CN107605148A - A kind of building intellectualization combines mounting bracket - Google Patents

A kind of building intellectualization combines mounting bracket Download PDF

Info

Publication number
CN107605148A
CN107605148A CN201710865102.3A CN201710865102A CN107605148A CN 107605148 A CN107605148 A CN 107605148A CN 201710865102 A CN201710865102 A CN 201710865102A CN 107605148 A CN107605148 A CN 107605148A
Authority
CN
China
Prior art keywords
steel pipe
vertical steel
arresting disk
slide cartridge
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710865102.3A
Other languages
Chinese (zh)
Inventor
马海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201710865102.3A priority Critical patent/CN107605148A/en
Publication of CN107605148A publication Critical patent/CN107605148A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a kind of building intellectualization to combine mounting bracket, including mounting bracket support body, mounting bracket support body is made up of vertical steel pipe and horizontal trombone slide, first position-arresting disk of vertical steel pipe is fixedly connected by bolt with the second position-arresting disk of another group of vertical steel pipe, vertical steel tube surface is slidingly connected and has slide cartridge, slide cartridge is movably fastened by two groups of limited blocks with chute, horizontal trombone slide fixed by camber clamp and protruding plate be plugged in ring stopper slot and square type neck in.Two groups of vertical steel pipes of the invention only need two bolts with regard to that can be stably fixed at together, improve the speed of upper strata scaffold lapping, the slide cartridge of vertical steel tube surface is adjusted to correct position, slide cartridge can be stably fixed to the correct position of vertical steel tube surface, horizontal steel pipe fixing clip is set to close in ring stopper slot, horizontal steel pipe can be rapidly completed to be fixedly connected with vertical steel pipe right-angled intersection, complete the work of whole scaffold installation overlap joint.

Description

A kind of building intellectualization combines mounting bracket
Technical field
The present invention relates to mounting bracket technical field, specially a kind of building intellectualization combination mounting bracket.
Background technology
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various supports set up.Architecture field Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height be used on construction site.Mainly for Workmen works up and down or perimeter security net is safeguarded and high-altitude installation component etc., is exactly plainly to build a framework, scaffold makes Material generally has:Bamboo and wood, steel pipe or synthetic material etc..Some engineerings also with scaffold when template use, in addition advertising, The departments such as municipal administration, traffic road and bridge, mine are also used extensively.For a long time, due to erecting tools in itself and its constructing technology and Management work safe to use is in more backward state, causes the incidence of accident higher.Relevant statistics surface:In China In the casualty accident that construction system is occurred every year, about 1/3 or so directly or indirectly with erecting tools and its The problem of use, is relevant.The scaffold made of tube material that China uses now has fastener type steel pipe scaffold, bowl fastening type Steel pipe scaffold, Bayenet type steel tube scaffold, door-type scaffold, also miscellaneous internal scaffolding, hang outrigger scaffold and Other tube material scaffolds.On the one hand scaffold after installation needs to consolidate, another to be conveniently accounted for the convenient of installation Property, installing easily occur being broken or collapsing out, and mainly at connecting point position in current scaffold installation Shortcomings Substantial amounts of manpower is needed, cost of labor is higher, therefore, it is proposed that a kind of building intellectualization combines mounting bracket.
The content of the invention
It is an object of the invention to provide a kind of building intellectualization to combine mounting bracket, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the present invention provides following technical scheme:A kind of building intellectualization combines mounting bracket, including peace Support body is shelved, the mounting bracket support body is made up of vertical steel pipe and horizontal trombone slide, and the vertical steel pipe upper end face fixes welding There is the first position-arresting disk, vertical steel pipe rear surface is fixedly welded with the second position-arresting disk, first position-arresting disk and the second position-arresting disk Both sides end surfaces offer the first screwed hole, and upper surface offers spliced eye in the middle part of first position-arresting disk, is set in spliced eye There is internal thread, the second position-arresting disk middle lower surface is fixedly welded with protrusion threaded post, and the vertical steel pipe is by protruding spiral shell The spliced eye of line post and another group of vertical steel pipe is connected, and the first position-arresting disk of vertical steel pipe is stood by bolt and another group Second position-arresting disk of formula steel pipe is fixedly connected, and the vertical steel pipe front side surface vertically uniformly offers multigroup through hole, and vertical Steel pipe front side surface vertically offers chute at through hole two side ends, and the vertical steel tube surface is slidingly connected and has slide cartridge, slide cartridge Inner front side surface is fixedly installed two groups of limited blocks, and the slide cartridge is movably fastened by two groups of limited blocks with chute, and in slide cartridge Portion's outer surface is fixedly installed outer reel, and the outer reel upper surface offers ring stopper slot, and outer reel outer surface Multigroup square type neck is uniformly offered, the square type neck runs through round stopper slot, and slide cartridge lower end front side surface is consolidated Surely round piece of protrusion is connected with, round piece of front side middle part surface is protruded and offers the second screwed hole, match somebody with somebody in second screwed hole Conjunction is connected with half-thread bolt, and the slide cartridge lower end rear side surface of the second screwed hole corresponding position offers circular hole, the slide cartridge Vertical steel tube surface is fixedly mounted on by half-thread bolt, the horizontal trombone slide both sides end surfaces are fixedly welded with protrusion Plate, protrusion front edge of board are fixedly installed camber clamp, and the horizontal trombone slide is fixed by camber clamp and protruding plate and is plugged in In ring stopper slot and in square type neck.
Preferably, the outer reel is structure as a whole with slide cartridge.
Preferably, the square type neck uniformly offers eight groups on outer reel surface, and the size of the square type neck is impartial In the sectional dimension of protruding plate, the radian of the camber clamp is equal to the radian of ring stopper slot.
Preferably, the half-thread bolt front end is smooth surface structure, and half-thread bolt end surface is provided with external screw thread, institute The smooth surface end for stating half-thread bolt is plugged in circular hole.
Preferably, the size of first position-arresting disk and the second position-arresting disk is equal sized.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention it is easy to operate, can quick lap joint scaffold, Reduce cost of labor, Simultaneous Stabilization is higher, situation about will not loosen, specific as follows:
1st, when needing to carry out installation overlap joint steel pipe scaffold, the protrusion threaded post of one group of vertical steel pipe lower end is screwed into another group In the spliced eye of vertical steel pipe upper end, then two groups of vertical steel pipes are fixedly connected by bolt, two groups of vertical steel pipes only need Two bolts together, improve the speed of upper strata scaffold lapping with regard to that can be stably fixed at, while improve upper strata scaffold Stability, situation about will not loosen;
2nd, slide cartridge is movably fastened by two groups of limited blocks and chute, and slide cartridge is fixedly mounted on vertical steel pipe table by half-thread bolt Face, by unscrewing half-thread bolt, the slide cartridge of vertical steel tube surface is adjusted to correct position, half-thread bolt is screwed into circular hole It is interior, slide cartridge is stably fixed at the correct position of vertical steel tube surface, the camber clamp of horizontal steel pipe is then passed through into hammer Son is hammered in ring stopper slot, horizontal steel pipe is fixed and is fastened in ring stopper slot, can be rapidly completed horizontal steel pipe It is fixedly connected with vertical steel pipe right-angled intersection, completes the work of whole scaffold installation overlap joint, improve scaffold installation just Victory, while substantial amounts of manpower can be saved, save cost of labor.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is slide cartridge sectional view of the present invention;
Fig. 3 is slide cartridge top view of the present invention.
In figure:1 vertical steel pipe, 2 horizontal trombone slides, 3 first position-arresting disks, 4 second position-arresting disks, 5 first screwed holes, 6 spliced eyes, It is 7 protrusion threaded posts, 8 chutes, 9 through holes, 10 slide cartridges, 11 limited blocks, 12 outer reels, 13 ring stopper slots, 14 square type necks, 15 convex Go out round piece, 16 half-thread bolts, 17 protruding plates, 18 camber clamps, 19 second screwed holes, 20 circular holes.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-3 are referred to, the present invention provides a kind of technical scheme:A kind of building intellectualization combines mounting bracket, including installation Frame support body, mounting bracket support body are made up of vertical steel pipe 1 and horizontal trombone slide 2, and the vertical upper end face of steel pipe 1 is fixedly welded with the first limit Position disk 3, the vertical rear surface of steel pipe 1 are fixedly welded with the second position-arresting disk 4, the size of the first position-arresting disk 3 and the second position-arresting disk 4 Equal sized, the first position-arresting disk 3 and the both sides end surfaces of the second position-arresting disk 4 offer the first screwed hole 5, in the first position-arresting disk 3 Portion upper surface offers spliced eye 6, is provided with internal thread in spliced eye 6, the middle lower surface of the second position-arresting disk 4 is fixedly welded with protrusion Threaded post 7, vertical steel pipe 1 is connected by protruding threaded post 7 and the spliced eye 6 of another group of vertical steel pipe 1, and vertical steel pipe 1 the first position-arresting disk 3 is fixedly connected by bolt with the second position-arresting disk 4 of another group of vertical steel pipe 1, two groups of vertical steel pipes 1 Need two bolts together, to improve the speed of upper strata scaffold lapping with regard to that can be stably fixed at, while improve upper strata pin hand The stability of frame, situation about will not loosen.
The vertical front side surface of steel pipe 1 vertically uniformly offers multigroup through hole 9, and the front side surface of vertical steel pipe 1 is in 9 liang of through hole Chute 8 is vertically offered at side, the vertical surface activity of steel pipe 1 is arranged with slide cartridge 10, and the inner front side surface of slide cartridge 10 is consolidated Surely two groups of limited blocks 11 are provided with, the slide cartridge 10 is movably fastened by two groups of limited blocks 11 with chute 8, and the middle part of slide cartridge 10 outside Surface is fixedly installed outer reel 12, and outer reel 12 is structure as a whole with slide cartridge 10, and the outer upper surface of reel 12 offers ring limit Position groove 13, and the outer surface of outer reel 12 uniformly offers multigroup square type neck 14, square type neck 14 is equal on the outer surface of reel 12 It is even to offer eight groups, the needs of different directions are disclosure satisfy that, square type neck 14 runs through round stopper slot 13, the lower end of slide cartridge 10 Front side surface is fixedly connected with round piece 15 of protrusion, and round piece of 15 front side middle part surfaces of protrusion offer the second screwed hole 19, the Half-thread bolt 16 is connected with two screwed holes 19, the lower end rear side surface of slide cartridge 10 of the corresponding position of the second screwed hole 19 opens up There is circular hole 20, the front end of half-thread bolt 16 is smooth surface structure, and the end surface of half-thread bolt 16 is provided with external screw thread, half-thread spiral shell The smooth surface end of bolt 16 is plugged in circular hole 20, and when can prevent that half-thread bolt 16 from bending, half-thread bolt 16 can not twisted Situation about coming, slide cartridge 10 is fixedly mounted on the vertical surface of steel pipe 1 by half-thread bolt 16, by the way that half-thread bolt 16 is screwed into In circular hole 20, slide cartridge 10 is set to be stably fixed at the correct position on the vertical surface of steel pipe 1.
The horizontal both sides end surfaces of trombone slide 2 are fixedly welded with protruding plate 17, and the front end of protruding plate 17 is fixedly installed camber Clamp 18, the size of square type neck 14 are equal to the sectional dimension of protruding plate 17, and the radian of camber clamp 18 is spacing equal to ring The radian of groove 13, horizontal trombone slide 2 are fixed by camber clamp 18 and protruding plate 17 and are plugged in ring stopper slot 13 and square type card In groove 14, the camber clamp 18 of horizontal steel pipe 2 is hammered in ring stopper slot 13 by hammer, horizontal steel pipe 2 is fixed It is fastened in ring stopper slot 13, horizontal steel pipe 2 can be rapidly completed and be fixedly connected with the vertical right-angled intersection of steel pipe 1.
Operation principle:When needing to carry out installation overlap joint steel pipe scaffold, by the protrusion screw thread of one group of vertical lower end of steel pipe 1 Post 7 is screwed into the spliced eye 6 of another group of vertical upper end of steel pipe 1, is then fixedly connected with two groups of vertical steel pipes 1 by bolt, complete Overlapped into the upper strata of steel pipe scaffold, the vertical surface slide cartridge 10 of steel pipe 1 is adjusted to correct position, half-thread bolt 16 is screwed into In circular hole 20, slide cartridge 10 is set to be stably fixed at the correct position on the vertical surface of steel pipe 1, then by the camber of horizontal steel pipe 2 Clamp 18 is hammered in ring stopper slot 13 by hammer, horizontal steel pipe 2 is fixed and is fastened in ring stopper slot 13, can It is rapidly completed the work that horizontal steel pipe 2 is fixedly connected with the vertical right-angled intersection of steel pipe 1.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of building intellectualization combines mounting bracket, including mounting bracket support body, the mounting bracket support body is by vertical steel pipe(1)And horizontal stroke To trombone slide(2)Composition, it is characterised in that:The vertical steel pipe(1)Upper end face is fixedly welded with the first position-arresting disk(3), it is vertical Steel pipe(1)Rear surface is fixedly welded with the second position-arresting disk(4), first position-arresting disk(3)With the second position-arresting disk(4)Two side ends Surface offers the first screwed hole(5), first position-arresting disk(3)Middle part upper surface offers spliced eye(6), spliced eye (6)It is interior to be provided with internal thread, second position-arresting disk(4)Middle lower surface is fixedly welded with protrusion threaded post(7), the Vertical Steel Pipe(1)By protruding threaded post(7)With another group of vertical steel pipe(1)Spliced eye(6)It is connected, and vertical steel pipe(1)'s First position-arresting disk(3)Pass through bolt and another group of vertical steel pipe(1)The second position-arresting disk(4)It is fixedly connected, the vertical steel pipe (1)Front side surface vertically uniformly offers multigroup through hole(9), and vertical steel pipe(1)Front side surface is in through hole(9)It is equal at two side ends Vertically offer chute(8), the vertical steel pipe(1)Surface activity is arranged with slide cartridge(10), slide cartridge(10)Inner front side surface is consolidated Surely two groups of limited blocks are provided with(11), the slide cartridge(10)Pass through two groups of limited blocks(11)With chute(8)It is movably fastened, and slide cartridge (10)Middle part outer surface is fixedly installed outer reel(12), the outer reel(12)Upper surface offers ring stopper slot (13), and outer reel(12)Outer surface uniformly offers multigroup square type neck(14), the square type neck(14)Run through Round stopper slot(13), the slide cartridge(10)Lower end front side surface is fixedly connected with round piece of protrusion(15), protrude round piece (15)Front side middle part surface offers the second screwed hole(19), second screwed hole(19)Inside it is connected with half-thread bolt (16), second screwed hole(19)The slide cartridge of corresponding position(10)Lower end rear side surface offers circular hole(20), the slide cartridge (10)Pass through half-thread bolt(16)It is fixedly mounted on vertical steel pipe(1)Surface, the horizontal trombone slide(2)Both sides end surfaces are solid Surely it is welded with protruding plate(17), protruding plate(17)Front end is fixedly installed camber clamp(18), the horizontal trombone slide(2)Pass through Camber clamp(18)And protruding plate(17)Fixation is plugged in ring stopper slot(13)Interior and square type neck(14)It is interior.
A kind of 2. building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The outer reel(12)With Slide cartridge(10)It is structure as a whole.
A kind of 3. building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The square type neck(14) In outer reel(12)Surface uniformly offers eight groups, the square type neck(14)Size be equal to protruding plate(17)Section chi It is very little, the camber clamp(18)Radian be equal to ring stopper slot(13)Radian.
A kind of 4. building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The half-thread bolt (16)Front end is smooth surface structure, half-thread bolt(16)End surface is provided with external screw thread, the half-thread bolt(16)Light Face end is plugged in circular hole(20)It is interior.
A kind of 5. building intellectualization combination mounting bracket according to claim 1, it is characterised in that:First position-arresting disk (3)Size and the second position-arresting disk(4)It is equal sized.
CN201710865102.3A 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket Pending CN107605148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710865102.3A CN107605148A (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710865102.3A CN107605148A (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Publications (1)

Publication Number Publication Date
CN107605148A true CN107605148A (en) 2018-01-19

Family

ID=61060504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710865102.3A Pending CN107605148A (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Country Status (1)

Country Link
CN (1) CN107605148A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025245A (en) * 2018-09-10 2018-12-18 严晓安 A kind of square tube scaffold connector and square tube scaffold
CN109109401A (en) * 2018-09-18 2019-01-01 浙江农林大学暨阳学院 A kind of bamboo architecture material and its preparation process
CN109537872A (en) * 2018-11-21 2019-03-29 郭忠标 A kind of building scaffold Fast Installation dismounting equipment

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178757Y (en) * 1994-02-19 1994-10-05 成志全 Plug-in multifunction scaffold
CN2506733Y (en) * 2001-06-23 2002-08-21 开平市优赢金属制品有限公司 YY shape strong adjustable steel shore
CN201953005U (en) * 2011-03-04 2011-08-31 孟志强 Detachable protective railing
CN204024004U (en) * 2014-01-23 2014-12-17 洛阳理工学院 A kind of scaffold take dismantling device fast
CN104358405A (en) * 2014-11-11 2015-02-18 天津大学 Heavy load full formwork support system
CN204299166U (en) * 2014-12-18 2015-04-29 中建四局第三建筑工程有限公司四川分公司 One vertically docks pipe box
CN205558247U (en) * 2016-01-31 2016-09-07 梁一星 Scaffold puts up connecting device for civil engineering
CN106121222A (en) * 2016-08-16 2016-11-16 山东天齐置业集团股份有限公司 Mold method at the bottom of a kind of adjusting beam end template support means and beam
CN205875662U (en) * 2016-07-04 2017-01-11 北京广佳建筑装饰股份有限公司 A light -duty scaffold frame for interior decoration's dismouting of being convenient for
CN106498859A (en) * 2016-12-22 2017-03-15 云南大力神金属构件有限公司 Be applicable to the support system of assembled architecture and bridge construction
CN207420009U (en) * 2017-09-22 2018-05-29 中建八局第二建设有限公司 A kind of building intellectualization combines mounting bracket

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178757Y (en) * 1994-02-19 1994-10-05 成志全 Plug-in multifunction scaffold
CN2506733Y (en) * 2001-06-23 2002-08-21 开平市优赢金属制品有限公司 YY shape strong adjustable steel shore
CN201953005U (en) * 2011-03-04 2011-08-31 孟志强 Detachable protective railing
CN204024004U (en) * 2014-01-23 2014-12-17 洛阳理工学院 A kind of scaffold take dismantling device fast
CN104358405A (en) * 2014-11-11 2015-02-18 天津大学 Heavy load full formwork support system
CN204299166U (en) * 2014-12-18 2015-04-29 中建四局第三建筑工程有限公司四川分公司 One vertically docks pipe box
CN205558247U (en) * 2016-01-31 2016-09-07 梁一星 Scaffold puts up connecting device for civil engineering
CN205875662U (en) * 2016-07-04 2017-01-11 北京广佳建筑装饰股份有限公司 A light -duty scaffold frame for interior decoration's dismouting of being convenient for
CN106121222A (en) * 2016-08-16 2016-11-16 山东天齐置业集团股份有限公司 Mold method at the bottom of a kind of adjusting beam end template support means and beam
CN106498859A (en) * 2016-12-22 2017-03-15 云南大力神金属构件有限公司 Be applicable to the support system of assembled architecture and bridge construction
CN207420009U (en) * 2017-09-22 2018-05-29 中建八局第二建设有限公司 A kind of building intellectualization combines mounting bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025245A (en) * 2018-09-10 2018-12-18 严晓安 A kind of square tube scaffold connector and square tube scaffold
CN109109401A (en) * 2018-09-18 2019-01-01 浙江农林大学暨阳学院 A kind of bamboo architecture material and its preparation process
CN109537872A (en) * 2018-11-21 2019-03-29 郭忠标 A kind of building scaffold Fast Installation dismounting equipment

Similar Documents

Publication Publication Date Title
CN107605148A (en) A kind of building intellectualization combines mounting bracket
CN204386134U (en) The attached mould scaffold of a kind of concrete cylindrical hoop
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN207420009U (en) A kind of building intellectualization combines mounting bracket
CN104695605B (en) A kind of rib floor assembled mould
CN203271096U (en) Operating platform
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN207109594U (en) Pier stud constructing operation lantern stand
CN207700662U (en) Steel-structure factory building scaffold
CN205669326U (en) Combined protective shed for constructional engineering
CN208309462U (en) A kind of municipal works guardrail for being easily installed disassembly
CN213389764U (en) Bridge junction reinforcing apparatus
CN210947661U (en) Installation device of socket type overhanging scaffold
CN208220153U (en) A kind of regulatable scaffold for building
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN102174856A (en) Finalized rebar machining shed
CN205637149U (en) Assembled protection canopy of activity board house
CN206769340U (en) A kind of easy-to-dismount construction platform
CN211873737U (en) Steel construction operation frame
CN217151185U (en) High-strength safety protective guard for building construction platform
CN208870496U (en) A kind of safety barrier facilitating construction site
CN214365102U (en) High-rise protective fence structure for building supporting construction
CN220620957U (en) High-safety scaffold for building construction
CN217205000U (en) Guardrail bar is prevented temporarily in construction
CN219794919U (en) Vertical retaining wall of river course

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119