of the invention;
Figure 22 be one embodiment of the invention can folding and unfolding hook pack up schematic diagram;
Figure 23 be one embodiment of the invention can folding and unfolding hook expanded schematic diagram;
Figure 24 be one embodiment of the invention can folding and unfolding load-bearing operating platform put down schematic diagram;
Figure 25 be one embodiment of the invention can folding and unfolding hook connection schematic diagram;
Figure 26 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up front elevation;
Figure 27 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up back view.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides Stone Vertical transport hanging basket in a kind of exterior wall scaffold, comprising:
Exterior wall scaffold 1 is separated by pre-determined distance, the bottom of the exterior wall scaffold between the exterior wall scaffold 1 and wall 5
There are two the vertical dragline connection components 2 extended to the wall for portion's setting;
The fast-assembling bolster 3 being set on the wall 5, the top phase of the fast-assembling bolster 3 and the exterior wall scaffold 1
It is right;
Two spaced vertical draglines 4, the top of every vertical dragline 4 are connect with the fast-assembling bolster 3, and every hangs down
The bottom end of straight dragline 4 is connect with a vertical dragline connection component 2;
The hoist engine 6 being set on the fast-assembling bolster 3, and the Operation switch 7 being connect with the hoist engine 6;Hoist engine
1~100 meter of hoisting depth of design;
Moving up and down, it is vertical to surround in the exterior wall scaffold 1, wall 5, hoist engine 6 and vertical dragline connection component 2
Hanging basket 8 in space, the hanging basket upper end are provided with lifting lug 9, and the lifting lug 9 is connect with the rope rolling 10 on the hoist engine 6, institute
It states 8 two sides of hanging basket and is provided with two groups of slide guide wheels 11, every group of slide guide wheel 11 slides on a vertical dragline 4.Here, this hair
Bright to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow, and vertical transport difficulty is big, safety
Be difficult to ensure, spend human and material resources, for the vertical transport of outer wall stone, provide a kind of innovation, efficiently, the outer foundation of safety
Stone Vertical transports hanging basket in hand cradle, by the cooperating of the components such as fast-assembling bolster, hoist engine, hanging basket, vertical dragline, so that
In scaffold in vertical direction stone material transport become it is simple, safe and reliable, and install, dismantle it is simple and quick, in addition, hang down
Straight dragline one end is directly connected with the exterior wall scaffold by vertical dragline connection component, eliminates ground factor to vertical fortune
The influence of transfer device, and install, dismantle quick and convenient, the other end is connected with fast-assembling bolster.As shown in figure 12, the vertical dragline
Connection component 2 is described to prolong by including sequentially connected scaffold fastenings 21, extending frame 22, vertical dragline connector 23
It stretches frame 22 to connect by scaffold fastenings 21 with exterior wall scaffold 1, the extension frame 22 passes through vertical dragline connector
23 connect with the vertical dragline 4, and the component part of the scaffold fastenings 21 is as shown in figure 13, the vertical dragline connection
The component part of part 23 is as shown in figure 14, and the extension frame 22 is connected by vertical dragline connector 23 with the vertical dragline 4
The enlarged drawing connect is as shown in figure 15.
In one embodiment of the invention, it may also include receiving in the preset height for being movably connected on the exterior wall scaffold 1
Put load-bearing operating platform 12, it is described can folding and unfolding load-bearing operating platform 12 guardrail of the exterior wall scaffold 1 is formed when packing up, it is described
Can folding and unfolding load-bearing operating platform 12 extend the exterior wall scaffold 1 to the wall 5 when putting down.
In one embodiment of the invention, as shown in Figures 2 and 3, the fast-assembling bolster 3 is by 9 square tubes and 2 blocks of steel plates, wherein
One square tube 31 is arranged in parallel with wall 5, the both ends of the first square tube 31 respectively with second square tube 32 and third party tube 33 one
The vertical connection in end, the centre of the first square tube 31 is vertical with one end of the 4th square tube 34 and the 5th square tube 35 respectively to be connect, institute
It is vertical with the wall 5 to state second square tube 32, third party tube 33, the 4th square tube 34 and the 5th square tube 35, the one of the 6th square tube 36
The oblique other end with the 4th square tube 34 is held to connect, the other end of the 6th square tube 36 is connect with the first steel plate 38, and described
One steel plate 38 is connect with the wall 5, and the oblique other end with the 5th square tube 35 in one end of the 7th square tube 37 is connect, and the 7th
The other end of square tube 37 is connect with first steel plate 38, and one end of one end of eighth pipe 38 and the 4th square tube 34 connects
It connects, the other end of eighth pipe 39 is connect with the second steel plate 41, one end of one end of the 9th square tube 40 and the 5th square tube 35
Connection, the other end of the 9th square tube 40 are connect with the second steel plate 41, and second steel plate 41 is connected on the wall 5, described
Hoist engine 6 is fixed in the 4th square tube 34 and the 5th square tube 35, as shown in FIG. 16 and 17, two vertical draglines 4 respectively with
Second square tube 32 is connected with the other end of third party tube 33.Here, fast-assembling bolster by 9 square steel and two blocks of steel plates by welding,
It is bolted composition, as shown in figure 4, hoist engine 6 is connect by 4 flat head bolts with the 4th square tube 34 and the 5th square tube 35, side
By being welded to connect between steel and steel plate, by welding and being bolted between square steel and square steel, the first and second steel plates difference
By 3 expansion bolts and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, as shown in figure 4, being provided with shield 13 on the hoist engine 6, hoist engine passes through 4
Flat head bolt and fast-assembling bolster are connected and fixed, and shield is arranged on hoist engine, play the role of sun-proof rain-proof.The present invention one is implemented
In example, hoist engine maximum carries 1000KG, design carrying 500KG.
In one embodiment of the invention, as shown in figure 5, the Operation switch 7 is arranged by extended line 14 can folding and unfolding load-bearing
Near operating platform 12, operator is facilitated to operate hoist engine according to field condition, the Operation switch includes up button 71
With past lower button 72.Here, pinning up button, hoist engine is up promoted, and hoist engine stops being promoted after the button that comes loose;Similarly,
It pins toward lower button, hoist engine declines down, and hoist engine stops decline after the button that comes loose, and prevents the generation of maloperation event.It presses
Firmly toward lower button, hoist engine declines down, and hoist engine stops decline after the button that comes loose, easy to operate to be illustrated, and prevents maloperation thing
The generation of part.
In one embodiment of the invention, as shown in fig. 6, mouth is additionally provided with limiting device 15, institute under the rope rolling of the hoist engine 6
It states limiting device 15 to be connected with the power supply of hoist engine 6, here, setting limiting device is as Anti-over-hoisting device, hoist engine was promoted
Cheng Zhong, when lifting lug rising bumps against lower mouth limiting device, then limiting device is connected with power supply can cut off the power supply of hoist engine at once, keep away
Exempt from hoist engine to rush to summit damage.
In one embodiment of the invention, every group of slide guide wheel is made of two pulleys, and every vertical dragline is from two pulleys
Between pass through, described two pulleys slide on a vertical dragline simultaneously.Here, double group slide guide wheels are respectively arranged in hanging basket two sides,
Vertical dragline is passed through between two pulleys, and cooperating limits the motion profile of hanging basket, it is therefore prevented that hanging basket is in the horizontal direction
On movement and topple.
In one embodiment of the invention, as shown in Fig. 7,8,9,10 and 11, the hanging basket 8 is L shape, convenient for loading stone material.?
This, L shape hanging basket originally belongs to eccentric equipment, by increasing by 8 upper end lifting lug 9 of hanging basket as eccentric lifting lug, and by with hoist engine 6
Under the orientation works status condition that connection and every group of slide guide wheel 11 are made of two pulleys, the Influence from Eccentric of hanging basket is eliminated, is reached
To antidumping effect.Hanging basket center of gravity and lifting lug, vertical dragline are in same vertical plane.When stone material is placed in hanging basket, tiltedly
To placement, center of gravity and hanging basket center of gravity are in same vertical plane.
In one embodiment of the invention, as shown in figure 9,8 external coating of the hanging basket has yellow black alternate striped 82, it arrived
Warning function guarantees the safety in operating process.
In one embodiment of the invention, as shown in Fig. 7,9,10 and 11, safety belt 81 is provided on the hanging basket 8.The present invention
In one embodiment, hanging basket high 800-1000mm, long 1800mm, wide 300mm are made of steel frame and aluminium sheet, can load 2-3 simultaneously
Two retractable safety bands are arranged on hanging basket for the high stone material of block 1600 wide 700, and fixing stone, limitation stone material is in the horizontal direction
Displacement, guarantee transport hanging basket safety.
In one embodiment of the invention, as shown in Figure 18~27, it is described can folding and unfolding load-bearing operating platform 12, by steel frame and aluminium
Board group at, while guaranteeing its rigidity, alleviate its weight, it is described can the side of folding and unfolding load-bearing operating platform 12 pass through platform and connect
Connected components 121 and the exterior wall scaffold 1 are flexibly connected, while can be provided with can folding and unfolding the another two sides of folding and unfolding load-bearing operating platform
Hook 122 and pulling plug 123, by can folding and unfolding hook 122, platform connection component 121 and pulling plug 123 so that can folding and unfolding load-bearing behaviour
Make platform 12 and 1 hanging basket of the exterior wall scaffold is combined as a whole, when work, load-bearing operating platform can be received by putting down, such as Figure 19,24
Shown in 25, can folding and unfolding hook 122 and the exterior wall scaffold 1 connect, rise transfer stone material, load-bearing, active station people the effects of, this
When can folding and unfolding hook 122 state it is as shown in figure 23.Can folding and unfolding hook 122 and can folding and unfolding load-bearing operating platform 12 frame weldering
It connects.As shown in figures 26 and 27, when not working, pack up can folding and unfolding hook, load-bearing operating platform can be received by packing up, pulling plug and the exterior wall
Scaffold connection, load-bearing operating platform can be used as scaffold guard rail use, at this time can folding and unfolding hook 122 state such as Figure 22 institute
Show.And it is simple, quick to dismantle installation, rapidly installation and the working face for needing handling.Platform connection component and load-bearing operation are flat
Platform welding, connects scaffold by flat head bolt.In addition, safety net can be arranged in lifting working face two sides, guarantee hoisting process
In personnel safety.
As shown in Figure 1, Stone Vertical transports the installation and application of hanging basket in above-mentioned exterior wall scaffold, comprising:
Exterior wall scaffold 1 is set, is separated by pre-determined distance between the exterior wall scaffold 1 and wall 5, in the outer foundation hand
Two vertical dragline connection components 2 extended to the wall 6 are arranged in the bottom of frame 1;Here, being determined outer according to construction speed
Foundation hand cradle, fast-assembling bolster, can folding and unfolding load-bearing operating platform, vertical hoist cable installation site;In stone wall surface construction, it is desirable that under
Supreme construction;
Indulge face according to stone material construction working, fix fast-assembling bolster 3 on the wall, the fast-assembling bolster 3 with it is described outer
The top of foundation hand cradle is opposite, and hoist engine 6, and the Operation switch connecting with the hoist engine 6 are installed on the fast-assembling bolster 3
7, two vertical draglines 4 are installed, the top of every vertical dragline 4 is connect with the fast-assembling bolster 3, the bottom of every vertical dragline 4
End is connect with a vertical dragline connection component 2, and the Operation switch 7 is arranged by extended line in the outer foundation hand
Near stone material construction height on frame;
Hanging basket 8 is installed from the bottom of exterior wall scaffold 1, lifting lug 9 is set in 8 upper end of hanging basket, by the lifting lug 9 and the volume
The rope rolling 10 raised on machine 6 connects, and two groups of slide guide wheels 11 is arranged in 8 two sides of hanging basket, every group of slide guide wheel 11 is described vertical at one
It is slided on straight dragline 4, the hanging basket 8 moves up and down in the exterior wall scaffold, wall, hoist engine and vertical dragline connection component
In surrounded vertical space;
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone
The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, the button that work surface operator operates the Operation switch make hanging basket to job platform, are responsible for the unloading of stone material, institute
State ground and operation and operator respectively at lifting bottom and work surface can be absorbed in entire lifting by folding and unfolding load-bearing operating platform
Process, timely correction of finding the problem, and keep in touch at any time, it is ensured that lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always
In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected
Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The ground handling operator notifies the work surface operator to pass through the Operation switch, control by intercom
Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow for lifting, during lifting, at the uniform velocity carries out, during lifting,
Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the work surface operator is stopped by the release Operation switch
The hoist engine drives the hanging basket to continue lifting rising, and the work surface operator station unloads stone on the job platform
After material, the hoist engine is controlled by the Operation switch, hanging basket is driven to continue to drop to ground floor.
In one embodiment of the invention, while installing two vertical draglines, also according to stone material construction height in the exterior wall
Installation can folding and unfolding load-bearing operating platform 12 on scaffold 1.
In one embodiment of the invention,
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone
The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, the button that work surface operator operates the Operation switch continue to put down hanging basket to job platform, are responsible for stone material
Unloading, the ground and operation and operator can be absorbed in by folding and unfolding load-bearing operating platform whole respectively at lifting bottom and work surface
A hoisting process, timely correction of finding the problem, and keep in touch at any time, it is ensured that lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always
In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected
Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The ground handling operator notifies the work surface operator to pass through the Operation switch, control by intercom
Hoist engine lifts by crane the stone material in the hanging basket, and at the beginning, speed is slow for lifting, during lifting, at the uniform velocity carries out, during lifting,
Lower work personnel forbid to enter lifting working region;
When hanging basket rises to the job platform, the work surface operator is stopped by the release Operation switch
The hoist engine drives the hanging basket to continue lifting rising, and the work surface operator station unloads stone on the job platform
After material, the hoist engine is controlled by the Operation switch, hanging basket is driven to continue to drop to ground floor, comprising:
Lifting group, every group of 2 people are set, and are equipped with intercom 2, wherein ground handling operator 1, take charge stone
The loading of material, after loading, intercom notice work surface operator is responsible for lifting operation, and is responsible for the peace during lifting
Full monitoring, after hanging basket is higher than job platform, work surface operator unclamps the button of the Operation switch, stops being promoted, put
It is lower described can be after folding and unfolding load-bearing operating platform, the button that work surface operator operates the Operation switch continues to put down hanging basket extremely
Can folding and unfolding load-bearing operating platform, be responsible for the unloading of stone material, the ground and operation and operator are respectively at lifting bottom and work
Industry face can be absorbed in entire hoisting process by folding and unfolding load-bearing operating platform, timely correction of finding the problem, and keep in touch at any time, it is ensured that
Lifting safety;
Hanging basket 8 is down to the bottom of exterior wall scaffold by the work surface operator, and the hook of hanging basket and hoist engine is always
In connection status, toppling for hanging basket is prevented, stone material is placed on hanging basket by the ground handling operator, oblique placement, is protected
Stone material center of gravity and hanging basket center of gravity are demonstrate,proved on a vertical plane;
The work surface operator will described in can the setting of folding and unfolding load-bearing operating platform be in collapsed state, the ground behaviour
Make personnel and notify the work surface operator by the Operation switch by intercom, controls hoist engine and lift by crane the hanging basket
In stone material, lifting at the beginning, speed is slow, during lifting, at the uniform velocity carry out, during lifting, lower work personnel forbid into
Enter to lift working region;
When hanging basket rise to it is described can be 1 meter above folding and unfolding load-bearing operating platform when, the work surface operator passes through described
Unclamp Operation switch, stop the hoist engine hanging basket is driven to continue lifting rising, put down it is described can folding and unfolding load-bearing operation it is flat
After platform, fall hanging basket extremely can folding and unfolding load-bearing operating platform, work surface operator station it is described can folding and unfolding load-bearing operation it is flat
After unloading stone material on platform, by the Operation switch control the hoist engine drive hanging basket rise to it is described can folding and unfolding load-bearing operate it is flat
1 meter of height above platform, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operating platform used as scaffold guard rail,
Hanging basket continues to drop to ground floor.
In one embodiment of the invention, after the bottom of exterior wall scaffold installation hanging basket, further includes:
Within the scope of 1 meter of two sides of the vertical space, longitudinally disposed safety net, during guaranteeing vertical transport, under
Side passes through without personnel, guarantees construction safety.
In one embodiment of the invention, fast-assembling bolster is fixed on the wall, and hoist engine is installed on the fast-assembling bolster,
Include:
The fast-assembling bolster is by 9 square tubes and 2 blocks of steel plates, wherein first square tube and wall is arranged in parallel, by described
The both ends of one square tube are vertical with one end of second square tube and third party tube respectively to be connect, by the centre of the first square tube respectively with
One end of 4th square tube and the 5th square tube vertically connects, the second square tube, third party tube, the 4th square tube and the 5th square tube and institute
Wall body vertical is stated, the oblique other end with the 4th square tube in one end of the 6th square tube is connect, by the other end of the 6th square tube
It is connect with the first steel plate, it is by first steel plate and the wall connecting, one end of the 7th square tube is oblique with the 5th side
The other end of pipe connects, and the other end of the 7th square tube is connect with the first steel plate, by one end of eighth pipe and the 4th square tube
One end connection, the other end of eighth pipe is connect with the second steel plate, by one end of the 9th square tube and the 5th square tube
One end connection, the other end of the 9th square tube is connect with the second steel plate, and the eighth pipe and the 9th square tube are parallel with wall, will
Second steel plate is connected on the wall, the hoist engine is fixed in the 4th square tube and the 5th square tube, two
Vertical dragline is connect with the other end of second square tube and third party tube respectively.Here, fast-assembling bolster is by 9 square steel and two blocks of steel plates
By welding, being bolted composition, hoist engine is connect by 4 flat head bolts with the 4th square tube and the 5th square tube, square steel and steel
By being welded to connect between plate, by welding and being bolted between square steel and square steel, the first and second steel plates pass through 3 respectively
Expansion bolt and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, on the fast-assembling bolster after installation hoist engine, further includes:
Shield is set in the hoist engine, hoist engine is connected and fixed by 4 flat head bolts and fast-assembling bolster, hoist engine
Upper setting shield, plays the role of sun-proof rain-proof.In one embodiment of the invention, hoist engine maximum carries 1000KG, and design is held
Carry 500KG.
In one embodiment of the invention, the preset height of the exterior wall scaffold is arranged in by extended line for the Operation switch
On, facilitate operator to operate hoist engine according to field condition, the Operation switch includes up button and past lower button.?
This, pins up button, and hoist engine is up promoted, and hoist engine stops being promoted after the button that comes loose;Similarly, it pins toward lower button, volume
It raises machine to decline down, hoist engine stops decline after the button that comes loose, and prevents the generation of maloperation event.It pins toward lower button, elevator
Machine declines down, and hoist engine stops decline after the button that comes loose, easy to operate to be illustrated, and prevents the generation of maloperation event.
In one embodiment of the invention, on the fast-assembling bolster after installation hoist engine, further includes:
Limiting device is arranged in mouth under the rope rolling of the hoist engine, and the limiting device is connected with the power supply of hoist engine,
Here, setting limiting device is used as Anti-over-hoisting device, in hoist engine lifting process, lower mouth limiting device is bumped against when lifting lug rises,
Then limiting device is connected with power supply can cut off the power supply of hoist engine at once, and hoist engine is avoided to rush to summit damage.
In one embodiment of the invention, two groups of slide guide wheels are set in the hanging basket two sides, every group of slide guide wheel is described vertical at one
It is slided on straight dragline, comprising:
Every group of slide guide wheel is set as being made of two pulleys, the vertical dragline is passed through between two pulleys, institute
It states two pulleys while being slided on the vertical dragline.Here, hanging basket two sides are respectively arranged double group slide guide wheels, vertical dragline is from two
It is passed through between a pulley, cooperating, limits the motion profile of hanging basket, it is therefore prevented that hanging basket movement in the horizontal direction and inclined
It covers.
In one embodiment of the invention, the hanging basket is L shape, to facilitate loading stone material.Here, L shape hanging basket originally belongs to partially
Heart design, by increasing hanging basket upper end lifting lug as eccentric lifting lug, and by being connect with hoist engine and every group of slide guide wheel is by two
Under the orientation works status condition of pulley composition, the Influence from Eccentric of hanging basket is eliminated, antidumping effect is reached.It hanging basket center of gravity and hangs
Ear, vertical dragline are in same vertical plane.When stone material is placed in hanging basket, oblique placement, center of gravity and hanging basket center of gravity
In in same vertical plane.
In one embodiment of the invention, before hanging basket is installed from the bottom of exterior wall scaffold, further includes:
In the yellow black alternate striped of the hanging basket external coating, it arrived warning function, guarantee the safety in operating process.
In one embodiment of the invention, after the bottom of exterior wall scaffold installation hanging basket, further includes:
Safety belt is set on the hanging basket;
After stone material is placed on hanging basket, further includes:
Using safety belt fixing stone position.In one embodiment of the invention, hanging basket high 800-1000mm, long 1800mm is wide
300mm is made of steel frame and aluminium sheet, can load the high stone material of 2-3 block 1600 wide 700 simultaneously, and setting two can receive on hanging basket
Contracting safety belt, fixing stone, the displacement of limitation stone material in the horizontal direction guarantee the safety of transport hanging basket.
In one embodiment of the invention, installation can folding and unfolding load-bearing operating platform on the exterior wall scaffold, comprising:
By it is described can folding and unfolding load-bearing operating platform be set as being made of steel frame and aluminium sheet, while guaranteeing its rigidity, subtract
Its light weight, by it is described can the side of folding and unfolding load-bearing operating platform pass through platform connection component and exterior wall scaffold activity
Connection, at the same can folding and unfolding load-bearing operating platform another two sides setting can folding and unfolding hook and pulling plug;
Put down it is described can folding and unfolding load-bearing operating platform, comprising:
Described in removing can folding and unfolding load-bearing operating platform connected with the pulling plug of the exterior wall scaffold, put down can folding and unfolding hook,
Put down it is described can folding and unfolding load-bearing operating platform, here, lifting lug connect with the exterior wall scaffold at this time, load-bearing effect is subsequent
Hanging basket can be fallen to load-bearing operating platform, stone material is unloaded, be transported to home;
Packing up can folding and unfolding load-bearing operating platform, comprising:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, will described in can folding and unfolding load-bearing operation it is flat
Platform is connected by pulling plug with the exterior wall scaffold, and subsequent hanging basket of falling is to ground, transport of reloading.It is held specifically, removing
Weight operating platform connect with the pulling plug of the exterior wall scaffold, put down can folding and unfolding link up with, put down can folding and unfolding load-bearing operating platform, this
When can folding and unfolding hook connected with the exterior wall scaffold, load-bearing effect.Fall hanging basket extremely can folding and unfolding load-bearing operating platform, it is described
Second operator station it is described can unload stone material on folding and unfolding load-bearing operating platform after, pass through the Operation switch and control the volume
Raise machine drive hanging basket rise to it is described can 1 meter of height above folding and unfolding load-bearing operating platform, pack up can folding and unfolding load-bearing operating platform, pack up
Can folding and unfolding hook, load-bearing operating platform connect by pulling plug with the exterior wall scaffold, can be used as scaffold guard rail and use.It falls
Hanging basket is to ground, transport of reloading.Here, by can folding and unfolding hook, platform connection component and pulling plug so that load-bearing operation is flat
Platform and the exterior wall scaffold hanging basket are combined as a whole, and when work, load-bearing operating platform can be received by putting down, can folding and unfolding hook and described
Exterior wall scaffold connection, acts the effects of shifting stone material, load-bearing, active station people.Can folding and unfolding hook and platform framework welding, do not work
When, pack up can folding and unfolding hook, load-bearing operating platform can be received by packing up, and pulling plug is connected with the exterior wall scaffold, load-bearing operating platform
It can be used as scaffold guard rail use, and dismantle installation simply, quickly, rapidly installation and the working face for needing handling.Platform connects
Connected components and the welding of load-bearing operating platform, connect scaffold by flat head bolt.In addition, can be arranged in lifting working face two sides
Safety net guarantees the personnel safety in hoisting process.
In addition, in terms of hoist engine maintenance: (1) carrying out regular adjustment to the braking hanging basket of hoist engine, hold lotus situation
Under, it slings after object is shut down without lower sliding phenomenon.(2) phenomena such as weld seam between bolster answers flawless, displacement.(3) hoist engine with
The phenomenon that connection bolt of square steel answers non-loosening, is cut bending deformation.(4) the hand-held switch of hoist engine, it is necessary to keep dry
Dry, the rainy day wraps using using Nylon Bag, prevents dampness from leaking electricity.(5) equipment is periodically checked weekly by full-time staff, is adjusted
It is whole.Adjustment braking hanging basket process should be debugged with peak load, have no lower sliding phenomenon.
In conclusion the present invention is to solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow
Small, vertical transport difficulty is big, the problem of being difficult to ensure safely, spend human and material resources, for the vertical transport of outer wall stone, provides
A kind of innovation, efficiently, Stone Vertical transports hanging basket in the exterior wall scaffold of safety, by fast-assembling bolster, hoist engine, hanging basket,
The cooperating of the components such as vertical dragline, so that the stone material transport in scaffold in vertical direction becomes simple, safe and reliable,
And install, dismantle it is simple and quick.In addition, vertical dragline one end by vertical dragline connection component directly and the outer foundation hand
Frame connection, eliminates influence of the ground factor to vertical transport equipment.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (8)
1. Stone Vertical transports hanging basket in a kind of exterior wall scaffold characterized by comprising
Exterior wall scaffold is separated by pre-determined distance, the bottom setting of the exterior wall scaffold between the exterior wall scaffold and wall
There are two the vertical dragline connection components extended to the wall;
The fast-assembling bolster being set on the wall, the fast-assembling bolster are opposite with the top of the exterior wall scaffold;
The top of two spaced vertical draglines, every vertical dragline is connect with the fast-assembling bolster, every vertical dragline
Bottom end connect with a vertical dragline connection component;
The hoist engine being set on the fast-assembling bolster, and the Operation switch being connect with the hoist engine;
It moves up and down in the exterior wall scaffold, wall, hoist engine and vertical the surrounded vertical space of dragline connection component
Hanging basket, the hanging basket upper end are provided with lifting lug, and the lifting lug is connect with the rope rolling on the hoist engine, the hanging basket two sides setting
There are two groups of slide guide wheels, every group of slide guide wheel slides on a vertical dragline;
Wherein, the fast-assembling bolster has 9 square tubes and 2 blocks of steel plates, and wherein first square tube is arranged in parallel with wall, and described first
The both ends of square tube are vertical with one end of second square tube and third party tube respectively to be connect, and the centre of the first square tube is respectively with the 4th
One end of square tube and the 5th square tube vertically connects, the second square tube, third party tube, the 4th square tube and the 5th square tube and the wall
Body is vertical, and the oblique other end with the 4th square tube in one end of the 6th square tube is connect, the other end and the first steel of the 6th square tube
Plate connection, first steel plate and the wall connecting, the oblique other end with the 5th square tube in one end of the 7th square tube connect
It connecing, the other end of the 7th square tube is connect with first steel plate, and one end of eighth pipe is connect with one end of the 4th square tube,
The other end of eighth pipe is connect with the second steel plate, and one end of the 9th square tube is connect with one end of the 5th square tube, the 9th side
The other end of pipe is connect with the second steel plate, and second steel plate is connected on the wall, and the hoist engine is fixed on described
In four square tubes and the 5th square tube, two vertical draglines are connect with the other end of second square tube and third party tube respectively.
2. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that set on the hoist engine
It is equipped with shield.
3. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the Operation switch is logical
Extended line is crossed to be arranged in the preset height of the exterior wall scaffold.
4. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the volume of the hoist engine
Lower mouth of restricting is additionally provided with limiting device, and the limiting device is connected with the power supply of hoist engine.
5. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that every group of slide guide wheel
It is made of two pulleys, every vertical dragline is passed through between two pulleys, and described two pulleys are simultaneously in a vertical dragline
Upper sliding.
6. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the hanging basket is L shape.
7. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that the hanging basket surface applies
Brushed with yellow black alternate striped.
8. Stone Vertical transports hanging basket in exterior wall scaffold as described in claim 1, which is characterized in that be arranged on the hanging basket
There is safety belt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009652.7A CN106586908B (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transports hanging basket in exterior wall scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009652.7A CN106586908B (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transports hanging basket in exterior wall scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106586908A CN106586908A (en) | 2017-04-26 |
CN106586908B true CN106586908B (en) | 2019-07-12 |
Family
ID=58590082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611009652.7A Active CN106586908B (en) | 2016-11-16 | 2016-11-16 | Stone Vertical transports hanging basket in exterior wall scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106586908B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116553440A (en) * | 2023-04-14 | 2023-08-08 | 云南建源电力器材有限公司 | Anti-falling device for overhead operation of power transmission line |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1260434A (en) * | 1999-08-23 | 2000-07-19 | 陈胜坤 | Multiple self-locked elevating scaffold |
CN201433079Y (en) * | 2009-05-26 | 2010-03-31 | 中国建筑第八工程局有限公司 | High-altitude inclined supporting wire lifting device for construction curtain wall |
CN101696598A (en) * | 2009-09-24 | 2010-04-21 | 中冶建工有限公司 | Wholly lifted construction external frame |
CN202467231U (en) * | 2012-02-27 | 2012-10-03 | 成都嘉泽正达金属制造有限公司 | Closed type vertical-surface protection system special for hanging basket construction |
CN203514758U (en) * | 2013-10-23 | 2014-04-02 | 江苏绿博低碳科技有限公司 | Scaffold for energy-saving transformation of building external wall |
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN204022201U (en) * | 2014-06-28 | 2014-12-17 | 中铁建设集团设备安装有限公司 | A kind of weight-lifting equipment for vertical transport |
CN206266182U (en) * | 2016-11-16 | 2017-06-20 | 上海市建筑装饰工程集团有限公司 | Stone Vertical transport hanging basket in exterior wall scaffold |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6129810B2 (en) * | 2014-11-17 | 2017-05-17 | 株式会社フジタ | Groundwork stand for outer wall panel and construction method |
-
2016
- 2016-11-16 CN CN201611009652.7A patent/CN106586908B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1260434A (en) * | 1999-08-23 | 2000-07-19 | 陈胜坤 | Multiple self-locked elevating scaffold |
CN201433079Y (en) * | 2009-05-26 | 2010-03-31 | 中国建筑第八工程局有限公司 | High-altitude inclined supporting wire lifting device for construction curtain wall |
CN101696598A (en) * | 2009-09-24 | 2010-04-21 | 中冶建工有限公司 | Wholly lifted construction external frame |
CN202467231U (en) * | 2012-02-27 | 2012-10-03 | 成都嘉泽正达金属制造有限公司 | Closed type vertical-surface protection system special for hanging basket construction |
CN203514758U (en) * | 2013-10-23 | 2014-04-02 | 江苏绿博低碳科技有限公司 | Scaffold for energy-saving transformation of building external wall |
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN204022201U (en) * | 2014-06-28 | 2014-12-17 | 中铁建设集团设备安装有限公司 | A kind of weight-lifting equipment for vertical transport |
CN206266182U (en) * | 2016-11-16 | 2017-06-20 | 上海市建筑装饰工程集团有限公司 | Stone Vertical transport hanging basket in exterior wall scaffold |
Also Published As
Publication number | Publication date |
---|---|
CN106586908A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103979383B (en) | Building operation multiple layer up-down plateform system | |
CN204716124U (en) | Portable removable level-sensing device inspection platform | |
KR20110137864A (en) | Lift for construction work | |
CN106639287B (en) | Stone Vertical transportation resources in exterior wall scaffold | |
CN106829781A (en) | Mobile shipment crane and its operating method of one kind | |
CN208814562U (en) | A kind of visualization formula glass curtain wall plate vertical transit system | |
CN107461023A (en) | A kind of hoistway operation platform for being provided with safeguard structure | |
CN106586908B (en) | Stone Vertical transports hanging basket in exterior wall scaffold | |
CN106586907B (en) | The installation and application of Stone Vertical transport hanging basket in exterior wall scaffold | |
KR101068229B1 (en) | Dismantled tower crane cargo handling system and cargo handling method using thereof | |
CN206266182U (en) | Stone Vertical transport hanging basket in exterior wall scaffold | |
CN206309001U (en) | Stone Vertical transportation system in exterior wall scaffold | |
CN206267514U (en) | Stone Vertical shipping platform in exterior wall scaffold | |
CN106522537B (en) | Stone Vertical transportation system in exterior wall scaffold | |
CN108946542A (en) | A kind of small gun carriage and its construction method | |
CN106639288A (en) | Installing using method of vertical transporting platform of stone in outer wall scaffold | |
CN106592955A (en) | Platform for vertically conveying stone material in exterior wall scaffolding | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN203946779U (en) | Loose steel pipe operation combined sling | |
CN203320415U (en) | Novel large-scale pier coating operation hanging basket | |
CN214399682U (en) | Hoisting device for building | |
CN111500298A (en) | Coke tank inclination unhooking detection system of dry quenching hoister | |
CN214989697U (en) | Masonry material hoisting guarantee device | |
RU120957U1 (en) | INTERFACE TRAVERS | |
CN218323981U (en) | Telescopic platform of unloading |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |