CN106522652B - A kind of construction revetment device - Google Patents

A kind of construction revetment device Download PDF

Info

Publication number
CN106522652B
CN106522652B CN201610965229.8A CN201610965229A CN106522652B CN 106522652 B CN106522652 B CN 106522652B CN 201610965229 A CN201610965229 A CN 201610965229A CN 106522652 B CN106522652 B CN 106522652B
Authority
CN
China
Prior art keywords
wall body
body plate
ash wall
support rail
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610965229.8A
Other languages
Chinese (zh)
Other versions
CN106522652A (en
Inventor
叶丽琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qidong ouchang New Material Co., Ltd
Original Assignee
叶丽琴
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶丽琴 filed Critical 叶丽琴
Priority to CN201610965229.8A priority Critical patent/CN106522652B/en
Publication of CN106522652A publication Critical patent/CN106522652A/en
Application granted granted Critical
Publication of CN106522652B publication Critical patent/CN106522652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of construction revetment devices, including left pillar(10)With right pillar(11), the left pillar(10)With the right pillar(11)Between be connected with support rail(7), the support rail(7)Left part pass through the left pillar(10)And extend the left pillar(10)Left side, the support rail(7)Right part pass through the right pillar(11)And extend the right pillar(11)Right side, the support rail(7)Left part and the support rail(7)Right part pass through locking nut respectively(9)With the left pillar(10)With the right pillar(11)It is fixedly connected, the support rail(7)Left part and the support rail(7)Right part on be both provided with the cooperation locking nut(9)External screw thread(8), in the support rail(7)On be arranged in order and be provided with two pieces or more of ash wall body plate(1).

Description

A kind of construction revetment device
Technical field
The present invention relates to a kind of construction revetment devices.
Background technology
Currently, the periphery in construction building site, is required for setting up enclosure wall, building site is completely cut off by enclosure wall, avoids inoperative Personnel enter the inside of construction site, and non-working person is also avoided to enter the generation that the inside of construction site causes the accident, Also avoid construction material in construction site from being stolen simultaneously, enclosure wall in the prior art is mostly masonry structure, therefore building and Larger manpower and materials are needed when dismounting, will result in larger quantities in this way, and the enclosure wall of masonry structure is after dismounting It can not reuse, waste larger in resource can be caused, input cost is larger.
Invention content
The technical problem to be solved in the present invention is to provide a kind of construction revetment devices.
To solve the above problems, the present invention adopts the following technical scheme that:
A kind of construction revetment device of the present invention, including left pillar and right pillar, the left pillar and the right side Support rail is connected between pillar, the left part of the support rail passes through the left pillar and extends the left pillar The right part in left side, the support rail passes through the right pillar and extends the right side of the right pillar, the support rail Left part and the right part of the support rail pass through locking nut and the left pillar respectively and the right pillar is fixed and connected It connects, the outer spiral shell for coordinating the locking nut is both provided on the right part of the left part of the support rail and the support rail Line is arranged in order on the support rail and is provided with two pieces or more of ash wall body plate, is provided on the left side of the ash wall body plate Insertion groove is provided with to coordinate the insertion of the insertion groove to protrude on the right side of the ash wall body plate, before the ash wall body plate It is provided with hanging block at the upper position of end face, support strip, the bearing are provided at the front end face upper position of the ash wall body plate Item is connected with two balancing poles by articulated shaft, that one end of two balancing poles far from the articulated shaft is provided with taper Head, the bottom of the ash wall body plate are provided with the insertion section in triangular shape, offer in the hanging block and match with the support rail The inside of the cooperation straight slot of conjunction, the cooperation straight slot is that arc-shaped coordinates to convenient with the support rail, the hanging block It is latter half of in be provided with counterbore, be provided with intercommunicating pore in the first half of the hanging block, be inserted into the counterbore and be combined with lock Rationed marketing, the counterbore is identical as the angle of inclination of the intercommunicating pore, and the counterbore is identical as the diameter of the intercommunicating pore, the lock Rationed marketing is extended to across the intercommunicating pore in the counterbore, and the locking pin is preventing the ash wall body plate to be detached from after being installed With the fixation of the support rail, it is both provided with positioning protrusion on the pedestal of the left pillar and on the pedestal of right pillar, two The positioning protrusion is oppositely arranged and the top of two positioning protrusions is both provided with U-type groove, and two U-type grooves are opposite to be set It sets, locating rod is connected in two U-type grooves, is flushed at the top of the trench bottom of the U-type groove and the support strip, The locating rod is located on the support strip and is contradicted with the support strip and the ash wall body plate, the locating rod and the branch Support cross bar is opposite to be arranged in parallel.
Further, the angle of inclination of the counterbore and the intercommunicating pore is 45 degree.
Further, the bottom end of the insertion section is less than the length of the balancing pole to the distance of the support strip.
Further, it is provided with the cross bar hole passed through for the support rail on the left pillar and the right pillar.
Further, the hanging block is fixedly connected by welding with the ash wall body plate, the support strip and the wall Plate is fixedly connected by welding.
Further, the insertion groove is identical as the size for being inserted into protrusion, in two pieces of ash wall body plate cooperations, In one piece of ash wall body plate insertion protrusion and the insertion groove of other one piece of ash wall body plate coordinate to realize two pieces The tight fit of the ash wall body plate.
Further, the upper and lower ends for being inserted into protrusion are provided with chamfering, and the setting of the chamfering is to described in convenience It is inserted into protrusion and is rapidly inserted into cooperation in the insertion groove.
Further, the height of the ash wall body plate is not less than 120cm, and the width of every piece of ash wall body plate is 60cm-80cm.
Further, the ash wall body plate is solid construction, and the ash wall body plate is made of PVC plastic.
Construction of the present invention is with the advantageous effect of revetment device:By the ash wall body plate of two pieces of support rail pair or more into Row support, the insertion section of ash wall body plate is inserted into underground, and is balanced support to ash wall body plate using two balancing poles, increases wall The stationarity of body plate after mounting by insertion groove and is inserted into the cooperation of protrusion so that being connected between two pieces or more of ash wall body plate More securely, locating rod pair is passed through to prevent ash wall body plate to be detached from the support of support rail by the cooperation of locking pin and counterbore Ash wall body plate carries out perpendicular positioning, prevents ash wall body plate inclination from putting, also increases wind resistance, the anti-pressure ability of ash wall body plate, when in use, The pedestal of left pillar and right pillar, which is cast, to be fixed on the ground, and one end of hanging block is equipped in ash wall body plate towards construction site It is interior, other end towards construction site outside, to prevent ash wall body plate stolen, the present apparatus can be rapidly completed and build, and the later stage tears open Except being convenient to, will not be damaged to any part in demolishing process causes to use, and has saved input cost, Its is simple in construction, easy to disassemble and assemble, convenient transport, of low cost, is suitble to promote the use of.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the overall co-ordination structural schematic diagram of construction revetment device of the present invention;
Fig. 2 is the front view of ash wall body plate in Fig. 1;
Fig. 3 is the left view of ash wall body plate in Fig. 1;
Fig. 4 is the sectional view of hanging block in Fig. 2, wherein locking pin is not inserted into intercommunicating pore and counterbore.
Fig. 5 is the left view that protrusion is positioned in Fig. 1.
Fig. 6 is the vertical view of Fig. 5.
Specific implementation mode
The preferred embodiment of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Refering to fig. 1 shown in -6, a kind of construction revetment device of the invention, including left pillar 10 and right pillar 11, Support rail 7 is connected between the left pillar 10 and the right pillar 11, the left part of the support rail 7 passes through the left side The right part in pillar 10 and the left side for extending the left pillar 10, the support rail 7 passes through the right pillar 11 and extends Go out the right side of the right pillar 11, the right part of the left part of the support rail 7 and the support rail 7 passes through locking respectively Nut 9 is fixedly connected with the left pillar 10 and the right pillar 11, the left part of the support rail 7 and the support rail It is both provided with the external screw thread 8 for coordinating the locking nut 9 on 7 right part, is arranged in order and is provided on the support rail 7 Two pieces or more of ash wall body plate 1 is provided with insertion groove 12 on the left side of the ash wall body plate 1, is set on the right side of the ash wall body plate 1 It is equipped with that the insertion of the insertion groove 12 is coordinated to protrude 13, suspension is provided at the front end face upper position of the ash wall body plate 1 Block 2 is provided with support strip 4 at the front end face upper position of the ash wall body plate 1, and the support strip 4 is connected with two by articulated shaft 5 Root balancing pole 6, that one end of two balancing poles 6 far from the articulated shaft 5 are provided with conical head 61, the ash wall body plate 1 Bottom is provided with the insertion section 3 in triangular shape, and the cooperation straight slot coordinated with the support rail 7 is offered in the hanging block 2 22, the inside of the cooperation straight slot 22 is that arc-shaped coordinates to convenient with the support rail 7, the hanging block 2 it is later half It is provided with counterbore 23 in portion, intercommunicating pore 24 is provided in the first half of the hanging block 2, is inserted into the counterbore 23 and is combined with lock Rationed marketing 25, the counterbore 23 is identical as the angle of inclination of the intercommunicating pore 24, the diameter of the counterbore 23 and the intercommunicating pore 24 Identical, the locking pin 25 is extended to across the intercommunicating pore 24 in the counterbore 23, and the locking pin 25 is described to prevent Ash wall body plate 1 is detached from after being installed and the fixation of the support rail 7, on the pedestal of the left pillar 10 and bottom of right pillar 11 Positioning protrusion 101 is both provided on seat, two positioning protrusions 101 are oppositely arranged and the top of two positioning protrusions 101 Portion is both provided with U-type groove 110, and two U-type grooves 110 are oppositely arranged, and it is fixed to be connected in two U-type grooves 110 Position bar 100, the trench bottom of the U-type groove 110 are flushed with the top of the support strip 4, and the locating rod 100 is located at the bearing It is contradicted on item 4 and with the support strip 4 and the ash wall body plate 1, the locating rod 100 is relatively parallel with the support rail 7 Setting.
Wherein, the counterbore 23 and the angle of inclination of the intercommunicating pore 24 are 45 degree.
Wherein, the bottom end of the insertion section 3 is less than the length of the balancing pole 6 to the distance of the support strip 4.
Wherein, it is provided with the cross bar hole passed through for the support rail 7 on the left pillar 10 and the right pillar 11.
Wherein, the hanging block 2 is fixedly connected by welding with the ash wall body plate 1, the support strip 4 and the ash wall body plate 1 is fixedly connected by welding.
Wherein, the insertion groove 12 is identical as the size for being inserted into protrusion 13, when two pieces of ash wall body plates 1 coordinate, Insertion protrusion 13 and the insertion groove 12 of other one piece of ash wall body plate 1 of one of ash wall body plate 1 coordinate with Realize the tight fit of two pieces of ash wall body plates 1.
Wherein, the upper and lower ends for being inserted into protrusion 13 are provided with chamfering 130, and the setting of the chamfering 130 is to convenient The insertion protrusion 13 is rapidly inserted into cooperation in the insertion groove 12.
Wherein, the height of the ash wall body plate 1 is not less than 120cm, and the width of every piece of ash wall body plate 1 is 60cm-80cm.
Wherein, the ash wall body plate 1 is solid construction, and the ash wall body plate 1 is made of PVC plastic.
Construction of the present invention is with the advantageous effect of revetment device:By the ash wall body plate of two pieces of support rail pair or more into Row support, the insertion section of ash wall body plate is inserted into underground, and is balanced support to ash wall body plate using two balancing poles, increases wall The stationarity of body plate after mounting by insertion groove and is inserted into the cooperation of protrusion so that being connected between two pieces or more of ash wall body plate More securely, locating rod pair is passed through to prevent ash wall body plate to be detached from the support of support rail by the cooperation of locking pin and counterbore Ash wall body plate carries out perpendicular positioning, prevents ash wall body plate inclination from putting, also increases wind resistance, the anti-pressure ability of ash wall body plate, when in use, The pedestal of left pillar and right pillar, which is cast, to be fixed on the ground, and one end of hanging block is equipped in ash wall body plate towards construction site It is interior, other end towards construction site outside, to prevent ash wall body plate stolen, the present apparatus can be rapidly completed and build, and the later stage tears open Except being convenient to, will not be damaged to any part in demolishing process causes to use, and has saved input cost, Its is simple in construction, easy to disassemble and assemble, convenient transport, of low cost, is suitble to promote the use of.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (9)

1. a kind of construction revetment device, it is characterised in that:Including left pillar (10) and right pillar (11), the left pillar (10) support rail (7) is connected between the right pillar (11), the left part of the support rail (7) passes through the left branch The right part in column (10) and the left side for extending the left pillar (10), the support rail (7) passes through the right pillar (11) And extend the right side of the right pillar (11), the right part of the left part and the support rail (7) of the support rail (7) It is fixedly connected respectively with the left pillar (10) and the right pillar (11) by locking nut (9), the support rail (7) The external screw thread (8) for coordinating the locking nut (9) is both provided on left part and the right part of the support rail (7), in institute It states and is arranged in order the ash wall body plate (1) for being provided with two pieces or more on support rail (7), be arranged on the left side of the ash wall body plate (1) There is insertion groove (12), is provided with to coordinate the insertion of the insertion groove (12) to protrude on the right side of the ash wall body plate (1) (13), hanging block (2) is provided at the front end face upper position of the ash wall body plate (1), the front end face of the ash wall body plate (1) is on the lower Support strip (4) is provided at position, the support strip (4) is connected with two balancing poles (6) by articulated shaft (5), described in two That one end of balancing pole (6) far from the articulated shaft (5) is provided with conical head (61), and the bottom of the ash wall body plate (1) is provided with In the insertion section (3) of triangular shape, the cooperation straight slot (22) coordinated with the support rail (7) is offered in the hanging block (2), The inside of the cooperation straight slot (22) is that arc-shaped coordinates to convenient with the support rail (7), after the hanging block (2) It is provided with counterbore (23) in half portion, intercommunicating pore (24), counterbore (23) interpolation are provided in the first half of the hanging block (2) Enter to be combined with locking pin (25), the counterbore (23) is identical as the angle of inclination of the intercommunicating pore (24), the counterbore (23) with The diameter of the intercommunicating pore (24) is identical, and the locking pin (25) extends to the counterbore (23) across the intercommunicating pore (24) It is interior, the locking pin (25) to prevent the ash wall body plate (1) be detached from after being installed with the fixation of the support rail (7), Positioning protrusion (101), two positioning are both provided on the pedestal of the left pillar (10) and on the pedestal of right pillar (11) Protrusion (101) is oppositely arranged and is both provided with U-type groove (110) at the top of two positioning protrusions (101), and two described U-shaped Slot (110) is oppositely arranged, and locating rod (100) is connected in two U-type grooves (110), the U-type groove (110) Flushed at the top of trench bottom and the support strip (4), the locating rod (100) be located on the support strip (4) and with it is described Support strip (4) and the ash wall body plate (1) contradict, and the locating rod (100) is opposite with the support rail (7) to be arranged in parallel.
2. construction according to claim 1 revetment device, it is characterised in that:The counterbore (23) is connected to described The angle of inclination in hole (24) is 45 degree.
3. construction according to claim 1 revetment device, it is characterised in that:The bottom end of the insertion section (3) is arrived The distance of the support strip (4) is less than the length of the balancing pole (6).
4. construction according to claim 1 revetment device, it is characterised in that:The left pillar (10) and the right side The cross bar hole passed through for the support rail (7) is provided on pillar (11).
5. construction according to claim 1 revetment device, it is characterised in that:The hanging block (2) and the wall Body plate (1) is fixedly connected by welding, and the support strip (4) is fixedly connected by welding with the ash wall body plate (1).
6. construction according to claim 1 revetment device, it is characterised in that:The insertion groove (12) is inserted with described The size for entering protrusion (13) is identical, and in two pieces of ash wall body plate (1) cooperations, the described of one of ash wall body plate (1) inserts Enter protrusion (13) and the insertion groove (12) of the other one piece ash wall body plate (1) coordinates to realize two pieces of ash wall body plates (1) Tight fit.
7. construction according to claim 6 revetment device, it is characterised in that:Above and below the insertion protrusion (13) It is provided at both ends with chamfering (130), the setting of the chamfering (130) is described to facilitate the insertion protrusion (13) to be rapidly inserted into Cooperation in insertion groove (12).
8. construction according to claim 1 revetment device, it is characterised in that:The height of the ash wall body plate (1) is not Less than 120cm, the width of every piece of ash wall body plate (1) is 60cm-80cm.
9. construction according to claim 8 revetment device, it is characterised in that:The ash wall body plate (1) is solid knot Structure, the ash wall body plate (1) are made of PVC plastic.
CN201610965229.8A 2016-11-04 2016-11-04 A kind of construction revetment device Active CN106522652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610965229.8A CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610965229.8A CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Publications (2)

Publication Number Publication Date
CN106522652A CN106522652A (en) 2017-03-22
CN106522652B true CN106522652B (en) 2018-08-14

Family

ID=58327081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610965229.8A Active CN106522652B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Country Status (1)

Country Link
CN (1) CN106522652B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly
CN205000733U (en) * 2015-09-15 2016-01-27 国家电网公司 Firm pre -buried formula electric power security fence pole of type

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly
CN205000733U (en) * 2015-09-15 2016-01-27 国家电网公司 Firm pre -buried formula electric power security fence pole of type

Also Published As

Publication number Publication date
CN106522652A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN206844659U (en) Basement barricade single side formwork system
CN205476394U (en) A pull -up formula I -steel cantilever beam structure for coiling detain scaffold
CN205116715U (en) Cast -in -situ box girder template bracing device
CN105126272A (en) Safety belt suspension device
CN203374008U (en) Elevator shaft titling plane protective structure
CN106522652B (en) A kind of construction revetment device
CN106382055B (en) A kind of construction revetment component
CN106401281B (en) A kind of construction revetment device
CN204357097U (en) A kind of building scaffold improving working security reinforces base
CN207420074U (en) A kind of detachable edge protection device of the outer cantilevered plate of Super High circular steel column
CN208430425U (en) A kind of high-speed railway pier top protective device of installation easy to disassemble
CN204079316U (en) A kind of harmless circular steel tube concrete post tower crane attachment anchor ear device
CN205713050U (en) A kind of scaffold protection network of municipal works
CN204960291U (en) Bracing piece of scaffold and fixed connection structure and scaffold between connecting rod
CN210766395U (en) Bridge edge guardrail template structure
CN208734198U (en) A kind of security power construction separation net
CN204060525U (en) Rig upper mast structure and rotary drilling rig
CN207686266U (en) A kind of means for fastening scaffolding of fast demountable
CN206941481U (en) A kind of protector of municipal administration
CN217501139U (en) Hole cover plate for miniature pile foundation
CN206722406U (en) A kind of sizing truss structure for basement barricade single side formwork
CN210977520U (en) Colliery is strutted with preventing structure that sinks
CN204139639U (en) Soft isolating and protecting component for building
CN206800990U (en) One kind casting pulley-clip scaffold
CN211777502U (en) Protector is used in tunnel construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201105

Address after: 362000, Quanzhou, Fujian province Quangang district after the town of Tu Tu village, East House No. 69

Patentee after: Liu Weiwei

Address before: Penglai Anxi County town of Quanzhou City, Fujian province 362402 Peng Ge Cun Tulou No. 50

Patentee before: Ye Liqin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201112

Address after: 201 Xinsheng street, Wangbao Town, Qidong City, Nantong City, Jiangsu Province 226200

Patentee after: Qidong ouchang New Material Co., Ltd

Address before: 362000, Quanzhou, Fujian province Quangang district after the town of Tu Tu village, East House No. 69

Patentee before: Liu Weiwei