CN205637149U - Assembled protection canopy of activity board house - Google Patents
Assembled protection canopy of activity board house Download PDFInfo
- Publication number
- CN205637149U CN205637149U CN201620406235.5U CN201620406235U CN205637149U CN 205637149 U CN205637149 U CN 205637149U CN 201620406235 U CN201620406235 U CN 201620406235U CN 205637149 U CN205637149 U CN 205637149U
- Authority
- CN
- China
- Prior art keywords
- steel
- square
- pipe
- vertical
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model provides an assembled protection canopy of activity board house, including a shed roof and four vertical mechanisms, the shed roof erects in four vertical mechanisms top, vertical mechanism includes a square steel, a pre -buried pipe, a circular steel tube and a concrete foundation, the square steel detachably be fixed in on the concrete foundation, pre -buried pipe lies in the inside of square steel, and steel sheet, lower steel sheet have been welded respectively to the top and the bottom of this pre -buried pipe, just it welds with the square steel respectively with lower steel sheet to go up the steel sheet, circular steel tube passes the steel sheet to insert locate pre -buried intraductal, just the connection is realized setting up through split bolt by circular steel tube, pre -buried pipe and square steel. The utility model discloses a stability of the activity board house the stiffness is improved, simple to operate has avoided the non - job that requires special skills personnel high altitude construction scheduling problem that has a big risk, and equal removable play of primary member and used repeatedly have reduced material loss effectively and has practiced thrift the manual work.
Description
Technical field
This utility model is specifically related to a kind of movable plank house assembled protection canopy.
Background technology
Flourish along with real estate industry, one, tier 2 cities land used growing tension, construction site is narrow and small
Phenomenon normalization, for meet produced on-site office and lodging demand, job site falling at tower crane
The situation setting up movable plank house in radius also gets more and more.It is positioned at tower crane according to relevant regulations to fall radius
Movable plank house must set up protection canopy.Though movable plank house producer of China is many at present, but is basically the same,
For applied widely, turnover rate is high, and the demand of easy-to-install Novel protective canopy increases the most day by day.Closely
Also more employing square steel is had to carry out setting up of movable plank house protection canopy over Nian, but each parts of existing protection canopy
Between all be use Welding Structure, substantial amounts of manpower need to be consumed, also exist non-special operation workers high-altitude make
Industry is of long duration, risk is big, install main joist mechanism, secondary joist mechanism time, face, production board house is because being stepped on
The weldquality stepped on and destroy cannot ensure, the component proportion of goods damageds big, and square steel is difficult to recycle, secondary week
Turn the problem that utilization rate is relatively low.
Utility model content
The technical problems to be solved in the utility model, is to provide a kind of movable plank house assembled protection canopy.
This utility model is achieved in that a kind of movable plank house assembled protection canopy, including a ceiling and
Four vertical mechanisms, described ceiling is set up in above four vertical mechanisms;Described vertical mechanism include a square steel,
One built-in pipe, a round steel pipe and a concrete pedestal, described square steel is detachably secured to concrete pedestal
On;Described built-in pipe is positioned at the inside of square steel, the top of this built-in pipe and bottom be respectively welded steel disc,
Lower steel disc, and described upper steel disc and lower steel disc weld with square steel respectively;Described round steel pipe passes upper steel disc,
And be inserted in built-in pipe, and described round steel pipe, built-in pipe and square steel realize, by split bolt, the company of fastening
Connect.
Preferably, the bottom of described square steel is welded with a steel plate, and this steel plate is provided with four screws;Described
Four the first foundation bolts matched with described screw it are inserted with, when being in work shape on concrete pedestal
During state, described square steel is paid on concrete pedestal by described four screws, four the first foundation bolt locks.
Preferably, described concrete pedestal is inserted with one second foundation bolt, and this second foundation bolt
On be arranged with a pvc pipe.
Preferably, described ceiling includes that a protective unit, described protective unit include four main joist mechanisms,
Four main joist mechanism initial and ends connect and enclose a square body;
Every described main joist mechanism all includes a plurality of vertical tube, a plurality of inclined tube and be arranged in parallel up and down two
Transverse tube, described a plurality of vertical tubes interval is located between two transverse tubes;Every described inclined tube homocline be located at two transverse tubes it
Between, and between two vertical tubes, and described transverse tube, vertical tube and inclined tube are the most all realized by fastener
Fasten and connect;The round steel pipe of four described vertical mechanisms is erected at the corner of described square body respectively, and
Described round steel pipe the most all realizes fastening by fastener with transverse tube, inclined tube and is connected.
Preferably, described square body includes setting up and down two square structure;
Described ceiling also includes be arrangeding in parallel up and down Liang Ge secondary joist mechanism, every described secondary joist mechanism is equal
Including the latticed a plurality of steel pipes of one-tenth interlaced with each other;Every described secondary joist mechanism is all layed in side described in
In shape structure, and the steel pipe of secondary joist mechanism all realizes fastening with described square structure being connected by fastener.
The utility model has the advantage of: preferably improve the integral rigidity of movable plank house, stability;
Main joist mechanism part uses steel tube fastener to be attached with the round steel pipe of vertical mechanism, main joist mechanism
" word support " is used to carry out drawknot between upper and lower two transverse tubes, easy for installation, it is to avoid non-special operation workers
The problems such as work high above the ground risk is big, main member the most removably and is reused, and significantly reduces material
It is lost and has saved artificial.
Accompanying drawing explanation
This utility model is further described the most in conjunction with the embodiments.
Fig. 1 is the overall diagram of this utility model a kind of movable plank house assembled protection canopy.
Fig. 2 be in this utility model vertical mechanism and soil layer coordinate figure.
Fig. 3 is the structural representation of vertical mechanism in this utility model (removing round steel pipe and concrete pedestal)
Figure.
Fig. 4 is the structural representation of concrete pedestal in this utility model.
Fig. 5 be in this utility model vertical mechanism and protective unit coordinate figure.
Fig. 6 is the structural representation of secondary joist mechanism in this utility model.
Fig. 7 is the use state diagram of this utility model a kind of movable plank house assembled protection canopy.
Detailed description of the invention
Referring to shown in Fig. 1-4, a kind of movable plank house assembled protection canopy 100, including ceiling 1 He
Four vertical mechanisms 2, described ceiling 1 is set up in above four vertical mechanisms 2;Described vertical mechanism 2 includes
One square steel 21, built-in pipe 22, round steel pipe 23 and a concrete pedestal 24, described square steel 21 can
Releasably it is fixed on concrete pedestal 24;The bottom of the most described square steel 21 is welded with a steel plate 25,
And this steel plate 25 is provided with four screws 251;Four and described spiral shell it is inserted with on described concrete pedestal 24
The first foundation bolt 241 matched in hole 251, when in running order, described square steel 21 passes through
251, four the first foundation bolt 241 locks of described four screw are paid on concrete pedestal 24.Described mixed
It is inserted with on one second foundation bolt 242, and this second foundation bolt 242 sheathed on solidifying soil matrix seat 24
There is a pvc pipe 3.Second foundation bolt 242, for Anti-Typhoon, is connected with steel wire rope.
Referring again to Fig. 2-3, described built-in pipe 22 is positioned at the inside of square steel 21, the top of this built-in pipe 22
Be respectively welded upper steel disc 4, lower steel disc 5 with bottom, and described upper steel disc 4 and lower steel disc 5 respectively with square steel
21 welding;Described round steel pipe 23 is through upper steel disc 4, and is inserted in built-in pipe 22, and described round steel pipe
23, built-in pipe 22 and square steel 21 realize fastening by split bolt 6 and connect.Described vertical mechanism 2 total height
For 7.16m, it is welded on inside square steel 21 for convenience of lower steel disc 5, square steel 21 can cut close to weld,
Finally use againCut two sections are welded by weld seam 211.
Referring again to Fig. 5-6, described ceiling 1 includes that a protective unit 11 and two be arranged in parallel up and down are secondary
Keel mechanism 12;Described protective unit 11 includes four main joist mechanisms 111, four main joist mechanisms 111
Initial and end connects and encloses a square body M, and described square body M includes setting up and down two square structure
M1.Every described main joist mechanism 111 all includes a plurality of vertical tube 111a, a plurality of inclined tube 111b and up and down
The two transverse tube 111c be arrangeding in parallel, described a plurality of vertical tube 111a are located between two transverse tube 111c at interval;Often
Described inclined tube 111b homocline is located between two transverse tube 111c, and between two vertical tube 111a, and described horizontal stroke
Pipe 111c, vertical tube 111a and inclined tube 111b the most all realize fastening by fastener 7 and connect;I.e. two-layer
Inclined tube 111b is used to carry out drawknot reinforcing by "the" shape between transverse tube 111c.Four described vertical mechanisms 2
Round steel pipe 23 be erected on respectively at the corner of described square body M, and described round steel pipe 23 and transverse tube
111c, inclined tube 111b the most all realize fastening by fastener 7 and connect.Every described secondary joist mechanism 12
All include the latticed a plurality of steel pipes 121 of one-tenth interlaced with each other;Every described secondary joist mechanism 12 is all layed in
On square structure M1 described in, and the steel pipe of secondary joist mechanism 12 all realizes square with described by fastener 7
Structure M1 fastens and connects.
Referring again to Fig. 2-3 and Fig. 7, when applying utility model works, in soil layer on relevant position
Excavation foundation trench, concrete pedestal 24 is put into excavated foundation trench in, by steel plate 25 bottom square steel 21
On four screws 251 solid with four the first foundation bolts 241 lockings of concrete pedestal 24.Fix
Finish, the main vertical member 9 of the vertical mechanism 2 of protection canopy 100 with movable plank house 8 be attached location,
And carry out the adjustment of perpendicularity, use angle bar to carry out between the vertical mechanism 2 of vertical mechanism 2 and movable plank house 8
Connecting, the front welding position of movable plank house 8 is bottom the railing of corridor, at accommodation rail, and dragon below canopy
At bone, rear is overhead at 0.5m, at 3m and at 5.5m.Carrying out ground, position, vertical mechanism 2 place
Before surface concrete hardening, use adhesive tape that four the first foundation bolt 241 joints leaked outside carry out parcel and protect
Protect, the second Anti-Typhoon foundation bolt 242 is used pvc pipe 3 (height and the ground concrete newly watered
Thickness is identical) it to be isolated with newly-laid concrete, it is ensured that the second foundation bolt 242 is the most above ground level.
Remaining position of concrete pedestal 24 all covers layer of plastic film, by concrete pedestal 24 and the coagulation at this
Soil surface isolates, to facilitate the later stage to dismantle.After engineering terminates, can be first to four main joist mechanisms
111 parts are removed, and remove and complete destroy concrete at movable plank house 8 peripheral path hardening,
After the nut of the second foundation bolt 242 and pvc pipe 3 are taken out, the most dismountable vertical mechanism 2 and concrete
Pedestal 24, round steel pipe 23 is split out by the split bolt 6 finally taken out in vertical mechanism 2, dismantles and complete just may be used
It is transported to next building site can be continuing with.
Assembled protection canopy 100 of the present utility model, dismounting simplicity, and round steel pipe therein 23, square steel
21 materials such as grade all can be gathered materials on the spot in construction site, and the cheap cost of material is low, the most recyclable repetition of main member
Utilize,
This utility model preferably improves the integral rigidity of movable plank house 8, stability.Vertical mechanism 2
Can assemble in advance, be arranged by the spacing of the main vertical member 9 of movable plank house 8.Main joist mechanism 111
Part uses the round steel pipe 23 of steel tube fastener 7 and vertical mechanism 2 to be attached, main joist mechanism 111 upper
" word support " is used to carry out drawknot between lower two transverse tube 111c, easy for installation, it is to avoid non-job that requires special skills people
The problems such as member's work high above the ground risk is big, main member the most removably and is reused, and significantly reduces material
Material loss has also been saved artificial, solves non-special operation workers high-altitude work present in existing protection canopy
Industry, the activity duration is long, risk is big, peace tear open operation inconvenience and easily finished product movable plank house 8 roofing is caused
Trample the problems such as destruction.
Claims (5)
1. a movable plank house assembled protection canopy, it is characterised in that: include a ceiling and four vertical machines
Structure, described ceiling is set up in above four vertical mechanisms;Described vertical mechanism include a square steel, a built-in pipe,
One round steel pipe and a concrete pedestal, described square steel is detachably secured on concrete pedestal;Described pre-
Pipe laying is positioned at the inside of square steel, and the top of this built-in pipe and bottom are respectively welded steel disc, lower steel disc,
And described upper steel disc and lower steel disc weld with square steel respectively;Described round steel pipe passes upper steel disc, and is inserted in
In built-in pipe, and described round steel pipe, built-in pipe and square steel realize fastening by split bolt and connect.
2. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: institute
The bottom stating square steel is welded with a steel plate, and this steel plate is provided with four screws;Insert on described concrete pedestal
It is provided with four the first foundation bolts matched with described screw, when in running order, described square steel
Paid on concrete pedestal by described four screws, four the first foundation bolt locks.
3. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: described
It is inserted with on concrete pedestal on one second foundation bolt, and this second foundation bolt and is arranged with a PVC
Pipe.
4. a kind of movable plank house assembled protection canopy as claimed in claim 1, it is characterised in that: described
Ceiling includes that a protective unit, described protective unit include four main joist mechanisms, four main joist mechanisms
Initial and end connects and encloses a square body;
Every described main joist mechanism all includes a plurality of vertical tube, a plurality of inclined tube and be arranged in parallel up and down two
Transverse tube, described a plurality of vertical tubes interval is located between two transverse tubes;Every described inclined tube homocline be located at two transverse tubes it
Between, and between two vertical tubes, and described transverse tube, vertical tube and inclined tube are the most all realized by fastener
Fasten and connect;The round steel pipe of four described vertical mechanisms is erected at the corner of described square body respectively, and
Described round steel pipe the most all realizes fastening by fastener with transverse tube, inclined tube and is connected.
5. a kind of movable plank house assembled protection canopy as claimed in claim 4, it is characterised in that: described
Square body includes setting up and down two square structure;
Described ceiling also includes be arrangeding in parallel up and down Liang Ge secondary joist mechanism, every described secondary joist mechanism is equal
Including the latticed a plurality of steel pipes of one-tenth interlaced with each other;Every described secondary joist mechanism is all layed in side described in
In shape structure, and the steel pipe of secondary joist mechanism all realizes fastening with described square structure being connected by fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620406235.5U CN205637149U (en) | 2016-05-06 | 2016-05-06 | Assembled protection canopy of activity board house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620406235.5U CN205637149U (en) | 2016-05-06 | 2016-05-06 | Assembled protection canopy of activity board house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637149U true CN205637149U (en) | 2016-10-12 |
Family
ID=57049168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620406235.5U Withdrawn - After Issue CN205637149U (en) | 2016-05-06 | 2016-05-06 | Assembled protection canopy of activity board house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637149U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780929A (en) * | 2016-05-06 | 2016-07-20 | 福建建工集团总公司 | Assembling type protective shed of prefabricated house |
-
2016
- 2016-05-06 CN CN201620406235.5U patent/CN205637149U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780929A (en) * | 2016-05-06 | 2016-07-20 | 福建建工集团总公司 | Assembling type protective shed of prefabricated house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
CN101397844B (en) | Construction method of special section steel concrete composite structure inclined wall mould base engineering | |
CN105926765B (en) | The regular polygon of falling umbrella steel structure module and its installation method | |
CN108756241A (en) | Overhanging slab form installs device on the outside of a kind of shear wall | |
CN212534174U (en) | Raft foundation steel bar supporting tool | |
US6843026B2 (en) | Cone shaped polygon roof structure | |
CN111764621A (en) | Overhanging scaffold and construction method | |
JP2008231904A (en) | Construction method for foundation, column footing and ground sill for building with elevated floor above ground | |
CN205637149U (en) | Assembled protection canopy of activity board house | |
CN105780929B (en) | A kind of movable plank house assembly type protection canopy | |
CN112227688A (en) | Stiffening plate bearing type outer frame-free construction platform for residential building and construction method | |
CN209817295U (en) | Structure is found to assembled building top layer eaves gutter | |
CN106504674A (en) | Billboard | |
CN207420009U (en) | A kind of building intellectualization combines mounting bracket | |
CN204139631U (en) | The guard rail of building site fast demountable | |
CN206554483U (en) | A kind of full fabricated scaffold is encorbelmented component | |
JP3986002B2 (en) | Large pipe house arch and large pipe house structure | |
CN212077954U (en) | Portable assembled deep basal pit steel sheet case supporting construction that can have enough to meet need | |
CN209958809U (en) | Protective shed of box-type movable board house | |
CN208964955U (en) | A kind of assembled operating platform | |
CN111636571A (en) | Quick installation method of combined container house | |
CN212688719U (en) | Bridge vase-shaped pier body protective bracket | |
CN205476459U (en) | Template system of consolidating on high formwork low -angle clear water inclined plane | |
CN218264949U (en) | Concrete cantilever member support system | |
CN216076209U (en) | Adjust nimble outer hanging handling frame of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89 Patentee after: Fujian construction engineering Refco Group Ltd Address before: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89 Patentee before: FUJIAN CONSTRUCTION ENGINEERING GROUP COMPANY |
|
CP01 | Change in the name or title of a patent holder | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161012 Effective date of abandoning: 20180223 |
|
AV01 | Patent right actively abandoned |