CN106570539A - Enterprise production data information collection method - Google Patents

Enterprise production data information collection method Download PDF

Info

Publication number
CN106570539A
CN106570539A CN201610956383.9A CN201610956383A CN106570539A CN 106570539 A CN106570539 A CN 106570539A CN 201610956383 A CN201610956383 A CN 201610956383A CN 106570539 A CN106570539 A CN 106570539A
Authority
CN
China
Prior art keywords
electronic tag
operator
production
management system
information management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610956383.9A
Other languages
Chinese (zh)
Inventor
陈聂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Business Technology Institute
Original Assignee
Zhejiang Business Technology Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Business Technology Institute filed Critical Zhejiang Business Technology Institute
Priority to CN201610956383.9A priority Critical patent/CN106570539A/en
Publication of CN106570539A publication Critical patent/CN106570539A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses an enterprise production data information collection method, and relates to the collection and processing of industrial enterprise data. The method comprises the steps: connecting all production equipment, operators and materials in a network through setting electronic tags; carrying out the data collection and processing through an information collection processing system, and enabling all elements in a production process to be monitored by the information collection processing system. Compared with the prior art, the method makes an optimal plan for the production process through collection and processing of various types of production data in the production process, enables the whole production efficiency to be maximized, and solves problems that a conventional large-scale manufacturing enterprise is tedious in information, and is not convenient for production process management.

Description

A kind of enterprise's creation data formation gathering method
Technical field
The present invention relates to a kind of collection of industrial undertaking's data and analysis method.
Background technology
For large-scale manufacturing enterprise, they have large number of operator and operation machinery, consume within one day Raw material is also countless with the product of output.Need to receive the information for processing magnanimity daily to maintain enterprise in production management It is normal to operate.Can just draw use and the maintenance situation of machine by collecting and surveying these data, the efficiency of operator's work, The consumption of raw material, product control rate of product etc., and production task is preferably arranged according to the change of data.And existing collection Can completely does not collect all data to method, once data have lost, then right-on cannot analyze creation data, be A kind of this factory-data collection method that can be quickly timely and complete of needs.
The content of the invention
The present invention is directed to deficiency of the prior art, there is provided a kind of enterprise's creation data formation gathering method, by right The collection of various creation datas and process in production process makes optimum arrangements to production procedure, makes whole production efficiency maximum Change, solution conventional ultra-large type manufacturing enterprise information is numerous and diverse, the problem of production process management inconvenience.
In order to solve above-mentioned technical problem, the present invention is addressed by following technical proposals:A kind of enterprise's creation data Formation gathering method, including information management system, operator's electronic tag, material electronic tag, product electronic tag and Production apparatus electronic tag, operator's electronic tag, material electronic tag, product electronic tag and production apparatus electronic tag can With by carrying out data interaction with information management system in the form of wirelessly or non-wirelessly;Operator wears operator's electronic tag Line activating is entered to operator's electronic tag afterwards, now operator's electronic tag and information management system interaction;Operator enters The production apparatus electronic tag in production equipment is arranged on by the activation of operator's electronic tag after entering station, apparatus electronics is produced Label with information management system connectivity and allows production equipment to start after being activated, then the distribution of information management system Material is produced to the production equipment having been started up, and is provided with material electronic tag, at information on the material of distribution Material electronic tag automatic during the distribution pass down the line of reason system on material, while information management system is material Information is sent to production apparatus electronic tag and operator's electronic tag;Material electronic tag after material is transported to production equipment With production apparatus electronic tag and automatic of operator's electronic tag it is right, if to success if produce, if to lose Lose, distribution transport is re-started by information management system;During production, operator is recorded to the operation of production equipment every time In production apparatus electronic tag, and produce apparatus electronic tag this information is all sent to into operator's electronic tag, produce When production apparatus electronic tag to information management system feedback manufacturing schedule, under allowing information management system to prepare in advance The material for once producing;After production terminates output product, raw material electronic tag is changed into product by operator's electronic tag Electronic tag is simultaneously placed on product, and product electronic tag is just activated and information management system connectivity immediately once formation, After only last batch material electronic tag is changed into product electronic tag, the material electronic tag of lower batch could be with production apparatus Electronic tag and operator's electronic tag are to success;After operator terminates production task, operator passes through operator's electronics mark Write comments on a document pin production apparatus electronic tag and production equipment is closed by producing apparatus electronic tag, then with information management system System connection, nullifies operator's electronic tag after obtaining the license of information management system.
In above-mentioned technical proposal, it is preferred that operator is bound with operator's electronic tag, there is per bit manipulation person unique behaviour Work person's electronic tag, needs to carry out authentication during operator's activation manipulation person's electronic tag.
In above-mentioned technical proposal, it is preferred that when being produced, operator's electronic tag is entered with production apparatus electronic tag Row timing response, if nonreply in the time limit, production equipment stops production and produces apparatus electronic tag automatic stay, while To information management system feedback information, simultaneously outstanding message collection processing system implementing is processed, and operator's electronic tag is needed at activation Communication information collection processing system implementing is needed to obtain information management system during production apparatus electronic tag under frozen state Mandate.
In above-mentioned technical proposal, it is preferred that in process of production, operator need temporarily away from when, need by operation Member's electronic tag applied to information management system, could be temporarily away from after application success, in this section of time production device Tool electronic tag can control the production operation that production equipment proceeds without operator's participation, produce if operator exceeds the time limit to return Equipment stops production and produces apparatus electronic tag automatic stay, while to information management system feedback information and waiting letter Breath collection processing system implementing is processed, and operator's electronic tag needs to need during production apparatus electronic tag of the activation under frozen state Communication information collection processing system implementing is wanted to obtain the mandate of information management system.
In above-mentioned technical proposal, it is preferred that connected with operator's electronic tag after the activation of product electronic tag automatically, product Product information transfer is in operator's electronic tag.
In above-mentioned technical proposal, it is preferred that when the failure of operator's electronic tag or failure, need operator to leave immediately Production scene re-replaces new operator's electronic tag or reactivates, when production apparatus electronic tag, raw material electronics mark Sign and product electronic tag fail or during failure, operator by operator's electronic tag to information management system feedback simultaneously Outstanding message collection processing system implementing processing information.
This method is a kind of method that extensive manufacturing enterprise's creation data is collected and processed.It is well known that large-scale Manufacturing enterprise has numerous production equipments and industrial workers, is required for daily expending great energy and goes to carry out production programming. Into after the information age, information technology is widely used in production, significantly increases the efficiency of production.But existing information skill Art optimization mostly simply to scheduling of production, relates generally to the pool of raw material, by more excellent arrangement allow raw material utilization rate more The lower purpose so as to reach production efficiency raising of high, turnaround time.And the present invention is raw material, production equipment, operator, product Etc. the combination of production factors system, by information technology by production process in all key elements all under information network control, Reasonably arranging raw material not only can supply, moreover it is possible to the situation of monitor in real time production equipment and operator, and then can be according to life Product equipment is made more excellent production with the state of operator and is planned as a whole.It is and product also serves as a member of key element, by system, arbitrary Product can trace back to its production equipment of production and operator.Whole production process thus can be dynamically adjusted, is made Production procedure is in optimal location all the time, makes the product produced consistently achieve first water.
Compared with prior art, the present invention is by the collection to various creation datas during production and processes to production Flow process makes optimum arrangements, allows whole production efficiency to maximize, and solution conventional ultra-large type manufacturing enterprise information is numerous and diverse, production procedure The problem of management inconvenience.
Specific embodiment
The present invention is described in further detail with reference to specific embodiment.
A kind of enterprise's creation data formation gathering method, is that full scale production key element in Large-scale Manufacturing production process is produced Raw data are collected and process.The full information prison of production factors is realized by all production factors are configured with electronic tag Control, and then the real-time status of production factors is grasped, realize the dynamic regulation to production activity.It is right that unification is provided with the present invention The information management system processed by gather information, and the electronic tag being arranged in each production factors.Electronics mark Label are broadly divided into operator's electronic tag, material electronic tag, intermedium electronic tag, product electronic tag and production apparatus electricity Subtab, also auxiliary has Quality Inspector's electronic tag and maintenance man's electronic tag in addition.Electronic tag is divided into built-in in the present invention Formula and movable type, for the production equipment of large-scale fixation mainly adopts built-in electronic tag, itself and information management system Communicated mainly by wired mode, and the electronic tag of the production factors of other movements is mainly card form, received with information Collection processing system is mainly by wirelessly being communicated.
Carry out producing front operator march into the arena when, need to wear operator's electronic tag, operator and operator's electronics mark Binding is signed, there is sole operation person's electronic tag per bit manipulation person, then enter line activating to operator's electronic tag, operator swashs Need to carry out authentication during operator's electronic tag living.Authentication may refer to the one of the verification modes such as stricture of vagina, password, iris Plant or several combinations.Operator can just allow operator's electronic tag and information management system after wearing operator's electronic tag System carries out system interaction, and interaction is carried out mainly by wireless mode.
During for product to single production equipment, operator is needed to enter the work of production equipment in process of production Behind position, the production apparatus electronic tag in production equipment is arranged on by the activation of operator's electronic tag, this active mode can Being NFC or bluetooth approach.Production apparatus electronic tag with information management system connectivity and allows production after being activated Equipment starts, and then information management system distribution material is produced to the production equipment having been started up.The material of distribution On be provided with material electronic tag, it is however generally that, be all placed on same transport agent with a batch of material, material electronics mark Label can be directly placed at transport agent.The staff that the activation of material electronic tag has material field enters line activating, material electricity Just interact with information management system after subtab activation, after information management system receives material electronic tag Material information is sent on production apparatus electronic tag and operator's electronic tag.When transport agent carrying material is transported to life After product equipment material electronic tag with production apparatus electronic tag and automatic of operator's electronic tag it is right, if to success if Produced, if to failure, by information management system re-start distribution transport.Matching is carried out automatically, works as material Electronic tag is just matched enough with production apparatus electronic tag or operator's electronic tag, as long as matching arbitrary Production apparatus electronic tag or operator's electronic tag, production apparatus electronic tag or operator's electronic tag can be mutual Transmission data.During production, operator is recorded to the operation of production equipment in production apparatus electronic tag every time, and is produced This information is all sent to operator's electronic tag and information management system, information management system by apparatus electronic tag System could be aware that all operations of the operator to production equipment.Production apparatus electronic tag is also needed to information management system Timing feedback manufacturing schedule, allows information management system to prepare the material for producing next time in advance.Produce when production terminates output After product, raw material electronic tag is changed into product electronic tag by operator's electronic tag and is placed on product, product electronics Label is once activation immediately and information management system connectivity is just formed, automatically electric with operator after the activation of product electronic tag Subtab is connected, and product information is transferred in operator's electronic tag, while also sending product to information management system Information, and the transhipment of product is carried out according to the requirement of information management system.Only last batch material electronic tag is changed into After product electronic tag, the material electronic tag of lower batch could be right with production apparatus electronic tag and operator's electronic tag Success.
When being produced, operator's electronic tag is timed response, the interval of timing with production apparatus electronic tag Needs are set according to practical situation.Operator need temporarily away from when, need by operator's electronic tag to information receive Collection processing system applied, could be temporarily away from after application success, can control life in this section of time production apparatus electronic tag Product equipment proceeds without the production operation of operator's participation, and if operator exceeds the time limit to return, production equipment stops production and produces Apparatus electronic tag automatic stay, while at information management system feedback information outstanding message collection processing system implementing Reason, operator's electronic tag need to need at communication information collection during production apparatus electronic tag of the activation under frozen state Reason system obtains the mandate of information management system.If nonreply in the time limit, production equipment stops production and produces apparatus Electronic tag automatic stay, while simultaneously outstanding message collection processing system implementing is processed to information management system feedback information, behaviour Work person's electronic tag needs to need communication information to collect processing system during production apparatus electronic tag of the activation under frozen state System obtains the mandate of information management system.
When multiple production equipment composition streamlines are needed for production large product, now arrange in operator's electronic tag Have the right limit value, operator's electronic tag use range of different rights value is different, correspondence is opened different production on streamline and set It is standby.In production line balance, whole piece streamline has various production equipments, and each production equipment is both provided with uniquely producing device Tool electronic tag, all production apparatus electronic tags on each streamline are all also with an identical eigenvalue and respectively Self-corresponding authority credentials, operator are arranged on the production device in production equipment by the activation of operator's electronic tag into after station Tool electronic tag, this active mode can be NFC or bluetooth approach.Operator's electronic tag can only be activated and its authority credentials Equal or authority credentials production apparatus electronic tag lower than it, production apparatus electronic tag be activated after with information management system System connection is interactive and allows production equipment to start.Production equipment on streamline is divided into can unattended machinery and someone's operation Machinery, during streamline overall operation, needs operator to enter someone's operation machinery station, whole someone's operations only on streamline Production apparatus electronic tag mechanically be activated after after whole streamline just come into operation, when on streamline so someone operates Machinery production apparatus electronic tag be activated after, any operation person's electronic tag on streamline can with information at Reason system mutually, activates the production apparatus electronics mark of unattended machinery on streamline by information management system remote Sign.
Then information management system distribution material is produced to the streamline having been started up.Set on the material of distribution It is equipped with material electronic tag, it is however generally that, all it is placed on same transport agent with a batch of material, material electronic tag can To be directly placed at transport agent.The staff that the activation of material electronic tag has material field enters line activating, material electronics mark Just interact with information management system after signing activation, thing after information management system receives material electronic tag Material information is sent on production apparatus electronic tag and operator's electronic tag.When transport agent carrying material is transported to streamline Material electronic tag is the first with streamline afterwards produces apparatus electronic tag and the operator's electronics mark on the first someone's station Sign automatic it is right, if to success if produce, if to failure, distribution is re-started by information management system Transport.Matching is carried out automatically, when material electronic tag is just carried out enough with production apparatus electronic tag or operator's electronic tag Matched, as long as matching arbitrary production apparatus electronic tag or operator's electronic tag, produced apparatus electronics mark Sign or operator's electronic tag can be with mutual data transmission.All production apparatus electronic tags after the match is successful on streamline Or operator's electronic tag all receives the information of material.During production, operator records to the operation of production equipment every time and is giving birth to Produce in apparatus electronic tag, and produce apparatus electronic tag and this information is all sent to into operator's electronic tag and information receipts Collection processing system, information management system could be aware that all operations of the operator to production equipment.Production apparatus electronics mark Label also need to feed back manufacturing schedule to information management timing, allow information management system to prepare in advance next secondary The material of product.
When being produced, operator's electronic tag is timed response with production apparatus electronic tag, if in the time limit Then streamline continues production but this production apparatus electronic tag automatic stay for nonreply, while to information management system feedback Information the process of outstanding message collection processing system implementing, operator's electronic tag need production apparatus of the activation under frozen state Communication information collection processing system implementing is needed to obtain the mandate of information management system during electronic tag.Operator need temporarily from When opening, need to be applied to information management system by operator's electronic tag, could be temporarily away from after application success, Origin operation person needs operator's electronic tag and production apparatus electronic tag of the new operator that information management system specifies Can leave after carrying out communication confirmation.When the production apparatus electronic tag and corresponding operator's electronics of arbitrary someone's operation machinery After label is out of touch, production apparatus electronic tag is set to not suspended state to be activated and is carried out with information management system Interaction, carries out malfunction elimination by information management system, and assigned operation person is carried out to this production apparatus electronic tag again Activation, the whole production line break-off if beyond this production apparatus electronic tag of stipulated time still un-activation.
For the product needed that the above two mode of production is produced carries out quality inspection at other special quality inspections.
When multiple streamlines are constituted for production ultra-large type product needed multiple production equipments, in addition it is also necessary to which Quality Inspector is to centre Thing-part carries out next step production after carrying out quality inspection again.When carrying out producing front Quality Inspector field, need to wear Quality Inspector's electronics mark Sign, Quality Inspector is bound with Quality Inspector's electronic tag, every Quality Inspector has unique Quality Inspector's electronic tag, then to Quality Inspector's electricity Subtab enters line activating, needs to carry out authentication during Quality Inspector's activation manipulation person's electronic tag.Authentication may refer to stricture of vagina, The one or more combination of the verification modes such as password, iris.Quality Inspector can just allow Quality Inspector after wearing Quality Inspector's electronic tag Electronic tag carries out system interaction with information management system, and interaction is carried out mainly by wireless mode.
The producing method of part is identical with the both above mode of production, is divided into single production equipment production and streamline is given birth to Produce, after output part, the material electronic tag on raw material becomes intermedium electronic tag by operator's electronic tag, and Intermedium electronic tag is placed on part, wherein intermedium electronic tag inherits the full content in material electronic tag, Intermedium electronic tag is transferred to operator component information once activation immediately and information management system connectivity is just formed In electronic tag, while also component information is sent to information management system, and according to the requirement of information management system Carry out the transhipment of part.Part is transported at related Quality Inspector according to the process of information management system, allows Quality Inspector to portion Part carries out quality inspection, needs Quality Inspector's electronic tag to interact with intermedium electronic tag in quality inspection, the qualified part of quality inspection Information management system is fed back to by intermedium electronic tag after Quality Inspector confirms, then by information management System allows part to enter next production stage.
When multiple parts carry out assembly, manual assembling can be carried out by operator or operator is entered by production equipment Row is assembled, during assembly operator's electronic tag to carry out with intermedium electronic tag it is right, only to successful ability Assembly is carried out, the assembled intermedium electronic tag terminated on back part becomes next stage intermedium electronics by operator's electronic tag Label or product electronic tag, wherein next stage intermedium electronic tag or product electronic tag inherit upper level intermedium The full content of electronic tag, also universal succession when with multiple upper level intermedium electronic tags.When with multiple assembly During flow process, Quality Inspector needs the part to producing each time to carry out quality inspection, and Quality Inspector is referred to by information management system Fixed, each quality inspection result will be recorded in intermedium electronic tag and is sent in information management system.
In process of production, once certain production equipment breaks down, then operator passes through operator's electronic tag to this The production apparatus electronic tag of equipment carries out fault flag, and fault message is fed back to information management system.Information is received After collection processing system receives fault message, which kind of status is the production equipment of failure judgement be in whole flow process, if not shadow Whole flow process production is rung, then only allows this production equipment to exit production, and the preferential waiting repair of repairing low to this production equipment labelling, If the production equipment of failure is had an impact but on whole flow process without impact on production, this equipment is allowed to exit production, and to this life Preferential waiting repair is repaired in producing device flag, it is if the production equipment of failure allows whole production line flow process to produce impact, right The high repairing of this production equipment labelling preferentially places under repair at once.The repairing person of needing repairing places under repair, needs when maintenance man marches into the arena Line activating is entered to maintenance man's electronic tag, now maintenance man's electronic tag and information management system interaction, at information Reason some maintenance men of system assignments go to repair the failure production equipment specified, and before repairing, the person of needing repairing passes through maintenance man It is right that production apparatus electronic tag in electronic tag and failure production equipment is carried out, to starting maintenance, maintenance man after success In maintenance, maintenance man's electronic tag is communicated with the electronic tag timing of production apparatus, if long-time communication disruption, produces device Tool electronic tag sends information outstanding message collection processing system implementing feedback and process to information management system.Maintenance man Bind with maintenance man's electronic tag, every maintenance man has unique maintenance man's electronic tag, maintenance man's activation maintenance man's electronics mark Need to carry out authentication during label, maintenance man's electronic tag is divided into internal affairs type maintenance man electronic tag and foreign guest's type maintenance man's electronics Label, internal affairs type maintenance man electronic tag are used by enterprises maintenance man, and foreign guest's type maintenance man electronic tag is tieed up by outside enterprise The person of repairing uses.When with several maintenance men, information management system formulates maintenance man's electronics mark of a certain position maintenance man Sign as main label, when with foreign guest's type maintenance man's electronic tag must by internal affairs type maintenance man's electronic tag as main label, Information management system is communicated with main label, is recognized from main label to other maintenance man's electronic tag distribution in maintenance For the maintenance progress of other maintenance man's electronic tags also feeds back to main label.When worked if some maintenance men together, often Maintenance man's electronic tag of individual maintenance man is all timed with production apparatus electronic tag and is communicated, when a certain maintenance man's electronic tag During with production apparatus electronic tag communication overtime, situation is fed back to information management system by production apparatus electronic tag, is believed Feedback of the information to main label, if main label is with production apparatus electronic tag communication overtime, is produced by breath collection processing system implementing Situation is fed back to information management system by apparatus electronic tag, and information pause is keeped in repair by information management system, until Main label is recommunicated with production apparatus electronic tag or information management system finishing is this time keeped in repair.
After operator terminates production task, operator nullifies production apparatus electronic tag by operator's electronic tag and leads to Cross production apparatus electronic tag and close production equipment, then with information management system connectivity, obtain information management system Operator's electronic tag is nullified after system license.After Quality Inspector terminates production task, Quality Inspector is by Quality Inspector's electronic tag and letter Breath collection processing system implementing connection, nullifies operator's electronic tag after obtaining the license of information management system.Maintenance task terminates Afterwards, maintenance man nullifies production apparatus electronic tag and by feedback of the information to information management system by maintenance man's electronic tag System, leaves workshop after then obtaining the license of information management system and nullifies maintenance man's electronic tag.
When the failure of operator's electronic tag or failure, need operator to leave production scene immediately and re-replace new behaviour Work person's electronic tag is reactivated.When the failure of maintenance man's electronic tag or failure, it is existing that the person of needing repairing leaves production immediately Field re-replaces new maintenance man's electronic tag or reactivates, if when main label failure or failure, suspending or terminating this Secondary maintenance is until main label is reactivated.When production apparatus electronic tag, raw material electronic tag, intermedium electronic tag and product When the failure of product electronic tag or failure, operator is by operator's electronic tag is to information management system feedback and waits letter Breath collection processing system implementing processing information.
By this set, all key elements in process of production are believed all under the monitoring of information management system Breath collection processing system implementing can dynamically adjust production procedure according to field data so that production is all the time in optimum flow process.And And information management system can also collect the operational data of operator, Quality Inspector and maintenance man, can by these data To know the work efficiency and working attitude of staff, this is also the important evidence of judge's labor cost value, the member to efficiency high Work can be rewarded, and can give education training to the employee of inefficiency.Simultaneously raw material-part-product in process of production All in monitoring, all of product can trace back to corresponding production equipment, operator and Quality Inspector to the whole production procedure of product. Originate and solve once quality problems occur and rapidly can instruct.If necessary can be with operator's electronic tag, dimension GPS chip is installed additional in the person's of repairing electronic tag and Quality Inspector's electronic tag, the location status of staff are understood in real time.Using this The bright flow process dynamic that can grasp whole production completely allows whole production efficiency to maximize, and solves conventional ultra-large type manufacturing enterprise letter Breath is numerous and diverse, the problem of production process management inconvenience.

Claims (6)

1. a kind of enterprise's creation data formation gathering method, it is characterized by, including information management system, operator's electronics mark Label, material electronic tag, product electronic tag and production apparatus electronic tag, operator's electronic tag, material electronic tag, product Product electronic tag and production apparatus electronic tag can enter line number by form wirelessly or non-wirelessly and information management system According to interaction;Operator enters line activating to operator's electronic tag after wearing operator's electronic tag, now operator's electronic tag Can interact with information management system;Operator is arranged on life by the activation of operator's electronic tag into after station Production apparatus electronic tag on product equipment, production apparatus electronic tag be activated after with information management system connectivity and Production equipment is allowed to start, then information management system distribution material is produced to the production equipment having been started up, and is distributed Material on be provided with material electronic tag, the material electronics when the distribution pass down the line of information management system on material Label automatic, while information management system is sent to production apparatus electronic tag and operator's electronics material information Label;After material is transported to production equipment, material electronic tag is automatic with production apparatus electronic tag and operator's electronic tag It is right, produce if to success, if to failure, re-starting distribution transport by information management system; During production, operator is recorded to the operation of production equipment in production apparatus electronic tag every time, and produces apparatus electronics mark This information is all sent to operator's electronic tag by label, produces apparatus electronic tag to information management system feedback during production Manufacturing schedule, allows information management system to prepare the material for producing next time in advance;After production terminates output product, the original Material electronic tag is changed into product electronic tag by operator's electronic tag and is placed on product, and product electronic tag is once shape Achievement activation immediately and information management system connectivity, only last batch material electronic tag are changed into product electronic tag Afterwards, the material electronic tag of lower batch could be with production apparatus electronic tag and operator's electronic tag to success;Operator After terminating production task, operator nullifies production apparatus electronic tag and by producing apparatus electronics by operator's electronic tag Label closes production equipment, then with information management system connectivity, nullifies behaviour after obtaining the license of information management system Work person's electronic tag.
2. a kind of enterprise's creation data formation gathering method according to claim 1, it is characterized by, operator and operator Electronic tag is bound, and has sole operation person's electronic tag per bit manipulation person, needs during operator's activation manipulation person's electronic tag Carry out authentication.
3. a kind of enterprise's creation data formation gathering method according to claim 1, it is characterized by, when being produced, Operator's electronic tag is timed response with production apparatus electronic tag, and if nonreply in the time limit, production equipment stops life Apparatus electronic tag automatic stay is produced and produces, while simultaneously outstanding message collection is processed to information management system feedback information System process, operator's electronic tag need to need communication information during production apparatus electronic tag of the activation under frozen state Collection processing system implementing obtains the mandate of information management system.
4. a kind of enterprise's creation data formation gathering method according to claim 1, it is characterized by, in process of production, Operator need temporarily away from when, need to be applied to information management system by operator's electronic tag, apply into Could be temporarily away from after work(, production equipment can be controlled in this section of time production apparatus electronic tag and proceed without operator's participation Production operation, if operator exceeds the time limit to return, production equipment stops production and produces apparatus electronic tag automatic stay, while To information management system feedback information, simultaneously outstanding message collection processing system implementing is processed, and operator's electronic tag is needed at activation Communication information collection processing system implementing is needed to obtain information management system during production apparatus electronic tag under frozen state Mandate.
5. a kind of enterprise's creation data formation gathering method according to claim 1, it is characterized by, product electronic tag swashs Automatically connect with operator's electronic tag after work, product information is transferred in operator's electronic tag.
6. a kind of enterprise's creation data formation gathering method according to claim 1, it is characterized by, when operator's electronics mark When signing failure or failure, need operator to leave production scene immediately and re-replace new operator's electronic tag or swash again Living, when the failure of apparatus electronic tag, raw material electronic tag and product electronic tag or failure is produced, operator is by operation Member's electronic tag is to information management system feedback outstanding message collection processing system implementing processing information.
CN201610956383.9A 2016-10-27 2016-10-27 Enterprise production data information collection method Pending CN106570539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610956383.9A CN106570539A (en) 2016-10-27 2016-10-27 Enterprise production data information collection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610956383.9A CN106570539A (en) 2016-10-27 2016-10-27 Enterprise production data information collection method

Publications (1)

Publication Number Publication Date
CN106570539A true CN106570539A (en) 2017-04-19

Family

ID=58535416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610956383.9A Pending CN106570539A (en) 2016-10-27 2016-10-27 Enterprise production data information collection method

Country Status (1)

Country Link
CN (1) CN106570539A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109426719A (en) * 2017-09-01 2019-03-05 鸿富锦精密电子(郑州)有限公司 Device authentication management method and verification management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006318193A (en) * 2005-05-12 2006-11-24 Hitachi Ltd Method for collecting information
CN103208054A (en) * 2013-03-15 2013-07-17 重庆大学 Fine monitoring method and system for discrete workshop production process work-in-process inventory
CN103632245A (en) * 2013-11-15 2014-03-12 东莞市艾炜特电子有限公司 Cloud service-based intelligent production system and implementation method
CN105204459A (en) * 2015-08-12 2015-12-30 昆山巨林科教实业有限公司 RFID based flexible processing system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006318193A (en) * 2005-05-12 2006-11-24 Hitachi Ltd Method for collecting information
CN103208054A (en) * 2013-03-15 2013-07-17 重庆大学 Fine monitoring method and system for discrete workshop production process work-in-process inventory
CN103632245A (en) * 2013-11-15 2014-03-12 东莞市艾炜特电子有限公司 Cloud service-based intelligent production system and implementation method
CN105204459A (en) * 2015-08-12 2015-12-30 昆山巨林科教实业有限公司 RFID based flexible processing system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姜贞勇: "《基于RFID的物料及在制品追踪管理系统》", 《硕士论文》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109426719A (en) * 2017-09-01 2019-03-05 鸿富锦精密电子(郑州)有限公司 Device authentication management method and verification management system
CN109426719B (en) * 2017-09-01 2024-04-16 鸿富锦精密电子(郑州)有限公司 Equipment verification management method and verification management system

Similar Documents

Publication Publication Date Title
CN104766147B (en) Intelligent device management method and management system
CN206363377U (en) A kind of engineering progress management system
CN105467946A (en) Aluminum electrolytic MES system based on accurate perception and intelligent decision
CN106707988A (en) MES system for engine online assembly control
CN201163361Y (en) Control system used for industry assembly line
CN108288119A (en) A kind of intelligentized factory control method and system
CN206594721U (en) Check class attendance system based on human face detection and tracing
CN109878760B (en) Universal aviation aircraft fault remote assistance platform and repairing method
CN103810573A (en) Real-time production scheduling management system and method based on mobile terminals
CN101299153A (en) Computer auxiliary assembly process control method facing to manual assembly
CN106125702A (en) A kind of enterprise's energy efficiency management system and management-control method thereof
CN107688893A (en) One kind measures abnormal closed-loop process method
CN106355312A (en) Intelligent material dispatching system based on large data in sugar factory
CN105184431B (en) Tempered glass technological operation management system
CN106570773A (en) Device operation and maintenance information collecting and processing method
CN102968689A (en) Intelligent monitoring method for remote control of power transformation overhaul work
CN108681830A (en) Substation patrol intelligent operation dynamic command method and system
CN109711695A (en) A kind of MES dynamic job shop scheduling manufacturing execution system
CN106022487A (en) Intelligent device operation and maintenance management system
CN106570539A (en) Enterprise production data information collection method
CN106570772A (en) Data collecting and processing method in production process
CN103056659A (en) Automatic production device for cabinets
CN106570630A (en) Collection method of material circulation data information in production process of enterprise
CN105843193A (en) Electrode processing unmanned control system and control method
CN111474910A (en) Production operation centralized control system for power station service

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419

RJ01 Rejection of invention patent application after publication