CN103352559B - Storage tank keeps in repair special hanging movable job platform - Google Patents

Storage tank keeps in repair special hanging movable job platform Download PDF

Info

Publication number
CN103352559B
CN103352559B CN201310301453.3A CN201310301453A CN103352559B CN 103352559 B CN103352559 B CN 103352559B CN 201310301453 A CN201310301453 A CN 201310301453A CN 103352559 B CN103352559 B CN 103352559B
Authority
CN
China
Prior art keywords
storage tank
hanging basket
pulley
travel mechanism
operation hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310301453.3A
Other languages
Chinese (zh)
Other versions
CN103352559A (en
Inventor
陈志强
江维安
屠永安
钱秋玲
江岳林
周耀
滕志宏
王阳阳
王志康
陈其明
乐加明
乐加虎
包成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinochem Zhoushan Xinghai Construction Co Ltd
Original Assignee
Sinochem Zhoushan Xinghai Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinochem Zhoushan Xinghai Construction Co Ltd filed Critical Sinochem Zhoushan Xinghai Construction Co Ltd
Priority to CN201310301453.3A priority Critical patent/CN103352559B/en
Publication of CN103352559A publication Critical patent/CN103352559A/en
Application granted granted Critical
Publication of CN103352559B publication Critical patent/CN103352559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Ladders (AREA)

Abstract

The present invention discloses a kind of high-altitude maintenance apparatus for work, particularly relates to a kind of storage tank and keeps in repair special hanging movable job platform; The storage tank of the present invention keeps in repair special hanging movable job platform, it is possible to effectively saves material, builds the time shorter, builds expense lower, does not need external impetus support, it may also be useful to security is higher; Comprise operation Hanging Basket group, the first travel mechanism and the 2nd travel mechanism, first walking organization establishes at the top of operation Hanging Basket group and the first travel mechanism by pulley relatively sliding on the wind ring of storage tank, 2nd travel mechanism is arranged on the side of operation Hanging Basket group, the top of the 2nd travel mechanism is pressed on the outer wall of storage tank by pulley top and relatively sliding, operation Hanging Basket group comprises end to end at least two operation Hanging Baskets, is provided with cat ladder between operation Hanging Basket.

Description

储罐维修专用挂式活动作业平台Special hanging movable operation platform for storage tank maintenance

技术领域 technical field

本发明涉及高空维修作业装置技术领域,特别是涉及一种储罐维修专用挂式活动作业平台。 The invention relates to the technical field of high-altitude maintenance operation devices, in particular to a special hanging movable operation platform for storage tank maintenance.

背景技术 Background technique

众所周知,大型储罐,尤其是石油行业的大型储罐,在长期使用后需要对储罐的立壁以及安装在立壁上的附件设备进行检修、防腐、保温等日常维护作业,然而储罐的高度通常较高、维护面积较大,因此如何安全有效、同时节省资源地实现储罐的高空维修,成为一项重要的课题;现有的储罐维修作业平台,通常包括脚手架式作业平台和高层吊篮式作业平台这两种方式;其中,脚手架式作业平台,存在搭建费用较高、搭建时间较长、材料运输困难进而影响整体工期的问题,以10万立方米的储罐为例,材料使用量接近100吨,另外参与作业的人员较多,在搭建拆除过程中存在较高的安全隐患;高层吊篮式作业平台,通常将电机设置在储罐的抗风圈上,通过钢丝绳在下方悬吊有吊篮,这种作业平台虽然材料需求较少,但是作业过程中需要电力支持,若储罐处于工作状态、且内部储存有介质则难以使用,即使储罐处于闲置状态,施工过程中尤其是电焊作业时,容易出现电弧电流与钢丝绳发生对流,进而烧断钢丝绳的问题,安全隐患较大。 As we all know, large storage tanks, especially large storage tanks in the petroleum industry, need to carry out daily maintenance operations such as overhaul, anti-corrosion, and heat preservation on the vertical wall of the storage tank and the accessory equipment installed on the vertical wall after long-term use. However, the height of the storage tank is usually Therefore, how to realize the high-altitude maintenance of storage tanks in a safe, effective and resource-saving manner has become an important issue; the existing storage tank maintenance work platforms usually include scaffolding work platforms and high-rise hanging baskets There are two ways of working platform; among them, the scaffolding working platform has the problems of high construction cost, long construction time, difficulty in material transportation and thus affecting the overall construction period. Taking a storage tank of 100,000 cubic meters as an example, the amount of materials used It is close to 100 tons, and there are many people involved in the operation, so there are high safety hazards in the process of building and dismantling; the high-rise basket-type work platform, the motor is usually set on the wind-resistant ring of the storage tank, and is suspended below by wire rope There are hanging baskets. Although this type of work platform requires less materials, it needs power support during the operation. If the storage tank is in working condition and there is a medium stored inside, it is difficult to use. Even if the storage tank is in an idle state, especially during the construction process During electric welding operations, convection between the arc current and the steel wire rope is likely to occur, and then the steel wire rope will be burned, which poses a greater safety hazard.

发明内容 Contents of the invention

为解决上述技术问题,本发明提供一种可以有效节省材料,搭建时间较短,搭建费用较低,不需外部动力支持,使用安全性较高的储罐维修专用挂式活动作业平台。 In order to solve the above-mentioned technical problems, the present invention provides a special hanging movable operation platform for maintenance of storage tanks that can effectively save materials, has shorter construction time, lower construction cost, no external power support, and high use safety.

本发明的储罐维修专用挂式活动作业平台,包括作业挂篮组、第一行走机构和第二行走机构,所述第一行走机构设置在作业挂篮组的顶部、并且所述第一行走机构通过第二承重滑轮在储罐的抗风圈上相对滑动,所述第二行走机构设置在作业挂篮组的侧面,所述第二行走机构的顶端通过横向行走滑轮顶压在所述储罐的外壁上并相对滑动,所述作业挂篮组包括首尾相连的至少两个作业挂篮,所述作业挂篮之间设置有爬梯,所述第一行走机构包括槽钢式的轨道、框架、第一承重滑轮、第二承重滑轮和保险滑轮,所述轨道包括相互连接为一体结构的顶板、侧板和底板,所述轨道固定安装在储罐抗风圈的外周边缘、并且所述轨道的槽型开口面向所述储罐的外壁,所述框架的顶部固定有横梁,所述横梁的一端突出在所述框架的外侧为突出部,所述突出部的底部固定有所述第一承重滑轮、第二承重滑轮和保险滑轮,所述第一承重滑轮在所述顶板的上表面相对滑动,所述第二承重滑轮在抗风圈上相对滑动,所述保险滑轮在所述顶板的下表面相对滑动,所述第二行走机构包括顶杆和横向行走滑轮,所述顶杆的一端固定在所述作业挂篮上、另一端固定有所述横向行走滑轮,所述横向行走滑轮在所述储罐的外壁上相对滑动。 The special hanging type movable work platform for storage tank maintenance of the present invention includes a working basket group, a first traveling mechanism and a second traveling mechanism, the first traveling mechanism is arranged on the top of the working hanging basket group, and the first walking mechanism The mechanism slides relatively on the wind-resistant ring of the storage tank through the second load-bearing pulley. The second traveling mechanism is arranged on the side of the work hanging basket group. and slide relatively on the outer wall of the tank, the work hanging basket group includes at least two work hanging baskets connected end to end, a ladder is arranged between the work hanging baskets, and the first walking mechanism includes a channel-type track, a frame , the first load-bearing pulley, the second load-bearing pulley and the safety pulley, the track includes a top plate, a side plate and a bottom plate connected to each other as an integral structure, the track is fixedly installed on the outer peripheral edge of the wind resistance ring of the storage tank, and the track The slot-shaped opening faces the outer wall of the storage tank, a beam is fixed on the top of the frame, one end of the beam protrudes outside the frame as a protrusion, and the bottom of the protrusion is fixed with the first load-bearing pulley, the second load-bearing pulley and the safety pulley, the first load-bearing pulley slides relatively on the upper surface of the top plate, the second load-bearing pulley slides relatively on the wind-resistant ring, and the safety pulley slides on the lower surface of the top plate The surface is relatively sliding, and the second walking mechanism includes a push rod and a lateral travel pulley. One end of the push rod is fixed on the work hanging basket, and the other end is fixed with the lateral travel pulley. Relatively sliding on the outer wall of the storage tank.

进一步的,所述作业挂篮的底面设置有底板,所述地板的一侧设置有通孔、并在所述通孔的底部设置有所述爬梯。 Further, the bottom surface of the work hanging basket is provided with a bottom plate, one side of the floor is provided with a through hole, and the ladder is provided at the bottom of the through hole.

进一步的,所述作业挂篮面对所述储罐的一侧为内侧,所述作业挂篮的内侧设置有活动栏板、并在作业挂篮上位于活动栏板的上方设置有第一固定槽,所述地板的中间设置有固定横销、内侧边缘设置有第二固定槽,所述活动栏板的底部通过拉索与作业挂篮的顶部相连,所述活动栏板的顶部与所述第一固定槽和固定横销相配合,所述活动栏板的底部与所述第二固定槽相配合。 Further, the side of the work hanging basket facing the storage tank is the inner side, the inner side of the work hanging basket is provided with a movable fence, and a first fixed fence is arranged on the work hanging basket above the movable fence. groove, the middle of the floor is provided with a fixed horizontal pin, and the inner edge is provided with a second fixed groove, the bottom of the movable fence is connected with the top of the work hanging basket through a cable, and the top of the movable fence is connected with the The first fixing groove is matched with the fixed horizontal pin, and the bottom of the movable fence is matched with the second fixing groove.

进一步的,还包括锚固定机构,所述锚固定机构包括固定端和磁石,所述磁石通过锚绳与所述固定端相连,所述固定端分别设置在所述作业挂篮组的底部和横梁上。 Further, it also includes an anchor fixing mechanism, the anchor fixing mechanism includes a fixed end and a magnet, the magnet is connected to the fixed end through an anchor rope, and the fixed end is respectively arranged on the bottom of the work hanging basket set and the cross beam superior.

进一步的,所述第一行走机构的顶部设置有栏杆,所述栏杆通过可拆卸连接件安装在所述第一行走机构上。 Further, a railing is provided on the top of the first traveling mechanism, and the railing is installed on the first traveling mechanism through a detachable connecting piece.

进一步的,所述第二行走机构为三个。 Further, there are three second traveling mechanisms.

与现有技术相比本发明的有益效果为:包括作业挂篮组、第一行走机构和第二行走机构,第一行走机构设置在作业挂篮组的顶部、并且第一行走机构通过第二承重滑轮在储罐的抗风圈上相对滑动,第二行走机构设置在作业挂篮组的侧面,第二行走机构的顶端通过横向行走滑轮顶压在储罐的外壁上并相对滑动,作业挂篮组包括首尾相连的至少两个作业挂篮,作业挂篮之间设置有爬梯;这样,可以在施工现场,将作业挂篮组相互组装,并与第一行走机构和第二行走机构安装在一起后,通过吊车将整体吊起挂在抗风圈上,作业平台在第一行走机构和第二行走机构的共同滑动作用下,沿着抗风圈和储罐外壁横向移动,另外,第一行走机构卡在抗风圈上,有效防止作业挂篮组外倾,第二行走机构顶压储罐内壁,可以有效防止作业挂篮组内倾;施工时,施工人员通过爬梯在不同高度的作业挂篮上施工;需要横向移动时,通过人工绳索拉动即可;这种施工方式可以有效节省材料,搭建时间较短,搭建费用较低,而且不需外部动力支持,使用安全性较高。 Compared with the prior art, the present invention has the beneficial effects of: comprising a work hanging basket group, a first running gear and a second running gear, the first running gear is arranged on the top of the working hanging basket group, and the first running gear passes through the second running gear. The load-bearing pulley slides relatively on the wind-resistant ring of the storage tank. The second traveling mechanism is arranged on the side of the work hanging basket group. The basket group includes at least two operation hanging baskets connected end to end, and a ladder is arranged between the operation hanging baskets; thus, the operation hanging basket group can be assembled with each other at the construction site, and installed on the first walking mechanism and the second walking mechanism. After being put together, the whole is hoisted and hung on the wind-resistant ring by a crane, and the working platform moves laterally along the wind-resistant ring and the outer wall of the storage tank under the joint sliding action of the first traveling mechanism and the second traveling mechanism. In addition, the first The running mechanism is stuck on the wind-resistant ring, which effectively prevents the work hanging basket group from tilting outward, and the second walking mechanism presses against the inner wall of the storage tank, which can effectively prevent the work hanging basket group from tilting inward; Construction on the basket; when lateral movement is required, it can be pulled by artificial ropes; this construction method can effectively save materials, the construction time is short, the construction cost is low, and no external power support is required, and the use safety is high.

附图说明 Description of drawings

图1是本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图2是本发明的右视图。 Fig. 2 is a right side view of the present invention.

图3是图1中A部的局部放大图。 Fig. 3 is a partial enlarged view of part A in Fig. 1 .

图4是本发明中作业挂篮的侧视图。 Fig. 4 is a side view of the work hanging basket in the present invention.

具体实施方式 detailed description

下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。 The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

如图1所示,本发明的储罐维修专用挂式活动作业平台,包括作业挂篮组1、第一行走机构2和第二行走机构3,第一行走机构2设置在作业挂篮组1的顶部、并且第一行走机构通过第二承重滑轮24在储罐的抗风圈5上相对滑动,第二行走机构3设置在作业挂篮组1的侧面,第二行走机构的顶端通过横向行走滑轮32顶压在储罐4的外壁上并相对滑动,作业挂篮组包括首尾相连的至少两个作业挂篮11,作业挂篮之间设置有爬梯13;这样,可以在施工现场,将作业挂篮组相互组装,并与第一行走机构和第二行走机构安装在一起后,通过吊车将整体吊起挂在抗风圈上,作业平台在第一行走机构和第二行走机构的共同滑动作用下,沿着抗风圈和储罐外壁横向移动,另外,第一行走机构卡在抗风圈上,有效防止作业挂篮组外倾,第二行走机构顶压储罐内壁,可以有效防止作业挂篮组内倾;施工时,施工人员通过爬梯在不同高度的作业挂篮上施工;需要横向移动时,通过人工绳索拉动即可;这种施工方式可以有效节省材料,搭建时间较短,搭建费用较低,而且不需外部动力支持,使用安全性较高;另外,使用时,可以在一个储罐上,同时使用4个本发明的储罐维修专用挂式活动作业平台,有效提高工作效率。 As shown in Figure 1, the special hanging type movable operation platform for storage tank maintenance of the present invention includes a work basket group 1, a first traveling mechanism 2 and a second traveling mechanism 3, and the first traveling mechanism 2 is arranged on the work hanging basket group 1. and the first traveling mechanism slides relatively on the wind-resistant ring 5 of the storage tank through the second load-bearing pulley 24, the second traveling mechanism 3 is arranged on the side of the work hanging basket group 1, and the top of the second traveling mechanism travels horizontally The pulley 32 is pressed against the outer wall of the storage tank 4 and relatively slides. The operation hanging basket group includes at least two operation hanging baskets 11 connected end to end, and a climbing ladder 13 is provided between the operation hanging baskets; The hanging basket group is assembled with each other and installed together with the first traveling mechanism and the second traveling mechanism, and the whole is hoisted and hung on the wind-resistant ring by a crane, and the working platform slides jointly between the first traveling mechanism and the second traveling mechanism Under the action, it moves laterally along the wind-resistant ring and the outer wall of the storage tank. In addition, the first traveling mechanism is stuck on the wind-resistant ring to effectively prevent the work hanging basket group from tilting. The second traveling mechanism presses against the inner wall of the storage tank, which can effectively prevent The work hanging basket group is inwardly tilted; during construction, the construction personnel use the ladder to construct on the work hanging baskets of different heights; when they need to move laterally, they can be pulled by artificial ropes; this construction method can effectively save materials, and the construction time is shorter. The cost is low, no external power support is needed, and the use safety is high; in addition, when in use, four hanging movable work platforms dedicated to storage tank maintenance of the present invention can be used on one storage tank at the same time, effectively improving work efficiency .

本发明的储罐维修专用挂式活动作业平台,第一行走机构2包括槽钢式的轨道21、框架22、第一承重滑轮23、第二承重滑轮24和保险滑轮25,轨道包括相互连接为一体结构的顶板、侧板和底板,轨道固定安装在储罐抗风圈5的外周边缘、并且轨道的槽底面向储罐的外壁,框架的顶部固定有横梁,横梁的一端突出在框架的外侧为突出部,突出部的底部固定有第一承重滑轮、第二承重滑轮和保险滑轮,第一承重滑轮在顶板的上表面相对滑动,第二承重滑轮在抗风圈上相对滑动,保险滑轮在顶板的下表面相对滑动;这样,第一承重滑轮可以有效承担作业平台的重量并横向移动,第二承重滑轮可以有效顶压抗风圈,防止作业挂篮组外倾,保险滑轮可以有效将第一承重滑轮固定在轨道上,防止脱落。 In the special hanging movable work platform for storage tank maintenance of the present invention, the first traveling mechanism 2 includes a channel steel track 21, a frame 22, a first load-bearing pulley 23, a second load-bearing pulley 24 and a safety pulley 25, and the track includes interconnection The top plate, side plate and bottom plate of an integrated structure, the track is fixedly installed on the outer peripheral edge of the wind resistance ring 5 of the storage tank, and the groove bottom of the track faces the outer wall of the storage tank, the top of the frame is fixed with a beam, and one end of the beam protrudes outside the frame It is a protruding part, and the bottom of the protruding part is fixed with a first load-bearing pulley, a second load-bearing pulley and a safety pulley. The first load-bearing pulley slides relatively on the upper surface of the top plate, and the second load-bearing pulley slides relatively on the wind resistance ring. The lower surface of the top plate slides relatively; in this way, the first load-bearing pulley can effectively bear the weight of the work platform and move laterally, the second load-bearing pulley can effectively press against the wind-resistant ring to prevent the work hanging basket group from tilting, and the safety pulley can effectively move the second load-bearing pulley A load-bearing pulley is fixed on the track to prevent falling off.

本发明的储罐维修专用挂式活动作业平台,第二行走机构3包括顶杆31和横向行走滑轮32,顶杆31的一端固定在作业挂篮11上、另一端固定有横向行走滑轮32,横向行走滑轮在储罐4的外壁上相对滑动;这样,在第二行走机构的顶压作用下,可以有效防止作业挂篮内倾。 In the special hanging movable work platform for storage tank maintenance of the present invention, the second traveling mechanism 3 includes a push rod 31 and a lateral travel pulley 32, one end of the push rod 31 is fixed on the work hanging basket 11, and the other end is fixed with a lateral travel pulley 32, The transverse travel pulley relatively slides on the outer wall of the storage tank 4; like this, under the action of the top pressure of the second traveling mechanism, the inclination of the work hanging basket can be effectively prevented.

本发明的储罐维修专用挂式活动作业平台,作业挂篮11的底面设置有地板12,地板的一侧设置有通孔、并在通孔的底部设置有爬梯13;这样,施工人员通过爬梯即可在不同高度的作业挂篮上完成施工。 In the special hanging movable work platform for storage tank maintenance of the present invention, the bottom surface of the work hanging basket 11 is provided with a floor 12, one side of the floor is provided with a through hole, and a ladder 13 is provided at the bottom of the through hole; The construction can be completed on the work hanging baskets of different heights.

本发明的储罐维修专用挂式活动作业平台,作业挂篮11面对储罐4的一侧为内侧,作业挂篮的内侧设置有活动栏板14、并在作业挂篮11上位于活动栏板14的上方设置有第一固定槽15,地板的中间设置有固定横销16、内侧边缘设置有第二固定槽17,活动栏板的底部通过拉索18与作业挂篮的顶部相连,活动栏板14的顶部与第一固定槽15和固定横销相配合,活动栏板的底部与第二固定槽相配合;这样,活动栏板既可成为扶手,也可放下成为底板,扩大施工面积,缩小作业挂篮与储罐外壁的间距,方便施工。 In the special hanging movable work platform for storage tank maintenance of the present invention, the side of the work hanging basket 11 facing the storage tank 4 is the inner side, and the inner side of the work hanging basket is provided with a movable fence 14, and the work hanging basket 11 is located on the movable fence. The top of the plate 14 is provided with a first fixed groove 15, the middle of the floor is provided with a fixed horizontal pin 16, and the inner edge is provided with a second fixed groove 17, and the bottom of the movable fence is connected with the top of the work hanging basket through a drag cable 18, and the movable The top of the fence 14 is matched with the first fixed groove 15 and the fixed horizontal pin, and the bottom of the movable fence is matched with the second fixed groove; in this way, the movable fence can be used as a handrail, or can be put down to become a base plate to expand the construction area , narrow the distance between the work hanging basket and the outer wall of the storage tank, which is convenient for construction.

本发明的储罐维修专用挂式活动作业平台,还包括锚固定机构6,锚固定机构包括固定端61和磁石62,磁石通过锚绳与固定端相连,固定端分别设置在作业挂篮组的底部和横梁上;这样,停止施工作业时,可以有效将作业平台固定,有效提高使用的安全性,另外,安装作业平台时,也可以有效固定作业平台,防止摆动。 The special hanging movable work platform for storage tank maintenance of the present invention also includes an anchor fixing mechanism 6. The anchor fixing mechanism includes a fixed end 61 and a magnet 62. The magnet is connected to the fixed end through an anchor rope, and the fixed ends are respectively arranged on the bottom of the work hanging basket group. In this way, when the construction operation is stopped, the operation platform can be effectively fixed, which can effectively improve the safety of use. In addition, when the operation platform is installed, the operation platform can also be effectively fixed to prevent swinging.

本发明的储罐维修专用挂式活动作业平台,第一行走机构的顶部设置有栏杆7,栏杆通过可拆卸连接件安装在第一行走机构上;这样,当施工人员在抗风圈上安装作业平台或是对储罐进行维修作业时,可以有效保护施工人员,有效提高安全性。 In the special hanging movable work platform for storage tank maintenance of the present invention, railings 7 are arranged on the top of the first traveling mechanism, and the railings are installed on the first traveling mechanism through detachable connectors; When repairing the platform or the storage tank, it can effectively protect the construction personnel and effectively improve safety.

本发明的储罐维修专用挂式活动作业平台,所述第二行走机构3为三个;这样,作业平台横向移动时的平稳性较高,同时作业挂篮相互连接处的扭力较小。 The special hanging movable work platform for storage tank maintenance of the present invention has three second traveling mechanisms 3; in this way, the stability of the work platform when moving laterally is high, and the torsion force at the joints of the work hanging baskets is relatively small.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the present invention, some improvements and modifications can also be made, these improvements and modifications It should also be regarded as the protection scope of the present invention.

Claims (6)

1. a storage tank keeps in repair special hanging movable job platform, it is characterized in that, comprise operation Hanging Basket group, first travel mechanism and the 2nd travel mechanism, described first walking organization establishes is at the top of operation Hanging Basket group, and described first travel mechanism is by the 2nd load-bearing pulley relatively sliding on the wind ring of storage tank, described 2nd travel mechanism is arranged on the side of operation Hanging Basket group, the top of described 2nd travel mechanism is pressed on the outer wall of described storage tank and relatively sliding by laterally walking pulley top, described operation Hanging Basket group comprises end to end at least two operation Hanging Baskets, it is provided with cat ladder between described operation Hanging Basket, described first travel mechanism comprises the track of channel-section steel formula, framework, first load-bearing pulley, 2nd load-bearing pulley and insurance pulley, described track comprises the top board being interconnected and being structure as a whole, side plate and base plate, described track is fixedly mounted on the neighboring of storage tank wind ring, and the grooved opening surface of described track is to the outer wall of described storage tank, the top of described framework is fixed with crossbeam, it is protuberance that one end of described crossbeam is given prominence in the outside of described framework, the bottom of described protuberance is fixed with described first load-bearing pulley, 2nd load-bearing pulley and insurance pulley, described first load-bearing pulley is in the upper surface relatively sliding of described top board, described 2nd load-bearing pulley relatively sliding on wind ring, described insurance pulley is in the lower surface relatively sliding of described top board, described 2nd travel mechanism comprises push rod and pulley of laterally walking, one end of described push rod is fixed on described operation Hanging Basket, the other end is fixed with described transverse direction and walks pulley, described laterally walking pulley relatively sliding on the outer wall of described storage tank.
2. storage tank as claimed in claim 1 keeps in repair special hanging movable job platform, it is characterised in that, the bottom surface of described operation Hanging Basket is provided with floor, and the side on described floor is provided with through hole and the bottom of described through hole is provided with described cat ladder.
3. storage tank as claimed in claim 2 keeps in repair special hanging movable job platform, it is characterized in that, described operation Hanging Basket is inner side in the face of the side of described storage tank, the inner side of described operation Hanging Basket is provided with movable breast board, and be positioned on operation Hanging Basket and be provided with the first pickup groove above movable breast board, the centre on described floor is provided with fixing horizontal pin, inside edge is provided with the 2nd pickup groove, the bottom of described movable breast board is connected by the top of drag-line with operation Hanging Basket, match with described first pickup groove and fixing horizontal pin in the top of described movable breast board, match with described 2nd pickup groove in the bottom of described movable breast board.
4. storage tank as claimed in claim 1 keeps in repair special hanging movable job platform, it is characterized in that, also comprise anchor fixed mechanism, described anchor fixed mechanism comprises inboardend and magnetite, described magnetite is connected with described inboardend by anchor line, on the bottom that described inboardend is separately positioned on described operation Hanging Basket group and crossbeam.
5. storage tank as claimed in claim 1 keeps in repair special hanging movable job platform, it is characterised in that, the top of described first travel mechanism is provided with railing, and described railing is arranged in described first travel mechanism by removable connector.
6. storage tank as claimed in claim 1 keeps in repair special hanging movable job platform, it is characterised in that, described 2nd travel mechanism is three.
CN201310301453.3A 2013-07-18 2013-07-18 Storage tank keeps in repair special hanging movable job platform Active CN103352559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310301453.3A CN103352559B (en) 2013-07-18 2013-07-18 Storage tank keeps in repair special hanging movable job platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310301453.3A CN103352559B (en) 2013-07-18 2013-07-18 Storage tank keeps in repair special hanging movable job platform

Publications (2)

Publication Number Publication Date
CN103352559A CN103352559A (en) 2013-10-16
CN103352559B true CN103352559B (en) 2016-06-15

Family

ID=49308967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310301453.3A Active CN103352559B (en) 2013-07-18 2013-07-18 Storage tank keeps in repair special hanging movable job platform

Country Status (1)

Country Link
CN (1) CN103352559B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358998B (en) * 2014-11-05 2016-04-13 中国海洋石油总公司 LNG storage tank gut line equipment integrative coordinated with vertical maintenance ladder
CN104963513B (en) * 2015-07-15 2017-05-31 杭州博彭科技有限公司 Build contoured machine
CN105442843B (en) * 2015-10-10 2018-05-04 欢颜创新科技(杭州)有限公司 The foldable contoured machine of building
CN107724660B (en) * 2017-11-07 2020-12-25 广西电网有限责任公司北海供电局 Multifunctional power maintenance operation platform
CN110374316A (en) * 2019-07-23 2019-10-25 京安工程有限公司 A kind of firefighting movable operation platform and its construction method
CN111706249A (en) * 2020-06-08 2020-09-25 深圳市华星光电半导体显示技术有限公司 Maintenance ladder
CN113356555B (en) * 2021-07-01 2022-06-17 中建三局集团有限公司 Vertical storage tank facade anticorrosion rust cleaning auxiliary device
CN116752741A (en) * 2023-07-10 2023-09-15 中建深圳装饰有限公司 A mobile platform for large-scale building exterior facade construction and its construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001003561A (en) * 1999-06-25 2001-01-09 Sanyo Toso Kk Work floor for tank
CN2926392Y (en) * 2006-07-21 2007-07-25 中国石油天然气管道局第三工程分公司 Elevator for storage tank exteral-wall construction
KR20110009738A (en) * 2009-07-15 2011-01-31 진명환경산업 주식회사 Aerial Railroad Cars
CN202718379U (en) * 2012-07-16 2013-02-06 中建工业设备安装有限公司 Mobile wall-mounted cart for construction of storage tanks
CN203531352U (en) * 2013-07-18 2014-04-09 江维安 Hanging type movable working platform for storage tank maintenance

Also Published As

Publication number Publication date
CN103352559A (en) 2013-10-16

Similar Documents

Publication Publication Date Title
CN103352559B (en) Storage tank keeps in repair special hanging movable job platform
CN105735140B (en) An aerial work platform device on the side of a bridge
CN105000482B (en) Tower crane with traveling mechanism
CN205591111U (en) Portable type bridge of cantilever type bottom is repaired and is used platform device
CN108862045B (en) Special-shaped steel truss beam member turning device and method for turning member
CN204310644U (en) A kind of single suspension centre cage guide installation and maintenance hanging basket
CN203531352U (en) Hanging type movable working platform for storage tank maintenance
CN205443933U (en) Be used for bridge to detect and maintain reinforcement equipment
CN207609153U (en) A kind of elevator liftable construction operation platform
CN204081436U (en) A kind of climbing frame and template integrated system
CN103879860A (en) Device special for elevator installation
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN106639287B (en) Vertical transportation method of stone in outer wall scaffolding
CN105071298A (en) Foldable operation platform for manned operation on high-voltage lines
CN110668332A (en) High stability cantilever crane for building
CN203767802U (en) Special device for elevator installation
CN219260998U (en) An anchor cable tensioner
CN213653209U (en) An integrated construction activity platform for bridge flange plates
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN215592465U (en) Super high-rise assembled circular rail hangs
CN203499232U (en) Attached lifting scaffold
CN204040442U (en) Integral lifting type elevator shaft operating platform
CN201896016U (en) Lifting basket device for storage tank maintenance
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN203320415U (en) Novel large-scale pier coating operation hanging basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: CHEN ZHIQIANG

Effective date: 20141124

Owner name: SINOCHEM (ZHOUSHAN) XINGHAI CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: JIANG WEIAN

Effective date: 20141124

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Zhiqiang

Inventor after: Chen Qiming

Inventor after: Le Jiaming

Inventor after: Le Jiahu

Inventor after: Bao Chenghua

Inventor after: Jiang Weian

Inventor after: Tu Yongan

Inventor after: Qian Qiuling

Inventor after: Jiang Yuelin

Inventor after: Zhou Yao

Inventor after: Teng Zhihong

Inventor after: Wang Yangyang

Inventor after: Wang Zhikang

Inventor before: Chen Zhiqiang

Inventor before: Le Jiaming

Inventor before: Le Jiahu

Inventor before: Zhou Yao

Inventor before: Wang Yangyang

Inventor before: Jiang Weian

Inventor before: Tu Yongan

Inventor before: Qian Qiuling

Inventor before: Wang Zhikang

Inventor before: Bao Chenghua

Inventor before: Teng Zhihong

Inventor before: Jiang Yuelin

Inventor before: Chen Qiming

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN ZHIQIANG JIANG WEIAN TU YONGAN QIAN QIULING WANG ZHIKANG BAO CHENGHUATENG ZHIHONG JIANG YUELIN CHEN QIMING LE JIAMING LE JIAHU ZHOU YAO WANG YANGYANG TO: CHEN ZHIQIANG JIANG WEIAN TU YONGAN QIAN QIULING JIANG YUELIN ZHOU YAO TENG ZHIHONG WANG YANGYANG WANG ZHIKANG CHEN QIMING LE JIAMING LE JIAHU BAO CHENGHUA

TA01 Transfer of patent application right

Effective date of registration: 20141124

Address after: 316000, No. 225, Jiefang West Road, Dinghai District, Zhejiang, Zhoushan, ten

Applicant after: Sinochem (Zhoushan) Xinghai Construction Co., Ltd.

Address before: 316000, Zhejiang, Zhoushan New District, Lincheng street, sea village 40, 3 units

Applicant before: Jiang Weian

Applicant before: Chen Zhiqiang

C14 Grant of patent or utility model
GR01 Patent grant