CN106996300B - A kind of anchor bar of waterproof plate in tunnels laying method - Google Patents

A kind of anchor bar of waterproof plate in tunnels laying method Download PDF

Info

Publication number
CN106996300B
CN106996300B CN201710256979.2A CN201710256979A CN106996300B CN 106996300 B CN106996300 B CN 106996300B CN 201710256979 A CN201710256979 A CN 201710256979A CN 106996300 B CN106996300 B CN 106996300B
Authority
CN
China
Prior art keywords
splash guard
strip tape
strip
tunnel
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710256979.2A
Other languages
Chinese (zh)
Other versions
CN106996300A (en
Inventor
胡昊
刘素云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201710256979.2A priority Critical patent/CN106996300B/en
Publication of CN106996300A publication Critical patent/CN106996300A/en
Application granted granted Critical
Publication of CN106996300B publication Critical patent/CN106996300B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of anchor bar of waterproof plate in tunnels laying method, comprising: strip tape (1) is arranged on splash guard (2) by step 1 in blossom type, and by strip tape (1) one end sweat soldering on splash guard (2), the other end is as free end;Geotextiles (6) are followed closely supporting in the early stage (7) surface by cement nail (5) as press strip by splash guard band (3) by step 2, and two cement nails (5) are one group;Step 3, it is laid with splash guard (2), keep strip tape (1) and every group of cement nail (5) corresponding one by one, and make strip tape (1) between every group of two cement nails (5), one by one by splash guard band (3) of strip tape (1) free end between every group of two cement nails (5) and gap geotextiles (6), by strip tape (1) free end sweat soldering on splash guard (2).It comes to nothing after secondary back caused by solving the problems, such as because of splash guard (2) not prison welding, improves splash guard (2) laying quality.

Description

A kind of anchor bar of waterproof plate in tunnels laying method
Technical field
The present invention relates to a kind of waterproof slab pavement method, more specifically to a kind of laying method of anchor bar of waterproof plate in tunnels, Belong to civil engineering technical field of tunnel construction.
Background technique
The laying of anchor bar of waterproof plate in tunnels is before Second Lining Construction, and branch mask upper berth sets one layer of non-woven geotextile in the early stage, Re-lay one layer of splash guard;With non-woven geotextile by climbing together with welder, splash guard detects splash guard after the completion of being laid with Its air-tightness, determine without it is damaged, without can just start Second Lining Construction after permeable.
Traditional waterproof slab pavement method is by heating the hot melt gasket of splash guard and fixed non-woven geotextile It welds, to which splash guard is laid on geotextiles outer layer;This sweat soldering process uses industrial hot hair dryer.But this There are following deficiencies for kind method: one, easy to fall off: splash guard requires to be laid with from tunnel top to two sides abutment wall, and prevents Water plate itself is heavier, and being laid with part before when the sweat soldering intensity of blowing hot wind is not enough to bear splash guard weight will take off It falls, vault part is be easy to cause to come to nothing;Two, easily scald broken: hot hair dryer is not easily controlled hot melting temperature and sphere of action, hot melt pad Piece thus fusing point different from splash guard material is different, easily that hot melt gasket is boiling hot broken with outer portion splash guard in operating process, prevents Water plate broken hole is more to will seriously affect waterproof effect.
Summary of the invention
It is an object of the invention to be laid with for existing anchor bar of waterproof plate in tunnels, technique not prison welding is easy to fall off, easily scalds broken formed The deficiencies of broken hole, proposes a kind of anchor bar of waterproof plate in tunnels laying method.
To achieve the above object, the technical solution of the invention is as follows: a kind of anchor bar of waterproof plate in tunnels laying method, including following Step:
Step 1 cuts out the strip tape of design requirement hot melt gasket quantity, hot melt gasket is substituted with strip tape, over-the-counter First strip tape is arranged on splash guard to be laid according to design requirement hot melt gasket spacing in blossom type, makes strip tape short side It lays along tunnel profile, long edge tunnel cross section direction, prevents the sweat soldering of strip tape one end in be laid outside the venue On water plate, the other end is as free end;
Step 2 cuts out the splash guard band isometric with a plate secondary lining longitudinal length, splash guard bandwidth with splash guard Degree is of same size with strip tape, and splash guard band quantity is equal with strip tape longitudinal direction columns, by splash guard band along tunnel profile side Geotextiles are followed closely by supporting surface in the early stage by cement nail to as press strip, two cement nails are one group, every group of two cement Spacing is greater than strip bandwidth between nail, and every group of cement nail installation position is corresponding with strip tape position on splash guard to be laid;
The splash guard that strip tape is welded is transported on tunnel inner waterproofing pallet vehicle, from tunnel vault to tunnel by step 3 Abutment wall starts to be laid with splash guard, two water for keeping strip tape and every group of cement nail corresponding one by one, and strip tape being made to be located at every group Between mud nail, one by one by splash guard band of the strip tape free end between every group of two cement nails and gap geotextiles, then By the sweat soldering of strip tape free end on splash guard;
Step 4, after whole strip tapes free end is welded on splash guard by method in step 3 on splash guard, i.e., Complete splash guard laying.
The strip tape is having a size of 15cm*3cm.
The design spacing of strip tape is 60cm on the splash guard of tunnel vault part in the step 1, is located at tunnel The design spacing of strip tape is 80cm on the splash guard of side wall portions.
Compared with prior art, the beneficial effects of the present invention are:
1, splash guard band is used as " press strip " in the present invention, and conventional waterproof plate is replaced to heat gasket, is utilized by cement nail anti- It is mass action that geotextiles are followed closely supporting surface, splash guard band in the early stage by water strip, and the single-point compared to hot melt gasket acts on fixation Effect is more preferable.
2, proposed by the present invention is welding requirements between water-proof sheet material, and the weld strength of identical storeroom is much higher than tradition Splash guard and hot melt gasket weld strength, effectively reduce splash guard two lining work progress in there is the general of local shedding Rate substantially increases work efficiency.
3, the sweat soldering technique of splash guard and splash guard requires welding temperature low, and weld interval is short, to waterproof around The influence of plate is small, can be effectively controlled damaged generation, greatly improves splash guard laying quality.
4, strip tape and splash guard band can use the remaining leftover pieces production of splash guard, save a large amount of hot melt gaskets, There is preferable economic benefit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that splash guard is welded with strip tape in the present invention.
Fig. 2 be in the present invention splash guard band in Tunnel surface layout position illustration.
Fig. 3 be in the present invention two lining splash guards be laid with after the completion of the schematic diagram of the section structure.
In figure, strip tape 1, splash guard 2, splash guard band 3, tunnel 4, cement nail 5, geotextiles 6, preliminary bracing 7.
Specific embodiment
Below in conjunction with Detailed description of the invention and specific embodiment, the present invention is described in further detail.
Referring to Fig. 1 to Fig. 3, a kind of anchor bar of waterproof plate in tunnels laying method is related to tunnel water proofing construction technology, including following step It is rapid:
Step 1 cuts out the strip tape 1 of design requirement hot melt gasket quantity, substitutes hot melt gasket with strip tape 1.It is on the scene It is outer to be first arranged in strip tape 1 on splash guard 2 to be laid in blossom type according to design requirement hot melt gasket spacing, due to waterproof Plate 2 is that circumferential direction is spread out in tunnel 4, lays 1 short side of strip tape along 4 vertical section of tunnel, long 4 cross-sectional direction of edge tunnel; Then outside the venue using 1 one end of strip tape using hot hair dryer sweat soldering on splash guard 2 to be laid, the other end as freely End.Because the sweat soldering intensity of identical storeroom is higher, splash guard 2 and strip tape 1 belong to identical material, to keep welding more firm Gu;The surplus splash guard of tailing or entire volume can be used in strip tape 1, increases economic efficiency.Herein in blossom type arrange, Strip tape 1 i.e. on two splash guard bands 3 of arbitrary neighborhood is staggered front to back arrangement, and is staggered front to back and is equidistant.Design herein It is required that hot melt gasket spacing, under normal circumstances, the design spacing of strip tape 1 is on the splash guard 2 of tunnel vault part 60cm~80cm, the design spacing of strip tape 1 is 80cm~100cm on the splash guard 2 of tunnel side wall part;Because of strip Band 1 is arranged in blossom type, so spacing herein refers to the linear distance between two strip tapes 1, it had both been tunnel profile The distance between two neighboring strip tape 1 in direction, and the spacing between the two neighboring strip tape 1 in tunnel cross section direction.
Step 2 cuts out the splash guard band 3 isometric with a plate secondary lining longitudinal length, splash guard band 3 with splash guard 2 Width and strip tape 1 are of same size, and 3 quantity of splash guard band is equal with the longitudinal columns of strip tape 1;Splash guard band 3 is indulged along tunnel 4 Geotextiles 6 are followed closely by 7 surface of supporting in the early stage by cement nail 5 as press strip in section direction.Two cement nails 5 are one group, every group Two cement nails 5 between spacing be greater than 1 width of strip tape, strip on every group of 5 installation position of cement nail and splash guard 2 to be laid 1 position of band is corresponding;1 width of strip tape herein is the length of 1 short side of strip tape.Phase is acted on existing hot melt gasket single-point Than mass action effect can be played as press strip by splash guard band 3, and fixed effect is more preferably.
The splash guard 2 that strip tape 1 is welded is transported on 4 inner waterproofing pallet vehicle of tunnel, according to first tunnel vault by step 3 The sequence of tunnel side wall afterwards is laid with splash guard 2, makes strip tape 1 and every group of cement nail 5 one since tunnel vault to tunnel side wall One is corresponding, and makes strip tape 1 between every group of two cement nails 5.1 free end of strip tape is passed through into every group of two water again Gap between splash guard band 3 and geotextiles 6 between mud nail 5, strip tape 1 across splash guard band 3 and geotextiles 6 behind gap, With the cross-shaped state of splash guard band 3, using hot hair dryer again by 1 free end sweat soldering of strip tape on splash guard 2.Strip tape 1 and splash guard 2 are identical material, weld strength between the two much higher than splash guard 2 in the prior art and hot melt gasket it Between weld strength;And bonding area is small, weld interval is short, so that small to the damage of splash guard 2 around.And in process of deployment Worker can strip tape 1 to be welded on splash guard 2 as impetus, simplify using the cumbersome of 2 stake tools of splash guard Operation;All operations simultaneously can carry out at 2 back side of splash guard, i.e., complete in the region between splash guard 2 and geotextiles 6, It is convenient to operate.
Step 4, after 1 free end of whole strip tapes is welded on splash guard 2 by method in step 3 on splash guard 2, Complete the laying of splash guard 2.
Specifically, the strip tape 1 is having a size of 15cm*3cm, i.e. the length of strip tape 1 is 15cm, width 3cm.
Specifically, accurate according to actual tunnel sectional dimension, reasonable Arrangement splash guard 2 to be laid vault and abutment wall portion Point, preferably make the design spacing 60cm of strip tape 1 on the splash guard 2 for being located at tunnel vault part in the step 1, be located at The design spacing of strip tape 1 is 80cm on the splash guard 2 of tunnel side wall part.Under normal conditions, in order to which practical operation is convenient, system The one design spacing for pressing strip tape 1 is 60cm arrangement.
This waterproof slab pavement method is easy to operate, caused by can solve because of 2 not prison welding of splash guard after secondary back It comes to nothing problem;And welding operation is small to the damage of splash guard 2, can be effectively controlled damaged generation, greatly improves the laying of splash guard 2 Quality.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, and above structure all shall be regarded as belonging to Protection scope of the present invention.

Claims (3)

1. a kind of anchor bar of waterproof plate in tunnels laying method, which comprises the following steps:
Step 1 is cut out a certain number of strip tapes (1), the hot melt gasket number of strip tape (1) quantity and design requirement Amount is consistent, substitutes hot melt gasket with strip tape (1), first strip tape (1) is arranged on splash guard to be laid (2) outside the venue, The strip tape (1) is arranged according to the hot melt gasket spacing of design requirement in blossom type, makes strip tape (1) short side along tunnel (4) Vertical section, long edge tunnel (4) cross-sectional direction are laid, and prevent strip tape (1) one end sweat soldering in be laid outside the venue On water plate (2), the other end is as free end;
Step 2 cuts out the splash guard band (3) isometric with a plate secondary lining longitudinal length, splash guard band with splash guard (2) (3) width and strip tape (1) are of same size, and splash guard band (3) quantity is equal with the longitudinal columns of strip tape (1), by splash guard band (3) along tunnel (4) vertical section direction as press strip by cement nail (5) by geotextiles (6) follow closely supporting in the early stage (7) surface, two A cement nail (5) is one group, and spacing is greater than strip tape (1) width, every group of cement nail (5) between every group of two cement nails (5) Installation position is corresponding with strip tape (1) position on splash guard to be laid (2);
The splash guard (2) that strip tape (1) is welded is transported on tunnel (4) inner waterproofing pallet vehicle by step 3, from tunnel vault to Tunnel side wall starts to be laid with splash guard (2), keeps strip tape (1) and every group of cement nail (5) corresponding one by one, and make strip tape (1) It is one by one that strip tape (1) free end is anti-between every group of two cement nails (5) between every group of two cement nails (5) Gap between water strip (3) and geotextiles (6), then by strip tape (1) free end sweat soldering on splash guard (2);
Step 4 is welded on splash guard (2) by method in step 3 to strip tape (1) free ends whole on splash guard (2) Afterwards, that is, splash guard (2) laying is completed.
2. a kind of anchor bar of waterproof plate in tunnels laying method according to claim 1, it is characterised in that: described strip tape (1) ruler Very little is 15cm*3cm.
3. a kind of anchor bar of waterproof plate in tunnels laying method according to claim 1, it is characterised in that: be located at tunnel in the step 1 The design spacing of strip tape (1) is 60cm, the splash guard (2) positioned at tunnel side wall part on the splash guard (2) of road vault part The design spacing of upper strip tape (1) is 80cm.
CN201710256979.2A 2017-04-19 2017-04-19 A kind of anchor bar of waterproof plate in tunnels laying method Active CN106996300B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256979.2A CN106996300B (en) 2017-04-19 2017-04-19 A kind of anchor bar of waterproof plate in tunnels laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256979.2A CN106996300B (en) 2017-04-19 2017-04-19 A kind of anchor bar of waterproof plate in tunnels laying method

Publications (2)

Publication Number Publication Date
CN106996300A CN106996300A (en) 2017-08-01
CN106996300B true CN106996300B (en) 2019-02-19

Family

ID=59434876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256979.2A Active CN106996300B (en) 2017-04-19 2017-04-19 A kind of anchor bar of waterproof plate in tunnels laying method

Country Status (1)

Country Link
CN (1) CN106996300B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561163A (en) * 2018-05-29 2018-09-21 陈禹彤 A kind of water-proof sheet material and its construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285793A (en) * 2001-03-26 2002-10-03 Taisei Corp Water-proof sheet for tunnel and its laying method
CN202431281U (en) * 2011-12-13 2012-09-12 中铁十八局集团第三工程有限公司 Waterproof structure outside side wall of subway station main body
CN202659252U (en) * 2012-05-31 2013-01-09 中铁十局集团西北工程有限公司 Tunnel water proofing system
CN202731941U (en) * 2012-08-15 2013-02-13 中铁十九局集团第二工程有限公司 Waterproof device for tunnel construction
CN202937276U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Waterproof structure for tunnel
CN103790601A (en) * 2014-03-08 2014-05-14 福州市规划设计研究院 Structure and method for multipoint suspending laying construction of tunnel waterproof board
CN103912291A (en) * 2014-01-15 2014-07-09 邓卫东 Sucker device for waterproof board construction and tunnel waterproof board construction method
JP2015505919A (en) * 2012-11-05 2015-02-26 デフン インダストリー カンパニー、リミテッド Tunnel tarpaulin
CN104453953A (en) * 2014-11-04 2015-03-25 中铁隧道集团有限公司 Simple fixing method for nail-free laying of waterproof board of tunnel
CN105422142A (en) * 2015-12-12 2016-03-23 中铁十九局集团第二工程有限公司 Construction method for high and cold region tunnel hole body water resistance

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285793A (en) * 2001-03-26 2002-10-03 Taisei Corp Water-proof sheet for tunnel and its laying method
CN202431281U (en) * 2011-12-13 2012-09-12 中铁十八局集团第三工程有限公司 Waterproof structure outside side wall of subway station main body
CN202659252U (en) * 2012-05-31 2013-01-09 中铁十局集团西北工程有限公司 Tunnel water proofing system
CN202731941U (en) * 2012-08-15 2013-02-13 中铁十九局集团第二工程有限公司 Waterproof device for tunnel construction
JP2015505919A (en) * 2012-11-05 2015-02-26 デフン インダストリー カンパニー、リミテッド Tunnel tarpaulin
CN202937276U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Waterproof structure for tunnel
CN103912291A (en) * 2014-01-15 2014-07-09 邓卫东 Sucker device for waterproof board construction and tunnel waterproof board construction method
CN103790601A (en) * 2014-03-08 2014-05-14 福州市规划设计研究院 Structure and method for multipoint suspending laying construction of tunnel waterproof board
CN104453953A (en) * 2014-11-04 2015-03-25 中铁隧道集团有限公司 Simple fixing method for nail-free laying of waterproof board of tunnel
CN105422142A (en) * 2015-12-12 2016-03-23 中铁十九局集团第二工程有限公司 Construction method for high and cold region tunnel hole body water resistance

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
八达岭隧道防水层施工技术研究;徐三甫;《铁道标准设计》;20010331;第21卷(第3期);第39-40页
浅谈铁路客运专线隧道防水施工技术;牛之印;《铁道建筑技术》;20080531;第39-42页

Also Published As

Publication number Publication date
CN106996300A (en) 2017-08-01

Similar Documents

Publication Publication Date Title
CN103225285B (en) A kind of steel membrane rock
CN209724368U (en) A kind of improved metro built by mining method water proof structure
CN204532378U (en) Subway tunneling boring rock tunnel development machine engineering method tunnel water handling constructs
CN106996300B (en) A kind of anchor bar of waterproof plate in tunnels laying method
CN104847382A (en) Self-adhesive composite waterproof layer for tunnel and paving method of self-adhesive composite waterproof layer
CN105421191A (en) Prefabricated rubber track and paving method thereof
CN205013018U (en) Severe cold district tunnel portal section waterproof heat -insulating layer construction structures
CN107060879A (en) A kind of easily paving hung type drain bar and its installation method
KR20050095797A (en) A process for water-proof construction
CN105422142A (en) Construction method for high and cold region tunnel hole body water resistance
CN205936663U (en) Undercut tunnel waterproof construction
CN106522283B (en) PVC lining corrosion protections and its construction and construction leak hunting method
CN213572282U (en) Anti-seepage road water guide ditch structure based on concrete blanket
CN206647136U (en) A kind of easily paving hung type drain bar
CN206360343U (en) A kind of post-cast strip side mold device for pre-installed and inverted adhered waterproof surface
CN205347925U (en) Prefabricated type rubber runway
CN205934864U (en) Arch dam induced joint grouting platform structure
CN105672469B (en) The irregular sludge lagoon covered structure of large area and construction method
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN202659252U (en) Tunnel water proofing system
CN104563392B (en) The regenerative mixed beam of a kind of built-in box shaped steel and construction technology thereof
CN212803268U (en) Tunnel waterproof node structure
CN206681761U (en) Tunnel gunite concrete shaping equipment
KR20100088973A (en) Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel
CN205530664U (en) Irregular sludge lagoon overlay structure of large tracts of land

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant