CN203374008U - Elevator shaft titling plane protective structure - Google Patents

Elevator shaft titling plane protective structure Download PDF

Info

Publication number
CN203374008U
CN203374008U CN201320430836.6U CN201320430836U CN203374008U CN 203374008 U CN203374008 U CN 203374008U CN 201320430836 U CN201320430836 U CN 201320430836U CN 203374008 U CN203374008 U CN 203374008U
Authority
CN
China
Prior art keywords
elevator shaft
horizon bar
doorway
braces
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320430836.6U
Other languages
Chinese (zh)
Inventor
唐国顺
周海军
张镛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201320430836.6U priority Critical patent/CN203374008U/en
Application granted granted Critical
Publication of CN203374008U publication Critical patent/CN203374008U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses an elevator shaft titling plane protective structure which comprises a hard protective part and/or a soft protective part. The hard protective part and/or the soft protective part are/is arranged obliquely in an erecting mode and form/forms a certain dip angle with the horizontal direction. The elevator shaft titling plane protective structure is convenient to erect and dismount, low in weight, free of embedded iron pieces or preserved holes, capable of cleaning garbage in protection conveniently, and safe and reliable in operation.

Description

Elevator hoistways clinoplain safeguard structure
Technical field
The utility model relates to a kind of elevator hoistways safeguard structure, particularly relates to a kind of elevator hoistways clinoplain safeguard structure.
Background technology
RC high-rise building exists in a large number both at home and abroad at present, and the elevator shaft in construction belongs to important one " mouth " of " four-hole five faces limit " of security protection.How to guarantee in elevator shaft that the safety of higher drop is the problem that each job site must solve up and down.The hoistway protection (hard protection and soft protection) that job site adopts at present, its way basically is level and sets up.Its stress point is generally embedded iron parts or reserved opening, also has minority to shore the larger ways of some danger such as fixed level bar with steel pipe frame.
The utility model content
Technical problem to be solved in the utility model be to provide a kind of take tear open conveniently, lightweight, be convenient to cleaning, the reliable elevator hoistways clinoplain of handling safety safeguard structure without the rubbish in embedded iron parts or reserved opening, protection.
In order to solve the problems of the technologies described above, the elevator hoistways clinoplain safeguard structure that the utility model provides, comprise hard protection and/or soft protection, it is characterized in that: described hard protection and/or soft protection and horizontal direction form certain inclination angle and tilt to set up and form.
Described hard protection is that the support body stressed member is 3 braces and 1 horizon bar, 3 described braces are from the horizontal by the angle of 18 °~20 °, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, on doorway, place is connected with right-angle coupler with described brace with the described horizon bar of a horizontal positioned, the two ends of described horizon bar exceed at least 200mm of the every limit of door opening, fix a webbed steel pipe frame of steel pipe shape with the about interval 500mm~600mm of right-angle coupler horizontal direction on 3 described braces, use the wooden a tree, used in making timber for boats of iron wire colligation 50 * 100mm every 200mm on the steel pipe frame fixed, on described wooden a tree, used in making timber for boats, nailing template forms hard protection.
Described soft protection is that 2 braces and 1 horizon bar bar are as main stress system, 2 described braces 1 form the angle of 18 °~20 ° with horizontal direction, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, on doorway, place is connected with right-angle coupler with described brace with the described horizon bar of a horizontal positioned, the two ends of described horizon bar exceed at least 200mm of the every limit of door opening, be stuck in the place, doorway, form stable triangle stress system between the floor at described brace 1 and described horizon bar 2 and elevator shaft sidewall and place, doorway, use fixedly steel pipe formation well cabinet frame of right-angle coupler level on described brace, at described well cabinet frame, horizontal blanket net is installed.
Adopt the elevator hoistways clinoplain safeguard structure of technique scheme, basic primary structure member is set up and is formed with common steel tube fastener support body, and different from common way is exactly, and this planar protective is not that level is set up, but forms certain inclination angle with horizontal direction.The main stressed material of this protection adopts 48.3 * 3.6 steel pipe, fastener adopts common right-angle coupler, and material meets existing " building operations fastener type steel pipe scaffold technical specification of security JGJ130-2011 ", the standard requirement such as " steel tube scaffold clasp GB15831-2006 ".
Adopt protective frame in the elevator shaft that the utility model makes to take to tear open conveniently, lightweight, be convenient to cleaning without the rubbish in embedded iron parts or reserved opening, protection, handling safety is reliable.
The accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is hard protection basic structure schematic diagram.
Fig. 3 is that hard protection basic structure adds wooden a tree, used in making timber for boats schematic diagram.
Fig. 4 is soft protection basic structure schematic diagram.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Referring to Fig. 1, elevator hoistways clinoplain safeguard structure, comprise hard protection and/or soft protection, and described hard protection and/or soft protection and horizontal direction form certain inclination angle and tilt to set up and form.
Referring to Fig. 1, Fig. 2 and Fig. 3, the support body stressed member of hard protection is 3 braces 1 and 1 horizon bar 2, wherein 3 braces 1 are from the horizontal by the angle of 18 °~20 °, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, for guaranteeing the not slippage downwards of this brace 1, therefore place is connected with brace 1 use right-angle coupler with the horizon bar 2 of a horizontal positioned on doorway, these horizon bar 2 two ends exceed the every limit 200mm of door opening, be stuck in the place, doorway, thereby this brace 1, form stable triangle stress system between the floor at horizon bar 2 and elevator shaft sidewall and place, doorway.And then fix a webbed steel pipe frame of steel pipe shape with the about interval 500~600mm of right-angle coupler horizontal direction on three braces 1, and horizontal bars is than the short 100mm of elevator shaft clear span, and in elevator shaft, the interval dislocation is arranged.On the steel pipe frame fixed every 200mm the wooden a tree, used in making timber for boats 4 with iron wire colligation 50 * 100mm, finally again on wooden a tree, used in making timber for boats 4 nailing template 5 form hard protections.
Referring to Fig. 1 and Fig. 4, similar with Fig. 2 and Fig. 3,2 braces 1 and 1 horizon bar 2 are as main stress system.2 braces 1 form the angle of 18 °~20 ° with horizontal direction, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, for guaranteeing the not slippage downwards of this brace 1, therefore place is connected with brace 1 use right-angle coupler with the horizon bar 2 of a horizontal positioned on doorway, these horizon bar 2 two ends exceed the every limit 200mm of door opening, be stuck in the place, doorway, thereby form stable triangle stress system between the floor at this brace 1, horizon bar 2 and elevator shaft sidewall and place, doorway.Different from the hard protection erection method, for guaranteeing to set up safety, be generally first direct installation in position again after brace 1 fixes horizon bar to form fixedly the well cabinet frame.First fix horizontal blanket net 3 before installation.

Claims (3)

1. an elevator hoistways clinoplain safeguard structure, comprise hard protection and/or soft protection, it is characterized in that: described hard protection and/or soft protection and horizontal direction form certain inclination angle and tilt to set up and form.
2. according to the described elevator hoistways clinoplain of right 1 safeguard structure,
It is characterized in that: described hard protection is that the support body stressed member is 3 braces (1) and 1 horizon bar (2), 3 described braces (1) are from the horizontal by the angle of 18 °~20 °, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, on doorway, place is connected with right-angle coupler with described brace (1) with the described horizon bar (2) of a horizontal positioned, the two ends of described horizon bar (2) exceed at least 200mm of the every limit of door opening, above with the about interval 500mm~600mm of right-angle coupler horizontal direction, fix a webbed steel pipe frame of steel pipe shape at 3 described braces (1), use the wooden a tree, used in making timber for boats (4) of iron wire colligation 50 * 100mm every 200mm on the steel pipe frame fixed, form hard protection at the upper nailing template (5) of described wooden a tree, used in making timber for boats (4).
3. according to the described elevator hoistways clinoplain of right 1 safeguard structure,
It is characterized in that: described soft protection is that 2 braces (1) and 1 horizon bar (2) bar are as main stress system, 2 described braces (1) form the angle of 18 °~20 ° with horizontal direction, slant setting between Chu ground, elevator shaft doorway and elevator shaft rear wall, on doorway, place is connected with right-angle coupler with described brace (1) with the described horizon bar (2) of a horizontal positioned, the two ends of described horizon bar (2) exceed at least 200mm of the every limit of door opening, be stuck in the place, doorway, form stable triangle stress system between the floor at described brace (1) and described horizon bar (2) and elevator shaft sidewall and place, doorway, at the upper fixedly steel pipe formation well cabinet frame of right-angle coupler level of using of described brace (1), at described well cabinet frame, horizontal blanket net (3) is installed.
CN201320430836.6U 2013-07-19 2013-07-19 Elevator shaft titling plane protective structure Expired - Fee Related CN203374008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320430836.6U CN203374008U (en) 2013-07-19 2013-07-19 Elevator shaft titling plane protective structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320430836.6U CN203374008U (en) 2013-07-19 2013-07-19 Elevator shaft titling plane protective structure

Publications (1)

Publication Number Publication Date
CN203374008U true CN203374008U (en) 2014-01-01

Family

ID=49836551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320430836.6U Expired - Fee Related CN203374008U (en) 2013-07-19 2013-07-19 Elevator shaft titling plane protective structure

Country Status (1)

Country Link
CN (1) CN203374008U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421798A (en) * 2015-11-12 2016-03-23 上海十三冶建设有限公司 Construction method with building forming boards serving for protection of edges and holes
CN105544999A (en) * 2015-12-28 2016-05-04 中建七局第二建筑有限公司 Horizontal safeguard device for elevator shaft
EP3388379A1 (en) * 2017-04-10 2018-10-17 KONE Corporation Elevator arrangement and method
CN109914837A (en) * 2019-04-01 2019-06-21 成都建工第二建筑工程有限公司 Elevator protective plate, elevator safety protecting method and construction of lift well method
CN110606429A (en) * 2019-08-29 2019-12-24 上海建工二建集团有限公司 Elevator shaft discharging device and using method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421798A (en) * 2015-11-12 2016-03-23 上海十三冶建设有限公司 Construction method with building forming boards serving for protection of edges and holes
CN105544999A (en) * 2015-12-28 2016-05-04 中建七局第二建筑有限公司 Horizontal safeguard device for elevator shaft
EP3388379A1 (en) * 2017-04-10 2018-10-17 KONE Corporation Elevator arrangement and method
CN108689275A (en) * 2017-04-10 2018-10-23 通力股份公司 Lift appliance and method
US10836608B2 (en) 2017-04-10 2020-11-17 Kone Corporation Elevator arrangement and method
CN108689275B (en) * 2017-04-10 2021-09-03 通力股份公司 Elevator arrangement and method
CN109914837A (en) * 2019-04-01 2019-06-21 成都建工第二建筑工程有限公司 Elevator protective plate, elevator safety protecting method and construction of lift well method
CN110606429A (en) * 2019-08-29 2019-12-24 上海建工二建集团有限公司 Elevator shaft discharging device and using method thereof

Similar Documents

Publication Publication Date Title
CN203374008U (en) Elevator shaft titling plane protective structure
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN202324571U (en) Overhanging type double-row scaffold
CN203487803U (en) Safety protection structure for elevator shaft construction
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN205116768U (en) Superelevation layer instrument formula protection platform of encorbelmenting
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN204590555U (en) Assembling elevator hoistway construction platform
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN204126290U (en) Elevator shaft horizontal protective device
CN204282860U (en) Interim board house bracing means
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN204826702U (en) Hard protector of folded cascade elevartor shaft
CN103741961A (en) Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building
CN204252083U (en) Arch dam bracket hangs plate device by the feet entirely
CN203097310U (en) Horizontal opening protective covering plate device of high-rise building face
CN204850515U (en) Steel construction faces limit protector
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN210013362U (en) Assembled oblique roofing construction structures
CN206468003U (en) A kind of Xin Jiamo guard bar structures
CN205591519U (en) Elevator well handling frame
CN202672694U (en) Shaft construction circulation operating platform
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN202658868U (en) Operating platform for super-high elevator shaft
CN201495788U (en) Safety protecting net system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140101

Termination date: 20170719

CF01 Termination of patent right due to non-payment of annual fee