CN106522652A - Parapet wall device used for building construction - Google Patents

Parapet wall device used for building construction Download PDF

Info

Publication number
CN106522652A
CN106522652A CN201610965229.8A CN201610965229A CN106522652A CN 106522652 A CN106522652 A CN 106522652A CN 201610965229 A CN201610965229 A CN 201610965229A CN 106522652 A CN106522652 A CN 106522652A
Authority
CN
China
Prior art keywords
wall body
body plate
ash wall
support rail
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610965229.8A
Other languages
Chinese (zh)
Other versions
CN106522652B (en
Inventor
叶丽琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qidong ouchang New Material Co., Ltd
Original Assignee
叶丽琴
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶丽琴 filed Critical 叶丽琴
Priority to CN201610965229.8A priority Critical patent/CN106522652B/en
Publication of CN106522652A publication Critical patent/CN106522652A/en
Application granted granted Critical
Publication of CN106522652B publication Critical patent/CN106522652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a parapet wall device used for building construction. The parapet wall device comprises a left supporting column (10) and a right supporting column (11). A supporting cross rod (7) is connected between the left supporting column (10) and the right supporting column (11). The left end of the supporting cross rod (7) penetrates through the left supporting column (10) and extends out of the left side of the left supporting column (10). The right end of the supporting cross rod (7) penetrates through the right supporting column (11) and extends out of the right side of the right supporting column (11). The left end and the right end of the supporting cross rod (7) are fixedly connected with the left supporting column (10) and the right supporting column (11) through locking nuts (9) correspondingly and are provided with external threads (8) matched with the locking nuts (9). Two or more wall plates (1) are sequentially arranged on the supporting cross rod (7).

Description

A kind of construction revetment device
Technical field
The present invention relates to a kind of construction revetment device.
Background technology
At present, in the periphery in construction building site, it is required for setting up enclosure wall, building site is completely cut off by enclosure wall, it is to avoid inoperative Personnel enter into the inside of construction site, also avoid non-working person from entering into the generation that the inside of construction site causes the accident, Simultaneously also avoid construction material in construction site from being stolen, enclosure wall of the prior art mostly is masonry structure, thus building and Larger manpower and materials are needed during dismounting, larger quantities is so will result in, and the enclosure wall of masonry structure is after dismounting Cannot reuse, waste larger in resource can be caused, input cost is larger.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of construction revetment device.
To solve the above problems, the present invention is adopted the following technical scheme that:
A kind of construction revetment device of the present invention, including left pillar and right pillar, the left pillar and the right pillar Between be connected with support rail, the left part of the support rail passes through the left pillar and extends a left side for the left pillar Side, the right part of the support rail pass through the right pillar and extend the right side of the right pillar, the support rail The right part of left part and the support rail is fixedly connected with the left pillar and the right pillar by locking nut respectively, The external screw thread for coordinating the locking nut is provided with the right part of the left part of the support rail and the support rail, The ash wall body plate for being provided with more than two pieces is arranged in order on the support rail, insertion on the left surface of the ash wall body plate, is provided with Groove, is provided with to coordinate on the right flank of the ash wall body plate insertion of the insertion groove to protrude, the front end face of the ash wall body plate Hanging block is provided with upper position, support strip at the front end face upper position of the ash wall body plate, is provided with, the support strip is led to Cross jointed shaft and be connected with two balancing poles, two balancing poles are provided with conical head away from that one end of the jointed shaft, institute The bottom for stating ash wall body plate is provided with the insertion section in triangular shape, offers and matching somebody with somebody that the support rail coordinates in the hanging block Close groove, the inside of the cooperation groove is that arc-shaped coordinates to the convenient and support rail, the hanging block it is later half Counterbore is provided with portion, intercommunicating pore in the first half of the hanging block, is provided with, the counterbore is inserted into being combined with stop pin, institute State that counterbore is identical with the angle of inclination of the intercommunicating pore, the counterbore is identical with the diameter of the intercommunicating pore, and the stop pin is worn Cross the intercommunicating pore to extend in the counterbore, the stop pin to prevent the ash wall body plate depart from after being installed with it is described The fixation of support rail, is provided with positioning protrusion on the base of the left pillar and on the base of right pillar, two described fixed Position protrusion is oppositely arranged and the top of two positioning protrusions is provided with U-type groove, and two U-type grooves are oppositely arranged, Locating rod is connected with two U-type grooves, the trench bottom of the U-type groove is flushed with the top of the support strip, described Locating rod is located on the support strip and is contradicted with the support strip and the ash wall body plate, and the locating rod supports horizontal with described Bar Relative vertical is arranged.
Further, the counterbore is 45 degree with the angle of inclination of the intercommunicating pore.
Further, the bottom of the insertion section is less than the length of the balancing pole to the distance of the support strip.
Further, the cross bar hole passed through for the support rail is provided with the left pillar and the right pillar.
Further, the hanging block is fixedly connected by welding with the ash wall body plate, the support strip and the body of wall Plate is fixedly connected by welding.
Further, the insertion groove is identical with the size of the insertion protrusion, when two pieces of ash wall body plates coordinate, its In the insertion protrusion of one piece of ash wall body plate coordinate to realize two pieces with the insertion groove of other one piece of ash wall body plate The tight fit of the ash wall body plate.
Further, the upper and lower ends of the insertion protrusion are provided with chamfering, and the setting of the chamfering is to convenient described Insertion protrusion is rapidly inserted in the insertion groove and coordinates.
Further, the height of the ash wall body plate is not less than 120cm, and the width per ash wall body plate described in block is 60cm-80cm.
Further, the ash wall body plate is solid construction, and the ash wall body plate is made up of PVC plastic.
The beneficial effect of construction revetment device of the present invention is:Entered by ash wall body plate of the support rail to more than two pieces Row is supported, and the insertion section of ash wall body plate is inserted into underground, and support is balanced to ash wall body plate using two balancing poles, increased wall Body plate stationarity after mounting, is connected between the ash wall body plate that more than two pieces are caused by the cooperation of insertion groove and insertion protrusion More firmly, by the cooperation of stop pin and counterbore to prevent ash wall body plate from departing from the support of support rail, by locating rod pair Ash wall body plate carries out perpendicular positioning, prevents ash wall body plate from inclining and puts, also increases wind resistance, the anti-pressure ability of ash wall body plate, when in use, The base of left pillar and right pillar is cast and fixes on the ground, is provided with one end of hanging block towards construction site in ash wall body plate Interior, towards outside construction site, so as to prevent ash wall body plate stolen, this device can be rapidly completed and build other end, and the later stage tears open Except being convenient to, in demolishing process, damage also will not be caused to any part to cause to use, saved input cost, Its simple structure, easy accessibility, convenient transport are with low cost, are adapted to promote the use of.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the overall co-ordination structural representation of construction revetment device of the present invention;
Fig. 2 is the front view of ash wall body plate in Fig. 1;
Fig. 3 is the left view of ash wall body plate in Fig. 1;
Fig. 4 is the sectional view of hanging block in Fig. 2, wherein, stop pin is not inserted in intercommunicating pore and counterbore.
Fig. 5 is to position the left view of protrusion in Fig. 1.
Top views of the Fig. 6 for Fig. 5.
Specific embodiment
Below in conjunction with the accompanying drawings the preferred embodiments of the present invention are described in detail, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent clearly defines so as to make to protection scope of the present invention.
Refering to shown in Fig. 1-6, a kind of construction revetment device of the present invention, including left pillar 10 and right pillar 11, Support rail 7 is connected between the left pillar 10 and the right pillar 11, the left part of the support rail 7 passes through the left side Pillar 10 simultaneously extends the left side of the left pillar 10, and the right part of the support rail 7 passes through the right pillar 11 and extends Go out the right part of the right side of the right pillar 11, the left part of the support rail 7 and the support rail 7 respectively by locking Nut 9 is fixedly connected with the left pillar 10 and the right pillar 11, the left part of the support rail 7 and the support rail The external screw thread 8 for coordinating the locking nut 9 is provided with 7 right part, is arranged in order on the support rail 7 and is provided with More than two pieces of ash wall body plate 1, is provided with insertion groove 12, sets on the right flank of the ash wall body plate 1 on the left surface of the ash wall body plate 1 It is equipped with to coordinate the insertion of the insertion groove 12 to protrude 13, at the front end face upper position of the ash wall body plate 1, is provided with suspension Block 2, is provided with support strip 4 at the front end face upper position of the ash wall body plate 1, the support strip 4 is connected with two by jointed shaft 5 Root balancing pole 6, two balancing poles 6 are provided with conical head 61 away from that one end of the jointed shaft 5, the ash wall body plate 1 Bottom is provided with the insertion section 3 in triangular shape, and the cooperation groove coordinated with the support rail 7 is offered in the hanging block 2 22, the inside for coordinating groove 22 is that arc-shaped is coordinated with the support rail 7 to convenient, the hanging block 2 it is later half Counterbore 23 is provided with portion, intercommunicating pore 24 in the first half of the hanging block 2, is provided with, the counterbore 23 is inserted into being combined with lock Rationed marketing 25, the counterbore 23 are identical with the angle of inclination of the intercommunicating pore 24, the diameter of the counterbore 23 and the intercommunicating pore 24 Identical, the stop pin 25 is extended in the counterbore 23 through the intercommunicating pore 24, and the stop pin 25 is described to prevent Ash wall body plate 1 departs from the fixation with the support rail 7 after being installed, the bottom on the base of the left pillar 10 with right pillar 11 Positioning protrusion 101 is provided with, two positioning protrusions 101 are oppositely arranged and two tops for positioning protrusion 101 Portion is provided with U-type groove 110, and two U-type grooves 110 are oppositely arranged, and it is fixed to be connected with two U-type grooves 110 Position bar 100, the trench bottom of the U-type groove 110 are flushed with the top of the support strip 4, and the locating rod 100 is located at the supporting Contradict on bar 4 and with the support strip 4 and the ash wall body plate 1, the locating rod 100 and 7 Relative vertical of the support rail Arrange.
Wherein, the counterbore 23 is 45 degree with the angle of inclination of the intercommunicating pore 24.
Wherein, the bottom of the insertion section 3 is less than the length of the balancing pole 6 to the distance of the support strip 4.
Wherein, the cross bar hole passed through for the support rail 7 is provided with the left pillar 10 and the right pillar 11.
Wherein, the hanging block 2 is fixedly connected by welding with the ash wall body plate 1, the support strip 4 and the ash wall body plate 1 is fixedly connected by welding.
Wherein, the insertion groove 12 is identical with the size of the insertion protrusion 13, when two pieces of ash wall body plates 1 coordinate, The insertion protrusion 13 of one of ash wall body plate 1 and the insertion groove 12 of other one piece of ash wall body plate 1 coordinate with Realize the tight fit of two pieces of ash wall body plates 1.
Wherein, the upper and lower ends of the insertion protrusion 13 are provided with chamfering 130, and the setting of the chamfering 130 is to convenient The insertion protrusion 13 is rapidly inserted in the insertion groove 12 and coordinates.
Wherein, the height of the ash wall body plate 1 is not less than 120cm, and the width per ash wall body plate described in block 1 is 60cm-80cm.
Wherein, the ash wall body plate 1 is solid construction, and the ash wall body plate 1 is made up of PVC plastic.
The beneficial effect of construction revetment device of the present invention is:Entered by ash wall body plate of the support rail to more than two pieces Row is supported, and the insertion section of ash wall body plate is inserted into underground, and support is balanced to ash wall body plate using two balancing poles, increased wall Body plate stationarity after mounting, is connected between the ash wall body plate that more than two pieces are caused by the cooperation of insertion groove and insertion protrusion More firmly, by the cooperation of stop pin and counterbore to prevent ash wall body plate from departing from the support of support rail, by locating rod pair Ash wall body plate carries out perpendicular positioning, prevents ash wall body plate from inclining and puts, also increases wind resistance, the anti-pressure ability of ash wall body plate, when in use, The base of left pillar and right pillar is cast and fixes on the ground, is provided with one end of hanging block towards construction site in ash wall body plate Interior, towards outside construction site, so as to prevent ash wall body plate stolen, this device can be rapidly completed and build other end, and the later stage tears open Except being convenient to, in demolishing process, damage also will not be caused to any part to cause to use, saved input cost, Its simple structure, easy accessibility, convenient transport are with low cost, are adapted to promote the use of.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification this The principle of invention, of the invention without departing from the spirit and scope of the present invention also to have various changes and modifications, these changes Change and improvement is both fallen within scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent is defined.

Claims (9)

1. a kind of construction revetment device, it is characterised in that:Including left pillar(10)With right pillar(11), the left pillar (10)With the right pillar(11)Between be connected with support rail(7), the support rail(7)Left part through described left Post(10)And extend the left pillar(10)Left side, the support rail(7)Right part pass through the right pillar(11) And extend the right pillar(11)Right side, the support rail(7)Left part and the support rail(7)Right part Pass through locking nut respectively(9)With the left pillar(10)With the right pillar(11)It is fixedly connected, the support rail(7)'s Left part and the support rail(7)Right part on be provided with the cooperation locking nut(9)External screw thread(8), institute State support rail(7)On be arranged in order the ash wall body plate for being provided with more than two pieces(1), the ash wall body plate(1)Left surface on arrange There is insertion groove(12), the ash wall body plate(1)Right flank on be provided with to coordinate the insertion groove(12)Insertion protrusion (13), the ash wall body plate(1)Front end face upper position at be provided with hanging block(2), the ash wall body plate(1)Front end face on the lower Support strip is provided with position(4), the support strip(4)By jointed shaft(5)It is connected with two balancing poles(6), described in two Balancing pole(6)Away from the jointed shaft(5)That one end be provided with conical head(61), the ash wall body plate(1)Bottom be provided with Insertion section in triangular shape(3), the hanging block(2)In offer and the support rail(7)The cooperation groove of cooperation (22), the cooperation groove(22)Inside be arc-shaped to the convenient and support rail(7)Coordinate, the hanging block (2)It is latter half of in be provided with counterbore(23), the hanging block(2)First half in be provided with intercommunicating pore(24), the counterbore (23)It is inserted into being combined with stop pin(25), the counterbore(23)With the intercommunicating pore(24)Angle of inclination it is identical, it is described heavy Hole(23)With the intercommunicating pore(24)Diameter it is identical, the stop pin(25)Through the intercommunicating pore(24)It is described heavy to extend to Hole(23)It is interior, the stop pin(25)To prevent the ash wall body plate(1)Depart from after being installed and the support rail(7)'s It is fixed, the left pillar(10)Base on and right pillar(11)Base on be provided with positioning protrusion(101), described in two Positioning protrusion(101)It is oppositely arranged and two positioning protrusions(101)Top be provided with U-type groove(110), described in two U-type groove(110)It is oppositely arranged, in two U-type grooves(110)In be connected with locating rod(100), the U-type groove(110) Trench bottom and the support strip(4)Top flush, the locating rod(100)Positioned at the support strip(4)On and with institute State support strip(4)With the ash wall body plate(1)Contradict, the locating rod(100)With the support rail(7)Relative vertical is arranged.
2. construction according to claim 1 revetment device, it is characterised in that:The counterbore(23)Connect with described Hole(24)Angle of inclination be 45 degree.
3. construction according to claim 1 revetment device, it is characterised in that:The insertion section(3)Bottom arrive The support strip(4)Distance be less than the balancing pole(6)Length.
4. construction according to claim 1 revetment device, it is characterised in that:The left pillar(10)With the right side Pillar(11)On be provided with for the support rail(7)The cross bar hole for passing through.
5. construction according to claim 1 revetment device, it is characterised in that:The hanging block(2)With the wall Body plate(1)It is fixedly connected by welding, the support strip(4)With the ash wall body plate(1)It is fixedly connected by welding.
6. construction according to claim 1 revetment device, it is characterised in that:The insertion groove(12)Insert with described Enter protrusion(13)Size it is identical, in two pieces of ash wall body plates(1)During cooperation, one of ash wall body plate(1)It is described insert Enter protrusion(13)With other one piece of ash wall body plate(1)The insertion groove(12)Coordinate to realize two pieces of ash wall body plates(1) Tight fit.
7. construction according to claim 6 revetment device, it is characterised in that:The insertion protrusion(13)It is upper and lower Two ends are provided with chamfering(130), the chamfering(130)Setting to facilitate it is described insertion protrusion(13)It is rapidly inserted into described Insertion groove(12)Interior cooperation.
8. construction according to claim 1 revetment device, it is characterised in that:The ash wall body plate(1)Height not Less than 120cm, per ash wall body plate described in block(1)Width be 60cm-80cm.
9. construction according to claim 8 revetment device, it is characterised in that:The ash wall body plate(1)For solid knot Structure, the ash wall body plate(1)It is made up of PVC plastic.
CN201610965229.8A 2016-11-04 2016-11-04 A kind of construction revetment device Active CN106522652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610965229.8A CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610965229.8A CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Publications (2)

Publication Number Publication Date
CN106522652A true CN106522652A (en) 2017-03-22
CN106522652B CN106522652B (en) 2018-08-14

Family

ID=58327081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610965229.8A Active CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Country Status (1)

Country Link
CN (1) CN106522652B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly
CN205000733U (en) * 2015-09-15 2016-01-27 国家电网公司 Firm pre -buried formula electric power security fence pole of type

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly
CN205000733U (en) * 2015-09-15 2016-01-27 国家电网公司 Firm pre -buried formula electric power security fence pole of type

Also Published As

Publication number Publication date
CN106522652B (en) 2018-08-14

Similar Documents

Publication Publication Date Title
CN207406115U (en) A kind of construction guardrail
CN203613817U (en) Base device for steel-structured safety protection fence
CN106835946A (en) A kind of wind resistance damping device and pillar shock-absorbing suspension rod
CN202899600U (en) Construction site limb quick installation and removal protecting device
CN106522652A (en) Parapet wall device used for building construction
CN206346509U (en) A kind of new creeping formwork guard rail
CN208618838U (en) A kind of safety device
CN107605148A (en) A kind of building intellectualization combines mounting bracket
CN210134699U (en) Fender is enclosed in construction of height-adjusting of being convenient for building
CN204835397U (en) Cable fixed bolster
CN204002872U (en) Top board temporary lining and anti-wall caving holder device
CN206707318U (en) A kind of construction safety column
CN205314666U (en) Novel protection guardrail with adjustable width
JP5572529B2 (en) Installation method and structure of fallen object prevention fence and mounting bracket
CN205976580U (en) Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction
CN106401281B (en) A kind of construction revetment device
CN211548680U (en) Scaffold for building construction
CN106382055A (en) Wall protection assembly for building construction
CN206538673U (en) A kind of wind resistance damping device and pillar shock-absorbing suspension rod
CN205637643U (en) Building engineering hangs down opening in a wall mouth rail guard
CN204139639U (en) Soft isolating and protecting component for building
CN205934748U (en) Support arrangement for be used for prestressing force stretch -draw of bent cap bottom surface
CN211777502U (en) Protector is used in tunnel construction
CN215484207U (en) Green building design is with concatenation formula roof safety barrier
CN211037782U (en) Triangular support frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201105

Address after: 362000, Quanzhou, Fujian province Quangang district after the town of Tu Tu village, East House No. 69

Patentee after: Liu Weiwei

Address before: Penglai Anxi County town of Quanzhou City, Fujian province 362402 Peng Ge Cun Tulou No. 50

Patentee before: Ye Liqin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201112

Address after: 201 Xinsheng street, Wangbao Town, Qidong City, Nantong City, Jiangsu Province 226200

Patentee after: Qidong ouchang New Material Co., Ltd

Address before: 362000, Quanzhou, Fujian province Quangang district after the town of Tu Tu village, East House No. 69

Patentee before: Liu Weiwei