CN104631666B - A kind of super thick built-in wall steel plate waterproof radioprotective construction method - Google Patents

A kind of super thick built-in wall steel plate waterproof radioprotective construction method Download PDF

Info

Publication number
CN104631666B
CN104631666B CN201510027320.0A CN201510027320A CN104631666B CN 104631666 B CN104631666 B CN 104631666B CN 201510027320 A CN201510027320 A CN 201510027320A CN 104631666 B CN104631666 B CN 104631666B
Authority
CN
China
Prior art keywords
steel plate
built
steel
wall
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510027320.0A
Other languages
Chinese (zh)
Other versions
CN104631666A (en
Inventor
耿凌鹏
袁斌
谢明鸣
付梦求
程艺
李强
罗伟杭
李昕睿
彭永钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Guangdong Construction Engineering Group Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Guangdong Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd, Guangdong Construction Engineering Group Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201510027320.0A priority Critical patent/CN104631666B/en
Publication of CN104631666A publication Critical patent/CN104631666A/en
Application granted granted Critical
Publication of CN104631666B publication Critical patent/CN104631666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The application relates to building field, more particularly relates to a kind of super thick built-in wall steel plate waterproof radioprotective construction technology, it is characterised in that comprises the steps of a. and installs built-in steel plate built-in fitting;B. floorslab concrete is poured;C., built-in steel plate unit block is installed;Between the most built-in steel plate unit block, junction steel plate and horizontal channel-section steel are installed;The most built-in steel plate welds with steel plate for sealing water;F. reinforcing bar binding;The most inside and outside layer synchronizes casting concrete;H. top board structure construction;I. constructed.Technical solution of the present invention provides the benefit that: first, uses built-in continuous steel plate, solves the seepage problem that the crack of concrete is caused, it is ensured that sidewall does not seeps water;Secondly, use built-in steel plate construction technology, be equivalent to be become, by one body of wall, the two road bodies of wall being closely affixed, if overcoming single body of wall in the case of crosscutting concern occurs to seep water and radiate the difficult problem leaked, the crosscutting concern being likely to occur can effectively be staggered by the different body of wall of inside and outside two layer thicknesses with continuous steel plate as interface, thus solve the radiation after crack occurs in single body of wall and leak, cause the serious problems of underground water and soil pollution.

Description

A kind of super thick built-in wall steel plate waterproof radioprotective construction method
Technical field
The application relates to building field, more particularly relates to a kind of super thick built-in wall steel plate waterproof radioprotective construction party Method.
Background technology
The instability of heavy nucleus can be caused after the proton of a medium energy gets to heavy nucleus (element such as tungsten, hydrargyrum) " to steam Send out " go out 20-30 neutron, such heavy nucleus " splits " and " dissipates " to all directions and goes out considerable neutron, in substantially increasing The generation efficiency of son, the device worked by this principle is referred to as spallation neutron target.Material science is carried out with Neutron scattering technology And life science, compared with X-ray technology and Synchrotron Radiation Technology, there is many advantages.But, owing to neutron has Higher radioactivity, environment can be caused serious radiation pollution, for avoiding radiation pollution, need to set its practicality by its use Standby especially body of wall carries out radioprotective process, and body of wall of the prior art and construction technology is many does not possess shielding property, It is unable to reach the purpose being prevented effectively from radiation pollution, therefore, in the urgent need to reaching to be prevented effectively from radiation pollution in reality Wall construction technology.
Summary of the invention
The present invention is to meet the reality need described in above-mentioned prior art, and the present invention provides a kind of super thick built-in wall steel plate Waterproof radioprotective construction method.
For solving above-mentioned technical problem, technical scheme is as follows:
A kind of super thick built-in wall steel plate waterproof radioprotective construction method, it is characterised in that comprise the steps of
A., built-in steel plate built-in fitting is installed: on floorboard after wall steel bar colligation and steel plate for sealing water installation, one by one Built-in steel plate built-in fitting is installed;
B. pour floorslab concrete: after installation of embedded parts completes, body of wall side form on floorboard is installed, and it is mixed to pour flooring Solidifying soil;
C. installing built-in steel plate unit block: be arranged on built-in fitting by built-in steel plate unit block, behind location, adjustment is hung down After straight degree meets the requirements, fix with built-in fitting full weld;
Between the most built-in steel plate unit block, junction steel plate and horizontal channel-section steel are installed: built-in steel plate unit block installation After, the steel plate between built-in steel plate unit block and horizontal channel-section steel one are installed, use, after first steel plate being installed, horizontal channel-section steel one is installed Order install, steel plate is connected with vertical channel-section steel full weld, and horizontal channel-section steel one welds with vertical channel-section steel full weld, horizontal channel-section steel one and steel Plate discontinuous welding connects;
The most built-in steel plate welds with steel plate for sealing water: be connected with pre-buried steel plate for sealing water full weld by built-in steel plate, and detects interior Put the weld seam of steel plate and steel plate for sealing water, to guarantee not seep water;
F. reinforcing bar binding: the assembling reinforcement simultaneously toward both sides, wall limit in wall, and determine the position of bracket;
The most inside and outside layer synchronizes casting concrete: after reinforcing bar binding completes, installation form, uses outer top form fixed form, Vertical casting concrete is to bracket;
H. top board structure construction: after roof plate template installation, installs roof steel bar, then suitable by top board after first sidewall Sequence casting concrete, maintenance afterwards, form removal;
I. constructed.
Compared with prior art, technical solution of the present invention provides the benefit that:
First, use built-in continuous steel plate, solve the seepage problem that the crack of concrete is caused, it is ensured that sidewall is not permeable Water;Secondly, using built-in steel plate construction technology, being equivalent to be become the two road bodies of wall being closely affixed, if overcoming by one body of wall In the case of there is crosscutting concern, single body of wall can seep water and radiate the difficult problem leaked, inside and outside two with continuous steel plate as interface The crosscutting concern being likely to occur can effectively be staggered by the different body of wall of layer thickness, thus solves after crack occurs in single body of wall Radiation leak, cause the serious problems of underground water and soil pollution.
Further, for the intensity of reinforcement unit assembly, described each described unit block include two vertical channel-section steels, six The horizontal channel-section steel of root two and a built-in steel plate;Two vertical channel-section steels are arranged along the long limit of built-in steel plate and with built-in steel plate full weld even Connect;The horizontal channel-section steel of the six roots of sensation two is connected between two vertical channel-section steels and with two vertical channel-section steel full welds, and breaks with built-in steel plate Continuous weldering connects.
Further, for ensureing the water resistance of built-in continuous steel plate, between described steel plate and built-in steel plate, there is 15mm Gap.
Further, for ensureing the intensity of built-in continuous steel plate, described horizontal channel-section steel has six roads, and first is liftoff 150mm, second from first 750mm, the 3rd road far from second 1000mm, the 4th road from the 3rd road 1000mm, the 5th road from 4th road 1000mm, the 6th road is from the 5th road 1000mm.
Further, for ensureing the pouring quality of body of wall, in described step g, the mode that pours of concrete is: inside and outside layer is taken turns Flow placement layer by layer, and the thickness of each layering is not more than 600mm.
Further, for the concreting mode of top board in step h described in the pouring quality of guarantee top board it is: point two-layer Gradient formula casting concrete.
Accompanying drawing explanation
Fig. 1 is construction work block diagram.
Fig. 2 is wall steel bar colligation and steel plate for sealing water scheme of installation on floorboard.
Fig. 3 is for pouring floorslab concrete schematic diagram.
Fig. 4 is for installing built-in steel plate unit block schematic diagram.
Fig. 5 is built-in steel plate unit block structural representation.
Fig. 6 is junction steel plate and horizontal channel-section steel scheme of installation between built-in steel plate unit block.
Fig. 7 is steel plate and horizontal channel-section steel mounting structure figure.
Fig. 8 is that built-in steel plate welds schematic diagram with steel plate for sealing water.
Fig. 9 is reinforcing bar binding schematic diagram.
Figure 10 is that inside and outside layer synchronizes casting concrete schematic diagram.
Figure 11 is top board structure construction schematic diagram.
Accompanying drawing being merely cited for property explanation, it is impossible to be interpreted as the restriction to this patent;In order to the present embodiment is more preferably described, attached Scheme some parts to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, In accompanying drawing, some known features and explanation thereof may be omitted and be will be understood by.Same or analogous label correspondence is same or similar Parts;Term the being merely cited for property explanation of position relationship described in accompanying drawing, it is impossible to be interpreted as the restriction to this patent.
Detailed description of the invention
With embodiment, technical scheme is described further below in conjunction with the accompanying drawings.
Embodiment 1
A kind of super thick built-in wall steel plate waterproof radioprotective construction method, it is characterised in that comprise the steps of
A., built-in steel plate built-in fitting (as shown in Figure 2) is installed: wall steel bar 1 colligation and steel plate for sealing water 2 are pacified on floorboard After installing into, built-in steel plate built-in fitting 3 is installed one by one;
B. pour floorslab concrete (as shown in Figure 3): after built-in fitting 3 installation, body of wall side form on floorboard be installed, And pour floor concrete 4;
C., built-in steel plate unit block (as illustrated in figures 4-5) is installed: built-in steel plate unit block 5 is arranged on built-in fitting 3 On, after behind location, adjustment perpendicularity meets the requirements, fix with built-in fitting 3 full weld;Each described unit block 5 includes that two are erected To channel-section steel 9, the horizontal channel-section steel of the six roots of sensation 2 12 and a built-in steel plate 8;Two vertical channel-section steels 9 are arranged also along the long limit of built-in steel plate 8 It is connected with built-in steel plate 8 full weld;The horizontal channel-section steel of the six roots of sensation 2 12 is expired between two vertical channel-section steels 9 and with two vertical channel-section steels 9 Weldering connects, and is connected with built-in steel plate 8 discontinuous welding;
Between the most built-in steel plate unit block, junction steel plate and horizontal channel-section steel install (as shown in fig. 6-7): built-in steel plate unit After assembly 5 installation, the steel plate 6 between built-in steel plate unit block 5 and horizontal channel-section steel 1 are installed, use and steel plate 6 is first installed The order of the horizontal channel-section steel of rear installation 1 is installed, by full with vertical channel-section steel 9 after steel plate 6 and built-in steel plate 8 location, 15mm gap apart Weldering connects;Weld, the most successively by second with vertical channel-section steel 9 full weld after horizontal for the first liftoff 150mm of channel-section steel 1 is positioned From first 750mm position after weld with vertical channel-section steel 9 full weld, the 3rd road far from second 1000mm location after with vertical channel-section steel 9 Full weld welding, the 4th road are welded with vertical channel-section steel 9 full weld behind the 3rd road 1000mm location, the 5th road is fixed from the 4th road 1000mm Weld with vertical channel-section steel 9 full weld after Wei, the 6th road welds with vertical channel-section steel 9 full weld behind the 5th road 1000mm location;Finally will The horizontal channel-section steel in each road 1 is connected with steel plate 6 discontinuous welding;
The most built-in steel plate welds with steel plate for sealing water (as shown in Figure 8): by built-in steel plate 8 and pre-buried steel plate for sealing water 2 full weld Connect, and detect the weld seam of built-in steel plate 8 and steel plate for sealing water 2, to guarantee not seep water;
F. reinforcing bar binding (as shown in Figure 9): the assembling reinforcement 10 simultaneously toward both sides, wall limit in wall, and determine bracket 11 Position;
The most inside and outside layer synchronizes casting concrete (as shown in figs. 10-11): after reinforcing bar binding completes, installation form, outside employing Top form fixed form, vertical casting concrete is to bracket 11, and it pours mode and is: vertically divide Secondary casting concrete, Pouring for the first time to bracket 11, second time pours together with top board, and the most inside and outside layer pours together, and layering thickness is not more than 600mm, inside and outside each layer pours in turn, pours order and sees 1-1 → 1-2 → 1-3 in " Figure 11 " ... 1-13 and 2-1 → 2-2 → 2-3……2-6;
H. top board structure construction (as shown in figure 11): after roof plate template installation, installs roof steel bar, then by first Top board order casting concrete after sidewall, wherein top board point two-layer gradient formula pours;Maintenance afterwards, form removal;
I. constructed.
Obviously, the above embodiment of the present invention is only for clearly demonstrating example of the present invention, and is not right The restriction of embodiments of the present invention.For those of ordinary skill in the field, the most also may be used To make other changes in different forms.Here without also cannot all of embodiment be given exhaustive.All at this Any amendment, equivalent and the improvement etc. made within the spirit of invention and principle, should be included in the claims in the present invention Protection domain within.

Claims (6)

1. a super thick built-in wall steel plate waterproof radioprotective construction method, it is characterised in that comprise the steps of
A., built-in steel plate built-in fitting is installed: on floorboard after wall steel bar (1) colligation and steel plate for sealing water (2) installation, by Individual installation built-in steel plate built-in fitting (3);
B. pour floorslab concrete: after built-in fitting (3) installation, body of wall side form on floorboard is installed, and pours flooring coagulation Soil (4);
C., built-in steel plate unit block is installed: built-in steel plate unit block (5) be arranged on built-in fitting (3), adjustment behind location After perpendicularity meets the requirements, fix with built-in fitting (3) full weld;
Between the most built-in steel plate unit block, junction steel plate and horizontal channel-section steel are installed: after the installation of built-in steel plate unit block (5), Installing the steel plate (6) between built-in steel plate unit block (5) and horizontal channel-section steel one (7), employing is first installed steel plate (6) and is installed water afterwards The order of steel one (7) of rising as high as the banks is installed, and steel plate (6) is connected with vertical channel-section steel (9) full weld, horizontal channel-section steel one (7) and vertical channel-section steel (9) Full weld welds, and horizontal channel-section steel one (7) is connected with steel plate (6) discontinuous welding;
The most built-in steel plate welds with steel plate for sealing water: is connected with pre-buried steel plate for sealing water (2) full weld by built-in steel plate (8), and detects Built-in steel plate (8) and the weld seam of steel plate for sealing water (2), to guarantee not seep water;
F. reinforcing bar binding: the assembling reinforcement simultaneously (10) toward both sides, wall limit in wall, and determine the position of bracket (11);
The most inside and outside layer synchronizes casting concrete: after reinforcing bar binding completes, installation form, uses outer top form fixed form, vertically Casting concrete is to bracket (11);
H. top board structure construction: after roof plate template installation, installs roof steel bar, then waters by top board order after first sidewall Build concrete, maintenance afterwards, form removal;
I. constructed.
Super thick built-in wall steel plate the most according to claim 1 waterproof radioprotective construction method, it is characterised in that Mei Gesuo State unit block (5) and include two vertical channel-section steels (9), the horizontal channel-section steel of the six roots of sensation two (12) and a built-in steel plate (8);Two vertical Channel-section steel (9) is arranged along the long limit of built-in steel plate (8) and is connected with built-in steel plate (8) full weld;The horizontal channel-section steel of the six roots of sensation two (12) is positioned at It is connected between two vertical channel-section steels (9) and with two vertical channel-section steel (9) full welds, and is connected with built-in steel plate (8) discontinuous welding.
Super thick built-in wall steel plate the most according to claim 2 waterproof radioprotective construction method, it is characterised in that described steel The gap of 15mm is there is between plate (6) and built-in steel plate (8).
Super thick built-in wall steel plate the most according to claim 3 waterproof radioprotective construction method, it is characterised in that described water Steel one (7) of rising as high as the banks has six roads, first is liftoff 150mm, and second is from first 750mm, and the 3rd road is far from second 1000mm, the 4th road is from the 3rd road 1000mm, and the 5th road is from the 4th road 1000mm, and the 6th road is from the 5th road 1000mm.
Super thick built-in wall steel plate the most according to claim 4 waterproof radioprotective construction method, it is characterised in that described step In rapid g, the mode that pours of concrete is: inside and outside layer placement layer by layer in turn, and the thickness of each layering is not more than 600mm.
Super thick built-in wall steel plate the most according to claim 5 waterproof radioprotective construction method, it is characterised in that described step In rapid h, the concreting mode of top board is: point two-layer gradient formula casting concrete.
CN201510027320.0A 2015-01-20 2015-01-20 A kind of super thick built-in wall steel plate waterproof radioprotective construction method Active CN104631666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510027320.0A CN104631666B (en) 2015-01-20 2015-01-20 A kind of super thick built-in wall steel plate waterproof radioprotective construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510027320.0A CN104631666B (en) 2015-01-20 2015-01-20 A kind of super thick built-in wall steel plate waterproof radioprotective construction method

Publications (2)

Publication Number Publication Date
CN104631666A CN104631666A (en) 2015-05-20
CN104631666B true CN104631666B (en) 2016-10-05

Family

ID=53210861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510027320.0A Active CN104631666B (en) 2015-01-20 2015-01-20 A kind of super thick built-in wall steel plate waterproof radioprotective construction method

Country Status (1)

Country Link
CN (1) CN104631666B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947710B (en) * 2015-05-27 2016-08-24 广东省建筑设计研究院 A kind of underground radioprotective rigid self-waterproof Architectural Construction and construction method thereof
CN106312245A (en) * 2015-09-28 2017-01-11 中国辐射防护研究院 Welding method for steel linear of low-background laboratory
CN107509300A (en) * 2017-09-12 2017-12-22 广东省建筑工程机械施工有限公司 A kind of radiation proof target center structure
CN107916727A (en) * 2017-12-22 2018-04-17 上海宝岳住宅工业有限公司 A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing
CN108118790A (en) * 2017-12-22 2018-06-05 上海紫宝住宅工业有限公司 Edge joint position waterproofing node construction and construction method among a kind of prefabricated composite wallboard in underground
CN108130956A (en) * 2017-12-22 2018-06-08 上海紫宝住宅工业有限公司 A kind of prefabricated composite wallboard corner wall waterproofing node structure in underground and construction method
CN110331796B (en) * 2019-07-26 2024-04-16 中建八局装饰工程有限公司 Construction method of wall surface anti-radiation paint layer and wall structure
CN112360144A (en) * 2020-11-08 2021-02-12 上海宝冶集团有限公司 Thickness control device for symmetric wall body of steel plate concrete shear wall and construction method thereof
CN112376754A (en) * 2020-11-12 2021-02-19 沈红明 Mounting process of trench-through protective wall
CN115324343B (en) * 2022-09-07 2024-06-18 中建八局第三建设有限公司 Construction method for embedding large-sized radiation-proof steel plates in shear wall

Also Published As

Publication number Publication date
CN104631666A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN104631666B (en) A kind of super thick built-in wall steel plate waterproof radioprotective construction method
CN103205979B (en) Method for constructing large raft foundation under high temperature
Tan et al. Zoned excavation of an oversized pit close to an existing metro line in stiff clay: Case study
CN104196042B (en) A kind of steel sheet pile cofferdam structure construction method
CN105696622B (en) A kind of prefabricated city piping lane and its construction method
CN102619236B (en) Compound type ice chest foundation construction method
CN107503382B (en) End template fixed rubber water stop belt structure and construction method thereof
CN109372019A (en) Cable duct original position rest construction method
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN104894926B (en) Retaining structure and its construction method on the high embankment of existing railway
CN103806426B (en) Earth pressure gauge adjustable position secure mounting arrangements
CN105297731B (en) Reverse construction method steel stand column positioning device and positioning method
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN108457148A (en) A kind of multi-functional temporary road structure of assembled and its construction method
CN103233465A (en) Collimation permanent point structure and construction method thereof
CN101963062B (en) Construction method for tunnel waterproofing system
CN103938633A (en) Steel pipe column concrete casting construction method employing cavern-pile method
CN103628899B (en) Retain CRD median septum and be welded with water flange construction technology
CN207717504U (en) A kind of support construction for ultra-large type bifurcated pipe group's water pressure test
CN105715094A (en) Protecting device for high-voltage line pole
CN104793262A (en) Stratum hierarchical displacement monitoring method
CN209960000U (en) Concrete-encapsulated pipeline structure
CN208501735U (en) Prefabricated piping lane
CN207775648U (en) A kind of precast concrete block road
CN104653227B (en) Construction method of movable shielding iron box crossing tunnel top plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Dong Heng Lu, Guangzhou city of Guangdong province Tianhe District 510000 martyrs No. 11

Patentee after: GUANGDONG PROVINCIAL ARCHITECTURAL ENGINEERING MACHINERY CONSTRUCTION Co.

Patentee after: GUANGDONG CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 510000 Guangdong Province, Guangzhou Tianhe Tianrun Road No. 87 wide building

Patentee before: GUANGDONG CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee before: GUANGDONG PROVINCIAL ARCHITECTURAL ENGINEERING MACHINERY CONSTRUCTION Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170329

Address after: Dong Heng Lu, Guangzhou city of Guangdong province Tianhe District 510000 martyrs No. 11

Patentee after: GUANGDONG PROVINCIAL ARCHITECTURAL ENGINEERING MACHINERY CONSTRUCTION Co.

Patentee after: GUANGDONG CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 510000 Guangdong Province, Guangzhou Tianhe Tianrun Road No. 87 wide building

Patentee before: GUANGDONG CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee before: GUANGDONG PROVINCIAL ARCHITECTURAL ENGINEERING MACHINERY CONSTRUCTION Co.