CN205637149U - Assembled protection canopy of activity board house - Google Patents

Assembled protection canopy of activity board house Download PDF

Info

Publication number
CN205637149U
CN205637149U CN201620406235.5U CN201620406235U CN205637149U CN 205637149 U CN205637149 U CN 205637149U CN 201620406235 U CN201620406235 U CN 201620406235U CN 205637149 U CN205637149 U CN 205637149U
Authority
CN
China
Prior art keywords
steel
square
pipe
vertical
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620406235.5U
Other languages
Chinese (zh)
Inventor
舒正伟
詹长思
庄发玉
梁晓劼
骆昆良
沈延泓
陈圣洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian construction engineering Refco Group Ltd
Original Assignee
FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN CONSTRUCTION ENGINEERING GROUP Co filed Critical FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority to CN201620406235.5U priority Critical patent/CN205637149U/en
Application granted granted Critical
Publication of CN205637149U publication Critical patent/CN205637149U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model provides an assembled protection canopy of activity board house, including a shed roof and four vertical mechanisms, the shed roof erects in four vertical mechanisms top, vertical mechanism includes a square steel, a pre -buried pipe, a circular steel tube and a concrete foundation, the square steel detachably be fixed in on the concrete foundation, pre -buried pipe lies in the inside of square steel, and steel sheet, lower steel sheet have been welded respectively to the top and the bottom of this pre -buried pipe, just it welds with the square steel respectively with lower steel sheet to go up the steel sheet, circular steel tube passes the steel sheet to insert locate pre -buried intraductal, just the connection is realized setting up through split bolt by circular steel tube, pre -buried pipe and square steel. The utility model discloses a stability of the activity board house the stiffness is improved, simple to operate has avoided the non - job that requires special skills personnel high altitude construction scheduling problem that has a big risk, and equal removable play of primary member and used repeatedly have reduced material loss effectively and has practiced thrift the manual work.

Description

A kind of movable plank house assembled protection canopy
Technical field
This utility model is specifically related to a kind of movable plank house assembled protection canopy.
Background technology
Flourish along with real estate industry, one, tier 2 cities land used growing tension, construction site is narrow and small Phenomenon normalization, for meet produced on-site office and lodging demand, job site falling at tower crane The situation setting up movable plank house in radius also gets more and more.It is positioned at tower crane according to relevant regulations to fall radius Movable plank house must set up protection canopy.Though movable plank house producer of China is many at present, but is basically the same, For applied widely, turnover rate is high, and the demand of easy-to-install Novel protective canopy increases the most day by day.Closely Also more employing square steel is had to carry out setting up of movable plank house protection canopy over Nian, but each parts of existing protection canopy Between all be use Welding Structure, substantial amounts of manpower need to be consumed, also exist non-special operation workers high-altitude make Industry is of long duration, risk is big, install main joist mechanism, secondary joist mechanism time, face, production board house is because being stepped on The weldquality stepped on and destroy cannot ensure, the component proportion of goods damageds big, and square steel is difficult to recycle, secondary week Turn the problem that utilization rate is relatively low.
Utility model content
The technical problems to be solved in the utility model, is to provide a kind of movable plank house assembled protection canopy.
This utility model is achieved in that a kind of movable plank house assembled protection canopy, including a ceiling and Four vertical mechanisms, described ceiling is set up in above four vertical mechanisms;Described vertical mechanism include a square steel, One built-in pipe, a round steel pipe and a concrete pedestal, described square steel is detachably secured to concrete pedestal On;Described built-in pipe is positioned at the inside of square steel, the top of this built-in pipe and bottom be respectively welded steel disc, Lower steel disc, and described upper steel disc and lower steel disc weld with square steel respectively;Described round steel pipe passes upper steel disc, And be inserted in built-in pipe, and described round steel pipe, built-in pipe and square steel realize, by split bolt, the company of fastening Connect.
Preferably, the bottom of described square steel is welded with a steel plate, and this steel plate is provided with four screws;Described Four the first foundation bolts matched with described screw it are inserted with, when being in work shape on concrete pedestal During state, described square steel is paid on concrete pedestal by described four screws, four the first foundation bolt locks.
Preferably, described concrete pedestal is inserted with one second foundation bolt, and this second foundation bolt On be arranged with a pvc pipe.
Preferably, described ceiling includes that a protective unit, described protective unit include four main joist mechanisms, Four main joist mechanism initial and ends connect and enclose a square body;
Every described main joist mechanism all includes a plurality of vertical tube, a plurality of inclined tube and be arranged in parallel up and down two Transverse tube, described a plurality of vertical tubes interval is located between two transverse tubes;Every described inclined tube homocline be located at two transverse tubes it Between, and between two vertical tubes, and described transverse tube, vertical tube and inclined tube are the most all realized by fastener Fasten and connect;The round steel pipe of four described vertical mechanisms is erected at the corner of described square body respectively, and Described round steel pipe the most all realizes fastening by fastener with transverse tube, inclined tube and is connected.
Preferably, described square body includes setting up and down two square structure;
Described ceiling also includes be arrangeding in parallel up and down Liang Ge secondary joist mechanism, every described secondary joist mechanism is equal Including the latticed a plurality of steel pipes of one-tenth interlaced with each other;Every described secondary joist mechanism is all layed in side described in In shape structure, and the steel pipe of secondary joist mechanism all realizes fastening with described square structure being connected by fastener.
The utility model has the advantage of: preferably improve the integral rigidity of movable plank house, stability; Main joist mechanism part uses steel tube fastener to be attached with the round steel pipe of vertical mechanism, main joist mechanism " word support " is used to carry out drawknot between upper and lower two transverse tubes, easy for installation, it is to avoid non-special operation workers The problems such as work high above the ground risk is big, main member the most removably and is reused, and significantly reduces material It is lost and has saved artificial.
Accompanying drawing explanation
This utility model is further described the most in conjunction with the embodiments.
Fig. 1 is the overall diagram of this utility model a kind of movable plank house assembled protection canopy.
Fig. 2 be in this utility model vertical mechanism and soil layer coordinate figure.
Fig. 3 is the structural representation of vertical mechanism in this utility model (removing round steel pipe and concrete pedestal) Figure.
Fig. 4 is the structural representation of concrete pedestal in this utility model.
Fig. 5 be in this utility model vertical mechanism and protective unit coordinate figure.
Fig. 6 is the structural representation of secondary joist mechanism in this utility model.
Fig. 7 is the use state diagram of this utility model a kind of movable plank house assembled protection canopy.
Detailed description of the invention
Referring to shown in Fig. 1-4, a kind of movable plank house assembled protection canopy 100, including ceiling 1 He Four vertical mechanisms 2, described ceiling 1 is set up in above four vertical mechanisms 2;Described vertical mechanism 2 includes One square steel 21, built-in pipe 22, round steel pipe 23 and a concrete pedestal 24, described square steel 21 can Releasably it is fixed on concrete pedestal 24;The bottom of the most described square steel 21 is welded with a steel plate 25, And this steel plate 25 is provided with four screws 251;Four and described spiral shell it is inserted with on described concrete pedestal 24 The first foundation bolt 241 matched in hole 251, when in running order, described square steel 21 passes through 251, four the first foundation bolt 241 locks of described four screw are paid on concrete pedestal 24.Described mixed It is inserted with on one second foundation bolt 242, and this second foundation bolt 242 sheathed on solidifying soil matrix seat 24 There is a pvc pipe 3.Second foundation bolt 242, for Anti-Typhoon, is connected with steel wire rope.
Referring again to Fig. 2-3, described built-in pipe 22 is positioned at the inside of square steel 21, the top of this built-in pipe 22 Be respectively welded upper steel disc 4, lower steel disc 5 with bottom, and described upper steel disc 4 and lower steel disc 5 respectively with square steel 21 welding;Described round steel pipe 23 is through upper steel disc 4, and is inserted in built-in pipe 22, and described round steel pipe 23, built-in pipe 22 and square steel 21 realize fastening by split bolt 6 and connect.Described vertical mechanism 2 total height For 7.16m, it is welded on inside square steel 21 for convenience of lower steel disc 5, square steel 21 can cut close to weld, Finally use againCut two sections are welded by weld seam 211.
Referring again to Fig. 5-6, described ceiling 1 includes that a protective unit 11 and two be arranged in parallel up and down are secondary Keel mechanism 12;Described protective unit 11 includes four main joist mechanisms 111, four main joist mechanisms 111 Initial and end connects and encloses a square body M, and described square body M includes setting up and down two square structure M1.Every described main joist mechanism 111 all includes a plurality of vertical tube 111a, a plurality of inclined tube 111b and up and down The two transverse tube 111c be arrangeding in parallel, described a plurality of vertical tube 111a are located between two transverse tube 111c at interval;Often Described inclined tube 111b homocline is located between two transverse tube 111c, and between two vertical tube 111a, and described horizontal stroke Pipe 111c, vertical tube 111a and inclined tube 111b the most all realize fastening by fastener 7 and connect;I.e. two-layer Inclined tube 111b is used to carry out drawknot reinforcing by "the" shape between transverse tube 111c.Four described vertical mechanisms 2 Round steel pipe 23 be erected on respectively at the corner of described square body M, and described round steel pipe 23 and transverse tube 111c, inclined tube 111b the most all realize fastening by fastener 7 and connect.Every described secondary joist mechanism 12 All include the latticed a plurality of steel pipes 121 of one-tenth interlaced with each other;Every described secondary joist mechanism 12 is all layed in On square structure M1 described in, and the steel pipe of secondary joist mechanism 12 all realizes square with described by fastener 7 Structure M1 fastens and connects.
Referring again to Fig. 2-3 and Fig. 7, when applying utility model works, in soil layer on relevant position Excavation foundation trench, concrete pedestal 24 is put into excavated foundation trench in, by steel plate 25 bottom square steel 21 On four screws 251 solid with four the first foundation bolts 241 lockings of concrete pedestal 24.Fix Finish, the main vertical member 9 of the vertical mechanism 2 of protection canopy 100 with movable plank house 8 be attached location, And carry out the adjustment of perpendicularity, use angle bar to carry out between the vertical mechanism 2 of vertical mechanism 2 and movable plank house 8 Connecting, the front welding position of movable plank house 8 is bottom the railing of corridor, at accommodation rail, and dragon below canopy At bone, rear is overhead at 0.5m, at 3m and at 5.5m.Carrying out ground, position, vertical mechanism 2 place Before surface concrete hardening, use adhesive tape that four the first foundation bolt 241 joints leaked outside carry out parcel and protect Protect, the second Anti-Typhoon foundation bolt 242 is used pvc pipe 3 (height and the ground concrete newly watered Thickness is identical) it to be isolated with newly-laid concrete, it is ensured that the second foundation bolt 242 is the most above ground level. Remaining position of concrete pedestal 24 all covers layer of plastic film, by concrete pedestal 24 and the coagulation at this Soil surface isolates, to facilitate the later stage to dismantle.After engineering terminates, can be first to four main joist mechanisms 111 parts are removed, and remove and complete destroy concrete at movable plank house 8 peripheral path hardening, After the nut of the second foundation bolt 242 and pvc pipe 3 are taken out, the most dismountable vertical mechanism 2 and concrete Pedestal 24, round steel pipe 23 is split out by the split bolt 6 finally taken out in vertical mechanism 2, dismantles and complete just may be used It is transported to next building site can be continuing with.
Assembled protection canopy 100 of the present utility model, dismounting simplicity, and round steel pipe therein 23, square steel 21 materials such as grade all can be gathered materials on the spot in construction site, and the cheap cost of material is low, the most recyclable repetition of main member Utilize,
This utility model preferably improves the integral rigidity of movable plank house 8, stability.Vertical mechanism 2 Can assemble in advance, be arranged by the spacing of the main vertical member 9 of movable plank house 8.Main joist mechanism 111 Part uses the round steel pipe 23 of steel tube fastener 7 and vertical mechanism 2 to be attached, main joist mechanism 111 upper " word support " is used to carry out drawknot between lower two transverse tube 111c, easy for installation, it is to avoid non-job that requires special skills people The problems such as member's work high above the ground risk is big, main member the most removably and is reused, and significantly reduces material Material loss has also been saved artificial, solves non-special operation workers high-altitude work present in existing protection canopy Industry, the activity duration is long, risk is big, peace tear open operation inconvenience and easily finished product movable plank house 8 roofing is caused Trample the problems such as destruction.

Claims (5)

1. a movable plank house assembled protection canopy, it is characterised in that: include a ceiling and four vertical machines Structure, described ceiling is set up in above four vertical mechanisms;Described vertical mechanism include a square steel, a built-in pipe, One round steel pipe and a concrete pedestal, described square steel is detachably secured on concrete pedestal;Described pre- Pipe laying is positioned at the inside of square steel, and the top of this built-in pipe and bottom are respectively welded steel disc, lower steel disc, And described upper steel disc and lower steel disc weld with square steel respectively;Described round steel pipe passes upper steel disc, and is inserted in In built-in pipe, and described round steel pipe, built-in pipe and square steel realize fastening by split bolt and connect.
2. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: institute The bottom stating square steel is welded with a steel plate, and this steel plate is provided with four screws;Insert on described concrete pedestal It is provided with four the first foundation bolts matched with described screw, when in running order, described square steel Paid on concrete pedestal by described four screws, four the first foundation bolt locks.
3. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: described It is inserted with on concrete pedestal on one second foundation bolt, and this second foundation bolt and is arranged with a PVC Pipe.
4. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: described Ceiling includes that a protective unit, described protective unit include four main joist mechanisms, four main joist mechanisms Initial and end connects and encloses a square body;
Every described main joist mechanism all includes a plurality of vertical tube, a plurality of inclined tube and be arranged in parallel up and down two Transverse tube, described a plurality of vertical tubes interval is located between two transverse tubes;Every described inclined tube homocline be located at two transverse tubes it Between, and between two vertical tubes, and described transverse tube, vertical tube and inclined tube are the most all realized by fastener Fasten and connect;The round steel pipe of four described vertical mechanisms is erected at the corner of described square body respectively, and Described round steel pipe the most all realizes fastening by fastener with transverse tube, inclined tube and is connected.
5. a kind of movable plank house assembled protection canopy as claimed in claim 4, it is characterised in that: described Square body includes setting up and down two square structure;
Described ceiling also includes be arrangeding in parallel up and down Liang Ge secondary joist mechanism, every described secondary joist mechanism is equal Including the latticed a plurality of steel pipes of one-tenth interlaced with each other;Every described secondary joist mechanism is all layed in side described in In shape structure, and the steel pipe of secondary joist mechanism all realizes fastening with described square structure being connected by fastener.
CN201620406235.5U 2016-05-06 2016-05-06 Assembled protection canopy of activity board house Withdrawn - After Issue CN205637149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620406235.5U CN205637149U (en) 2016-05-06 2016-05-06 Assembled protection canopy of activity board house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620406235.5U CN205637149U (en) 2016-05-06 2016-05-06 Assembled protection canopy of activity board house

Publications (1)

Publication Number Publication Date
CN205637149U true CN205637149U (en) 2016-10-12

Family

ID=57049168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620406235.5U Withdrawn - After Issue CN205637149U (en) 2016-05-06 2016-05-06 Assembled protection canopy of activity board house

Country Status (1)

Country Link
CN (1) CN205637149U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780929A (en) * 2016-05-06 2016-07-20 福建建工集团总公司 Assembling type protective shed of prefabricated house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780929A (en) * 2016-05-06 2016-07-20 福建建工集团总公司 Assembling type protective shed of prefabricated house

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN105926765B (en) The regular polygon of falling umbrella steel structure module and its installation method
CN108756241A (en) Overhanging slab form installs device on the outside of a kind of shear wall
CN212534174U (en) Raft foundation steel bar supporting tool
US6843026B2 (en) Cone shaped polygon roof structure
CN111764621A (en) Overhanging scaffold and construction method
JP2008231904A (en) Construction method for foundation, column footing and ground sill for building with elevated floor above ground
CN205637149U (en) Assembled protection canopy of activity board house
CN105780929B (en) A kind of movable plank house assembly type protection canopy
CN112227688A (en) Stiffening plate bearing type outer frame-free construction platform for residential building and construction method
CN209817295U (en) Structure is found to assembled building top layer eaves gutter
CN106504674A (en) Billboard
CN207420009U (en) A kind of building intellectualization combines mounting bracket
CN204139631U (en) The guard rail of building site fast demountable
CN206554483U (en) A kind of full fabricated scaffold is encorbelmented component
JP3986002B2 (en) Large pipe house arch and large pipe house structure
CN212077954U (en) Portable assembled deep basal pit steel sheet case supporting construction that can have enough to meet need
CN209958809U (en) Protective shed of box-type movable board house
CN208964955U (en) A kind of assembled operating platform
CN111636571A (en) Quick installation method of combined container house
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN205476459U (en) Template system of consolidating on high formwork low -angle clear water inclined plane
CN218264949U (en) Concrete cantilever member support system
CN216076209U (en) Adjust nimble outer hanging handling frame of building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Patentee after: Fujian construction engineering Refco Group Ltd

Address before: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Patentee before: FUJIAN CONSTRUCTION ENGINEERING GROUP COMPANY

CP01 Change in the name or title of a patent holder
AV01 Patent right actively abandoned

Granted publication date: 20161012

Effective date of abandoning: 20180223

AV01 Patent right actively abandoned