CN208618838U - A kind of safety device - Google Patents
A kind of safety device Download PDFInfo
- Publication number
- CN208618838U CN208618838U CN201821170239.3U CN201821170239U CN208618838U CN 208618838 U CN208618838 U CN 208618838U CN 201821170239 U CN201821170239 U CN 201821170239U CN 208618838 U CN208618838 U CN 208618838U
- Authority
- CN
- China
- Prior art keywords
- safety device
- steel pipe
- steel
- protective upright
- steel beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of safety devices, including two groups of protective upright rods (5), lifeline (7) between protective upright rod described in being connected to two groups (5), with the protective upright rod (5) lower end] structural steel beam (6) that connect of font fixture (3), the occasional passage (8) being laid between structural steel beam described in twice (6), the protective upright rod (5) includes steel pipe (1) along the vertical direction, it is welded and fixed with the steel pipe (1) lower end] font fixture (3), described in the top flange insertion of the structural steel beam (6)] structural steel beam (6) top flange is held out against in the groove of font fixture (3) and by bolt (4).In terms of the safety device efficiently solves the problems, such as Construction of Steel Structure personal height operation safety.
Description
Technical field
The utility model relates to technical field of building construction, more particularly to a kind of safety device.
Background technique
Currently, improving with the continuous development of society, super high-rise building emerges one after another, and super high-rise building is mostly concrete
Core Walls Structure-outline border steel construction structure type when outline border Construction of Steel Structure, is support personnel's safety, prevents personnel's eminence from falling
It falls, occasional passage must be laid with, but the safeguard procedures of occasional passage are always construction industry " old, big, difficult " problem, set up temporary steel
Pipe protection is time-consuming and laborious, and is removed using time too short i.e. palpus, causes the waste on project cost.
In conclusion the problem of in terms of how efficiently solving Construction of Steel Structure personal height operation safety, be current sheet
Field technical staff's urgent problem.
Utility model content
The purpose of the utility model is to provide a kind of safety device, which efficiently solves steel knot
The problem of in terms of structure construction personnel high-altitude working safety.
In order to solve the above technical problems, the utility model provides the following technical solutions:
A kind of safety device, including two groups of protective upright rods, be connected to two groups described in lifeline between protective upright rod,
With the protective upright rod lower end] structural steel beam that font fixture is connect, the occasional passage being laid between structural steel beam described in twice,
The protective upright rod includes steel pipe along the vertical direction, is welded and fixed with the steel pipe lower end] font fixture, the structural steel
Described in the top flange insertion of beam] the structural steel beam top flange is held out against in the groove of font fixture and by bolt.
Preferably, the top and middle part of the steel pipe are provided with drawing ear, and the lifeline is connected by the drawing ear.
Preferably, the drawing ear is welded in the steel pipe at bottom 300mm, 1200mm, and the steel plate for drawing ear is thick
Degree is 2-3mm.
Preferably, the occasional passage is the wooden springboard, profiled sheet or steel bar truss floor support plate.
Preferably, the lifeline is wirerope.
Preferably, described] font fixture is using 10mm thick steel plate welding fabrication, having a size of 200mm × 80mm × 10mm.
Preferably, the steel pipe is 30mm × 30mm square steel tube, and intermediate square hole is 25mm × 25mm.
Safety device provided by the utility model, including two groups of protective upright rods, lifeline are connected to two groups of protection
Between upright bar.Protective upright rod include steel pipe ,] font fixture, steel pipe along the vertical direction ,] font fixture and the welding of steel pipe lower end it is solid
It is fixed, fast assembling-disassembling is formed from steady security protection upright bar.Structural steel beam and protective upright rod lower end] font fixture connect, and it is interim logical
Road is laid between twice structural steel beam.The top flange of structural steel beam is inserted into] in the groove of font fixture, and pass through bolt top tight structure
It is constant from steady system to form geometry for girder steel top flange.
Safety device provided by the utility model is connected using from steady protective upright rod with structural steel beam, twice
The wooden springboard is completely spread between structural steel beam, and is drawn between twice draw ear from steady protective upright rod and set lifeline, composition super high steel structure peace
Full protection system guarantees construction personnel's high-altitude working safety.Structural steel beam with] font fixture be detachably connected, set up time saving
Laborsaving, it is convenient to remove.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of safety device provided by specific embodiment in the utility model;
Fig. 2 is the structural schematic diagram of protective upright rod in Fig. 1;
Fig. 3 is the working condition connection schematic diagram of safety device.
It is marked in attached drawing as follows:
1- steel pipe, 2- draw ear, 3-] font fixture, 4- bolt, 5- protective upright rod, 6- structural steel beam, 7- lifeline, 8- face
Shi Tongdao.
Specific embodiment
The core of the utility model is to provide a kind of safety device, which efficiently solves steel knot
The problem of in terms of structure construction personnel high-altitude working safety.
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 3 is please referred to, Fig. 1 is safety device provided by specific embodiment a kind of in the utility model
Structural schematic diagram;Fig. 2 is the structural schematic diagram of protective upright rod in Fig. 1;Fig. 3 is that the working condition connection of safety device is shown
It is intended to.
In a specific embodiment, safety device provided by the utility model, including two groups of protective upright rods
5, lifeline 7 is connected between two groups of protective upright rods 5.Protective upright rod 5 include steel pipe 1 ,] font fixture 3, steel pipe 1 is along vertical side
To ,] font fixture 3 is welded and fixed with 1 lower end of steel pipe, composition fast assembling-disassembling is from steady security protection upright bar 5.Structural steel beam 6 and anti-
Protecting upright bar 5 lower end] font fixture 3 connects, and occasional passage 8 is laid between twice structural steel beam 6.It inserts the top flange of structural steel beam 6
Enter] in the groove of font fixture 3, and by 4 top tight structure girder steel of bolt, 6 top flange, it is constant from steady system to form geometry.
Safety device provided by the utility model is connected using from steady protective upright rod 5 with structural steel beam 6, and two
The wooden springboard is completely spread between road structural steel beam 6, and draws between twice draw ear 2 from steady protective upright rod 5 and sets lifeline 7, forms Super High steel
Structure security protection system guarantees construction personnel's high-altitude working safety.Structural steel beam 6 with] font fixture 3 be detachably connected,
It is time saving and energy saving to set up, and it is convenient to remove.
Above-mentioned safety device is only a kind of preferred embodiment, is specifically not limited thereto, on this basis can be according to reality
Border, which needs to make to have, targetedly to be adjusted, to obtain different embodiments, the top and middle part of steel pipe 1 are provided with drawing ear
2, lifeline 7 draws ear 2 that lifeline 7 is facilitated to connect by drawing ear 2 to connect.
On the basis of above-mentioned specific embodiment, those skilled in the art can be according to the difference of specific occasion, to peace
Full protection device carries out several changes, and ear 2 is drawn to be welded in steel pipe 1 apart from bottom 300mm, 1200mm at, and height properly, can be compared with
Protect construction personnel well.The steel plate thickness for drawing ear 2 is 2-3mm, and intensity is higher, is unlikely to deform, is broken, is crushed, safer.
Obviously, under the guidance of this thought, those skilled in the art can be according to the difference of specific occasion to above-mentioned
Specific embodiment carries out several changes, and occasional passage 8 can be the wooden springboard, and cost is relatively low;It is also possible to profiled sheet, intensity
Higher, safety is preferable;It can also be other suitable structures, such as steel bar truss floor support plate, be unlikely to deform, specific structure shape
Formula is unrestricted, can be all within the protection scope of the present utility model depending on practical situations.
It is important to note that safety device provided by the utility model is not intended to be limited to such situation,
Lifeline 7 is wirerope, more solid, not easy to break, securely and reliably.
Safety device provided by the utility model, in the immovable situation of other components ,] font fixture 3 adopts
With 10mm thick steel plate welding fabrication, wider, convenient formation of drawing materials, easy to process, cost is relatively low.Size can for 200mm ×
80mm × 10mm facilitates connection structure girder steel 6.
For the safety device in above-mentioned each embodiment, steel pipe 1 is 30mm × 30mm square steel tube, and intermediate square hole is
25mm × 25mm, intensity is higher, and stability is preferable.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Claims (7)
1. a kind of safety device, which is characterized in that including two groups of protective upright rods (5), be connected to two groups described in protective upright rod
(5) lifeline (7) between, with the protective upright rod (5) lower end] font fixture (3) connect structural steel beam (6), be laid on
Occasional passage (8) between structural steel beam described in twice (6), the protective upright rod (5) include steel pipe (1) along the vertical direction, with
Steel pipe (1) lower end is welded and fixed] font fixture (3), the structural steel beam (6) top flange insertion described in] font card
Have in the groove of (3) and holds out against the structural steel beam (6) top flange by bolt (4).
2. safety device according to claim 1, which is characterized in that the top of the steel pipe (1) and middle part setting
Have drawing ear (2), the lifeline (7) is connected by the drawing ear (2).
3. safety device according to claim 2, which is characterized in that the drawing ear (2) is welded in the steel pipe (1)
At bottom 300mm, 1200mm, the steel plate thickness for drawing ear (2) is 2-3mm.
4. safety device according to claim 1, which is characterized in that the occasional passage (8) is wooden springboard, die mould
Steel plate or steel bar truss floor support plate.
5. safety device according to claim 1, which is characterized in that the lifeline (7) is wirerope.
6. safety device according to claim 1, which is characterized in that described] font fixture (3) use 10mm thickness steel
Plate welding fabrication, having a size of 200mm × 80mm × 10mm.
7. safety device according to claim 6, which is characterized in that the steel pipe (1) is 30mm × 30mm square steel
Pipe, intermediate square hole are 25mm × 25mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821170239.3U CN208618838U (en) | 2018-07-23 | 2018-07-23 | A kind of safety device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821170239.3U CN208618838U (en) | 2018-07-23 | 2018-07-23 | A kind of safety device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208618838U true CN208618838U (en) | 2019-03-19 |
Family
ID=65706887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821170239.3U Expired - Fee Related CN208618838U (en) | 2018-07-23 | 2018-07-23 | A kind of safety device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208618838U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719938A (en) * | 2020-06-12 | 2020-09-29 | 五冶集团上海有限公司 | Method for manufacturing and installing temporary safety guardrail for steel beam installation |
CN113389429A (en) * | 2021-05-12 | 2021-09-14 | 广船国际有限公司 | Interim protector and interim rail guard, interim flood prevention device |
-
2018
- 2018-07-23 CN CN201821170239.3U patent/CN208618838U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719938A (en) * | 2020-06-12 | 2020-09-29 | 五冶集团上海有限公司 | Method for manufacturing and installing temporary safety guardrail for steel beam installation |
CN113389429A (en) * | 2021-05-12 | 2021-09-14 | 广船国际有限公司 | Interim protector and interim rail guard, interim flood prevention device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202139833U (en) | Cantilever scaffold for building construction | |
CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
CN208618838U (en) | A kind of safety device | |
CN105952133A (en) | Suspended large-span reinforced concrete structure construction steel platform and construction method | |
CN211470603U (en) | Telescopic tower crane passageway | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN203097253U (en) | Elevator shaft triangular support type formwork platform | |
CN211689948U (en) | Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge | |
CN206329024U (en) | Hanging large-span steel-reinforced concrete structure construction steel platform | |
CN212406019U (en) | Adjustable regularization safety operation platform construction equipment | |
CN205713050U (en) | A kind of scaffold protection network of municipal works | |
CN212295581U (en) | Instrument formula elevartor shaft operation platform | |
CN203222981U (en) | Suspended platform for steel reinforced concrete cantilever structure construction | |
CN211228141U (en) | A New Type of T-beam Diaphragm Construction Platform Cross Bracing | |
CN210947661U (en) | Installation device of socket type overhanging scaffold | |
CN102677680A (en) | Dismantling method for concrete waist beam | |
CN211736289U (en) | Operation platform | |
CN103669889A (en) | High-altitude safety fence for steel structure assembling and manufacturing method of high-altitude safety fence | |
CN208815876U (en) | A kind of fixed device of detachable suspended scaffold upright rod load | |
CN203213631U (en) | Protective handrail close to edge | |
CN208105834U (en) | The moving platform device of eminence welded steel beam cantilever | |
CN206503377U (en) | A kind of movable railing of steel trestle | |
CN103114712B (en) | Buckle steel platform support system and construction method thereof | |
CN202658868U (en) | Operating platform for super-high elevator shaft | |
CN114960462B (en) | Self-propelled overhead steel beam suspension construction protection shed frame for railway line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190319 |
|
CF01 | Termination of patent right due to non-payment of annual fee |