CN106563937B - A kind of full-automatic relay tablet press machine - Google Patents

A kind of full-automatic relay tablet press machine Download PDF

Info

Publication number
CN106563937B
CN106563937B CN201610277572.3A CN201610277572A CN106563937B CN 106563937 B CN106563937 B CN 106563937B CN 201610277572 A CN201610277572 A CN 201610277572A CN 106563937 B CN106563937 B CN 106563937B
Authority
CN
China
Prior art keywords
shrapnel
cylinder
product
control box
distribution control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610277572.3A
Other languages
Chinese (zh)
Other versions
CN106563937A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GREAT ELECTRICAL CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810325163.5A priority Critical patent/CN108274220B/en
Priority to CN201610277572.3A priority patent/CN106563937B/en
Publication of CN106563937A publication Critical patent/CN106563937A/en
Application granted granted Critical
Publication of CN106563937B publication Critical patent/CN106563937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • B23P19/004Feeding the articles from hoppers to machines or dispensers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • B23P19/007Picking-up and placing mechanisms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Specific Conveyance Elements (AREA)
  • Press Drives And Press Lines (AREA)

Abstract

The present invention relates to a kind of full-automatic relay tablet press machines,It includes rack,Bottom of the frame is provided with distribution control box,Conveying device is provided with above distribution control box,Product guide rail is combined on the left of conveying device,Right side is combined with blow tank,Blow tank is connect with discharging feeder motor,The product guide rail is connected with product vibration discharge port plate,Three shrapnel guide rails are provided on front side of conveying device,Shrapnel guide rail is connected with shrapnel vibration discharge port plate,It is provided with the fetching device coordinated with shrapnel above tail end,And fetching device also coordinates with the left part of conveying device,It is provided with the press-loading apparatus coordinated with product above the right part of conveying device,The present invention vibrates discharge port plate by shrapnel and shrapnel guide rail realizes the self-emptying of shrapnel,Shrapnel is captured by fetching device,And it is accurately docked with the product on product conveying,Another rise is transported in processing unit (plant) later,Being greatly saved manpower will be,The case where avoiding neglected loading simultaneously occurs.

Description

A kind of full-automatic relay tablet press machine
Technical field
The present invention relates to relay assembling field more particularly to a kind of full-automatic relay tablet press machines.
Background technology
Relay is widely used in various photoelectric fields because of its excellent quality, be widely used it is general, it is deep to be pursued by people.
Relay is assembled by various parts, it is especially desirable to install three pieces of shrapnels additional, and existing relay and shrapnel Assembling be all semi-automatic mostly, i.e., relay is conveyed by conveying, and shrapnel need it is artificial assign, later Press fitting molding is being carried out by processing unit (plant), the relay product processed, still, using the shrapnel of this semi-automation Assembling mode consumes the work of a large amount of manpower, while the case where there is also shrapnel neglected loading, and then influences the finished product of relay Rate.
Invention content
The object of the present invention is to provide a kind of full-automatic relay tablet press machines, vibrate discharge port plate and shrapnel guide rail by shrapnel The self-emptying for realizing shrapnel, is captured shrapnel by fetching device, and is carried out with the product on product conveying Accurate docking, later another rise transport in processing unit (plant), being greatly saved manpower will be, while the case where avoid neglected loading Occur.
In order to achieve the goal above, the technical solution adopted by the present invention is:A kind of full-automatic relay tablet press machine, it includes Rack(4), the rack(4)Bottom is provided with distribution control box(2), the distribution control box(2)Top be provided with Conveying device is combined with product guide rail on the left of the conveying device(11), right side is combined with blow tank(32), described goes out Hopper(32)With discharging feeder motor(31)Connection, the product guide rail(11)Discharge port plate is vibrated with product(5)It is connected, Three shrapnel guide rails are provided on front side of the conveying device(33), every shrapnel guide rail(33)Initiating terminal connection there are one Shrapnel vibrates discharge port plate(9), be provided with the fetching device coordinated with shrapnel above tail end, and fetching device also with conveying device Left part coordinates, and the right part top of the conveying device is provided with and product(57)The press-loading apparatus of cooperation, the product shake Dynamic discharge port plate, conveying device, shrapnel vibration discharge port plate, fetching device and press-loading apparatus are all connected to distribution control box.
Further, the conveying device includes being arranged in conveying seat(9)On conveying, the conveying leads Rail chair(9)It is arranged in distribution control box(2)On support plate(51)On;The conveying passes through link block(56)With crank (55)Connection, the crank(55)It is connected on gear shaft, the gear on the gear shaft(54)With processing motor(52) On bevel gear cooperation, be provided with stopper on the left of the gear shaft(53);Uniformly it is arranged on the conveying Head and product(57)The guide holder of cooperation(58);The processing motor(52)It is connected to distribution control box(2).
Further, the press-loading apparatus includes the processing cylinder being arranged above conveying device right part(41), described Processing cylinder(41)Cylinder head downwards and be connected with and product(57)The processing head of cooperation(52), the processing head(52) Both sides be provided with and product(57)Coordinate guide pad(43);The processing cylinder(41)It is connected to distribution control box(2).
Further, the left end of the conveying device is provided with the sub-material dislocation block coordinated with it(12), described divides Material dislocation block(12)With dislocation cylinder(13)Cylinder head connection, the dislocation cylinder(13)It is connected to distribution control box(2).
Further, two shrapnel guide rails of left part(33)A fetching device is shared, and this fetching device includes setting The first carrying cylinder of setting is kept flat before and after side on a conveyor(16), first carrying cylinder(16)Front end setting There is the first carrying and installation plate(17), the first carrying and installation plate(17)On the first manipulator cylinder is installed(18), described The first manipulator cylinder(18)On be provided with and two shrapnel guide rails of left part(33)On shrapnel cooperation first gripping finger (19);First carrying cylinder(16)With the first manipulator cylinder(18)It is all connected to distribution control box(2).
Further, two shrapnel guide rails of left part(33)It is both provided with the first clamping plate coordinated with shrapnel(21), institute The first clamping plate stated(21)It is connected to the first clamping cylinder(20)On, and two shrapnel guide rails(33)The first of upper setting clamps Plate(21)Center line be located in same perpendicular;First clamping cylinder(20)It is connected to distribution control box(2).
Further, the conveying device left part is provided with and product(57)The compact heap of cooperation(15), the pressure Tight block(15)It is connected to compression cylinder(14)On, and compact heap(15)Center line and the first clamping plate(21)Center line be located at In same perpendicular, the compression cylinder(14)It is connected to distribution control box(2).
Further, two shrapnel guide rails of left part(33)Middle part be both provided with and shrapnel cooperation sub-material clamping plate(24), The sub-material clamping plate(24)It is arranged in sub-material link block(23)On, the sub-material link block(23)First material splitting cylinder is set (22)On, first material splitting cylinder(22)It is connected to distribution control box(2).
Further, the shrapnel guide rail of right part(33)The fetching device of top setting includes before side on a conveyor is arranged The second carrying cylinder of setting is kept flat afterwards(38), second carrying cylinder(38)Front end be provided with the second carrying and installation plate (39), the second carrying and installation plate(39)On be provided with and shrapnel guide rail(33)On shrapnel cooperation the second manipulator (40), second carrying cylinder(38)With the second manipulator(40)It is all connected to distribution control box(2).
Further, the shrapnel guide rail of right part(33)Middle part above be provided with the shrapnel sub-material hand coordinated with shrapnel (34), the shrapnel sub-material hand(34)It is arranged in the second material splitting cylinder(35)On, second material splitting cylinder(35)Connection To distribution control box(2).
Further, the rack(4)Bottom be provided with mutually matched traveling wheel and adjustment foot(6), described Distribution control box(2)Front side be provided with side door(3).
Beneficial effects of the present invention are:
1, discharge port plate is vibrated by shrapnel and shrapnel guide rail realizes the self-emptying of shrapnel, grabbed shrapnel by fetching device It is captured, and is accurately docked with the product on product conveying, another rise is transported in processing unit (plant) later, greatly The manpower that saves will be, while the case where avoiding neglected loading, occurs.
2, the structure design of conveying device can control the distance advanced every time by crank, and then may be implemented precisely Docking, improves the precision of assembling.
3, the structure of press-loading apparatus is simple, easy to operate, while can realize accurately press-fit effect, can also play and lead To effect.
4, the design of sub-material dislocation block, can control the spacing entered between the product on conveying, it is made to press Interference is not will produce when dress, reaches better press-fit effect.
5, the design of fetching device, it is simple in structure, feeding and blowing are coordinated by manipulator and carrying cylinder, precision is high, It picks and places efficient, is not in the case where leakage is put.
6, the design of clamping cylinder and clamping plate can make the shrapnel that manipulator captures will not be movable on shrapnel track, And then improve efficiency and the accuracy of crawl.
7, the design of compact heap and compression cylinder can be such that the two panels shrapnel that left part feeding device captures is carried out on product It is preliminary to compress, it prevents from falling during subsequent delivery, ensures the effect being subsequently pressed.
Shrapnel on shrapnel track can be separated according to certain distance, be prevented by the 8, design of cutting plate and material splitting cylinder Polylith is once captured in crawl.
9, traveling wheel and adjustment foot are used cooperatively, and are shaken when not only facilitating movement, but also will not work again, side The design of plate facilitates the maintenance of distribution control box.
Description of the drawings
Fig. 1 is a kind of stereoscopic schematic diagram of full-automatic relay tablet press machine.
Fig. 2 is the stereoscopic schematic diagram of left part access portion.
Fig. 3 is the stereoscopic schematic diagram of right part fetching device and press-loading apparatus.
Fig. 4 is the stereoscopic schematic diagram of conveying device.
Fig. 5 is the partial enlarged view of A in Fig. 2.
Label character as shown in the figure is expressed as:2, match electric operated control box;3, side door;4, rack;5, product vibrates discharge port plate; 6, foot is adjusted;7, shrapnel processing unit (plant);8, preforming device;9, shrapnel vibrates discharge port plate;11, product guide rail;12, sub-material misplaces Block;13, misplace cylinder;14, compression cylinder;15, compact heap;16, the first carrying cylinder;17, the first carrying and installation plate;18, One manipulator cylinder;19, the first gripping finger;20, the first clamping cylinder;21, the first clamping plate;22, the first material splitting cylinder; 23, sub-material link block;24, sub-material clamping plate;31, discharge feeder motor;32, blow tank;33, shrapnel guide rail;34, shrapnel sub-material Hand;35, the second material splitting cylinder;36, the second clamping plate;37, the second clamping cylinder;38, the second carrying cylinder;39, it second carries Mounting plate;40, the second manipulator;41, cylinder is processed;42, processing head;43, guide pad;51, support plate;52, motor is processed; 53, stopper;54. gear;55, crank;56, link block;57, product;58, guide holder;59, conveying mounting base.
Specific implementation mode
In order to make those skilled in the art more fully understand technical scheme of the present invention, below in conjunction with the accompanying drawings to the present invention into The description of row detailed description, this part is only exemplary and explanatory, should not there is any limitation to protection scope of the present invention Effect.
As Figure 1-Figure 5, concrete structure of the invention is:A kind of full-automatic relay tablet press machine, it includes rack 4, 4 bottom of rack is provided with distribution control box 2, and the top of the distribution control box 2 is provided with conveying device, described Product guide rail 11 is combined on the left of conveying device, right side is combined with blow tank 32, the blow tank 32 and discharging conveying electricity Machine 31 connects, and the product guide rail 11 is connected with product vibration discharge port plate 5, is provided on front side of the conveying device Three shrapnel guide rails 33, there are one be provided with above shrapnel vibration discharge port plate 9, tail end for the initiating terminal connection of every shrapnel guide rail 33 The fetching device coordinated with shrapnel, and fetching device also coordinates with the left part of conveying device, on the right part of the conveying device Side is provided with press-loading apparatus coordinate with product 57, the product vibrate discharge port plate, conveying device, shrapnel vibrate discharge port plate, Fetching device and press-loading apparatus are all connected to distribution control box.
Preferably, the conveying device includes the conveying being arranged on conveying seat 9, the conveying seat In 9 support plates 51 being arranged on distribution control box 2;The conveying is connect by link block 56 with crank 55, described Crank 55 be connected on gear shaft, the gear 54 on the gear shaft with processing motor 52 on bevel gear coordinate, it is described Gear shaft on the left of be provided with stopper 53;The guide holder that head coordinates with product 57 is uniformly set on the conveying 58;The processing motor 52 is connected to distribution control box 2.
Preferably, the press-loading apparatus includes the processing cylinder 41 being arranged above conveying device right part, and described adds The cylinder head of work cylinder 41 is downward and is connected with the processing head 52 coordinated with product 57, and the both sides of the processing head 52 are provided with Coordinate guide pad 43 with product 57;The processing cylinder 41 is connected to distribution control box 2.
Preferably, the left end of the conveying device is provided with the sub-material dislocation block 12 coordinated with it, and the sub-material is wrong Position block 12 is connect with the cylinder head of dislocation cylinder 13, and the dislocation cylinder 13 is connected to distribution control box 2.
Preferably, two shrapnel guide rails 33 of left part share a fetching device, and this fetching device includes being arranged defeated The first carrying cylinder 16 of setting is kept flat before and after sending above device, the front end of first carrying cylinder 16 is provided with first and removes Mounting plate 17 is transported, the first manipulator cylinder 18, the described first mechanical luck are installed on the first carrying and installation plate 17 The first gripping finger 19 with the shrapnel cooperation on two shrapnel guide rails 33 of left part is provided on cylinder 18;Described first carries gas Cylinder 16 and the first manipulator cylinder 18 are all connected to distribution control box 2.
Preferably, two shrapnel guide rails 33 of left part are both provided with the first clamping plate 21 coordinated with shrapnel, and described One clamping plate 21 is connected on the first clamping cylinder 20, and the center line for the first clamping plate 21 being arranged on two shrapnel guide rails 33 In same perpendicular;First clamping cylinder 20 is connected to distribution control box 2.
Preferably, the conveying device left part is provided with the compact heap 15 coordinated with product 57, the compact heap 15 It is connected in compression cylinder 14, and the center line of the center line of compact heap 15 and the first clamping plate 21 is located at same perpendicular Interior, the compression cylinder 14 is connected to distribution control box 2.
Preferably, the middle part of two shrapnel guide rails 33 of left part is both provided with coordinates sub-material clamping plate 24 with shrapnel, described Sub-material clamping plate 24 is arranged on sub-material link block 23, and the sub-material link block 23 is arranged in the first material splitting cylinder 22, described First material splitting cylinder 22 is connected to distribution control box 2.
Preferably, the fetching device that 33 top of shrapnel guide rail of right part is arranged includes being put down before and after side on a conveyor is arranged The second carrying cylinder 38 of setting is put, the front end of second carrying cylinder 38 is provided with the second carrying and installation plate 39, described The second carrying and installation plate 39 on be provided with on shrapnel guide rail 33 shrapnel cooperation the second manipulator 40, described second removes Fortune cylinder 38 and the second manipulator 40 are all connected to distribution control box 2.
Preferably, it is provided with the shrapnel sub-material hand 34 coordinated with shrapnel above the middle part of the shrapnel guide rail 33 of right part, it is described Shrapnel sub-material hand 34 be arranged in the second material splitting cylinder 35, second material splitting cylinder 35 is connected to distribution control box 2.
Preferably, the bottom of the rack 4 is provided with mutually matched traveling wheel and adjustment foot 6, and described matching is automatically controlled The front side of case 2 processed is provided with side door 3.
When specifically used, first pass through distribution control box 2 and control product vibration feeding disc 5 and three shrapnel vibration feeding discs 9 Running, while product track 11 and shrapnel track 33 also operate, first product 57 when dislocation distribution block 12 by can directly lead to Cross, then drive crank 55 to move a lattice by work drive motor 52, first product 57 is made to move forward a lattice, second product 57 into Enter to delivery track, 57 barred of third product, while shrapnel is also in this way, being blocked by sub-material clamping plate 24, only first bullet Piece is clamped by clamping plate and clamping cylinder, then grips a bullet on the shrapnel track 33 of the leftmost side by the first gripping finger 19 Then piece is carried forward by the first carrying cylinder 16, be located at the top of 33 first shrapnels of intermediate shrapnel track, and is led to It crosses the first manipulator cylinder 18 to be put down, two panels shrapnel is made to overlap, two panels shrapnel is then gripped by the first gripping finger 19, Then it is carried backward by the first carrying cylinder 16, is located at the top of first product 57, then pass through the first manipulator Cylinder 18 puts down two pieces of shrapnels, and shrapnel is docked with product 57, then drives compact heap 15 by product 57 by compression cylinder 14 It is tentatively compressed with two pieces of shrapnels, the prudent process upper again of second product 57 is then directed to, when first product 57 transports When the position docked with right side shrapnel, first shrapnel on right part shrapnel guide rail 33 is gripped by the second manipulator 40, and lead to The top that the second carrying cylinder 38 is transported to first product 57 is crossed, is produced product peace side at first by the second manipulator 40 On product 57, then advanced one again by work drive motor 52, second product 57 repeats the above process, and first product of gear is defeated When sending to the lower section of press-loading apparatus, working cylinder 41 is controlled by distribution control box 2, work head 41 is driven to be pressed downward, realize product 57 with the press fitting of three pieces shrapnel, move on later, discharging completed from blow tank 32, so complete first product 57 from Dynamicization shrapnel is pressed, and subsequent product repeats the operating procedure of first product.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.
Principle and implementation of the present invention are described for specific case used herein, the explanation of above example It is merely used to help understand the method and its core concept of the present invention.The above is only a preferred embodiment of the present invention, it answers When pointing out due to the finiteness of literal expression, and objectively there is unlimited concrete structure, for the common skill of the art For art personnel, without departing from the principle of the present invention, several improvement, retouching or variation can also be made, can also incited somebody to action Above-mentioned technical characteristic is combined in the right way;These improve retouching, variation or combination, or the not improved structure by invention Think and technical solution directly applies to other occasions, is regarded as protection scope of the present invention.

Claims (9)

1. a kind of full-automatic relay tablet press machine, it includes rack(4), the rack(4)Bottom is provided with distribution control box (2), which is characterized in that the distribution control box(2)Top be provided with conveying device, the left side of the conveying device is matched Conjunction has product guide rail(11), right side is combined with blow tank(32), the blow tank(32)With discharging feeder motor(31)Connection, The product guide rail(11)Discharge port plate is vibrated with product(5)It is connected, three is provided on front side of the conveying device Shrapnel guide rail(33), every shrapnel guide rail(33)Initiating terminal connection there are one shrapnel vibrate discharge port plate(9), setting above tail end There is the fetching device coordinated with shrapnel, and fetching device also coordinates with the left part of conveying device, the right part of the conveying device Top is provided with and product(57)The press-loading apparatus of cooperation, the product vibrate discharge port plate, conveying device, shrapnel vibration discharging Disk, fetching device and press-loading apparatus are all connected to distribution control box, and the conveying device includes being arranged in conveying seat(9) On conveying, the conveying seat(9)It is arranged in distribution control box(2)On support plate(51)On;The conveying Guide rail passes through link block(56)With crank(55)Connection, the crank(55)It is connected on gear shaft, on the gear shaft Gear(54)With processing motor(52)On bevel gear cooperation, be provided with stopper on the left of the gear shaft(53);Institute Head and product are uniformly set on the conveying stated(57)The guide holder of cooperation(58);The processing motor(52)It is connected to Distribution control box(2).
2. a kind of full-automatic relay tablet press machine according to claim 1, which is characterized in that the press-loading apparatus includes The processing cylinder being arranged above conveying device right part(41), the processing cylinder(41)Cylinder head downwards and be connected with Product(57)The processing head of cooperation(42 ), the processing head(42 )Both sides be provided with and product(57)Coordinate guide pad (43);The processing cylinder(41)It is connected to distribution control box(2).
3. a kind of full-automatic relay tablet press machine according to claim 1, which is characterized in that a left side for the conveying device End is provided with the sub-material dislocation block coordinated with it(12), the sub-material misplaces block(12)With dislocation cylinder(13)Cylinder head connect It connects, the dislocation cylinder(13)It is connected to distribution control box(2).
4. a kind of full-automatic relay tablet press machine according to claim 3, which is characterized in that two shrapnel guide rails of left part (33)A fetching device is shared, and this fetching device includes keeping flat the first of setting before and after side on a conveyor is arranged to carry Cylinder(16), first carrying cylinder(16)Front end be provided with the first carrying and installation plate(17), described first carries Mounting plate(17)On the first manipulator cylinder is installed(18), first manipulator cylinder(18)On be provided with and left part two Shrapnel guide rail(33)On shrapnel cooperation first gripping finger(19);First carrying cylinder(16)With the first machinery Luck cylinder(18)It is all connected to distribution control box(2).
5. a kind of full-automatic relay tablet press machine according to claim 4, which is characterized in that two shrapnel guide rails of left part (33)It is both provided with the first clamping plate coordinated with shrapnel(21), first clamping plate(21)It is connected to the first clamping cylinder (20)On, and two shrapnel guide rails(33)First clamping plate of upper setting(21)Center line be located in same perpendicular;Institute The first clamping cylinder stated(20)It is connected to distribution control box(2).
6. a kind of full-automatic relay tablet press machine according to claim 5, which is characterized in that the conveying device left part It is provided with and product(57)The compact heap of cooperation(15), the compact heap(15)It is connected to compression cylinder(14)On, and compress Block(15)Center line and the first clamping plate(21)Center line be located in same perpendicular, the compression cylinder(14)Even It is connected to distribution control box(2).
7. a kind of full-automatic relay tablet press machine according to claim 5 or 6, which is characterized in that two shrapnels of left part Guide rail(33)Middle part be both provided with and shrapnel cooperation sub-material clamping plate(24), the sub-material clamping plate(24)Setting is connected in sub-material Block(23)On, the sub-material link block(23)First material splitting cylinder is set(22)On, first material splitting cylinder(22)Even It is connected to distribution control box(2).
8. a kind of full-automatic relay tablet press machine according to claim 3, which is characterized in that the shrapnel guide rail of right part(33) The fetching device of top setting includes the second carrying cylinder that setting is kept flat before and after side on a conveyor is arranged(38), described Second carrying cylinder(38)Front end be provided with the second carrying and installation plate(39), the second carrying and installation plate(39)Upper setting Have and shrapnel guide rail(33)On shrapnel cooperation the second manipulator(40), second carrying cylinder(38)With the second machinery Hand(40)It is all connected to distribution control box(2).
9. a kind of full-automatic relay tablet press machine according to claim 8, which is characterized in that the shrapnel guide rail of right part(33) Middle part above be provided with the shrapnel sub-material hand coordinated with shrapnel(34), the shrapnel sub-material hand(34)It is arranged in the second sub-material Cylinder(35)On, second material splitting cylinder(35)It is connected to distribution control box(2).
CN201610277572.3A 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine Active CN106563937B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810325163.5A CN108274220B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine
CN201610277572.3A CN106563937B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610277572.3A CN106563937B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201810325163.5A Division CN108274220B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine

Publications (2)

Publication Number Publication Date
CN106563937A CN106563937A (en) 2017-04-19
CN106563937B true CN106563937B (en) 2018-08-07

Family

ID=58532104

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610277572.3A Active CN106563937B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine
CN201810325163.5A Active CN108274220B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201810325163.5A Active CN108274220B (en) 2016-05-02 2016-05-02 A kind of full-automatic relay tablet press machine

Country Status (1)

Country Link
CN (2) CN106563937B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110238627B (en) * 2017-08-22 2020-07-24 浙江富兴服装有限公司 Pressing wheel mechanism for assembling synchronous wheel of motor
CN108172467A (en) * 2018-02-09 2018-06-15 太仓神明电子有限公司 A kind of relay bottom sealing device
CN109664093B (en) * 2018-12-31 2023-12-08 张毅 Annular friction plate assembly system and working method thereof
CN109896280B (en) * 2019-04-23 2020-10-16 厦门海宏信自动化设备有限公司 Automatic tray loader of relay
CN114227240B (en) * 2021-11-30 2023-04-11 苏州浪潮智能科技有限公司 Automatic kludge of relay

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1337931A1 (en) * 1985-12-02 1987-09-15 Предприятие П/Я А-7359 Device for assembling armature unit with pusher of electromagnetic relay
CN202804600U (en) * 2012-07-27 2013-03-20 天津长城精益汽车零部件有限公司 Tool for press fitting of automotive relays
CN202910557U (en) * 2012-08-07 2013-05-01 中山市天键电声有限公司 Automatic assembling machine of microphone parts
CN202943420U (en) * 2012-12-14 2013-05-22 厦门东声电子有限公司 Automatic assembling machine for elastic sheet
CN104191255A (en) * 2014-07-29 2014-12-10 山东建筑大学 Special-shaped cooling fin automatic assembly line
CN205069516U (en) * 2015-06-29 2016-03-02 乐清市德技自动化设备有限公司 Full -automatic ac contactor assembly machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201868337U (en) * 2010-11-19 2011-06-15 四川宏发电声有限公司 Moving and static spring plugging-in machine on relay production line
CN102610442B (en) * 2012-02-29 2015-07-08 宁波海锐自动化科技有限公司 Relay part generation device having double-guide rails

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1337931A1 (en) * 1985-12-02 1987-09-15 Предприятие П/Я А-7359 Device for assembling armature unit with pusher of electromagnetic relay
CN202804600U (en) * 2012-07-27 2013-03-20 天津长城精益汽车零部件有限公司 Tool for press fitting of automotive relays
CN202910557U (en) * 2012-08-07 2013-05-01 中山市天键电声有限公司 Automatic assembling machine of microphone parts
CN202943420U (en) * 2012-12-14 2013-05-22 厦门东声电子有限公司 Automatic assembling machine for elastic sheet
CN104191255A (en) * 2014-07-29 2014-12-10 山东建筑大学 Special-shaped cooling fin automatic assembly line
CN205069516U (en) * 2015-06-29 2016-03-02 乐清市德技自动化设备有限公司 Full -automatic ac contactor assembly machine

Also Published As

Publication number Publication date
CN108274220B (en) 2019-09-10
CN108274220A (en) 2018-07-13
CN106563937A (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN106563937B (en) A kind of full-automatic relay tablet press machine
CN106571255B (en) A kind of automatic assembling test mechanisms of switch
CN106239135B (en) Motor Automated assembly streamline
CN108688854A (en) A kind of two-sided sealer packing machine for blade
CN104802510B (en) A kind of pad printing machine
CN105438765B (en) The round automatic implant system of copper pin of charger
CN204957025U (en) Device of starting going to a nursery is put in to material electronic counting
CN208836710U (en) Needle mushroom high-volume recovering device
CN108974866A (en) It is a kind of for overturn assembling material fetching mechanism
CN108620930A (en) A kind of full-automation bar processing machine bed
CN109227904A (en) A kind of glaze spraying machine for capableing of automatic charging
CN207090488U (en) A kind of feed device
CN111029283A (en) System for realizing automatic packaging of semiconductor
CN102699223A (en) Transverse conveying device on multi-working position press for processing large-size parts
CN104495305B (en) Automatic sheet feeding production line with function of cutting original sheet into two parts
CN105666856B (en) A kind of automatic assembly line of photo frame and its assemble method
CN204659179U (en) A kind of pad printing machine
CN205274561U (en) Automatic device of implanting of round copper foot of charger
CN204776237U (en) Cubic food feeding system
CN105775742A (en) Automatic feeding and taking machine and automatic feeding and taking method thereof
CN102669794A (en) Fully-automatic pitter for red dates
CN203071051U (en) Wafer separator for wet silicon wafer
CN110803509A (en) Multi-station automatic feeding machine
CN109220576A (en) Needle mushroom high-volume production recovery arrangement and method
CN206406467U (en) A kind of automatic assembling device of motor shockproof rubber coil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191111

Address after: 314117, No. 38 South Taoyuan Road, Yao Town, Jiashan County, Jiaxing, Zhejiang

Patentee after: Zhejiang Great Electrical Co., Ltd.

Address before: 523808 12N203 room, electrical and mechanical building, Dongguan University of Technology, Songshan University Road, 1, Guangdong, Dongguan

Patentee before: Deng Jun

TR01 Transfer of patent right