CN205976580U - Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction - Google Patents

Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction Download PDF

Info

Publication number
CN205976580U
CN205976580U CN201620909405.1U CN201620909405U CN205976580U CN 205976580 U CN205976580 U CN 205976580U CN 201620909405 U CN201620909405 U CN 201620909405U CN 205976580 U CN205976580 U CN 205976580U
Authority
CN
China
Prior art keywords
guard rail
super high
steel structure
anchor structure
tool anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620909405.1U
Other languages
Chinese (zh)
Inventor
甄维峰
王昌
李维强
张程成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620909405.1U priority Critical patent/CN205976580U/en
Application granted granted Critical
Publication of CN205976580U publication Critical patent/CN205976580U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a guardrail bar instrument anchor structure is prevented to superelevation layer steel construction, including last centre gripping fixed part, lower centre gripping fixed part and hook member, it is used for the connection to prevent guardrail bar with lower centre gripping fixed part to go up centre gripping fixed part, thereby it sets up the one end that forms the centre gripping space between the two and be used for the bottom plate of the I -steel of the fixed superelevation layer steel construction of centre gripping in the interval from top to bottom with lower centre gripping fixed part to go up centre gripping fixed part, hook member can dismantle with lower centre gripping fixed part and be connected, the opening of hook member's couple is used for centre gripping PMKD's the other end towards the centre gripping space. Better, still include reinforcement, first support reinforcement, second support reinforcement. Centre gripping fixed part under the open -ended direction in -cut connection of hook member edge couple. The utility model discloses a guardrail bar instrument anchor structure is prevented to superelevation layer steel construction is fixed simple and convenient, firm, and design benefit, and the structure is succinct, and simple manufacture is suitable for extensive popularization and application.

Description

A kind of super high steel structure guard rail tool anchor structure
Technical field
This utility model is related to technical field of building construction, particularly to guard rail technical field, specifically refers to one kind Super high steel structure guard rail tool anchor structure.
Background technology
In the world height is referred to as high-rise building more than the high building of 30 layers or more than 100m.Therefore, Super High steel knot Structure generally refers to 30 layers or more than 100m, is mainly connected using shaped steel such as I-steel, steel plate or is welded into component, then through even The structural system connect, being welded.Super high steel structure commonly uses steel-frame structure, steel frame-concrete core barrel structure form.
Have that lightweight, intensity is high, anti-seismic performance is good due to steel building, can reasonable Arrangement function be interval, construction Short time limit, recycling are worth high and comprehensive cost low feature, in recent years, steel building particularly super high steel structure Building gets more and more in China.
With the continuous development of urbanization, resistance of super high-rise steel structures continues to bring out, to super high steel structure construction safety Guard technology is put forward higher requirement.
In existing super high steel structure installation process, protection is to draw to set twice horizontal wire rope conduct between two columns Protection in superstructure installation process, steel wire rope span is long, and security protection is not sufficiently stable and steel wire rope bolt hangs over two two Need on column to weld clasp in advance so that steel wire rope hangs, weld-ring is difficult to remove, and affects steel structure surface anticorrosive coat total quality.
Accordingly, it is desirable to provide a kind of super high steel structure guard rail fixed structure, it is simple for structure, fixation is easy, firm By firm.
Utility model content
In order to overcome above-mentioned shortcoming of the prior art, a purpose of the present utility model is to provide a kind of Super High steel Structural shielding railing tool anchor structure, its fixation is easy, firm firm, is suitable to large-scale promotion application.
Another object of the present utility model is to provide a kind of super high steel structure guard rail tool anchor structure, its Design is ingenious, simple for structure, makes simple, is suitable to large-scale promotion application.
For reaching object above, super high steel structure guard rail tool anchor structure of the present utility model, its feature Be, including on grip part, under grip part and hook part, described on grip part and described lower clamping Fixed component is used for connecting guard rail, described on grip part and described under grip the upper and lower interval setting of part from And grip on described part and described under grip and form grasping part between part and be used for gripping Super High One end of the base plate of the I-steel of steel construction, described hook part with described under grip part and be detachably connected, described extension The opening of the hook of hook part is used for gripping the other end of described base plate towards described grasping part.
It is preferred that grip on described part and described under grip part and be used for welding guard rail.
It is preferred that grip on described part and described under grip part for connecting the anti-of described guard rail Shield vertical rod.
It is preferred that described super high steel structure guard rail tool anchor structure also includes girth member, described girth member Movable insertion is connected on and grips in part on described and one end is located in described grasping part for being resisted against described base plate One end on.
It is preferred that described super high steel structure guard rail tool anchor structure also includes the first support reinforcement, institute State that the first support reinforcement is inclined relative to horizontal setting and one end connects and grips part and the other end is used on described Connect described guard rail.
More preferably, one end of the first described support reinforcement is welded and is gripped part, or described first on described The other end of support reinforcement is used for welding described guard rail.
It is preferred that described super high steel structure guard rail tool anchor structure also includes the second support reinforcement, institute State the second support reinforcement be inclined relative to horizontal setting and one end connect described under grip part and the other end is used for Connect described guard rail.
More preferably, part, or described second are gripped under one end welding of the second described support reinforcement is described The other end of support reinforcement is used for welding described guard rail.
It is preferred that gripping portion under described in the direction socket connection of the opening along described hook for the described hook part Part.
More preferably, described hook part has plug, and described plug is provided with least one first fixing hole, described under Grip part and there is slot, the side wall of described slot is provided with least one second fixing hole, described plug is plugged in In described slot, at least one of described first fixing hole and at least one of described second fixing hole are plugged with fixation Part.
The beneficial effects of the utility model essentially consist in:
1st, super high steel structure guard rail tool anchor structure of the present utility model include gripping part, under Grip part and hook part, above grip part and under grip part and be used for connecting guard rail, upper clamping Fixed component and under grip the upper and lower interval setting of part thus upper grip part and under grip between part Formed grasping part be used for grip super high steel structure the base plate of I-steel one end, hook part with grip Part is detachably connected, and the opening of the hook of hook part is used for gripping the other end of base plate towards grasping part, therefore, Fixation is easy, firm firm, is suitable to large-scale promotion application.
2nd, super high steel structure guard rail tool anchor structure of the present utility model include gripping part, under Grip part and hook part, above grip part and under grip part and be used for connecting guard rail, upper clamping Fixed component and under grip the upper and lower interval setting of part thus upper grip part and under grip between part Formed grasping part be used for grip super high steel structure the base plate of I-steel one end, hook part with grip Part is detachably connected, and the opening of the hook of hook part is used for gripping the other end of base plate towards grasping part, therefore, Design is ingenious, simple for structure, makes simple, is suitable to large-scale promotion application.
These and other objects of the present utility model, feature and advantage, by following detailed descriptions, accompanying drawing and right will Try to achieve to fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in claims.
Brief description
Fig. 1 is that a specific embodiment of super high steel structure guard rail tool anchor structure of the present utility model connects The main view perspective diagram of guard rail and I-steel.
Fig. 2 is the decomposition schematic front view of the structure shown in Fig. 1.
(symbol description)
Part is gripped on 1;Part is gripped under 2;21 slots;22 second fixing holes;3 hook parts;31 hooks; 32 plugs;33 first fixing holes;4 grasping parts;5 girth members;6 first support reinforcement;7 second support reinforcement;8 is fixing Part;10 I-steel;20 base plates;30 protective upright rods.
Specific embodiment
In order to be more clearly understood that technology contents of the present utility model, describe in detail especially exemplified by following examples.
Refer to shown in Fig. 1-Fig. 2, super high steel structure guard rail tool anchor structure of the present utility model includes On grip part 1, under grip part 2 and hook part 3, described on grip part 1 and described lower clamping is solid Determine part 2 to be used for connecting guard rail, described on grip part 1 and described under grip part interval setting about 2 Thus grip on described part 1 and described under grip formed between part 2 grasping part 4 be used for gripping super One end of the base plate 20 of the I-steel 10 of high-rise steel structure, described hook part 3 with described under grip part 2 and detachably connect Connect, the opening of the hook 31 of described hook part 3 is used for gripping the another of described base plate 20 towards described grasping part 4 End.
Grip on described part 1 and described under grip part 2 be used for connecting guard rail can adopt any Suitable structure, in a specific embodiment of the present utility model, described on grip part 1 and described under grip portion Part 2 is used for welding guard rail.
Grip on described part 1 and described under grip part 2 be used for connecting guard rail can connect described Any suitable part of guard rail, it is preferred that grip on described part 1 and described under grip part 2 and be used for Connect the protective upright rod 30 of described guard rail.In a specific embodiment of the present utility model, grip portion on described Part 1 and described under grip in the case that part 2 is used for welding guard rail, described on grip part 1 and described under Grip part 2 for welding the protective upright rod 30 of described guard rail.
In order to further enhance the fixation of the one end to described base plate 20, refer to shown in Fig. 1-Fig. 2, new in this practicality In one specific embodiment of type, described super high steel structure guard rail tool anchor structure also includes girth member 5, described plus Firmware 5 movable insertion be connected on described grip in part 1 and one end be located in described grasping part 4 be used for being resisted against described One end of base plate 20 on.
Obviously, girth member 5 can also movable insertion be connected on described under grip in part 2 and one end be located at described clamping It is used in space 4 being resisted against under described one end of base plate 20, similar effect can be played.
Described girth member 5 can be any suitable part, refer to shown in Fig. 1-Fig. 2, in of the present utility model one tool In body embodiment, described girth member 5 is the first bolt, described on grip vertically be provided with part 1 first screw (figure Not shown in), described first bolt thread is engaged in described first screw.First bolt can be such as M10 plain bolt.
In order to increase the intensity gripping part 1 on described, refer to shown in Fig. 1-Fig. 2, of the present utility model one In specific embodiment, described super high steel structure guard rail tool anchor structure also includes the first support reinforcement 6, described First support reinforcement 6 is inclined relative to horizontal setting and one end connects and grips part 1 and the other end is used on described Connect described guard rail.
One end of the first described support reinforcement 6 connects and grips part 1 and the described first support on described The other end of reinforcement 6 is used for connecting described guard rail and can adopt any suitable structure, more preferably, described first One end of support reinforcement 6 is welded and is gripped part 1 on described, or the other end of the first described support reinforcement 6 is used for welding Connect described guard rail.In a specific embodiment of the present utility model, institute is welded in one end of the first described support reinforcement 6 State and grip part 1, and the other end of the first described support reinforcement 6 is used for welding described guard rail.
The other end of the first described support reinforcement 6 is used for connecting described guard rail and can connect described guard rail Any suitable part, more preferably, the other end of described the first support reinforcement 6 is used for connecting the anti-of described guard rail Shield vertical rod 30.In a specific embodiment of the present utility model, it is used for welding in the other end of the first described support reinforcement 6 In the case of described guard rail, the other end of the first described support reinforcement 6 is used for welding the protection of described guard rail Vertical rod 30.
In order to increase described under grip the intensity of part 2, refer to shown in Fig. 1-Fig. 2, of the present utility model one In specific embodiment, described super high steel structure guard rail tool anchor structure also includes the second support reinforcement 7, described Second support reinforcement 7 is inclined relative to horizontal setting and one end connect described under grip part 2 and the other end is used for Connect described guard rail.
Part 2 and the described second support is gripped under one end connection of the second described support reinforcement 7 is described The other end of reinforcement 7 is used for connecting described guard rail and can adopt any suitable structure, more preferably, described second Grip part 2 under one end welding of support reinforcement 7 is described, or the other end of the second described support reinforcement 7 is used for welding Connect described guard rail.In a specific embodiment of the present utility model, institute is welded in one end of the second described support reinforcement 7 State down and grip part 2, and the other end of the second described support reinforcement 7 is used for welding described guard rail.
The other end of the second described support reinforcement 7 is used for connecting described guard rail and can connect described guard rail Any suitable part, more preferably, the other end of described the second support reinforcement 7 is used for connecting the anti-of described guard rail Shield vertical rod 30.In a specific embodiment of the present utility model, it is used for welding in the other end of the second described support reinforcement 7 In the case of described guard rail, the other end of the second described support reinforcement 7 is used for welding the protection of described guard rail Vertical rod 30.
Described hook part 3 with described under grip part 2 and be detachably connected and can adopt any suitable structure, relatively Goodly, grip part 2 under described in the direction socket connection of the opening along described hook 31 for the described hook part 3.Please join As shown in Fig. 1-Fig. 2, in a specific embodiment of the present utility model, described hook part 3 has plug 32, described plug 32 On be provided with least one first fixing hole 33, described under grip part 2 and there is slot 21, on the side wall of described slot 21 It is provided with least one second fixing hole 22, described plug 32 is plugged in described slot 21, in described first fixing hole 33 At least one of at least one and described second fixing hole 22 are plugged with fixture 8.
The number of described first fixing hole 33, described second fixing hole 22 and described fixture 8 can determine as needed, Refer to shown in Fig. 1-Fig. 2, in a specific embodiment of the present utility model, described first fixing hole 33, described second fixation The number of hole 22 and described fixture 8 is 3.
Described fixture 8, described first fixing hole 33 and described second fixing hole 22 can be any suitable parts, In a specific embodiment of the present utility model, described fixture 8 is the second bolt, and described first fixing hole 33 is the second screw, Described second fixing hole 22 is the 3rd screw, and described second bolt thread is engaged on described second screw and described 3rd screw In.Second bolt can be such as M10 plain bolt.
Grip on described part 1, described under grip part 2, described first support reinforcement 6, described second Support reinforcement 7 and described hook part 3 can be any suitable parts, in a specific embodiment of the present utility model, Grip on described part 1, described under grip part 2, described first support reinforcement 6, described second support reinforcing Part 7 and described hook part 3 are all square tubes.For example grip on described part 1, described under grip part 2, described One support reinforcement 6 and described second support reinforcement 7 are the square tubes of 40mm (length) * 40mm (width) * 2mm (thickness), institute State the square tube that hook part 3 is 30mm (length) * 30mm (width) * 1.2mm (thickness).
When this utility model uses, as shown in Fig. 2 hook part 3 and under grip part 2 and be in disassembly status, so Afterwards by the first support reinforcement 6, on grip part 1, under grip part 2 and the second support reinforcement 7 welds protection The protective upright rod 30 of railing, then one end of the base plate 20 of I-steel 10 is snapped in grip part 1 and under grip portion In grasping part 4 between part 2, mobile girth member 5 makes its one end be resisted against on described one end of base plate 20, then will link up with The opening of the hook 31 of part 3 is mobile towards grasping part 4, hooks the other end of base plate 20, and the plug 32 of hook part 3 is inserted The slot 21 of part 2 is gripped, then fixture 8 is plugged in the first fixing hole 33 and the second fixing hole 22 under entering, thus Guard rail is fixed on I-steel 10, finally as shown in Figure 1.
Therefore, this utility model pass through above to grip part 1 and under grip part 2 and connect guard rail, and lead to Cross grip part 1 and under grip the fixing I-steel 10 of part clamping 2 base plates 20 one end, by hook part 3 hook 31 blocks the other end of the base plate 20 of I-steel 10, then by hook part 3 with grip part 2 and be connected, thus Guard rail is fixed on I-steel 10, structure is novel, fixing reliable.
It should be noted that, although this utility model is all to say the anchoring of super high steel structure guard rail tool in the whole text Structure, but super high steel structure guard rail tool anchor structure of the present utility model be equally applicable to high-rise steel structure and Low layer steel construction.
To sum up, super high steel structure guard rail tool anchor structure fixation of the present utility model is easy, firm firm, And design ingenious, and simple for structure, make simple, be suitable to large-scale promotion application.
As can be seen here, the purpose of this utility model completely and is effectively achieved.Function of the present utility model and Structural principle has been shown in an embodiment and has been illustrated, without departing substantially under described principle, embodiment can arbitrarily be changed.Institute So that this utility model includes all variant embodiment based on claim spirit and right.

Claims (10)

1. a kind of super high steel structure guard rail tool anchor structure it is characterised in that include on grip part, under Grip part and hook part, described on grip part and described under grip part and be used for connecting guard rail Bar, described on grip part and described under grip the upper and lower interval setting of part thus gripping part on described And grip under described and form grasping part between part and be used for gripping the base plate of I-steel of super high steel structure One end, described hook part with described under grip part and be detachably connected, the opening direction of the hook of described hook part Described grasping part is used for gripping the other end of described base plate.
2. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described upper folder Hold fixed component and described under grip part and be used for welding guard rail.
3. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described upper folder Hold fixed component and described under grip part for connecting the protective upright rod of described guard rail.
4. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described superelevation Layer steel structure protective railing tool anchor structure also includes girth member, and it is solid that described girth member movable insertion is connected on described upper clamping Determine in part and one end is located in described grasping part for being resisted against one end of described base plate.
5. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described superelevation Layer steel structure protective railing tool anchor structure also includes the first support reinforcement, and described first support reinforcement is with respect to water Planar tilt setting and one end connect and grip part and the other end is used for connecting described guard rail on described.
6. super high steel structure guard rail tool anchor structure as claimed in claim 5 is it is characterised in that described One end of one support reinforcement is welded and is gripped part on described, or the other end of the first described support reinforcement is used for welding Connect described guard rail.
7. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described superelevation Layer steel structure protective railing tool anchor structure also includes the second support reinforcement, and described second support reinforcement is with respect to water Planar tilt setting and one end connect described under grip part and the other end is used for connecting described guard rail.
8. super high steel structure guard rail tool anchor structure as claimed in claim 7 is it is characterised in that described Grip part under one end welding of two support reinforcement is described, or the other end of the second described support reinforcement is used for welding Connect described guard rail.
9. super high steel structure guard rail tool anchor structure as claimed in claim 1 is it is characterised in that described hook Part is gripped under described in the direction socket connection of the opening along described hook for the part.
10. super high steel structure guard rail tool anchor structure as claimed in claim 9 is it is characterised in that described extension Hook part has plug, and described plug is provided with least one first fixing hole, described under grip part there is slot, At least one second fixing hole is provided with the side wall of described slot, described plug is plugged in described slot, described first is solid Determine at least one of at least one of hole and described second fixing hole and be plugged with fixture.
CN201620909405.1U 2016-08-19 2016-08-19 Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction Expired - Fee Related CN205976580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620909405.1U CN205976580U (en) 2016-08-19 2016-08-19 Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620909405.1U CN205976580U (en) 2016-08-19 2016-08-19 Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction

Publications (1)

Publication Number Publication Date
CN205976580U true CN205976580U (en) 2017-02-22

Family

ID=58031906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620909405.1U Expired - Fee Related CN205976580U (en) 2016-08-19 2016-08-19 Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction

Country Status (1)

Country Link
CN (1) CN205976580U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877726A (en) * 2020-07-06 2020-11-03 中建七局第一建筑有限公司 Construction method of semi-climbing type protective outer frame based on steel pipe concrete bundle structure
CN113944339A (en) * 2021-10-29 2022-01-18 国网河北省电力有限公司衡水供电分公司 Fixing device and protective structure for installing steel structure fence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877726A (en) * 2020-07-06 2020-11-03 中建七局第一建筑有限公司 Construction method of semi-climbing type protective outer frame based on steel pipe concrete bundle structure
CN113944339A (en) * 2021-10-29 2022-01-18 国网河北省电力有限公司衡水供电分公司 Fixing device and protective structure for installing steel structure fence

Similar Documents

Publication Publication Date Title
CN205976580U (en) Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction
CN202899600U (en) Building site faces swift formula installation in limit and tears protection device open
CN205206267U (en) Safe multi -functional scaffold
CN210105267U (en) Hanging basket suspension structure
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN103306473A (en) Tool type anchoring part for overhanging scaffold
CN202882454U (en) Temporary safe protective barrier
CN204826867U (en) Building construction protection fence of steel cable structure
CN209760855U (en) Safety belt fastening and hanging device for balcony part construction
CN205976575U (en) Safety net fixing device is prevented weighing down in steel construction inboard
CN210659531U (en) Dual-purpose temporary safety guardrail for bridge construction
CN203684714U (en) Temporary security protective barrier
CN103966990A (en) Single-rack pile leg block closure method and single-rack pile leg block closure tool
CN202073302U (en) Direct plugging type scaffold
CN104481127A (en) Rigidly-connected and high-strength die plate supporting system
CN204139639U (en) Soft isolating and protecting component for building
CN110805458A (en) Tunnel supporting device for mountain track traffic
CN204920171U (en) Elevartor shaft is platform for safety protection
CN204238548U (en) A kind of concrete blinding clamp frame connector and column template clamp frame
CN204001725U (en) The adjustable gusseted of a kind of reinforcing bar self-bearing type
CN213806524U (en) Protective net frame for scaffold
CN217840978U (en) Guard rail fixing facility for door and window opening
CN203569880U (en) Scaffold connecting mechanism
CN215056040U (en) Curtain wall connecting structure of high-rise building
CN210597644U (en) Combined type screw thread anchor built-in fitting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

CF01 Termination of patent right due to non-payment of annual fee