CN106639288A CN201611009490.7A CN201611009490A CN106639288A CN 106639288 A CN106639288 A CN 106639288A CN 201611009490 A CN201611009490 A CN 201611009490A CN 106639288 A CN106639288 A CN 106639288A
Authority
CN
China
Prior art keywords
folding
unfolding
platform
operating platform
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611009490.7A
Other languages
Chinese (zh)
Other versions
CN106639288B (en
Inventor
王辉平
王利雄
连珍
陈莹
马宇哲
郭佳俊
蒲聿聪
徐永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201611009490.7A priority Critical patent/CN106639288B/en
Publication of CN106639288A publication Critical patent/CN106639288A/en
Application granted granted Critical
Publication of CN106639288B publication Critical patent/CN106639288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Abstract

The invention provides an installing using method of a vertical transporting platform of stone in an outer wall scaffold. The outer wall scaffold is installed, a bearing operation platform capable of being stretched out and drawn back is installed in the outer wall scaffold according to the construction height of the stone, and a vertical transporting device capable of moving upwards and downwards in a vertical space enclosed by the outer wall scaffold and a wall body is installed. According to the installing using method of the vertical transporting platform of the stone in the outer wall scaffold, the problem that in traditional construction, a stone transporting field of high-rise building outer wall stone construction is small, the vertical transporting difficulty is high, safety is difficult to ensure, and manpower and material resources are wasted are solved; the installing using method of the vertical transporting platform of the stone in the outer wall scaffold aiming at vertical transporting of the outer wall stone; and the bearing operation platform capable of being stretched out and drawn back can cooperate with the vertical transporting device installed in the outer wall scaffold, so that stone transporting in the vertical direction in the scaffold becomes easy, safe and reliable, and mounting and dismounting of the platform are easy and quick.

Description

The installation and application of Stone Vertical shipping platform in exterior wall scaffold
Technical field
The invention belongs to building decoration engineering construction field, Stone Vertical transport is flat in more particularly to a kind of exterior wall scaffold The installation and application of platform.
Background technology
Conventional outer wall stone material is constructed, and alien invasion is built after scaffold so that the transport of stone material is carried out in small space.Manpower Carry difficulty big, and security is difficult to ensure that, while easily causing the breakage of stone material.Goods lift is carried away from operation ground, and Need manpower rehandling, security, integrality, it is difficult to ensure.
The content of the invention
It is an object of the invention to provide in a kind of exterior wall scaffold Stone Vertical shipping platform installation and application, energy Enough solve in traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow and small, and vertical transport difficulty is big, and safety is difficult To ensure, the problem of labor intensive material resources.
To solve the above problems, the present invention provides a kind of side of installing and using of Stone Vertical shipping platform in exterior wall scaffold Method, including:
Exterior wall scaffold is set, between the exterior wall scaffold and body of wall predeterminable range is separated by;
Being installed on the exterior wall scaffold according to stone material construction height can folding and unfolding load-bearing operating platform;
The vertical transferring apparatus surrounded in the exterior wall scaffold and body of wall in vertical space that move up and down are set;
Lifting group, per group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and the peace being responsible for during lifting Full monitoring, after hanging basket is higher than job platform, scope of operation operating personnel stop the vertical transferring apparatus and are lifted, put down it is described can After folding and unfolding load-bearing operating platform, scope of operation operating personnel operate the vertical transferring apparatus put down stone material to it is described can folding and unfolding load-bearing Operating platform, is responsible for the unloading of stone material, the ground and operation and operating personnel can folding and unfolding respectively at lifting bottom and the scope of operation Whole hoisting process is absorbed on load-bearing operating platform side, correction in time of pinpointing the problems, and keeps in touch at any time, it is ensured that lifting safety;
The scope of operation operating personnel by it is described can folding and unfolding load-bearing operating platform arrange and be in collapsed state, ground behaviour Make personnel and notify that the scope of operation operating personnel operate the vertical transferring apparatus to lift by crane stone material by intercom, lifting is just When, speed is slow, during lifting, at the uniform velocity carries out, and during lifting, lower work personnel forbid into lifting working region;
When stone material rise to it is described can 1 meter of folding and unfolding load-bearing operating platform top when, the scope of operation operating personnel stop described Vertical transferring apparatus continue to lift by crane stone material and rise, put down it is described can folding and unfolding load-bearing operating platform, falling stone material extremely can folding and unfolding load-bearing Operating platform, the scope of operation standing it is described can unload stone material on folding and unfolding load-bearing operating platform after, packing up can folding and unfolding Load-bearing operating platform, can folding and unfolding load-bearing operating platform use as scaffold guard rail.
Further, in above-mentioned installation and application, installing on the exterior wall scaffold can folding and unfolding load-bearing operation Platform, including:
By it is described can folding and unfolding load-bearing operating platform be set to be made up of steel frame and aluminium sheet.
Further, in above-mentioned installation and application, installing on the exterior wall scaffold can folding and unfolding load-bearing operation Platform, including:
By it is described can folding and unfolding load-bearing operating platform side by platform coupling assembly and exterior wall scaffold activity even Connect, at the same can folding and unfolding load-bearing operating platform another both sides arrange can folding and unfolding hook and pulling plug.
Further, in above-mentioned installation and application, put down it is described can folding and unfolding load-bearing operating platform, including:
Remove it is described can folding and unfolding load-bearing operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook, Can folding and unfolding load-bearing operating platform described in putting down.
Further, in above-mentioned installation and application, pack up can folding and unfolding load-bearing operating platform, including:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, will it is described can folding and unfolding load-bearing operation put down Platform is connected by pulling plug and the exterior wall scaffold.
Further, in above-mentioned installation and application, can folding and unfolding load-bearing operating platform another both sides arrange can receive Hook and pulling plug are put, including:
By it is described can folding and unfolding hook with can folding and unfolding load-bearing operating platform steel frame welding.
Further, in above-mentioned installation and application, by it is described can folding and unfolding load-bearing operating platform side by flat Platform coupling assembly and the exterior wall scaffold are flexibly connected, including:
By the platform coupling assembly with it is described can the welding of folding and unfolding load-bearing operating platform, the platform coupling assembly is by flat Hook bolt connects the exterior wall scaffold.
Further, in above-mentioned installation and application, it is described can folding and unfolding load-bearing operating platform both sides vertical blank It is interior, longitudinally disposed safety net.
Compared with prior art, the present invention is by arranging exterior wall scaffold;According to stone material construction height in the outer foundation Installing in hand cradle can folding and unfolding load-bearing operating platform;When stone material rise to can 1 meter of folding and unfolding load-bearing operating platform top when, stop the stone Material continue lift by crane rise, put down can folding and unfolding load-bearing operating platform, fall stone material extremely can folding and unfolding load-bearing operating platform, the second operator Member station can after folding and unfolding load-bearing operating platform unloading stone material, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operation it is flat Platform is used as scaffold guard rail, during the present invention is to solve traditional construction, the stone material transport field of external wall of high-rise building stone material construction Ground is narrow and small, and vertical transport difficulty is big, is difficult to ensure that safely, the problem of labor intensive material resources, for the vertical transport of outer wall stone, Can folding and unfolding load-bearing operating platform can coordinate with the vertical transferring apparatus that are arranged in exterior wall scaffold so that it is vertical in scaffold On direction stone material transport become it is simple, safe and reliable, and stage+module, dismantle it is simple and quick.
Description of the drawings
Fig. 1 is the structure chart of Stone Vertical transportation system in the exterior wall scaffold of one embodiment of the invention;
Fig. 2 is the Facad structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 3 is the backside structure figure of the fast-assembling bolster of one embodiment of the invention;
Fig. 4 is the scheme of installation of the hoist engine of one embodiment of the invention;
Fig. 5 is the structure chart of the Operation switch of one embodiment of the invention;
Fig. 6 is the scheme of installation of the stopping means of one embodiment of the invention;
Fig. 7 is the connection diagram of the hanging basket of one embodiment of the invention;
Fig. 8 is the schematic diagram of the slide guide wheel of one embodiment of the invention;
Fig. 9 is the schematic diagram of the hanging basket for being brushed with yellow black alternate striped of one embodiment of the invention;
Figure 10 is the structure chart of the hanging basket of one embodiment of the invention;
Figure 11 is the profile of the hanging basket of one embodiment of the invention;
Figure 12 is the connection diagram of the vertical dragline coupling assembly of one embodiment of the invention;
Figure 13 is the structure chart of the scaffold fastenings of one embodiment of the invention;
Figure 14 is the structure chart of the vertical dragline connector of one embodiment of the invention;
Figure 15 is the connection diagram of the vertical dragline connector of one embodiment of the invention;
Figure 16 is the connection diagram of the vertical dragline of one embodiment of the invention;
Figure 17 is the connection enlarged drawing of the vertical dragline of one embodiment of the invention;
Figure 18 be one embodiment of the invention can folding and unfolding load-bearing operating platform structure chart;
Figure 19 be one embodiment of the invention can folding and unfolding load-bearing operating platform scheme of installation;
Figure 20 is the connection diagram of the platform coupling assembly of one embodiment of the invention;
Figure 21 is the schematic diagram of the platform coupling assembly of one embodiment of the invention;
Figure 22 be one embodiment of the invention can folding and unfolding hook pack up schematic diagram;
Figure 23 be one embodiment of the invention can folding and unfolding hook expanded schematic diagram;
Figure 24 be one embodiment of the invention can folding and unfolding load-bearing operating platform put down schematic diagram;
Figure 25 be one embodiment of the invention can folding and unfolding hook connection diagram;
Figure 26 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up front elevation;
Figure 27 be one embodiment of the invention can folding and unfolding load-bearing operating platform pack up back view.
Specific embodiment
It is understandable to enable the above objects, features and advantages of the present invention to become apparent from, it is below in conjunction with the accompanying drawings and concrete real The present invention is further detailed explanation to apply mode.
As shown in figure 1, the present invention provides Stone Vertical shipping platform in a kind of exterior wall scaffold, including:
Exterior wall scaffold 1, between the exterior wall scaffold 1 and body of wall 5 predeterminable range is separated by,
Be movably connected in the preset height of the exterior wall scaffold 1 can folding and unfolding load-bearing operating platform 12, it is described to receive Put the guardrail that the exterior wall scaffold 1 is formed when load-bearing operating platform 12 is packed up, it is described can folding and unfolding load-bearing operating platform 12 put down When the exterior wall scaffold 1 is extended to the body of wall 5;
Move up and down the vertical transferring apparatus surrounded in the exterior wall scaffold 1 and body of wall 5 in vertical space.Here, Vertical transferring apparatus can be the devices such as elevator.Here, during the present invention is to solve traditional construction, the construction of external wall of high-rise building stone material Stone material shipping yard it is narrow and small, vertical transport difficulty is big, is difficult to ensure that safely, labor intensive material resources, hanging down for outer wall stone A kind of straight transport, there is provided Stone Vertical shipping platform in innovation, exterior wall scaffold efficiently, safe, can folding and unfolding load-bearing operation Platform can coordinate with the vertical transferring apparatus being arranged in exterior wall scaffold so that the stone material fortune in scaffold in vertical direction Defeated change it is simple, safe and reliable, and stage+module, dismantle it is simple and quick.
Vertical transferring apparatus described in one embodiment of the invention, including:
Two vertical dragline coupling assemblies 2 extended to the body of wall of the bottom of the exterior wall scaffold are set;
The fast-assembling bolster 3 being arranged on the body of wall 5, the top phase of the fast-assembling bolster 3 and the exterior wall scaffold 1 It is right;
Two spaced vertical draglines 4, per root, the top of vertical dragline 4 is connected with the fast-assembling bolster 3, hangs down per root The bottom vertical dragline coupling assembly 2 described with of straight dragline 4 is connected;
The hoist engine 6 being arranged on the fast-assembling bolster 3, and the Operation switch 7 being connected with the hoist engine 6;Hoist engine 1~100 meter of hoisting depth of design;
Moving up and down, it is vertical to surround in the exterior wall scaffold 1, body of wall 5, hoist engine 6 and vertical dragline coupling assembly 2 Hanging basket 8 in space, the hanging basket upper end is provided with hanger 9, and the hanger 9 is connected with the serving 10 on the hoist engine 6, institute State the both sides of hanging basket 8 and be provided with two groups of slide guide wheels 11, every group of slide guide wheel 11 slides on a vertical dragline 4.Here, vertical Dragline one end is directly connected by vertical dragline coupling assembly with the exterior wall scaffold, eliminates ground factor to vertical transport The impact of equipment, and install, dismantle quick and convenient, the other end and fast-assembling bolster connect.As shown in figure 12, the vertical dragline connects Connected components 2 are by including scaffold fastenings 21, extension framework 22, the vertical dragline connector 23 being sequentially connected, the extension Framework 22 is connected by scaffold fastenings 21 with exterior wall scaffold 1, and the extension framework 22 passes through vertical dragline connector 23 It is connected with the vertical dragline 4, the part of the scaffold fastenings 21 is as shown in figure 13, the vertical dragline connector As shown in figure 14, the extension framework 22 is connected 23 part by vertical dragline connector 23 with the vertical dragline 4 Enlarged drawing it is as shown in figure 15.
In one embodiment of the invention, as shown in Figures 2 and 3, the fast-assembling bolster 3 by 9 square tubes and 2 blocks of steel plates, wherein One square tube 31 be arranged in parallel with body of wall 5, and the two ends of first square tube 31 are respectively with the one of the second square tube 32 and third party's pipe 33 The vertical connection in end, the centre of first square tube 31 is vertical with one end of the 4th square tube 34 and the 5th square tube 35 respectively to be connected, institute State the second square tube 32, third party's pipe 33, the 4th square tube 34 and the 5th square tube 35 vertical with the body of wall 5, the one of the 6th square tube 36 The oblique other end with the 4th square tube 34 in end is connected, and the other end of the 6th square tube 36 is connected with the first steel plate 38, and described the One steel plate 38 is connected with the body of wall 5, and the oblique other end with the 5th square tube 35 in one end of the 7th square tube 37 is connected, and the 7th The other end of square tube 37 is connected with first steel plate 38, and one end of eighth pipe 38 connects with one end of the 4th square tube 34 Connect, the other end of eighth pipe 39 is connected with the second steel plate 41, one end of one end of the 9th square tube 40 and the 5th square tube 35 Connection, the other end of the 9th square tube 40 is connected with the second steel plate 41, and second steel plate 41 is connected on the body of wall 5, described Hoist engine 6 is fixed in the 4th square tube 34 and the 5th square tube 35, as shown in FIG. 16 and 17, two vertical draglines 4 respectively with The other end connection of the second square tube 32 and third party's pipe 33.Here, fast-assembling bolster by 9 square steel and two blocks of steel plates by welding, Bolt connection is constituted, as shown in figure 4, hoist engine 6 is connected by 4 flat head bolts with the 4th square tube 34 and the 5th square tube 35, side By being welded to connect between steel and steel plate, by welding and bolt connection between square steel and square steel, the first and second steel plates difference By 3 expansion bolts and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, as shown in figure 4, being provided with protective cover 13 on the hoist engine 6, hoist engine passes through 4 Flat head bolt and fast-assembling bolster are connected, and protective cover is arranged on hoist engine, play a part of sun-proof rain-proof.The present invention one is implemented In example, hoist engine is maximum to carry 1000KG, and design carries 500KG.
In one embodiment of the invention, as shown in figure 5, the Operation switch 7 be arranged on by extended line 14 can folding and unfolding load-bearing Near operating platform 12, operating personnel are facilitated to operate hoist engine, the Operation switch to include up button 71 according to field condition Down button 72.Here, pinning up button, hoist engine is up lifted, and hoist engine stops being lifted after the button that comes loose;In the same manner, Down button is pinned, hoist engine down declines, hoist engine stops declining after the button that comes loose, and prevents the generation of maloperation event.Press Firmly down button, hoist engine down declines, and hoist engine stops declining after the button that comes loose, simple to operate to understand, prevents maloperation thing The generation of part.
In one embodiment of the invention, as shown in fig. 6, mouth is additionally provided with stopping means 15, institute under the serving of the hoist engine 6 State stopping means 15 to be connected with the power supply of hoist engine 6, here, arranging stopping means as Anti-over-hoisting device, hoist engine was lifted Cheng Zhong, when hanger rises lower mouth stopping means is bumped against, then stopping means is connected with power supply can at once cut off the power supply of hoist engine, keep away Exempt from hoist engine to rush to summit damage.
In one embodiment of the invention, every group of slide guide wheel is made up of two pulleys, and per root, vertical dragline is from two pulleys Between pass through, the simultaneously slip on a vertical dragline of described two pulleys.Here, hanging basket both sides respectively arrange double group slide guide wheels, From passing through between two pulleys, cooperating limits the movement locus of hanging basket to vertical dragline, it is therefore prevented that hanging basket is in the horizontal direction On motion and topple.
In one embodiment of the invention, as shown in Fig. 7,8,9,10 and 11, the hanging basket 8 is L-shaped, is easy to load stone material. This, L-shaped hanging basket originally belongs to eccentric equipment, and by increasing the upper end hanger 9 of hanging basket 8 eccentric hanger is used as, and by with hoist engine 6 Under the orientation works status condition that connection and every group of slide guide wheel 11 are made up of two pulleys, the Influence from Eccentric of hanging basket is eliminated, reached To antidumping effect.Hanging basket center of gravity and hanger, vertical dragline are in same vertical plane.When stone material is positioned in hanging basket, tiltedly To placement, its center of gravity and hanging basket center of gravity are in same vertical plane.
In one embodiment of the invention, as shown in figure 9, the external coating of the hanging basket 8 has yellow black alternate striped 82, reach Warning function, it is ensured that the safety in operating process.
In one embodiment of the invention, as shown in Fig. 7,9,10 and 11, safety belt 81 is provided with the hanging basket 8.The present invention In one embodiment, the high 800-1000mm of hanging basket, long 1800mm, wide 300mm are made up of steel frame and aluminium sheet, can simultaneously load 2-3 The high stone material of block 1600 wide 700, arranges two retractable safety bands on hanging basket, fixing stone limits stone material in the horizontal direction Displacement, it is ensured that the security of transportation system.
In one embodiment of the invention, as shown in Figure 18~27, it is described can folding and unfolding load-bearing operating platform 12, by steel frame and aluminium Plate is constituted, it is ensured that while its rigidity, alleviates its weight, it is described can the side of folding and unfolding load-bearing operating platform 12 connected by platform Connected components 121 and the exterior wall scaffold 1 are flexibly connected, while can be provided with can folding and unfolding the another both sides of folding and unfolding load-bearing operating platform Hook 122 and pulling plug 123, by can folding and unfolding hook 122, platform coupling assembly 121 and pulling plug 123 so that can folding and unfolding load-bearing behaviour Make platform 12 and the system of the exterior wall scaffold 1 is combined as a whole, during work, putting down can receive load-bearing operating platform, such as Figure 19,24 With shown in 25, can folding and unfolding hook 122 and the exterior wall scaffold 1 connect, play transfer stone material, load-bearing, active station people etc. and act on, this When can folding and unfolding hook 122 state it is as shown in figure 23.Can folding and unfolding hook 122 with can folding and unfolding load-bearing operating platform 12 steel frame weldering Connect, it is ensured that connection fastness.As shown in figures 26 and 27, when not working, pack up can folding and unfolding hook, packing up can receive load-bearing operating platform, Pulling plug and the exterior wall scaffold connect, and load-bearing operating platform can be used as scaffold guard rail, now can folding and unfolding hook 122 State is as shown in figure 22.And remove and install simple, quick, the rapid working face installed and need handling.The platform connection Component with it is described can the welding of folding and unfolding load-bearing operating platform, the platform coupling assembly connects the outer foundation hand by flat head bolt Frame, to ensure bonding strength.In addition, safety net can be arranged in lifting working face both sides, it is ensured that the personal security in hoisting process.
As shown in figure 1, in above-mentioned exterior wall scaffold Stone Vertical shipping platform installation and application, including:
Exterior wall scaffold 1 is set, between the exterior wall scaffold 1 and body of wall 5 predeterminable range is separated by;
Being installed on the exterior wall scaffold 1 according to stone material construction height can folding and unfolding load-bearing operating platform 12;
The vertical transferring apparatus surrounded in the exterior wall scaffold and body of wall in vertical space that move up and down are set;
Lifting group, per group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and the peace being responsible for during lifting Full monitoring, after hanging basket is higher than job platform, scope of operation operating personnel stop the vertical transferring apparatus and are lifted, put down it is described can After folding and unfolding load-bearing operating platform, scope of operation operating personnel operate the vertical transferring apparatus put down stone material to it is described can folding and unfolding load-bearing Operating platform, is responsible for the unloading of stone material, the ground and operation and operating personnel can folding and unfolding respectively at lifting bottom and the scope of operation Whole hoisting process is absorbed on load-bearing operating platform side, correction in time of pinpointing the problems, and keeps in touch at any time, it is ensured that lifting safety;
The scope of operation operating personnel by it is described can folding and unfolding load-bearing operating platform arrange and be in collapsed state, ground behaviour Make personnel and notify that the scope of operation operating personnel operate the vertical transferring apparatus to lift by crane stone material by intercom, lifting is just When, speed is slow, during lifting, at the uniform velocity carries out, and during lifting, lower work personnel forbid into lifting working region;
When stone material rise to it is described can 1 meter of folding and unfolding load-bearing operating platform top when, the scope of operation operating personnel stop described Vertical transferring apparatus continue to lift by crane stone material and rise, put down it is described can folding and unfolding load-bearing operating platform, falling stone material extremely can folding and unfolding load-bearing Operating platform, the scope of operation standing it is described can unload stone material on folding and unfolding load-bearing operating platform after, packing up can folding and unfolding Load-bearing operating platform, can folding and unfolding load-bearing operating platform use as scaffold guard rail.
In one embodiment of the invention, two can be arranged to hanging down that the body of wall 6 extends in the bottom of the exterior wall scaffold 1 Straight dragline coupling assembly 2;Here, according to construction speed, determine exterior wall scaffold, fast-assembling bolster, can folding and unfolding load-bearing operating platform, Vertical hoist cable installation site;In stone wall surface construction, it is desirable to construct from bottom to up;
According to the vertical face of stone material construction working, fast-assembling bolster 3 is fixed on the body of wall, the fast-assembling bolster 3 is outer with described The top of foundation hand cradle is relative, and hoist engine 6, and the Operation switch being connected with the hoist engine 6 are installed on the fast-assembling bolster 3 7, while installing two vertical draglines 4, per root, the top of vertical dragline 4 is connected with the fast-assembling bolster 3, the vertical dragline 4 per root Bottom vertical dragline coupling assembly 2 described be connected, by the Operation switch 7 by extended line be arranged on can folding and unfolding hold Near weight operating platform 12;
Hanging basket 8 is installed from the bottom of exterior wall scaffold 1, hanger 9 is set in the upper end of hanging basket 8, by the hanger 9 and the volume The serving 10 raised on machine 6 connects, and in the both sides of the hanging basket 8 two groups of slide guide wheels 11 are arranged, and every group of slide guide wheel 11 is described vertical at one Slide on straight dragline 4, the hanging basket 8 moves up and down in the exterior wall scaffold, body of wall, hoist engine and vertical dragline coupling assembly In surrounded vertical space;
Lifting group, per group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone The loading of material, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and the peace being responsible for during lifting Full monitoring, after hanging basket is higher than job platform, scope of operation operating personnel unclamp the button of the Operation switch, stop being lifted, and put It is lower described can be after folding and unfolding load-bearing operating platform, scope of operation operating personnel operate the button of the Operation switch to continue to put down hanging basket extremely Can folding and unfolding load-bearing operating platform, be responsible for the unloading of stone material, the ground and operation and operating personnel are respectively at lifting bottom and work Industry face can be absorbed in whole hoisting process by folding and unfolding load-bearing operating platform, correction in time of pinpointing the problems, and keep in touch at any time, it is ensured that Lifting safety;
Hanging basket 8 is down to the hook of the bottom of exterior wall scaffold, hanging basket and hoist engine all the time for the scope of operation operating personnel In connection status, prevent toppling for hanging basket, the ground handling operator that stone material is positioned on hanging basket, oblique placement is protected Card stone material center of gravity and hanging basket center of gravity are on a vertical plane;
The scope of operation operating personnel by it is described can folding and unfolding load-bearing operating platform arrange and be in collapsed state, ground behaviour Make personnel notifies the scope of operation operating personnel by the Operation switch by intercom, and control hoist engine lifts by crane the hanging basket In stone material, at the beginning, speed is slow, during lifting, at the uniform velocity carries out for lifting, during lifting, lower work personnel forbid into Enter to lift working region;
When hanging basket rise to it is described can 1 meter of folding and unfolding load-bearing operating platform top when, second operating personnel pass through the pine Open Operation switch, stop the hoist engine and drive the hanging basket to continue to lift by crane and rise, put down it is described can folding and unfolding load-bearing operating platform Afterwards, fall hanging basket extremely can folding and unfolding load-bearing operating platform, second standing it is described can be on folding and unfolding load-bearing operating platform After unloading stone material, by the Operation switch control the hoist engine drive hanging basket rise to it is described can be on folding and unfolding load-bearing operating platform Side 1 meter of height, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operating platform use as scaffold guard rail, hanging basket Continue to drop to ground floor.
In one embodiment of the invention, install after hanging basket from the bottom of exterior wall scaffold, also include:
Described safety net can be vertically arranged with the both sides vertical space of folding and unfolding load-bearing operating platform, it is vertical to ensure In transportation, lower section passes through without personnel, it is ensured that construction safety.
In one embodiment of the invention, fast-assembling bolster is fixed on the body of wall, hoist engine is installed on the fast-assembling bolster, Including:
The fast-assembling bolster by 9 square tubes and 2 blocks of steel plates, wherein, the first square tube and body of wall are be arranged in parallel, by described The two ends of one square tube are vertical with one end of the second square tube and third party's pipe respectively to be connected, by the centre of first square tube respectively with 4th square tube is vertical with one end of the 5th square tube to be connected, second square tube, third party's pipe, the 4th square tube and the 5th square tube and institute Wall body vertical is stated, the oblique other end with the 4th square tube in one end of the 6th square tube is connected, by the other end of the 6th square tube It is connected with the first steel plate, it is by first steel plate and the wall connecting, one end of the 7th square tube is oblique with the 5th side The other end connection of pipe, the other end of the 7th square tube is connected with the first steel plate, by one end of eighth pipe and the 4th square tube One end connection, the other end of eighth pipe is connected with the second steel plate, by one end of the 9th square tube and the 5th square tube One end connects, and the other end of the 9th square tube is connected with the second steel plate, and the eighth pipe and the 9th square tube are parallel with body of wall, will Second steel plate is connected on the body of wall, the hoist engine is fixed in the 4th square tube and the 5th square tube, two Vertical dragline is connected respectively with the other end of the second square tube and third party's pipe.Here, fast-assembling bolster is by 9 square steel and two blocks of steel plates Constituted by welding, bolt connection, hoist engine is connected by 4 flat head bolts with the 4th square tube and the 5th square tube, square steel and steel By being welded to connect between plate, by welding and bolt connection between square steel and square steel, the first and second steel plates pass through respectively 3 Expansion bolt and wall connecting, install, dismantle it is simple and quick.
In one embodiment of the invention, after hoist engine is installed on the fast-assembling bolster, also include:
Protective cover is set in the hoist engine, hoist engine is connected by 4 flat head bolts and fast-assembling bolster, hoist engine Upper setting protective cover, plays a part of sun-proof rain-proof.In one embodiment of the invention, hoist engine is maximum to carry 1000KG, and design is held Carry 500KG.
In one embodiment of the invention, the Operation switch by extended line be arranged on can near folding and unfolding load-bearing operating platform, Operating personnel are facilitated to operate hoist engine, the Operation switch to include up button and down button according to field condition.Here, pressing Firmly up button, hoist engine is up lifted, and hoist engine stops being lifted after the button that comes loose;In the same manner, down button is pinned, hoist engine is past Lower decline, hoist engine stops declining after the button that comes loose, and prevents the generation of maloperation event.Down button is pinned, hoist engine is down Decline, hoist engine stops declining after the button that comes loose, simple to operate to understand, prevents the generation of maloperation event.
In one embodiment of the invention, after hoist engine is installed on the fast-assembling bolster, also include:
Mouth arranges stopping means under the serving of the hoist engine, and the stopping means is connected with the power supply of hoist engine, Here, arranging stopping means as Anti-over-hoisting device, in hoist engine lifting process, lower mouth stopping means is bumped against when hanger rises, Then stopping means is connected with power supply can at once cut off the power supply of hoist engine, it is to avoid hoist engine is rushed to summit damage.
In one embodiment of the invention, two groups of slide guide wheels are set in the hanging basket both sides, every group of slide guide wheel is described vertical at one Slide on straight dragline, including:
Every group of slide guide wheel is set to be made up of two pulleys, by the vertical dragline from passing through between two pulleys, institute State two pulleys to slide on the vertical dragline simultaneously.Here, hanging basket both sides respectively arrange double group slide guide wheels, vertical dragline is from two Pass through between individual pulley, cooperating, limit the movement locus of hanging basket, it is therefore prevented that hanging basket motion in the horizontal direction and incline Cover.
In one embodiment of the invention, the hanging basket is L-shaped, to facilitate loading stone material.Here, L-shaped hanging basket is originally belonged to partially The heart is designed., it is used as eccentric hanger by increasing hanging basket upper end hanger, and by being connected with hoist engine and every group of slide guide wheel is by two Under the orientation works status condition of pulley composition, the Influence from Eccentric of hanging basket is eliminated, reach antidumping effect.Hanging basket center of gravity and hang Ear, vertical dragline are in same vertical plane.When stone material is positioned in hanging basket, oblique placement, its center of gravity and hanging basket center of gravity In same vertical plane.
In one embodiment of the invention, install before hanging basket from the bottom of exterior wall scaffold, also include:
In the yellow black alternate striped of the hanging basket external coating, warning function has been reached, it is ensured that the safety in operating process.
In one embodiment of the invention, install after hanging basket from the bottom of exterior wall scaffold, also include:
Safety belt is set on the hanging basket;
After stone material is positioned on hanging basket, also include:
Using safety belt fixing stone position.In one embodiment of the invention, the high 800-1000mm of hanging basket, long 1800mm are wide 300mm, is made up of steel frame and aluminium sheet, can simultaneously load the high stone material of 2-3 blocks 1600 wide 700, and arranging two on hanging basket can receive Contracting safety belt, fixing stone limits stone material displacement in the horizontal direction, it is ensured that the security of transportation system.
In one embodiment of the invention, on the exterior wall scaffold install can folding and unfolding load-bearing operating platform, including:
By it is described can folding and unfolding load-bearing operating platform be set to be made up of steel frame and aluminium sheet, it is ensured that while its rigidity, subtract Light its weight, by it is described can folding and unfolding load-bearing operating platform side by platform coupling assembly and exterior wall scaffold activity Connection, at the same can folding and unfolding load-bearing operating platform another both sides arrange can folding and unfolding hook and pulling plug;
Put down it is described can folding and unfolding load-bearing operating platform, including:
Remove it is described can folding and unfolding load-bearing operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook, Put down it is described can folding and unfolding load-bearing operating platform, here, now can folding and unfolding hook and exterior wall scaffold connection, play load-bearing and make With, hanging basket can be subsequently fallen to load-bearing operating platform, stone material is unloaded, it is transported to home;
Pack up can folding and unfolding load-bearing operating platform, including:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, will it is described can folding and unfolding load-bearing operation put down Platform is connected by pulling plug and the exterior wall scaffold, subsequently falls hanging basket to ground, transport of reloading.Specifically, removing is held Weight operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook, put down can folding and unfolding load-bearing operating platform, this When can folding and unfolding hook and the exterior wall scaffold connection, rise load-bearing effect.Fall hanging basket extremely can folding and unfolding load-bearing operating platform, it is described Scope of operation standing it is described can unload stone material on folding and unfolding load-bearing operating platform after, it is described by Operation switch control Hoist engine drive hanging basket rise to it is described can the two meters of height in folding and unfolding load-bearing operating platform top, pack up can folding and unfolding load-bearing operating platform, Pack up can folding and unfolding hook, load-bearing operating platform connected by pulling plug and the exterior wall scaffold, can be used as scaffold guard rail. Hanging basket is fallen to ground, transport of reloading.Here, by can folding and unfolding hook, platform coupling assembly and pulling plug so that load-bearing is grasped Make platform and the exterior wall scaffold system be combined as a whole, during work, putting down can receive load-bearing operating platform, can folding and unfolding hook and The exterior wall scaffold connection, plays the effects such as transfer stone material, load-bearing, active station people.Can folding and unfolding hook and platform framework welding.Not During work, pack up can folding and unfolding hook, packing up can receive load-bearing operating platform, and pulling plug and the exterior wall scaffold connect, load-bearing operation Platform can be used as scaffold guard rail.And remove and install simple, quick, the rapid working face installed and need handling.It is flat Platform coupling assembly, and the welding of load-bearing operating platform, by flat head bolt scaffold is connected.In addition, can be in lifting working face both sides Safety net is set, it is ensured that the personal security in hoisting process.
In addition, in terms of hoist engine maintenance:(1) regular adjustment is carried out to the brakes of hoist engine, holds lotus situation Under, without lower sliding phenomenon after object of slinging shutdown.(2) weld seam between bolster answers the phenomenons such as flawless, displacement.(3) hoist engine with The connecting bolt of square steel answers non-loosening, is cut diastrophic phenomenon.(4) the hand-held switch of hoist engine, it is necessary to keep dry Dry, the rainy day, using wrapping using Nylon Bag, prevents electric leakage of making moist.(5) equipment is periodically checked by full-time staff weekly, adjusted It is whole.Adjustment brake system process should be debugged with peak load, have no lower sliding phenomenon.
In sum, the present invention is by arranging exterior wall scaffold;According to stone material construction height on the exterior wall scaffold Installation can folding and unfolding load-bearing operating platform;Setting to move up and down and surround hanging down in vertical space in the exterior wall scaffold and body of wall Straight conveying arrangement;When stone material rise to can two meters of folding and unfolding load-bearing operating platform top when, stop the stone material and continue to lift by crane to rise, put Under can folding and unfolding load-bearing operating platform, fall stone material extremely can folding and unfolding load-bearing operating platform, the second standing is can folding and unfolding load-bearing Operating platform unloading stone material after, pack up can folding and unfolding load-bearing operating platform, can folding and unfolding load-bearing operating platform as scaffold guard rail Use, during the present invention is to solve traditional construction, the stone material shipping yard of external wall of high-rise building stone material construction is narrow and small, and vertical transport is difficult Degree is big, is difficult to ensure that safely, the problem of labor intensive material resources, for the vertical transport of outer wall stone, can folding and unfolding load-bearing operation it is flat Platform can coordinate with the vertical transferring apparatus being arranged in exterior wall scaffold so that the stone material transport in scaffold in vertical direction Become it is simple, safe and reliable, and stage+module, dismantle it is simple and quick.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out the spirit of various changes and modification without deviating from the present invention to invention And scope.So, if these modifications of the present invention and modification belong to the claims in the present invention and its equivalent technologies scope it Interior, then the present invention is also intended to including including these changes and modification.

Claims (8)

1. in a kind of exterior wall scaffold Stone Vertical shipping platform installation and application, it is characterised in that include:
Exterior wall scaffold is set, between the exterior wall scaffold and body of wall predeterminable range is separated by;
Being installed on the exterior wall scaffold according to stone material construction height can folding and unfolding load-bearing operating platform;
The vertical transferring apparatus surrounded in the exterior wall scaffold and body of wall in vertical space that move up and down are set;
Lifting group, per group of 2 people are set, and are equipped with intercom 2, wherein, ground handling operator 1, take charge stone material Load, after loading is finished, intercom notifies that scope of operation operating personnel are responsible for lifting operation, and is responsible for the safety prison during lifting Control, after hanging basket is higher than job platform, scope of operation operating personnel stop the vertical transferring apparatus and are lifted, put down it is described can folding and unfolding After load-bearing operating platform, scope of operation operating personnel operate the vertical transferring apparatus put down stone material to it is described can folding and unfolding load-bearing operation Platform, is responsible for the unloading of stone material, the ground and operation and operating personnel can folding and unfolding load-bearing respectively at lifting bottom and the scope of operation Whole hoisting process is absorbed on operating platform side, correction in time of pinpointing the problems, and keeps in touch at any time, it is ensured that lifting safety;
The scope of operation operating personnel by it is described can folding and unfolding load-bearing operating platform arrange be in collapsed state, the terrestrial operation people Member notifies that the scope of operation operating personnel operate the vertical transferring apparatus to lift by crane stone material by intercom, and lifting is at the beginning, fast Degree is slow, during lifting, at the uniform velocity carries out, and during lifting, lower work personnel forbid into lifting working region;
When stone material rise to it is described can 1 meter of folding and unfolding load-bearing operating platform top when, the scope of operation operating personnel stop described vertical Conveying arrangement continues to lift by crane stone material and rises, put down it is described can folding and unfolding load-bearing operating platform, falling stone material extremely can folding and unfolding load-bearing operation Platform, the scope of operation standing it is described can unload stone material on folding and unfolding load-bearing operating platform after, packing up can folding and unfolding load-bearing Operating platform, can folding and unfolding load-bearing operating platform use as scaffold guard rail.
2. in exterior wall scaffold as claimed in claim 1 Stone Vertical shipping platform installation and application, it is characterised in that On the exterior wall scaffold install can folding and unfolding load-bearing operating platform, including:
By it is described can folding and unfolding load-bearing operating platform be set to be made up of steel frame and aluminium sheet.
3. in exterior wall scaffold as claimed in claim 1 Stone Vertical shipping platform installation and application, it is characterised in that On the exterior wall scaffold install can folding and unfolding load-bearing operating platform, including:
By it is described can the side of folding and unfolding load-bearing operating platform be flexibly connected by platform coupling assembly and the exterior wall scaffold, together The another both sides of Shi Ke folding and unfolding load-bearing operating platforms are arranged can folding and unfolding hook and pulling plug.
4. in exterior wall scaffold as claimed in claim 3 Stone Vertical shipping platform installation and application, it is characterised in that Put down it is described can folding and unfolding load-bearing operating platform, including:
Remove it is described can folding and unfolding load-bearing operating platform and the exterior wall scaffold pulling plug connection, put down can folding and unfolding hook, put down It is described can folding and unfolding load-bearing operating platform.
5. in exterior wall scaffold as claimed in claim 3 Stone Vertical shipping platform installation and application, it is characterised in that Pack up can folding and unfolding load-bearing operating platform, including:
Pack up it is described can folding and unfolding load-bearing operating platform, pack up it is described can folding and unfolding hook, by it is described can folding and unfolding load-bearing operating platform lead to Cross pulling plug and exterior wall scaffold connection.
6. Stone Vertical shipping platform in exterior wall scaffold as claimed in claim 3, it is characterised in that can folding and unfolding load-bearing behaviour Make platform another both sides arrange can folding and unfolding hook and pulling plug, including:
By it is described can folding and unfolding hook with can folding and unfolding load-bearing operating platform steel frame welding.
7. Stone Vertical shipping platform in exterior wall scaffold as claimed in claim 3, it is characterised in that by it is described can folding and unfolding hold The side of weight operating platform is flexibly connected by platform coupling assembly and the exterior wall scaffold, including:
By the platform coupling assembly with it is described can folding and unfolding load-bearing operating platform welding, the platform coupling assembly pass through tack spiral shell Tether and connect the exterior wall scaffold.
8. Stone Vertical shipping platform in the exterior wall scaffold as described in any one of claim 1 to 7, it is characterised in that in institute State and install on exterior wall scaffold and can also include after folding and unfolding load-bearing operating platform:
It is described can be in the both sides vertical space of folding and unfolding load-bearing operating platform, longitudinally disposed safety net.
CN201611009490.7A 2016-11-16 2016-11-16 Method for installing and using vertical transport platform for stone in outer wall scaffold Active CN106639288B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611009490.7A CN106639288B (en) 2016-11-16 2016-11-16 Method for installing and using vertical transport platform for stone in outer wall scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611009490.7A CN106639288B (en) 2016-11-16 2016-11-16 Method for installing and using vertical transport platform for stone in outer wall scaffold

Publications (2)

Publication Number Publication Date
CN106639288A true CN106639288A (en) 2017-05-10
CN106639288B CN106639288B (en) 2023-02-28

Family

ID=58807161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611009490.7A Active CN106639288B (en) 2016-11-16 2016-11-16 Method for installing and using vertical transport platform for stone in outer wall scaffold

Country Status (1)

Country Link
CN (1) CN106639288B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113353A (en) * 2018-07-24 2019-01-01 北京天恒建设集团有限公司 A kind of construction material feeding plateform system with enhanced feature

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159233A (en) * 1999-12-02 2001-06-12 Hitachi Building Systems Co Ltd Working scaffold device for elevator
JP2006241897A (en) * 2005-03-04 2006-09-14 Kyanpekkusu Kogyo Kk Material carrying lift device used for construction scaffolding
JP2007327221A (en) * 2006-06-07 2007-12-20 Suzuya Denki Service:Kk Working scaffolding
JP4397431B1 (en) * 2009-06-03 2010-01-13 株式会社アイル Scaffolding lift
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
CN201486124U (en) * 2009-08-12 2010-05-26 上海美装外墙工程设备有限公司 Outer wall engineering suspended basket net protective device
CN203514758U (en) * 2013-10-23 2014-04-02 江苏绿博低碳科技有限公司 Scaffold for energy-saving transformation of building external wall
CN203878957U (en) * 2014-03-31 2014-10-15 成都嘉泽正达科技有限公司 Protective screen module unit
CN204702448U (en) * 2015-05-20 2015-10-14 河北建工集团有限责任公司 High-altitude operation platform feeding system
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001159233A (en) * 1999-12-02 2001-06-12 Hitachi Building Systems Co Ltd Working scaffold device for elevator
JP2006241897A (en) * 2005-03-04 2006-09-14 Kyanpekkusu Kogyo Kk Material carrying lift device used for construction scaffolding
JP2007327221A (en) * 2006-06-07 2007-12-20 Suzuya Denki Service:Kk Working scaffolding
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
JP4397431B1 (en) * 2009-06-03 2010-01-13 株式会社アイル Scaffolding lift
CN201486124U (en) * 2009-08-12 2010-05-26 上海美装外墙工程设备有限公司 Outer wall engineering suspended basket net protective device
CN203514758U (en) * 2013-10-23 2014-04-02 江苏绿博低碳科技有限公司 Scaffold for energy-saving transformation of building external wall
CN203878957U (en) * 2014-03-31 2014-10-15 成都嘉泽正达科技有限公司 Protective screen module unit
CN204702448U (en) * 2015-05-20 2015-10-14 河北建工集团有限责任公司 High-altitude operation platform feeding system
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113353A (en) * 2018-07-24 2019-01-01 北京天恒建设集团有限公司 A kind of construction material feeding plateform system with enhanced feature
CN109113353B (en) * 2018-07-24 2020-12-04 北京天恒建设集团有限公司 Building construction receiving platform system with lifting function

Also Published As

Publication number Publication date
CN106639288B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN204716124U (en) Portable removable level-sensing device inspection platform
CN103352559B (en) Storage tank keeps in repair special hanging movable job platform
CN208814562U (en) A kind of visualization formula glass curtain wall plate vertical transit system
CN111994820A (en) New energy automobile overhauls platform
CN106639287B (en) Stone Vertical transportation resources in exterior wall scaffold
CN106829781A (en) Mobile shipment crane and its operating method of one kind
CN206267514U (en) Stone Vertical shipping platform in exterior wall scaffold
CN206309001U (en) Stone Vertical transportation system in exterior wall scaffold
CN106639288A (en) Installing using method of vertical transporting platform of stone in outer wall scaffold
CN206266182U (en) Stone Vertical transport hanging basket in exterior wall scaffold
CN201753253U (en) Suspension hook for fork truck
CN106592955A (en) Platform for vertically conveying stone material in exterior wall scaffolding
CN106586908B (en) Stone Vertical transports hanging basket in exterior wall scaffold
CN106586907B (en) The installation and application of Stone Vertical transport hanging basket in exterior wall scaffold
CN106522537B (en) Stone Vertical transportation system in exterior wall scaffold
CN204958320U (en) Building heavy object lifting machine
CN110029807A (en) For installing the device of steel construction traverse colored steel
CN213923658U (en) Conveying device for lifting materials in super high-rise building floor
CN210313105U (en) Fast loading and unloading hanging basket
CN214399682U (en) Hoisting device for building
CN205346400U (en) Room formula bag package shipment equipment of in bundling
CN205916997U (en) Mechanical and electrical installation movable tipping arrangement
CN206088146U (en) Empty haulage equipment that hangs of subway construction level
CN205652953U (en) High -speed landing protection device of elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant