CN106522283A - PVC protection lining and construction and construction leakage detecting method thereof - Google Patents

PVC protection lining and construction and construction leakage detecting method thereof Download PDF

Info

Publication number
CN106522283A
CN106522283A CN201610907348.8A CN201610907348A CN106522283A CN 106522283 A CN106522283 A CN 106522283A CN 201610907348 A CN201610907348 A CN 201610907348A CN 106522283 A CN106522283 A CN 106522283A
Authority
CN
China
Prior art keywords
overlay region
minor face
lining
long
overlap joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610907348.8A
Other languages
Chinese (zh)
Other versions
CN106522283B (en
Inventor
蒋澍钧
徐增贻
周卫东
彭建青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshou City Cheng Cheng Waterproof Engineering Materials Co Ltd
Original Assignee
Changshou City Cheng Cheng Waterproof Engineering Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshou City Cheng Cheng Waterproof Engineering Materials Co Ltd filed Critical Changshou City Cheng Cheng Waterproof Engineering Materials Co Ltd
Priority to CN201610907348.8A priority Critical patent/CN106522283B/en
Publication of CN106522283A publication Critical patent/CN106522283A/en
Application granted granted Critical
Publication of CN106522283B publication Critical patent/CN106522283B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/06Roof covering by making use of flexible material, e.g. supplied in roll form by making use of plastics
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a PVC protection lining and a construction and construction leakage detecting method thereof. The PVC protection lining comprises a lining body; and a T-shaped fixed key projected on the surface of the lining body is arranged on one side, towards reinforced concrete, of the lining body. The PVC protection lining is characterized in that a T-shaped fixed key beneficiation combination cavity is formed on the top surface of the T-shaped fixed key in the length direction of the T-shaped fixed key. The method comprises the following steps: one side, with the T-shaped fixed key, of the lining body faces to the reinforced concrete after pouring, and the T-shaped fixed key is inserted in the reinforced concrete; the edge parts in long edge directions of two adjacent lining bodies are overlapped, and the edge parts in short edge directions are overlapped; long edge leakage detection electric conducting metal wires are inlaid in the long edge joint overlapping area, and short edge leakage detection electric conducting metal wires are inlaid in the short edge joint overlapping area; and a hot air welding gun is used for welding. The reliable and everlasting combination effect with the reinforced concrete is improved; the conditions are created for the leakage detection after construction; and the leakage points in the long and short edge joint overlapping areas after hot welding welding can be detected.

Description

PVC lining corrosion protections and its construction and construction leak hunting method
Technical field
The invention belongs to building member and its technical field of construction, and in particular to a kind of PVC lining corrosion protections, and also relate to And its construction and leak hunting method of constructing.
Background technology
Aforesaid PVC lining corrosion protections are also referred to as PVC protective liners or anti-corrosion liner, are widely used in such as urban operating mechanism work It is journey, town and country sewage treatment project, tunnel, subway, underground civil defence projects, City Building underground garage, building roofing, military The occasion of facility such as Aircraft Hangar, reservoir, swimming pool and agriculture irrigation canals and ditches etc.Previously, to being not limited to the occasion for above enumerating Antiseep protection generally using brushing protecting film, lay waterproof roll, pour the measures such as surface protecting layer of covering, shortcoming be engineering make Industry amount is big, construction period length, low construction efficiency, the construction environment to construction site and weather have fastidious property, protection effect difference simultaneously And the cycle is short protected.With the release of PVC lining corrosion protections, aforementioned shortcoming is substantially made up, because PVC linings can be real Existing factorial praluction simultaneously realizes site operation.
The technical information with regard to PVC linings can be seen in disclosed Chinese patent literature, and such as CN201428867Y recommends Have " reinforced concrete sewer pipe with PVC corrosion protective linings ", its be concrete reinforced pipe inner surface have with reference to one layer it is anti- The PVC liners of rotten effect(That is PVC lining corrosion protections), specifically can be found in the 3rd to 17 row of patent specification page 3;And for example CN201560487Y is provided with " PVC liner of anti-corrosion steel bar concrete water discharging pipe ", and the patent is had with aforementioned CN201428867Y There is the effect of different Qu Tonggong, feature is the projection of liner surface to be configured to the shape of T-shaped or rhombus anchoring key and is divided in the shape of a spiral Cloth, specifically can be found in the 0015th to 0016 section of the patent specification;For another example publication No. CN105649649A is introduced a kind of " band Corrosion protection system in lined with PVC sheets duct pieces of shield tunnel ", according to the description of the description the 0013rd to 0015 of the patent application, Which is to lay corrosion-proof lining on the surface of lining segment, and by corrosion-proof lining towards the side of lining segment T-shaped retainingf key With lining segment reliable connection.
Disclosed in above-mentioned patent documentation, PVC lining corrosion protections have common construction featuress, are embodied in:In lining body Under use state towards carrier such as armored concrete side spaced surface constitute have be raised in lining body surface and Transverse shape retainingf key in T shape, ensures the combination effect between lining body and carrier by retainingf key, but this There is logical disadvantage as follows in structure;As the top surface of retainingf key is smooth without recessed, and as lining body and aforementioned bearer are different Material, thus effect structure especially in conjunction with persistency be difficult to meet the expection of industry, after a period of time exist point De- anxiety.
As is known in the industry, the quality of construction can produce impact to construction quality, and so-called construction quality is mainly manifested in oozes Leakage, because the door width of lining body is fabric width is typically limited, in laid processes i.e. in work progress, by two adjacent linings In edge overlap forming lap width(The 0010th section of the description such as CN105649649A is recorded, and lap width is big In 20mm), it is mutually bonded at the position of the lap width and is ensured that bonding patch is tight(Such as the explanation of CN201428867Y The 13rd to 15 row of book page 3).But can due to cannot verify the sealing that cannot detect the overlapping part being bonded together By property, consequently only that engineering be put to using it is rear i.e. under arms during seepage when be just found, it is but late.Current Disposal method has two:One is, when leak magnitude is slight, to carry out leak stopping using sealing agent;Two is when leak magnitude is serious, in fact Apply and do over again, then not only overlapping investment manually causes the daily increase for managing and protecting cost, and causes the waste of resource, because doing over again Old cloth must be abandoned new.Applicant have noted that what the 3rd section of the 11st to 14 row of the Instructions Page 2 of CN201428867Y was recorded: " instrumentation of the tightness of an inspection lining is have also been devised, the seam and Guan Yuguan connections to PVC material in every section pipe When lining seam inspection, to guarantee the tight of lining, and then ensure to improve the life-span of concrete reinforced pipe ", but be not given The concrete enlightenment for how checking sealing.
For above-mentioned prior art, it is necessary to improved, it is that this applicant has made beneficial exploration, defines following The technical scheme that will introduce and simulation test is have passed through in the case where secrecy provision is taken, as a result prove practicable.
The content of the invention
The top priority of the present invention is to provide a kind of retainingf key for contributing to significantly enhancing on lining body to carry with conduct There are the PVC lining corrosion protections for releasing in durable bond effect between the armored concrete of body and using during avoiding under arms.
Another task of the present invention is to provide a kind of construction method of PVC lining corrosion protections, and the construction method can be construction The online leak detection at scene provides leak detection condition and uses and play the effect of checking erroneous ideas at the outset.
The another task of the present invention is to provide a kind of PVC lining corrosion protections construction leak hunting method, and the method will can be constructed The breakthrough in time detection of the overlapping part of two adjacent lining bodies is occurred in journey and is used and is ensured construction quality and engineering Persistently military service effect.
What the task of the present invention was performed by, a kind of PVC lining corrosion protections, including lining body, in the lining body Side under use state towards armored concrete is constituted the T-shaped fixation on the surface for being raised in lining body with space state Key, the length direction for being characterised by the top surface of the T-shaped retainingf key and follow T-shaped retainingf key are constituted and have one recessed Sink into the T-shaped retainingf key potentiation binding cavity of the top surface of T-shaped retainingf key.
In a specific embodiment of the present invention, the breadth width of the lining body is 1350-1540mm, and is served as a contrast In body thickness be 1.5-3mm;The height of the T-shaped retainingf key is 8-12mm, and the width at the top of T-shaped retainingf key is 6-8mm, the spacing between adjacent T-shaped retainingf key are 68-72mm.
What another task of the present invention was performed by, a kind of construction method of PVC lining corrosion protections, including following step Suddenly:
A) lay, lining body is had into the one side of T-shaped retainingf key to the armored concrete of casting complete, and is made T-shaped Retainingf key is insinuated in armored concrete, and the edge of the long side direction of two adjacent lining bodies is overlapped each other and length is formed Edge lap overlay region and the overlap joint overlapping degree of long edge lap overlay region is controlled, while by the minor face side of two adjacent lining bodies To edge it is overlapped and formed minor face overlap joint overlay region and control minor face overlap overlay region overlap joint overlapping degree;
B) welding preparation, to step A)Described in long edge lap overlay region in be bumped into a long frontier inspection and leak conductive wire, the length Frontier inspection leak conductive wire by described two adjacent lining bodies long side direction edge institute envelope, and long frontier inspection leakage The two ends end of long edge lap overlay region described in the two ends difference indentation of conductive wire, while to step A)Described in minor face Minor face leak detection conductive wire is bumped in overlap joint overlay region, and the minor face hunts leak conductive wire by described two adjacent lining bodies Short side direction edge institute envelope, and minor face overlap joint described in the two ends difference indentation of minor face leak detection conductive wire The two ends end of overlay region;
C) weld, adopt hot air welding gun with the non-contacting state of the lining body to step B)Described long edge lap weight Folded region and minor face overlap joint overlapping region carry out hot jet welding, are formed long edge lap overlay region and minor face overlap joint overlay region Sealing, and the welding temperature of hot air welding gun, the translational speed of control hot air welding gun, control hot air welding gun is controlled from long edge lap The distance on the surface of overlay region and control hot air welding gun overlap the surface distance of overlay region from minor face.
In another specific embodiment of the present invention, step A)Described in the long edge lap overlay region of control overlap joint Overlapping degree is that overlap joint is controlled to 2-6 by overlapping degree;Described control minor face overlaps the overlap joint overlapping degree of overlay region It is that overlap joint overlapping degree is controlled to into 3-8.
In another specific embodiment of the present invention, in the edge phase of the short side direction to the lining body Mutually overlap and before forming short side direction overlap joint overlay region, prune corresponding to the minor face overlap joint overlay region region the T words Shape retainingf key, T-shaped fixed key length of pruning are 3-8.
In another specific embodiment of the present invention, step B)Described in long frontier inspection leakage conductive wire two ends contracting The indentation degree for entering the two ends end of the long edge lap overlay region is 1-3, the two ends of the minor face leak detection conductive wire Described in indentation, the indentation degree of the two ends end of minor face leak detection overlay region is similarly 1-3.
In an also specific embodiment of the present invention, described long frontier inspection leaks conductive wire and described minor face Leak detection conductive wire is copper wire.
In the present invention more and in a specific embodiment, step C)Described in control hot jet welding temperature be by The temperature control of hot jet welding is 1000-1600 DEG C, and the speed of described control hot jet welding is by the speed control of hot jet welding 4-6s/m is made as, the described hot air welding gun that controls is to be by the distance controlling with a distance from the surface of the long edge lap overlay region 3-10mm, described control hot air welding gun is equally to be controlled to the distance with a distance from the surface that the minor face overlaps overlay region 3-10mm。
What another task of the present invention was performed by, a kind of construction leak hunting method of PVC lining corrosion protections, including following Step:
A) prepare before examining, first to lining body back to the side diversion of armored concrete, when the length after the thermal weld described in When edge lap overlay region and minor face overlap joint overlay region have leakage situation, the aquiform stool caused on lining body penetrates into long edge lap In overlay region and in minor face overlap joint overlay region and invade the long frontier inspection leakage conductive wire and minor face leak detection conducting metal Silk;
B) hunt leak, detected using spark rifle, open the detection switch of spark rifle and by leak detection personnel by the pipette tips pair of spark rifle Lining body movement is against in the state of Ying Yuchang frontier inspections leakage conductive wire, it is arbitrary when the long edge lap overlay region When position has seepage situation, when the pipette tips of spark rifle move to the breakthrough, electric shock spark shape is produced because short circuit occurs in circuit Into a white electric arc arc light, the position for producing electric shock spark is marked by leak detection personnel, to point out workmen at once Repair, hunted leak after repairing again, after finishing to the leak detection of long edge lap overlay region, overlay region is overlapped to the minor face in the same manner Leak detection.
The present invention's and then in a specific embodiment, described spark rifle is low voltage and high current spark rifle.
The technical scheme that the present invention is provided has technical effect that:First, due to the T-shaped retainingf key in lining body Top surface is additionally arranged T-shaped retainingf key potentiation binding cavity, thus can significantly improve the reliability between armored concrete and lasting Combination effect, under arms during be not in release situation;Second, as the construction method for providing is in long and short edge lap The position of overlay region has been bumped into long and short frontier inspection leakage conductive wire respectively, thus creates condition for the leak detection after construction; Third, provide detection method by means of long and short frontier inspection leak conductive wire on the premise of can detect hot jet welding after length, Minor face overlaps the breakthrough of overlay region, is made up with profit in time, it is ensured that construction quality.
Description of the drawings
Fig. 1 is the example structure figure of PVC lining corrosion protections of the present invention.
Fig. 2 is that the long side direction of two adjacent lining bodies is overlapped each other to form long edge lap weight by construction method of the present invention Folded area and the schematic diagram that long frontier inspection leaks conductive wire is bumped in the long edge lap overlay region.
Fig. 3 is that construction method of the present invention forms minor face overlap joint weight by the long side direction of two adjacent lining bodies overlapped Folded area and minor face is bumped in minor face overlap joint overlay region hunts leak the schematic diagram of conductive wire.
Fig. 4 is the schematic diagram that the present invention is applied to tunnel.
Specific embodiment
Embodiment 1:
Fig. 1 is referred to, shows that material is PVC(Polrvinyl chloride)And the lining body 1 for obtaining is extruded by extruded mould, Side under 1 use state of lining body towards armored concrete is constituted the table that is raised in lining body 1 with space state The T-shaped retainingf key 11. in face
The technical essential of the technical scheme provided as the present invention:Aforementioned T-shaped retainingf key 11 top surface and follow T words The length direction of shape retainingf key 11 constitutes the T-shaped retainingf key potentiation for having a top surface for being depressed in T-shaped retainingf key 11 and combines Chamber 111, plays the combination effect significantly improved and armored concrete between by T-shaped retainingf key potentiation binding cavity 111, will not Occur the situation de- with armored concrete point during military service in the future.
In the present embodiment, the breadth width of aforementioned lining body 1 is 1350mm(1.35m), the thickness of lining body 1 is 2mm, the height of T-shaped retainingf key 11 is 12mm, and the top width of T-shaped retainingf key 11 is 7mm, two adjacent T-shaped retainingf keys Spacing between 11(Spacing distance)For 68mm.
Embodiment 2:
The breadth width of lining body 1 is changed to into 1460mm only, the thickness of lining body 1 is changed to into 1.5mm, by T-shaped fixation The height of key 11 is changed to 8mm, and the width at the top of T-shaped retainingf key 11 is changed to 6mm, by two adjacent T-shaped retainingf keys 11 it Between spacing be changed to 72mm, remaining is with the description to embodiment 1.
Embodiment 3:
The breadth width of lining body 1 is changed to into 1540mm only, the thickness of lining body 1 is changed to into 3mm, by T-shaped retainingf key 11 height is changed to 10mm, and the width at the top of T-shaped retainingf key 11 is changed to 8mm, by between two adjacent T-shaped retainingf keys 11 Spacing be changed to 70mm, remaining is with the description to embodiment 1.
Construction example 1:
This construction example be for the lining body 1 described in embodiment 1, and construction site be terrace.
Refer to Fig. 2 and Fig. 3 and combine Fig. 1, the construction method of the PVC lining corrosion protections of the present invention is comprised the following steps:
A) lay, the one side that lining body 1 as shown in Figure 1 has T-shaped retainingf key 11 is mixed to the reinforcing bar of casting complete Solidifying soil, and T-shaped retainingf key 11 is insinuated in armored concrete, by the edge part of the long side direction of two adjacent lining bodies 1 Position overlaps each other and forms long edge lap overlay region 2 and the overlap joint overlapping degree of long edge lap overlay region 2 is controlled to 6, Simultaneously will be the edge of the short side direction of two adjacent lining bodies 1 overlapped and formation minor face overlap joint overlay region 3 and general The overlap joint overlapping degree of minor face overlap joint overlay region 3 is controlled to 3;
B) welding preparation, to step A)In be bumped into a long frontier inspection in aforesaid long edge lap overlay region 2 and leak conductive wire 4, should Long frontier inspection leakage conductive wire 4 by aforementioned two adjacent lining bodies 1 long side direction edge institute envelope, and the long side The two ends end of the two ends aforementioned long edge lap overlay region of difference indentation 2 of leak detection conductive wire 4(Port can also be claimed)Each 1, Simultaneously to step A)In aforesaid minor face overlap joint overlay region 3 be bumped into minor face leak detection conductive wire 5, the minor face is hunted leak conductive gold Category silk 5 by aforementioned two adjacent lining city bodies 1 short side direction edge institute envelope, and the minor face hunts leak conductive wire The 5 aforementioned minor face of two ends difference indentation overlaps the two ends end of overlay region 3(Port can also be claimed)Each 2, it is T-shaped solid due to existing Determine key 11, thus the edge in the short side direction to lining body 1 is overlapped and form short side direction overlap joint overlay region 3 Pruned using cutter before(Eliminate)Corresponding to the aforementioned T-shaped retainingf key 11 in the region of the minor face overlap joint overlay region 3, prune T The length of font retainingf key 11 is 3, certainly, if the T-shaped retainingf key in the region is not eliminated, then can produce and take Interference situations are connect, in the present embodiment, aforesaid long frontier inspection leakage conductive wire 4 and minor face leak detection conductive wire 5 are copper Silk;
C) weld, adopt hot air welding gun with 1 non-contacting state of aforementioned lining body to step B)Long edge lap overlap Region 2 and minor face overlap joint overlapping region 3 carry out hot jet welding, the material at high temperature at long edge lap overlay region 2 is melted and is tied It is combined and forms sealing, and the material at high temperature at minor face overlap joint overlay region 3 is melted and is combined together and forms close Envelope, and control hot air welding gun 1300 DEG C of welding temperature, control hot air welding gun translational speed be 5s/m, control hot air welding gun With a distance from the surface of long edge lap overlay region 2 and control hot air welding gun from minor face overlap overlay region 3 surface distance be respectively 3mm, as the mechanism welded using hot air welding gun belongs to known technology, thus the not reinflated explanation of applicant, in the present embodiment In, hot air welding gun is selected with being II type hot air welding guns of XG- by the trade mark of Chinese Shanghai new photocoagulation equipment company limited production and sales.
Construction example 2:
The present embodiment is that, for the lining body 1 described in embodiment 2,1 difference of example is with constructing:Only by step A)In The overlap joint overlapping degree of described long edge lap overlay region 2 is changed to 2, and the overlap joint overlapping degree that minor face overlaps overlay region 3 is changed For 8, by step B) described in long frontier inspection leakage conductive wire 4 the long edge lap overlay region of two ends difference indentation 2 two ends The degree of end is changed to each 3, the two ends of the two ends difference indentation minor face overlap joint overlay region 3 of conductive wire 5 that minor face is hunted leak The degree of end is changed to each 1, and the length of T-shaped retainingf key 11 of pruning is changed to 8;By step C)In hot air welding gun welding Temperature is changed to 1000 DEG C, and the translational speed of hot air welding gun is changed to 6s/m, by hot air welding gun from long edge lap overlay region 2 and short The distance on the surface of edge lap overlay region 3 is changed to 10mm.Remaining is with the description to example 1 of constructing.
Construction example 3:
The present embodiment is that, for the lining body 1 described in embodiment 3,1 difference of example is with constructing:Only by step A)In The overlap joint overlapping degree of described long edge lap overlay region 2 is changed to 4, and the overlap joint overlapping degree that minor face overlaps overlay region 3 is changed For 5, by step B) described in long frontier inspection leakage conductive wire 4 the long edge lap overlay region of two ends difference indentation 2 two ends The degree of end is changed to each 2, the two ends of the two ends difference indentation minor face overlap joint overlay region 3 of conductive wire 5 that minor face is hunted leak The degree of end is changed to each 3, and the length of T-shaped retainingf key 11 of pruning is changed to 5;By step C)In hot air welding gun welding Temperature is changed to 1600 DEG C, and the translational speed of hot air welding gun is changed to 4s/m, by hot air welding gun from long edge lap overlay region 2 and short The distance on the surface of edge lap overlay region 3 is changed to 6.5mm.Remaining is with the description to example 1 of constructing.
Construction example 4:
Fig. 4 is referred to, this construction example is, for tunnel 6, due to being directed to tunnel 6, thus to lay lining body 1 When supported by support bracket is interim to lining body 1(Supporting), remaining is with the description to example 1 of constructing.
Detection example 1:
Hunted leak in arbitrary job site of construction example 1 to 3, its step is as follows:
A) prepare before examining, first to lining body 1 back to the side diversion of armored concrete, when it is premenstrual state thermal weld after long side take When connecing overlay region 2 and minor face overlap joint overlay region 3 presence leakage situation, the aquiform stool caused on lining body 1 penetrates into long edge lap In overlay region 2 and in minor face overlap joint overlay region 3 and invade long frontier inspection leakage conductive wire 4 and minor face leak detection conductive wire 5, can be in the position corresponding to long edge lap overlay region 2 and the two ends end of minor face overlap joint overlay region 3 as preferred scheme Clamped with clip, in case water enters from end and attacks long and short frontier inspection and leak conductive wire 4,5;
B) hunt leak, detected using spark rifle, open the detection switch of spark rifle and by leak detection personnel by the pipette tips pair of spark rifle The surface movement of aforementioned lining body 1 is against in the state of Ying Yuchang frontier inspections leakage conductive wire 4, when long edge lap overlay region 2 Arbitrary position when there is seepage situation, produce electric shock fire because short circuit occurs in circuit when the pipette tips of spark rifle move to the breakthrough A white electric arc arc light is spent and formed, the position for producing electric shock spark is marked by leak detection personnel, to point out constructor Member repairs at once, is hunted leak after repairing again, in the same manner the minor face is overlapped after finishing to the leak detection of long edge lap overlay region 2 Hunt leak overlay region 3.Spark rifle described in the present embodiment is low voltage and high current spark rifle, and also there is warning and electric current to show Show function, this spark rifle is preferred, but not limited to select with by the production of departure electrical equipment company limited of Shenzhen of Guangdong province, China Model DZB-3 type detector.
Detection example 2:
Detected in the job site of construction example 4, due to being applied to tunnel 6, thus relative to detection example 1 without the need for lining sheet 1 diversion of body, but using itself moisture in the armored concrete in tunnel 6, remaining is with the description of detection example 1.
In sum, the technical scheme that the present invention is provided compensate for the shortcoming in prior art, favorably accomplish invention Task, the technique effect referred in faithfully having cashed the superincumbent technique effect hurdle of applicant.

Claims (10)

1. a kind of PVC lining corrosion protections, including lining body (1), towards armored concrete under lining body (1) use state Side constituted the T-shaped retainingf key (11) on the surface for being raised in lining body (1) with space state, it is characterised in that in institute The length direction composition for stating on the top surface of T-shaped retainingf key (11) and follow T-shaped retainingf key (11) has one to be depressed in T words T-shaped retainingf key potentiation binding cavity (111) of the top surface of shape retainingf key (11).
2. PVC lining corrosion protections according to claim 1, it is characterised in that the breadth width of lining body (1) is 1350-1540mm, and the thickness of lining body (1) is 1.5-3mm;The height of T-shaped retainingf key (11) is 8-12mm, T The width at the top of font retainingf key (11) is 6-8mm, and the spacing between adjacent T-shaped retainingf key (11) is 68-72mm.
3. a kind of construction method of PVC lining corrosion protections as claimed in claim 1, it is characterised in that comprise the following steps:
A) lay, lining body (1) is had into armored concrete of the one side of T-shaped retainingf key (11) to casting complete, and T-shaped retainingf key (11) is insinuated in armored concrete, by the edge of the long side direction of two adjacent lining body (1) that This overlaps and forms long edge lap overlay region (2) and control the overlap joint overlapping degree of long edge lap overlay region (2), while by two The edge of the short side direction of adjacent lining body (1) is overlapped and form minor face overlap joint overlay region (3) and control short The overlap joint overlapping degree of edge lap overlay region (3);
B) welding preparation, to step A)Described in long edge lap overlay region (2) in be bumped into a long frontier inspection and leak conductive wire (4), long frontier inspection leakage conductive wire (4) by described two adjacent lining body (1) long side direction edge institute envelope, And the two ends end of long edge lap overlay region (2) described in the two ends difference indentation of long frontier inspection leakage conductive wire (4), while To step A)Described in minor face overlap joint overlay region (3) in be bumped into minor face leak detection conductive wire (5), minor face leak detection is conductive Tinsel (5) by described two adjacent lining body (1) short side direction edge institute envelope, and minor face leak detection is conductive The two ends end of minor face overlap joint overlay region (3) described in the two ends difference indentation of tinsel (5);
C) weld, adopt hot air welding gun with lining body (1) non-contacting state to step B)Take on described long side Connecing overlapping region (2) and minor face overlap joint overlapping region (3) carries out hot jet welding, makes long edge lap overlay region (2) and minor face Overlap joint overlay region (3) forms sealing, and controls the welding temperature of hot air welding gun, the translational speed of control hot air welding gun, control Hot air welding gun is with a distance from the surface of long edge lap overlay region (2) and control hot air welding gun overlaps overlay region (3) from minor face Surface distance.
4. the construction method of PVC lining corrosion protections according to claim 3, it is characterised in that step A)Described in control it is long The overlap joint overlapping degree of edge lap overlay region (2) is that overlap joint is controlled to 2-6 by overlapping degree;Described control minor face overlap joint The overlap joint overlapping degree of overlay region (3) is that overlap joint overlapping degree is controlled to 3-8.
5. the construction method of PVC lining corrosion protections according to claim 3, it is characterised in that to lining body (1) Short side direction edge it is overlapped and formed short side direction overlap joint overlay region (3) before, prune corresponding to the minor face The described T-shaped retainingf key (11) in the region of overlap joint overlay region (3), the length of T-shaped retainingf key (11) of pruning is 3-8.
6. the construction method of PVC lining corrosion protections according to claim 3, it is characterised in that step B)Described in the leakage of long frontier inspection The indentation degree of the two ends end of long edge lap overlay region (2) described in the two ends indentation of conductive wire (4) is 1-3, described Described in the two ends indentation of minor face leak detection conductive wire (5), the indentation degree of the two ends end of minor face leak detection overlay region (3) is same For 1-3.
7. the construction method of the PVC lining corrosion protections according to claim 3 or 6, it is characterised in that described long frontier inspection leakage is led Electric metal silk (4) and described minor face leak detection conductive wire (5) are copper wire.
8. the construction method of PVC lining corrosion protections according to claim 3, it is characterised in that step C)Described in control heat It is 1000-1600 DEG C by the temperature control of hot jet welding that the temperature of wind welding is, the speed of described control hot jet welding be by The speed controlling of hot jet welding is 4-6s/m, and described control hot air welding gun is from the surface of long edge lap overlay region (2) It is 3-10mm by the distance controlling that distance is, described control hot air welding gun overlaps the surface of overlay region (3) from the minor face Distance is that the distance is equally controlled to 3-10mm.
9. a kind of construction leak hunting method of PVC lining corrosion protections as claimed in claim 3, it is characterised in that comprise the following steps:
A) prepare before examining, first to lining body (1) back to the side diversion of armored concrete, described in after the thermal weld described in When long edge lap overlay region (2) and minor face overlap joint overlay region (3) have leakage situation, the aquiform stool on lining body (1) is caused Penetrate in long edge lap overlay region (2) and minor face overlap joint overlay region (3) is interior and invades long frontier inspection leakage conductive wire (4) And minor face leak detection conductive wire (5);
B) hunt leak, detected using spark rifle, open the detection switch of spark rifle and by leak detection personnel by the pipette tips pair of spark rifle Described lining body (1) movement is against in the state of Ying Yuchang frontier inspections leakage conductive wire (4), when the long edge lap overlay region (2), when arbitrary position has seepage situation, when the pipette tips of spark rifle move to the breakthrough, electricity is produced because short circuit occurs in circuit Hit spark and form a white electric arc arc light, the position for producing electric shock spark is marked by leak detection personnel, to point out to apply Workman person repairs at once, is hunted leak after repairing again, in the same manner to described short after finishing to long edge lap overlay region (2) leak detection Hunt leak edge lap overlay region (3).
10. the construction leak hunting method of PVC lining corrosion protections according to claim 9, it is characterised in that described spark rifle is Low voltage and high current spark rifle.
CN201610907348.8A 2016-10-19 2016-10-19 PVC lining corrosion protections and its construction and construction leak hunting method Active CN106522283B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610907348.8A CN106522283B (en) 2016-10-19 2016-10-19 PVC lining corrosion protections and its construction and construction leak hunting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610907348.8A CN106522283B (en) 2016-10-19 2016-10-19 PVC lining corrosion protections and its construction and construction leak hunting method

Publications (2)

Publication Number Publication Date
CN106522283A true CN106522283A (en) 2017-03-22
CN106522283B CN106522283B (en) 2018-10-09

Family

ID=58332235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610907348.8A Active CN106522283B (en) 2016-10-19 2016-10-19 PVC lining corrosion protections and its construction and construction leak hunting method

Country Status (1)

Country Link
CN (1) CN106522283B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110525818A (en) * 2019-07-31 2019-12-03 武汉吉隆过滤技术有限公司 A kind of anti-corrosion slot and preparation method thereof
CN111255047A (en) * 2020-01-21 2020-06-09 贵州开磷集团矿肥有限责任公司 Safety and environment-friendly protection construction method for chemical plant device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145394A (en) * 1998-11-13 2000-05-26 Ohbayashi Corp Plastic sheet-adhered segment and its joint processing method
CN201428867Y (en) * 2009-07-03 2010-03-24 天津市泽宝水泥制品有限公司 Reinforced concrete water drainage pipe with PVC anti-corrosion lining
CN201560487U (en) * 2009-11-13 2010-08-25 天津市泽宝水泥制品有限公司 PVC liner of anti-corrosion steel bar concrete water discharging pipe
CN102059739A (en) * 2009-11-13 2011-05-18 天津市泽宝水泥制品有限公司 Production process of lining-type anti-corrosion reinforced concrete pipe
CN105649649A (en) * 2016-02-04 2016-06-08 广州市市政工程设计研究总院 PVC sheet shield tunnel segment inner corrosion prevention system with linings

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145394A (en) * 1998-11-13 2000-05-26 Ohbayashi Corp Plastic sheet-adhered segment and its joint processing method
CN201428867Y (en) * 2009-07-03 2010-03-24 天津市泽宝水泥制品有限公司 Reinforced concrete water drainage pipe with PVC anti-corrosion lining
CN201560487U (en) * 2009-11-13 2010-08-25 天津市泽宝水泥制品有限公司 PVC liner of anti-corrosion steel bar concrete water discharging pipe
CN102059739A (en) * 2009-11-13 2011-05-18 天津市泽宝水泥制品有限公司 Production process of lining-type anti-corrosion reinforced concrete pipe
CN105649649A (en) * 2016-02-04 2016-06-08 广州市市政工程设计研究总院 PVC sheet shield tunnel segment inner corrosion prevention system with linings

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱少锋: "聚氯乙烯防蚀内衬材料的应用", 《混凝土与水泥制品》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110525818A (en) * 2019-07-31 2019-12-03 武汉吉隆过滤技术有限公司 A kind of anti-corrosion slot and preparation method thereof
CN111255047A (en) * 2020-01-21 2020-06-09 贵州开磷集团矿肥有限责任公司 Safety and environment-friendly protection construction method for chemical plant device

Also Published As

Publication number Publication date
CN106522283B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN109667606B (en) Tunnel multiple waterproof construction method
CN110617083A (en) Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness
CN203742624U (en) Splicing laying structure of tunnel water proof board
CN104631666B (en) A kind of super thick built-in wall steel plate waterproof radioprotective construction method
CN111828056B (en) Shallow-buried underground excavation tunnel waterproof construction method
CN104018857A (en) Splicing paving method of waterproof plates in tunnel and splicing paving structure of waterproof plates in tunnel
CN108916470A (en) A kind of natural gas line construction method based on construction protecting device
CN106522283A (en) PVC protection lining and construction and construction leakage detecting method thereof
CN103225285A (en) Steel membrane concrete faced rockfill dam
CN105649649B (en) Corrosion protection system in a kind of band lined with PVC sheets duct pieces of shield tunnel
CN109695246A (en) A kind of mass concrete construction heat dissipating method
CN114000661A (en) Waterproof pressure tank sealing structure for vertical serging roof coiled material and construction method
KR100644778B1 (en) A process for Water-Proof Construction
CN109667607B (en) Tunnel partition waterproof construction process
CN106759365B (en) A kind of counterfort wing wall waterproof curtain construction method of foundation pit enclosure wall
CN205560115U (en) Use up cured fiber reinforced composite and carry out pipeline that reinforcement was restoreed to non - excavation
CN103291329B (en) Waterproofing and gas tightness construction method and structure for subsurface tunnel
CN203285457U (en) Bored tunnel structure with high water resistance and high air impermeability
CN216196068U (en) Upright lockrand roof coiled material waterproof indent sealing device
CN108625407A (en) A kind of open-cut station tunneling segment structure waterproof method
CN108180021A (en) The anti-rotational wing plate of push-bench
CN206071614U (en) Waterproof system at a kind of tunnel Varied section negative and positive angle
CN207092065U (en) A kind of diaphragm wall seepage repairs structure
CN106996300B (en) A kind of anchor bar of waterproof plate in tunnels laying method
CN110374638A (en) A kind of anchor bar of waterproof plate in tunnels zip mode connection system and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant