CN207420009U - A kind of building intellectualization combines mounting bracket - Google Patents

A kind of building intellectualization combines mounting bracket Download PDF

Info

Publication number
CN207420009U
CN207420009U CN201721222009.2U CN201721222009U CN207420009U CN 207420009 U CN207420009 U CN 207420009U CN 201721222009 U CN201721222009 U CN 201721222009U CN 207420009 U CN207420009 U CN 207420009U
Authority
CN
China
Prior art keywords
steel pipe
vertical steel
mounting bracket
arresting disk
slide cartridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721222009.2U
Other languages
Chinese (zh)
Inventor
马海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201721222009.2U priority Critical patent/CN207420009U/en
Application granted granted Critical
Publication of CN207420009U publication Critical patent/CN207420009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model provides a kind of building intellectualization combination mounting bracket, including mounting bracket frame body, mounting bracket frame body is made of vertical steel pipe and horizontal trombone slide, first position-arresting disk of vertical steel pipe is fixedly connected by bolt with the second position-arresting disk of another group of vertical steel pipe, vertical steel tube surface is slidingly connected and has slide cartridge, slide cartridge is movably fastened by two groups of limited blocks with sliding slot, horizontal trombone slide by camber snap-gauge and protruding plate fixation be plugged in ring limiting slot and square type card slot in.Two groups of vertical steel pipes of the utility model only need two bolts with regard to that can be stably fixed at together, improve the speed of upper strata scaffold lapping, the slide cartridge of vertical steel tube surface is adjusted to suitable position, slide cartridge can be stably fixed to the suitable position of vertical steel tube surface, horizontal steel pipe fixing clip is made to close in ring limiting slot, horizontal steel pipe can be rapidly completed to be fixedly connected with vertical steel pipe right-angled intersection, complete the work of entire scaffold installation overlap joint.

Description

一种建筑智能化组合安装架A building intelligent combination installation frame

技术领域technical field

本实用新型涉及安装架技术领域,具体为一种建筑智能化组合安装架。The utility model relates to the technical field of mounting frames, in particular to an intelligent building assembly mounting frame.

背景技术Background technique

脚手架指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架。建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方。主要为了施工人员上下干活或外围安全网维护及高空安装构件等,说白了就是搭架子,脚手架制作材料通常有:竹、木、钢管或合成材料等。有些工程也用脚手架当模板使用,此外在广告业、市政、交通路桥、矿山等部门也广泛被使用。长期以来,由于架设工具本身及其构造技术和使用安全管理工作处于较为落后的状态,致使事故的发生率较高。有关统计表面 :在中国建筑施工系统每年所发生的伤亡事故中,大约有 1/3 左右直接或间接地与架设工具及其使用的问题有关。中国现在使用的用钢管材料制作的脚手架有扣件式钢管脚手架、碗扣式钢管脚手架、承插式钢管脚手架、门式脚手架,还有各式各样的里脚手架、挂挑脚手架以及其它钢管材料脚手架。安装后的脚手架一方面需要稳固,另一方便也要考虑到安装的便捷性,目前的脚手架安装存在不足,主要是接点位置处容易出现断裂或者崩开,而且安装起来需要大量的人力,人工成本比较高,为此,我们提出一种建筑智能化组合安装架。Scaffolding refers to the various supports set up on the construction site for workers to operate and solve vertical and horizontal transportation. The generic term on building circle, refers to building site be used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height. It is mainly for construction workers to work up and down or to maintain peripheral safety nets and to install components at high altitudes. Some projects also use scaffolding as a template, and it is also widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments. For a long time, due to the relatively backward state of the erection tool itself and its construction technology and use safety management, the incidence of accidents has been relatively high. Relevant statistics show that about 1/3 of the annual casualties in China's construction system are directly or indirectly related to erection tools and their use. The scaffolds made of steel pipe materials currently used in China include fastener-type steel pipe scaffolds, bowl-buckle steel pipe scaffolds, socket-type steel pipe scaffolds, door-type scaffolds, and various inner scaffolds, hanging scaffolds and other steel pipe materials. scaffold. On the one hand, the installed scaffold needs to be stable, and on the other hand, the convenience of installation must also be considered. The current installation of scaffolds is insufficient, mainly because the joints are prone to breakage or collapse, and the installation requires a lot of manpower and labor costs. Relatively high, for this reason, we propose a kind of building intelligent combination installation frame.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑智能化组合安装架,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide an intelligent building assembly mounting frame to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑智能化组合安装架,包括安装架架体,所述安装架架体由立式钢管和横向拉管组成,所述立式钢管上端表面固定焊接有第一限位盘,立式钢管下端表面固定焊接有第二限位盘,所述第一限位盘与第二限位盘两侧端表面均开设有第一螺纹孔,所述第一限位盘中部上表面开设有插接孔,插接孔内设有内螺纹,所述第二限位盘中部下表面固定焊接有凸出螺纹柱,所述立式钢管通过凸出螺纹柱与另一组立式钢管的插接孔配合连接,且立式钢管的第一限位盘通过螺栓与另一组立式钢管的第二限位盘固定连接,所述立式钢管前侧表面竖向均匀开设有多组通孔,且立式钢管前侧表面在通孔两侧端处均竖向开设有滑槽,该立式钢管表面活动套设有滑筒,滑筒内部前侧表面固定设置有两组限位块,该滑筒通过两组限位块与滑槽活动卡合,且滑筒中部外侧表面固定设置有外轴盘,所述外轴盘上表面开设有圈型限位槽,且外轴盘外侧表面均匀开设有多组矩型卡槽,所述矩型卡槽均贯通于圆型限位槽,所述滑筒下端前侧表面固定连接有凸出圆型块,凸出圆型块前侧中部表面开设有第二螺纹孔,所述第二螺纹孔内配合连接有半螺纹螺栓,所述第二螺纹孔对应处的滑筒下端后侧表面开设有圆孔,所述滑筒通过半螺纹螺栓固定安装在立式钢管表面,所述横向拉管两侧端表面均固定焊接有凸出板,凸出板前端均固定设置有弧型卡板,所述横向拉管通过弧型卡板和凸出板固定插设在圈型限位槽内和矩型卡槽内。In order to achieve the above purpose, the utility model provides the following technical solutions: an intelligent building assembly installation frame, including the installation frame body, the installation frame body is composed of vertical steel pipes and horizontal pull pipes, the upper end of the vertical steel pipes The surface is fixedly welded with a first limit plate, and the surface of the lower end of the vertical steel pipe is fixedly welded with a second limit plate. Both sides of the first limit plate and the second limit plate are provided with first threaded holes. The upper surface of the middle part of the first limiting plate is provided with an insertion hole, and an internal thread is provided in the insertion hole, and the lower surface of the middle part of the second limiting plate is fixedly welded with a protruding threaded column, and the vertical steel pipe passes through the protruding The threaded column is mated and connected with the socket holes of another group of vertical steel pipes, and the first limit plate of the vertical steel pipe is fixedly connected with the second limit plate of another group of vertical steel pipes through bolts. There are multiple groups of through holes evenly arranged vertically on the side surface, and the front side surface of the vertical steel pipe is vertically provided with chute at both ends of the through hole, and the surface of the vertical steel pipe is movable. Two sets of limit blocks are fixed on the side surface, and the sliding cylinder is engaged with the chute through the two sets of limit blocks, and the outer surface of the middle part of the slide cylinder is fixedly equipped with an outer shaft disc, and the upper surface of the outer shaft disc is provided with a ring Type limit grooves, and the outer surface of the outer shaft disk is evenly provided with a plurality of sets of rectangular card slots, the rectangular card slots are all connected to the circular limit grooves, and the front surface of the lower end of the sliding cylinder is fixedly connected with a protruding circle Type block, the surface of the middle part of the front side of the protruding circular block is provided with a second threaded hole, the second threaded hole is fitted with a half-threaded bolt, and the rear surface of the lower end of the slider corresponding to the second threaded hole is provided with a round hole, the sliding cylinder is fixedly installed on the surface of the vertical steel pipe through half-threaded bolts, the surface of both sides of the horizontal drawing pipe is fixedly welded with protruding plates, and the front ends of the protruding plates are fixedly equipped with arc-shaped clamping plates. The horizontal pulling tube is fixed and inserted in the ring-shaped limiting groove and the rectangular-shaped locking groove through the arc-shaped clamping plate and the protruding plate.

优选的,所述外轴盘与滑筒为一体结构。Preferably, the outer shaft disk and the sliding cylinder are integrally structured.

优选的,所述矩型卡槽在外轴盘表面均匀开设有八组,所述矩型卡槽的尺寸均等于凸出板的截面尺寸,所述弧型卡板的弧度等于圈型限位槽的弧度。Preferably, eight groups of rectangular clamping slots are evenly opened on the surface of the outer shaft disk, the dimensions of the rectangular clamping slots are all equal to the cross-sectional size of the protruding plate, and the radian of the arc-shaped clamping plate is equal to the ring-shaped limiting slot radians.

优选的,所述半螺纹螺栓前端为光面结构,半螺纹螺栓末端表面设置有外螺纹,所述半螺纹螺栓的光面端插设在圆孔内。Preferably, the front end of the half-threaded bolt has a smooth structure, the surface of the end of the half-threaded bolt is provided with external threads, and the smooth end of the half-threaded bolt is inserted into the round hole.

优选的,所述第一限位盘的尺寸与第二限位盘的尺寸相等。Preferably, the size of the first limiting disc is equal to that of the second limiting disc.

与现有技术相比,本实用新型的有益效果是:本实用新型操作方便,能够快速搭接脚手架,减少了人工成本,同时稳定性较高,不会发生松动的情况,具体如下:Compared with the prior art, the beneficial effect of the utility model is: the utility model is easy to operate, can quickly overlap the scaffolding, reduces the labor cost, and at the same time has high stability without loosening, the details are as follows:

1、当需要进行安装搭接钢管脚手架时,将一组立式钢管下端的凸出螺纹柱拧入另一组立式钢管上端的插接孔内,然后通过螺栓将两组立式钢管固定连接,两组立式钢管只需要两根螺栓就能稳定固定在一起,提高了上层脚手架搭接的速度,同时提高了上层脚手架的稳定性,不会发生松动的情况;1. When it is necessary to install lap steel pipe scaffolding, screw the protruding threaded column at the lower end of one set of vertical steel pipes into the socket hole at the upper end of another set of vertical steel pipes, and then fix the two sets of vertical steel pipes through bolts. , Two sets of vertical steel pipes can be stably fixed together with only two bolts, which increases the speed of the upper scaffolding lap, and at the same time improves the stability of the upper scaffolding, and will not loosen;

2、滑筒通过两组限位块与滑槽活动卡合,滑筒通过半螺纹螺栓固定安装在立式钢管表面,通过拧松半螺纹螺栓,将立式钢管表面的滑筒调整到合适位置,将半螺纹螺栓拧入圆孔内,使滑筒能够稳定固定在立式钢管表面的合适位置,然后将横向钢管的弧型卡板通过锤子锤入圈型限位槽内,使横向钢管能够固定卡合在圈型限位槽内,能够快速完成横向钢管与立式钢管十字交叉固定连接,完成整个脚手架安装搭接的工作,提高了脚手架安装的便捷性,同时能够节省大量的人力,节省了人工成本。2. The sliding cylinder is engaged with the chute through two sets of limit blocks. The sliding cylinder is fixed and installed on the surface of the vertical steel pipe through half-threaded bolts. By loosening the half-threaded bolts, the sliding cylinder on the surface of the vertical steel pipe is adjusted to a suitable position. , screw the half-threaded bolt into the round hole, so that the sliding cylinder can be stably fixed at a suitable position on the surface of the vertical steel pipe, and then hammer the arc-shaped clamping plate of the horizontal steel pipe into the ring-shaped limiting groove through a hammer, so that the horizontal steel pipe can be It is fixedly engaged in the ring-shaped limiting groove, which can quickly complete the cross-fixed connection between the horizontal steel pipe and the vertical steel pipe, and complete the work of lapping the entire scaffold installation, which improves the convenience of scaffold installation and saves a lot of manpower and saves labor costs.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型滑筒剖视图;Fig. 2 is a sectional view of the sliding cylinder of the utility model;

图3为本实用新型滑筒俯视图。Fig. 3 is a top view of the sliding cylinder of the present invention.

图中:1立式钢管、2横向拉管、3第一限位盘、4第二限位盘、5第一螺纹孔、6插接孔、7凸出螺纹柱、8滑槽、9通孔、10滑筒、11限位块、12外轴盘、13圈型限位槽、14矩型卡槽、15凸出圆型块、16半螺纹螺栓、17凸出板、18弧型卡板、19第二螺纹孔、20圆孔。In the figure: 1 vertical steel pipe, 2 horizontal pull pipe, 3 first limit plate, 4 second limit plate, 5 first threaded hole, 6 socket hole, 7 protruding threaded column, 8 chute, 9 through Hole, 10 slider, 11 limit block, 12 outer shaft plate, 13 ring limit groove, 14 rectangular card slot, 15 protruding round block, 16 half-threaded bolt, 17 protruding plate, 18 arc card Plate, 19 second threaded holes, 20 round holes.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-3,本实用新型提供一种技术方案:一种建筑智能化组合安装架,包括安装架架体,安装架架体由立式钢管1和横向拉管2组成,立式钢管1上端表面固定焊接有第一限位盘3,立式钢管1下端表面固定焊接有第二限位盘4,第一限位盘3的尺寸与第二限位盘4的尺寸相等,第一限位盘3与第二限位盘4两侧端表面均开设有第一螺纹孔5,第一限位盘3中部上表面开设有插接孔6,插接孔6内设有内螺纹,第二限位盘4中部下表面固定焊接有凸出螺纹柱7,立式钢管1通过凸出螺纹柱7与另一组立式钢管1的插接孔6配合连接,且立式钢管1的第一限位盘3通过螺栓与另一组立式钢管1的第二限位盘4固定连接,两组立式钢管1只需要两根螺栓就能稳定固定在一起,提高了上层脚手架搭接的速度,同时提高了上层脚手架的稳定性,不会发生松动的情况。Please refer to Figures 1-3, the utility model provides a technical solution: a building intelligent combination installation frame, including the installation frame body, the installation frame body is composed of a vertical steel pipe 1 and a horizontal pull pipe 2, the vertical steel pipe 1 The upper surface of the upper end is fixedly welded with the first limiting disc 3, the lower surface of the vertical steel pipe 1 is fixedly welded with the second limiting disc 4, the size of the first limiting disc 3 is equal to the size of the second limiting disc 4, the first Both sides of the limit plate 3 and the second limit plate 4 are provided with first threaded holes 5, and the upper surface of the middle part of the first limit plate 3 is provided with an insertion hole 6, and an internal thread is provided in the insertion hole 6. The lower surface of the middle part of the second limit plate 4 is fixedly welded with a protruding threaded column 7, and the vertical steel pipe 1 is connected with the socket hole 6 of another group of vertical steel pipes 1 through the protruding threaded column 7, and the vertical steel pipe 1 The first limit plate 3 is fixedly connected with the second limit plate 4 of another set of vertical steel pipes 1 through bolts, and the two sets of vertical steel pipes 1 can be stably fixed together with only two bolts, which improves the overlap of the upper scaffolding. The speed, while improving the stability of the upper scaffolding, will not loosen the situation.

立式钢管1前侧表面竖向均匀开设有多组通孔9,且立式钢管1前侧表面在通孔9两侧端处均竖向开设有滑槽8,该立式钢管1表面活动套设有滑筒10,滑筒10内部前侧表面固定设置有两组限位块11,该滑筒10通过两组限位块11与滑槽8活动卡合,且滑筒10中部外侧表面固定设置有外轴盘12,外轴盘12与滑筒10为一体结构,外轴盘12上表面开设有圈型限位槽13,且外轴盘12外侧表面均匀开设有多组矩型卡槽14,矩型卡槽14在外轴盘12表面均匀开设有八组,能够满足不同方向的需要,矩型卡槽14均贯通于圆型限位槽13,滑筒10下端前侧表面固定连接有凸出圆型块15,凸出圆型块15前侧中部表面开设有第二螺纹孔19,第二螺纹孔19内配合连接有半螺纹螺栓16,第二螺纹孔19对应处的滑筒10下端后侧表面开设有圆孔20,半螺纹螺栓16前端为光面结构,半螺纹螺栓16末端表面设置有外螺纹,半螺纹螺栓16的光面端插设在圆孔20内,能够防止半螺纹螺栓16发生弯折时,半螺纹螺栓16拧不出来的情况,滑筒10通过半螺纹螺栓16固定安装在立式钢管1表面,通过将半螺纹螺栓16拧入圆孔20内,使滑筒10能够稳定固定在立式钢管1表面的合适位置。The front side surface of the vertical steel pipe 1 is vertically evenly opened with multiple groups of through holes 9, and the front side surface of the vertical steel pipe 1 is vertically provided with chute 8 at both ends of the through holes 9, and the surface of the vertical steel pipe 1 is movable. The sliding sleeve 10 is sleeved, and the inner front surface of the sliding sleeve 10 is fixedly provided with two sets of limiting blocks 11, the sliding sleeve 10 is movably engaged with the chute 8 through the two sets of limiting blocks 11, and the outer surface of the middle part of the sliding sleeve 10 The outer shaft disc 12 is fixedly arranged, and the outer shaft disc 12 and the sliding cylinder 10 are integrally structured. The upper surface of the outer shaft disc 12 is provided with a ring-shaped limiting groove 13, and the outer surface of the outer shaft disc 12 is evenly provided with a plurality of sets of rectangular clips. Slots 14, eight groups of rectangular card slots 14 are evenly opened on the surface of the outer shaft disk 12, which can meet the needs of different directions. There is a protruding circular block 15, and the front middle surface of the protruding circular block 15 is provided with a second threaded hole 19, and the second threaded hole 19 is fitted with a half-threaded bolt 16, and the sliding cylinder at the corresponding position of the second threaded hole 19 The rear side surface of the lower end of 10 is provided with a round hole 20, the front end of the half-threaded bolt 16 is a smooth structure, the surface of the end of the half-threaded bolt 16 is provided with external threads, and the smooth end of the half-threaded bolt 16 is inserted in the round hole 20, which can prevent When the half-thread bolt 16 is bent and the half-thread bolt 16 cannot be unscrewed, the sliding cylinder 10 is fixedly installed on the surface of the vertical steel pipe 1 by the half-thread bolt 16, and the half-thread bolt 16 is screwed into the circular hole 20 to make the The sliding cylinder 10 can be stably fixed at a suitable position on the surface of the vertical steel pipe 1 .

横向拉管2两侧端表面均固定焊接有凸出板17,凸出板17前端均固定设置有弧型卡板18,矩型卡槽14的尺寸均等于凸出板17的截面尺寸,弧型卡板18的弧度等于圈型限位槽13的弧度,横向拉管2通过弧型卡板18和凸出板17固定插设在圈型限位槽13内和矩型卡槽14内,将横向钢管2的弧型卡板18通过锤子锤入圈型限位槽13内,使横向钢管2能够固定卡合在圈型限位槽13内,能够快速完成横向钢管2与立式钢管1十字交叉固定连接。The surface of both sides of the horizontal pull pipe 2 is fixedly welded with a protruding plate 17, and the front end of the protruding plate 17 is fixedly provided with an arc-shaped clamping plate 18. The radian of the type clamping plate 18 is equal to the radian of the ring-shaped limiting groove 13, and the transverse pull pipe 2 is fixedly inserted in the ring-shaped limiting groove 13 and the rectangular-shaped clamping groove 14 through the arc-shaped clamping plate 18 and the protruding plate 17. Hammer the arc-shaped clamping plate 18 of the horizontal steel pipe 2 into the ring-shaped limiting groove 13 with a hammer, so that the horizontal steel pipe 2 can be fixed and engaged in the ring-shaped limiting groove 13, and the horizontal steel pipe 2 and the vertical steel pipe 1 can be quickly completed. Cross fixed connection.

工作原理:当需要进行安装搭接钢管脚手架时,将一组立式钢管1下端的凸出螺纹柱7拧入另一组立式钢管1上端的插接孔6内,然后通过螺栓将两组立式钢管1固定连接,完成钢管脚手架的上层搭接,将立式钢管1表面滑筒10调整到合适位置,将半螺纹螺栓16拧入圆孔20内,使滑筒10能够稳定固定在立式钢管1表面的合适位置,然后将横向钢管2的弧型卡板18通过锤子锤入圈型限位槽13内,使横向钢管2能够固定卡合在圈型限位槽13内,能够快速完成横向钢管2与立式钢管1十字交叉固定连接的工作。Working principle: When it is necessary to install lapped steel pipe scaffolding, the protruding threaded column 7 at the lower end of one set of vertical steel pipes 1 is screwed into the socket hole 6 at the upper end of another set of vertical steel pipes 1, and then the two sets of vertical steel pipes are connected by bolts. The vertical steel pipe 1 is fixedly connected, and the upper layer of the steel pipe scaffolding is completed. Adjust the sliding cylinder 10 on the surface of the vertical steel pipe 1 to a suitable position, and screw the half-threaded bolt 16 into the round hole 20, so that the sliding cylinder 10 can be stably fixed on the vertical the proper position on the surface of the steel pipe 1, and then hammer the arc-shaped clamping plate 18 of the horizontal steel pipe 2 into the ring-shaped limiting groove 13 through a hammer, so that the horizontal steel pipe 2 can be fixedly engaged in the ring-shaped limiting groove 13, and can quickly Complete the work of the cross fixed connection between the horizontal steel pipe 2 and the vertical steel pipe 1.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (5)

1. a kind of building intellectualization combines mounting bracket, including mounting bracket frame body, the mounting bracket frame body is by vertical steel pipe(1)And horizontal stroke To trombone slide(2)Composition, it is characterised in that:The vertical steel pipe(1)Upper end face is fixedly welded with the first position-arresting disk(3), it is vertical Steel pipe(1)Rear surface is fixedly welded with the second position-arresting disk(4), first position-arresting disk(3)With the second position-arresting disk(4)Two side ends Surface offers the first threaded hole(5), first position-arresting disk(3)Middle part upper surface offers spliced eye(6), spliced eye (6)It is interior to be equipped with internal thread, second position-arresting disk(4)Middle lower surface is fixedly welded with protrusion threaded post(7), the Vertical Steel Pipe(1)By protruding threaded post(7)With another group of vertical steel pipe(1)Spliced eye(6)It is connected, and vertical steel pipe(1)'s First position-arresting disk(3)Pass through bolt and another group of vertical steel pipe(1)The second position-arresting disk(4)It is fixedly connected, the vertical steel pipe (1)Front side surface is vertically uniformly provided with multigroup through hole(9), and vertical steel pipe(1)Front side surface is in through hole(9)It is equal at two side ends Vertically offer sliding slot(8), the vertical steel pipe(1)Surface activity is arranged with slide cartridge(10), slide cartridge(10)Inner front side surface is consolidated Surely two groups of limited blocks are provided with(11), the slide cartridge(10)Pass through two groups of limited blocks(11)With sliding slot(8)It is movably fastened, and slide cartridge (10)Middle part outer surface is fixedly installed outer reel(12), the outer reel(12)Upper surface offers ring limiting slot (13), and outer reel(12)Outer surface is uniformly provided with multigroup square type card slot(14), the square type card slot(14)Run through Round limiting slot(13), the slide cartridge(10)Lower end front side surface is fixedly connected with round piece of protrusion(15), protrude round piece (15)Front side middle part surface offers the second threaded hole(19), second threaded hole(19)Inside it is connected with half-thread bolt (16), second threaded hole(19)The slide cartridge of corresponding position(10)Lower end rear side surface offers circular hole(20), the slide cartridge (10)Pass through half-thread bolt(16)It is fixedly mounted on vertical steel pipe(1)Surface, the transverse direction trombone slide(2)Both sides end surfaces are solid Surely it is welded with protruding plate(17), protruding plate(17)Front end is fixedly installed camber snap-gauge(18), the transverse direction trombone slide(2)Pass through Camber snap-gauge(18)And protruding plate(17)Fixation is plugged in ring limiting slot(13)Interior and square type card slot(14)It is interior.
2. a kind of building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The outer reel(12)With Slide cartridge(10)It is structure as a whole.
3. a kind of building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The square type card slot(14) In outer reel(12)Surface is uniformly provided with eight groups, the square type card slot(14)Size be equal to protruding plate(17)Section ruler It is very little, the camber snap-gauge(18)Radian be equal to ring limiting slot(13)Radian.
4. a kind of building intellectualization combination mounting bracket according to claim 1, it is characterised in that:The half-thread bolt (16)Front end be smooth surface structure, half-thread bolt(16)End surface is provided with external screw thread, the half-thread bolt(16)Light Face end is plugged in circular hole(20)It is interior.
5. a kind of building intellectualization combination mounting bracket according to claim 1, it is characterised in that:First position-arresting disk (3)Size and the second position-arresting disk(4)It is equal sized.
CN201721222009.2U 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket Expired - Fee Related CN207420009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721222009.2U CN207420009U (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721222009.2U CN207420009U (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Publications (1)

Publication Number Publication Date
CN207420009U true CN207420009U (en) 2018-05-29

Family

ID=62313832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721222009.2U Expired - Fee Related CN207420009U (en) 2017-09-22 2017-09-22 A kind of building intellectualization combines mounting bracket

Country Status (1)

Country Link
CN (1) CN207420009U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605148A (en) * 2017-09-22 2018-01-19 中建八局第二建设有限公司 A kind of building intellectualization combines mounting bracket
CN110670869A (en) * 2019-11-07 2020-01-10 上海建工四建集团有限公司 Drawknot device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605148A (en) * 2017-09-22 2018-01-19 中建八局第二建设有限公司 A kind of building intellectualization combines mounting bracket
CN110670869A (en) * 2019-11-07 2020-01-10 上海建工四建集团有限公司 Drawknot device

Similar Documents

Publication Publication Date Title
CN208202530U (en) A kind of new type scaffold wall-connecting piece
CN207420009U (en) A kind of building intellectualization combines mounting bracket
CN107605148A (en) A kind of building intellectualization combines mounting bracket
CN209066848U (en) A kind of external hanging type hanging basket holder device
CN204754271U (en) Take protection frame of prefabricated outer wall hanging plate construction usefulness of window of wafing
CN104088453B (en) A kind of scaffold edge support structure and using method thereof
CN209837658U (en) Special fastener for outer rod of cross brace of fastener type steel pipe scaffold
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN107476564B (en) Special fastener for support frame
CN206873894U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN213979829U (en) Scaffold frame capable of being rapidly disassembled and assembled and scaffold
CN209855215U (en) Safe type combination formula scaffold frame
CN203987851U (en) A kind of track locking device
CN203742263U (en) Fencing framework connection structure
CN210947661U (en) Installation device of socket type overhanging scaffold
CN202611139U (en) Supporting device for glass awning
CN205677224U (en) A kind of scaffold being readily disassembled
CN103615106B (en) Scaffold
CN218323856U (en) A detachable scaffold connector
CN219241269U (en) An assembled attached lifting scaffolding
CN216865888U (en) A new type of construction scaffolding fastener structure
CN219196388U (en) Layered assembly type combined steel structure
CN104405121A (en) Conveniently detached scaffold
CN216840059U (en) Combined shear wall steel bundle tube structure
CN218779931U (en) Quick assembly disassembly scaffold frame is used in construction in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529