KR20100088973A - Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel - Google Patents
Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel Download PDFInfo
- Publication number
- KR20100088973A KR20100088973A KR1020090008143A KR20090008143A KR20100088973A KR 20100088973 A KR20100088973 A KR 20100088973A KR 1020090008143 A KR1020090008143 A KR 1020090008143A KR 20090008143 A KR20090008143 A KR 20090008143A KR 20100088973 A KR20100088973 A KR 20100088973A
- Authority
- KR
- South Korea
- Prior art keywords
- sheet
- waterproof
- loop
- drain
- tunnel
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/381—Setting apparatus or devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2450/00—Gaskets
- E02D2450/10—Membranes
- E02D2450/105—Membranes impermeable
- E02D2450/106—Membranes impermeable for liquids
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Abstract
Description
본 발명은 터널용 방수부재 및 이를 이용한 터널 방수 시공방법에 관한 것으로, 더 상세하게는 숏크리트층에 배수시트 및 방수시트의 설치를 간편하게 할 수 있고, 배수시트가 벨크로화스너에 확실하게 부착되는 터널용 방수부재 및 이를 이용한 터널 방수 시공방법에 관한 것이다.The present invention relates to a tunnel waterproof member and a tunnel waterproof construction method using the same, and more particularly, it is possible to simplify the installation of the drain sheet and the waterproof sheet in the shotcrete layer, the drain sheet is securely attached to the Velcro fastener It relates to a waterproof member and a tunnel waterproof construction method using the same.
터널이란 교통, 통수 등의 목적으로 산악, 지하 또는 수저 등에 구멍을 뚫어 형성한 상당 크기의 내공 단면을 가지는 갱도를 말하는 것으로, 주로 도로, 철도 등의 건설시 산악 지형 등 장애물을 만나는 경우 직선 경로의 확보를 위하여 건설되어 왔으며, 특히 최근 들어서는 지상의 도로 교통량의 분산을 위해 지하철의 건설이 늘어감에 따라 도심의 지하 공간을 관통하는 도심 터널의 시공이 증가하고 있는 추세이다.A tunnel is a tunnel with a substantial internal cross section formed by drilling holes in a mountain, underground, or cutlery for the purpose of transportation, water transportation, etc. In recent years, the construction of urban tunnels that penetrate underground spaces of the city has been increasing as the construction of subways has increased in order to distribute road traffic on the ground.
이러한 터널의 시공 공법으로는 종래로부터 다양한 방식이 개발되어 적용되고 있으며 현재 도심지의 지하철 터널을 비롯한 지하 공간은, 도 1에 도시한 바와 같이 시공된다. 즉, 터널(1)의 시공 예정 부위에 굴착 기기를 이용하여 굴착을 행하고 암반 등이 있는 경우는 화약 장전에 의한 발파 작업을 통하여 터널 공을 형성한다. 상기와 같이 형성된 터널(1)의 굴착면은 대단히 굴곡이 심하여 후속 방수 작업을 착수하기에 부적합하므로 터널(1) 굴착면을 안정시키고 방수 바탕면을 평활하게 만들기 위해 숏크리트(shotcrete)를 분사하여 숏크리트층(2)을 시공하고, 이어서 터널(1) 내부로 유입되는 지하수의 침투를 막기 위해 배수층인 부직포와 방수부재를 시공한 다음. 터널 내벽을 보호하는 콘크리트 보강 벽체인 라이닝 콘크리트층(Lining concrete; 3)를 타설하는 방식으로 이루어진다.As a construction method of such a tunnel, various methods have been developed and applied conventionally, and underground spaces including subway tunnels in urban areas are currently constructed as shown in FIG. 1. That is, the excavation is carried out at the construction site of the
한편, 터널(1)을 비롯하여 수분과 접하는 구조물에서는 내부로 수분이 스며드는 것을 방지하기 위해 방수 공사를 하는 것이 필수적이며 특히 터널(1)의 경우 지하수와 상시 접촉하고 있는 이유로 이러한 방수 공사의 중요성이 더욱 강조된다. On the other hand, in the structure that is in contact with moisture, including the tunnel (1), it is essential to perform a waterproof construction in order to prevent the penetration of moisture into the interior, especially in the case of the tunnel (1) because of the constant contact with the groundwater, the importance of such waterproof construction Is emphasized.
일반적으로 터널(1) 내부의 방수 공사는 숏크리트층(2) 타설면의 상부에 부직포(5)를 고정 설치하고 상기 부직포(5)의 상부에 방수시트(6)를 적층함으로써 터널(1) 내부로 유입된 물이 부직포(5)를 따라 하부로 흘러내려 터널(1)과 나란하게 설치된 배수관을 통해 배출되도록 하는 유도 방수 방식으로 행해지고 있다. In general, the waterproof construction inside the
도 2는 부직포(5) 및 방수시트(6)로 이루어진 방수부재를 보인 개략적 부분 단면도로써, 숏크리트층(2)에는 일정 간격마다 고정못(8)을 타정하여 부직포(5)를 고정시킨다. 이 때 부직포(5) 상부에 설치될 방수시트(6)의 고정을 위하여 통상 란델(7)이라고 불리는 부재를 고정못(8)에 끼워 함께 설치하여 두며, 위와 같이 설치된 부직포(5)의 상부에는 불투수성의 방수시트(6)를 덧대어 설치하고 이를 란델(7) 에 열접합시킴으로써 방수층을 형성하게 된다.FIG. 2 is a schematic partial cross-sectional view showing a waterproof member composed of a
여기서 란델(7)이란 상부에 설치되는 방수시트(6)의 고정을 위한 디스크 형상의 부재로서 그 재질은 방수시트(6)의 재질과 동일하거나 유사한 재질로 되어 있어 방수시트(6)가 겹쳐진 후 열 기기로 가열하면 용융되어 방수시트(6)와 일체로 열융착되는 일종의 방수시트(6)용 고정 부재이다.Here, the landel (7) is a disk-shaped member for fixing the waterproof sheet (6) to be installed on the upper portion of the material is the same or similar to the material of the waterproof sheet (6) after the waterproof sheet (6) is overlapped It is a kind of fixing member for the
그러나 상기와 같은 종래의 방식은 부직포(5) 상에 일정 간격으로 설치된 란델(7)과 방수시트(6)를 열융착하는 방법에 의해 이루어지고 있는 바, 이 때 과도한 열을 가할 경우 부직포(5)가 연소될 위험이 있고, 란델(7)과의 접합부가 보이지 않아 시공자의 견실한 시공이 어렵다는 문제가 있었으며, 더구나 부직포(5)의 시공과 방수시트(6)의 시공이 별도의 공정으로 이루어져 있어 작업이 번거롭다는 문제점이 있었다.However, the conventional method as described above is made by a method of thermal fusion of the landel 7 and the
이러한 문제점을 해결하기 위해 종래에는 도 3에 도시한 바와 같은 방수부재가 개발되어 사용되고 있다. 이는, 부직포(5)의 배면에 고정부(5a)를 일체로 형성시키고 이 고정부(5a)를 숏크리트층(2)에 밀착시킨 후 고정못(8)을 타정하여서 부직포(5)를 숏크리트층(2)에 고정시킨다. 부직포(5)와 방수시트(6)는 열융착에 의해 서로 고정된다.In order to solve this problem, a waterproof member as shown in FIG. 3 has been developed and used in the related art. This is to form the
그런데 이러한 종래 터널용 방수부재는 부직포(5)를 숏크리트층(2)에 설치하기 위해서는 최소한 2인 이상의 작업자가 배치되어 1인 이상이 부직포 등을 아래로 처지지 않도록 받쳐주고 이와 더불어 또 다른 작업자가 고정못(8)의 타정 작업을 해 나가야 한다.However, in the conventional tunnel waterproof member, at least two or more workers are disposed in order to install the
따라서 상기와 같은 방식은 작업이 매우 번거롭고 노력이 많이 소요되어 작업 능률이 저하될 뿐 아니라 다수의 작업 인력이 투입되므로 작업 효율성 및 경제성에도 문제가 있다. 또한 천정 부위를 시공하는 경우에는 상향 작업을 하여야 하는데, 작업자의 자세가 불안정해짐에 따라 타정작업의 정확도나 작업성이 그만큼 떨어지게 되며, 고정못(8)이 튀거나 작업자가 작업 발판으로부터의 추락하는 등 안전 사고의 위험이 상승되었다.Therefore, the above-described method is very cumbersome and requires a lot of effort, so that not only work efficiency is lowered, but also a large number of workforces are put into place, which leads to problems in work efficiency and economy. In addition, when the ceiling is installed, the work should be upward. As the posture of the worker becomes unstable, the accuracy and workability of the tableting work decreases, and the
상술한 문제점을 해결하기 위한 본 발명의 목적은, 숏크리트층에 배수시트 및 방수시트의 설치를 간편하게 할 수 있도록 한 터널용 방수부재 및 이를 이용한 터널 방수 시공방법을 제공하는데 있다.An object of the present invention for solving the above problems is to provide a tunnel waterproof member and a tunnel waterproof construction method using the same to simplify the installation of the drain sheet and the waterproof sheet in the shotcrete layer.
본 발명의 다른 목적은, 배수시트가 벨크로화스너에 확실하게 부착되도록 한 터널용 방수부재 및 이를 이용한 터널 방수 시공방법을 제공하는데 있다.Another object of the present invention is to provide a tunnel waterproof member and a tunnel waterproof construction method using the same, in which a drain sheet is securely attached to a Velcro fastener.
이와 같은 목적을 달성하기 위한 본 발명의 터널용 방수부재는, 숏크리트층에 고정되고 일면에 후크가 형성된 벨크로화스너; 상기 벨크로화스너 및 숏크리트층에 고정되어서 상기 벨크로화스너를 상기 숏크리트층에 고정시키는 고정못; 상기 벨크로화스너의 후크에 부착되도록 대응면에 루프가 형성된 배수시트; 상기 루프의 반대측면인 상기 배수시트에 열융착되어서 고정되며, 라이닝 콘크리트층의 형성을 위한 콘크리트 타설시 콘크리트의 압력 및 불규칙한 숏크리트층의 표면에 의해 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부와 동일한 두께를 갖는 다수의 엠보싱돌기들이 형성된 방수시트;로 이루어진 것을 특징으로 한다.Tunnel waterproof member of the present invention for achieving the above object, Velcro fastener is fixed to the shotcrete layer and the hook is formed on one surface; A fixing nail fixed to the velcro fasteners and the shotcrete layer to fix the velcro fasteners to the shotcrete layer; A drain sheet having a loop formed on a corresponding surface to be attached to the hook of the Velcro fastener; It is fixed by being heat-sealed to the drain sheet, which is the opposite side of the loop, and stretches in the multi-axial direction according to the stretching pressure applied in the irregular direction by the pressure of concrete and the surface of the irregular shotcrete layer when the concrete is laid for the formation of the lining concrete layer. Characterized in that consisting of; waterproof sheet formed with a plurality of embossing projections having the same thickness as the flat portion.
본 발명 터널용 방수부재의 한 특징은, 상기 배수시트의 루프는, 상기 배수시트의 재질인 부직포를 구성하는 화이버의 일부분으로 이루어진다.One feature of the waterproof member for a tunnel of the present invention is that the loop of the drain sheet comprises a portion of the fiber constituting the nonwoven fabric of the drain sheet.
본 발명 터널용 방수부재의 다른 특징은, 상기 배수시트의 루프는, 상기 배 수시트가 테이블의 상부면을 따라 수평방향으로 이송되면서 권취롤러에 권취되는 동안 다수의 침들이 설치된 침판이 상기 배수시트 내에 꽂힌 후 분리되도록 상기 테이블의 상부면 측으로 승강되면서 상기 배수시트의 표면에 형성하는 보풀로 이루어진다.According to another aspect of the present invention, the loop of the drain sheet may include a needle plate provided with a plurality of needles while the drain sheet is wound on a winding roller while the drain sheet is horizontally transferred along the upper surface of the table. It is made of a fluff formed on the surface of the drain sheet while being lifted to the upper surface side of the table to be separated after being plugged in.
상술한 목적을 달성하기 위한 본 발명 터널용 방수부재는, 숏크리트층에 고정되고 일면에 제1후크가 형성된 제1벨크로화스너; 상기 제1벨크로화스너 및 숏크리트층에 고정되어서 상기 제1벨크로화스너를 상기 숏크리트층에 고정시키는 고정못; 상기 제1벨크로화스너의 제1후크에 부착되도록 대응면에 제1루프가 형성되고 상기 제1루프의 반대측 면에 제2루프가 형성된 배수시트; 상기 배수시트의 제2루프에 부착되고 라이닝 콘크리트층의 형성을 위한 콘크리트 타설시 콘크리트의 압력 및 불규칙한 숏크리트층의 표면에 의해 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부와 동일한 두께를 갖는 다수의 엠보싱돌기들이 형성된 방수시트; 상기 방수시트에 고정되고, 상기 배수시트의 제2루프에 부착되도록 일면에 제2후크가 형성된 제2벨크로화스너;로 이루어진 것을 특징으로 한다.A waterproof member for a tunnel according to the present invention for achieving the above object includes: a first Velcro fastener fixed to a shotcrete layer and having a first hook formed on one surface thereof; A fixing nail fixed to the first Velcro fastener and the shotcrete layer to fix the first Velcro fastener to the shotcrete layer; A drain sheet having a first loop formed on a corresponding surface to be attached to the first hook of the first Velcro fastener and a second loop formed on a surface opposite to the first loop; It is attached to the second loop of the drain sheet and the same thickness as the flat portion so as to extend in the multi-axial direction in accordance with the pressure of the concrete and the stretching pressure applied in the irregular direction by the surface of the irregular shotcrete layer when the concrete is laid to form the lining concrete layer Waterproof sheet formed with a plurality of embossing projections; The second Velcro fastener is fixed to the waterproof sheet, the second hook is formed on one surface to be attached to the second loop of the drain sheet.
상술한 본 발명 터널용 방수부재의 한 특징은, 상기 배수시트의 제1루프는, 상기 배수시트가 제1테이블의 하부면을 따라 수평방향으로 이송되면서 권취롤러에 권취되는 동안 다수의 제1침들이 설치된 제1침판이 상기 배수시트의 일면에 꽂힌 후 분리되도록 상기 제1테이블의 하부면 측으로 승강되면서 상기 배수시트의 제1루프에 형성되는 보풀로 이루어지며; 상기 배수시트의 제2루프는, 상기 배수시트가 제2테이블의 상부면을 따라 수평방향으로 이송되면서 권취롤러에 권취되는 동안 다수의 제2침들이 설치된 제2침판이 상기 배수시트의 타면에 꽂힌 후 분리되도록 상기 제2테이블의 상부면 측으로 승강되면서 상기 배수시트의 제2루프에 형성되는 보풀로 이루어진다.One feature of the waterproof member for tunnels of the present invention described above is that the first loop of the drain sheet includes a plurality of first needles while the drain sheet is wound on the winding roller while being transported horizontally along the lower surface of the first table. The first needle plate is installed is made of a fluff formed in the first loop of the drain sheet while being elevated to the lower surface side of the first table to be separated after being plugged into one surface of the drain sheet; The second loop of the drain sheet has a second needle plate having a plurality of second needles installed on the other surface of the drain sheet while the drain sheet is wound on the winding roller while being transported horizontally along the upper surface of the second table. It is then made of a fluff formed in the second loop of the drain sheet while being elevated to the upper surface side of the second table to be separated.
상술한 목적을 달성하기 위한 터널용 방수부재를 이용한 터널 방수 시공방법은, 굴착된 터널의 내면에 숏크리트층을 타설하는 숏크리트층 형성단계; 상기 숏크리트층을 따라 일정한 크기의 벨크로화스너를 고정시키도록 후크가 형성된 벨크로화스너를 일정한 크기로 재단하는 벨크로화스너 재단단계; 재단된 상기 벨크로화스너를 고정못을 이용하여 숏크리트층에 고정하는 벨크로화스너 고정단계; 상기 벨크로화스너의 후크에 부착되도록 대응면에 루프가 형성된 배수시트와, 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부와 동일한 두께를 갖는 다수의 엠보싱돌기들이 형성된 방수시트를 준비하는 배수시트 및 방수시트 준비단계; 준비된 상기 배수시트의 루프 반대측 면과 방수시트의 평면부를 열융착하여서 고정시키는 배수시트 및 방수시트 열융착단계; 상기 배수시트의 루프 면을 상기 벨크로화스너의 후크에 부착시켜서 상기 배수시트 및 방수시트를 터널의 내측면을 따라 부착시키는 배수시트 및 방수시트 부착단계; 상기 방수시트의 일면에 콘크리트를 타설하여서 마감하는 라이닝 콘크리트층 형성단계;로 이루어진 것을 특징으로 한다.Tunnel waterproof construction method using the waterproof member for the tunnel to achieve the above object, the shotcrete layer forming step of pouring a shotcrete layer on the inner surface of the excavated tunnel; Velcro fastener cutting step of cutting the Velcro fastener formed with a hook to a fixed size to secure the Velcro fastener of a predetermined size along the shotcrete layer; Velcro fastener fixing step of fixing the cut Velcro fastener to the shotcrete layer using a nail; Preparing a drain sheet having a loop on the corresponding surface to be attached to the hook of the Velcro fastener, and a waterproof sheet formed with a plurality of embossed projections having the same thickness as the flat portion to extend in the multi-axial direction in accordance with the stretching pressure applied in an irregular direction Drainage sheet and waterproof sheet preparation step; A heat dissipation sheet and a water dissipation sheet for heat dissipation and fixing the planar portion of the waterproof sheet to the opposite side of the loop of the water dissipation sheet; Attaching the loop surface of the drain sheet to the hook of the Velcro fastener to attach the drain sheet and the waterproof sheet along the inner surface of the tunnel; Characterized in that consisting of; lining concrete layer forming step of finishing by pouring concrete on one surface of the waterproof sheet.
이상에서와 같은 본 발명은, 숏크리트층의 둘레에는 배수시트의 루프가 부착 되도록 후크가 형성된 벨크로화스너가 고정되어 있다. 따라서 배수시트의 일단을 터널의 일측 하단에 고정된 벨크로화스너에 부착시킨 후 숏크리트의 곡면을 따라 배수시트를 밀어 올리면 배수시트의 루프 면이 대향된 벨크로화스너의 후크들에 순차적으로 부착되면서 터널의 내주면에 부착된다. 그러므로 배수시트를 숏크리트층의 벨크로화스너들에 밀착시키면 배수시트가 숏크리트층에 간단히 부착되므로 한 명의 작업자가 배수시트를 간단히 설치할 수 있으며, 이에 따라 인건비가 절감될 뿐 아니라 작업 효율이 크게 향상된다.In the present invention as described above, the hook-shaped Velcro fastener is fixed to the circumference of the shotcrete layer so that the loop of the drain sheet is attached. Therefore, if one end of the drain sheet is attached to the velcro fastener fixed at the bottom of one side of the tunnel and then the drain sheet is pushed up along the curved surface of the shotcrete, the loop surface of the drain sheet is attached to the hooks of the velcro fasteners facing each other and the inner circumferential surface of the tunnel Is attached to. Therefore, when the drain sheet is in close contact with the Velcro fasteners of the shotcrete layer, the drain sheet is simply attached to the shotcrete layer so that one worker can simply install the drain sheet, thereby reducing labor costs and greatly improving work efficiency.
본 발명의 배수시트는 테이블의 상부면을 따라 수평방향으로 이송되면서 권취롤러에 권취되는 동안 다수의 침들이 설치된 침판이 배수시트 내에 꽂힌 후 분리되도록 테이블의 상부면 측으로 승강된다. 따라서, 배수시트는 수평방향으로 이송되는 동안 다수의 침들은 수직방향으로 승강되면서 배수시트에 꽂힌 후 분리되므로 배수시트 및 침들의 이송방향이 엇갈리면서 침들에 의해 배수시트의 표면에는 보풀이 형성된다. 배수시트의 표면에 형성된 보풀은 평평한 상태의 배수시트의 표면에 비해 벨크로화스너의 후크에 확실하게 결합된다. 그러므로 배수시트가 벨크로화스너에 확실하게 부착되므로 작업성이 향상되고 시공상태가 양호하다.The drain sheet of the present invention is elevated to the upper surface side of the table so that the needle plate provided with a plurality of needles is inserted into the drain sheet while being wound on the winding roller while being transported in the horizontal direction along the upper surface of the table. Accordingly, while the drain sheet is transported in the horizontal direction, the plurality of needles are separated after being inserted into the drain sheet while being lifted in the vertical direction, and thus the fluff is formed on the surface of the drain sheet by the needles while the conveying directions of the drain sheet and the needles are staggered. The fluff formed on the surface of the drain sheet securely engages the hooks of the Velcro fasteners relative to the surface of the drain sheet in a flat state. Therefore, since the drain sheet is securely attached to the Velcro fasteners, workability is improved and construction conditions are good.
본 발명의 구체적인 특징 및 이점은 첨부된 도면을 참조한 이하의 설명으로 더욱 명확해질 것이다.Specific features and advantages of the present invention will become more apparent from the following description with reference to the accompanying drawings.
도 4는 본 발명의 터널용 방수부재가 시공된 상태를 보인 개략적 단면도이고, 도 5는 본 발명 방수부재(10)의 일 실시예를 보인 개략적 부분 단면도로써, 이 는, 벨크로화스너(11), 고정못(12), 배수시트(13), 방수시트(14)로 이루어진다. Figure 4 is a schematic cross-sectional view showing a state in which the waterproof member for the tunnel of the present invention is constructed, Figure 5 is a schematic partial cross-sectional view showing an embodiment of the
벨크로화스너(11)는, 숏크리트층(2)에 고정되고 일면에 후크(hook; 11a)가 형성되어 있다. 이 벨크로화스너(11)는 일정한 크기로 재단되어서 숏크리트층(2)의 외면에 일정한 간격을 갖도록 이격된 상태로 고정된다.The Velcro
여기서 벨크로화스너(11)는 상술한 바와 같이 일정한 크기로 재단되어서 숏크리트층(2)에 고정될 수도 있지만 길게 한 줄로 이루어질 수도 있다. 이러한 한 줄의 벨크로화스너(11)를 여러 개의 고정못(12)으로 숏크리트층(2)의 내주면에 고정시킬 수도 있다.Here, the Velcro
고정못(12)은 벨크로화스너(11)를 숏크리트층(2)에 고정시키는 역할을 수행한다. 즉, 벨크로화스너(11)를 숏크리트층(2)에 밀착시킨 후 벨크로화스너(11)에 타정하여서 이를 숏크리트층(2)에 고정시킨다. The
배수시트(13)는, 벨크로화스너(11)의 후크에 부착되도록 대응면에 루프(loop; 13a)가 형성되어 있다. 이 배수시트(13)의 루프(13a)는, 배수시트(13)의 재질인 부직포를 구성하는 화이버(fiber)의 일부분으로 이루어진다. 부직포는 화이버의 구성이 비교적 엉성하기 때문에 그 사이에 틈새가 있으며, 루프(13a) 역할을 한다. 따라서 이러한 배수시트(13)를 벨크로화스너(11)의 후크(11a)에 밀착시키면 후크(11a)가 배수시트(13)의 화이버 사이로 진입하면서 화이버와 후크(11a)가 서로 걸리면서 부착된다.The
배수시트(13)의 루프(13a) 면이 비교적 평평하고 부직포의 화이버가 비교적 치밀한 경우, 도 6에 도시한 바와 같이 배수시트(13)의 루프(13a) 면에 보풀을 형 성시킬 수 있다. When the
즉, 긴 길이의 배수시트(13)가 테이블(20)의 상부면을 경유하도록 하고 그 일단이 권취롤러(21)에 권취되도록 한다. 테이블(20)의 상부에는 배수시트(13)의 루프(13a) 면에 보풀을 형성시킬 수 있도록 다수의 침(23)들이 형성된 침판(22)이 승강되도록 설치되어 있다. 침판(22)의 승강은 유압실린더(미도시)에 의한 유압식으로 이루어질 수도 있고, 체인에 의한 기계식으로 이루어질 수도 있다.That is, the
권취롤러(21)가 구동모터(미도시)에 의해 회전되면 배수시트(13)가 테이블(20)의 상부면을 따라 수평방향으로 이송되되면서 권취롤러(21)에 감기게 된다. 이때 침판(22)은 배수시트(13) 측으로 승강운동을 한다. When the take-up
침판(22)이 하강되어서 침(23)들이 배수시트(13)의 루프(13a) 면에 박혔다가 빠지는 작업이 반복되는 동안에도 배수시트(13)는 테이블(20)의 상부면을 따라 수평방향으로 계속 이송된다. While the
배수시트(13)가 이송되지 않고 고정된 상태에서 침판(22)의 침(23)들만 배수시트(13)의 루프(13a)면 측으로 승강되면 배수시트(13)의 루프(13a) 면에는 보풀이 형성되지 않는다. 그런데 침판(22)이 승강되는 동안에도 배수시트(13)가 수평방향으로 이송된다. 즉, 침(23)들이 배수시트(13)에 삽입되어 있는 동안에도 배수시트(13)의 이송이 이루어지므로 침(23)들이 배수시트(13)에 삽입된 후 배수시트(13)로부터 완전히 이격되는 동안 배수시트(13)의 수평 이송거리만큼 배수시트(13)의 루프(13a) 면은 침(23)들에 의해 일부 뜯겨지게 된다. If only the
따라서 배수시트(13)가 테이블(20)의 상부면을 따라 수평방향으로 이송되면 서 권취롤러(21)에 권취되는 동안 다수의 침(23)들이 설치된 침판(22)이 배수시트(13) 내에 꽂힌 후 분리되도록 테이블(20)의 상부면 측으로 승강되면서 배수시트(13)의 표면에 형성하는 보풀이 형성된다.Accordingly, while the
이와 같이 배수시트(13)의 루프(13a) 면에 형성된 보풀은 벨크로화스너(11)의 후크(11a)에 용이하게 결합되도록 한다. 이러한 배수시트(13)를 벨크로화스너(11) 측으로 강하게 누르지 않고 살짝만 눌러도 보풀들이 벨크로화스너(11)의 후크(11a)에 결합되면서 쉽게 부착된다.Thus, the fluff formed on the surface of the
이러한 보풀은 도 6에 도시한 바와 같이 배수시트(13)의 루프(13a) 면에 연속적으로 형성될 수도 있지만 도 7과 같이 배수시트(13)의 루프(13a) 면에 일정한 간격만큼 이격되도록 형성될 수도 있다.Such fluff may be formed continuously on the surface of the
이는, 권취롤러(21)의 권취속도나 침판(22)의 하강속도를 조절하여서 만들 수 있다. 먼저 배수시트(13)의 루프(13a)면 전체에 보풀을 형성시키려면 다음과 같이 할 수 있다. 침판(22)이 하강된 후 상승되면 배수시트(13)의 루프(13a)면에 침(23)들이 배열된 폭만큼 보풀이 형성된다. 형성된 보풀이 침(23)들의 하부 투영면을 완전히 벗어나기 전에 다시 침판(22)이 하강되어서 배수시트(13)에 삽입된 후 상승된다. 이와 같이 반복하면 배수시트(13)의 루프(13a)면에 보풀이 연속적으로 형성된다.This can be made by adjusting the winding speed of the winding
한편, 배수시트(13)의 루프(13a)면에 벨크로화스너(11)들의 간격만큼 이격되도록 보풀을 형성시키려면 다음과 같이 할 수 있다. 침판(22)이 하강된 후 상승되면 배수시트(13)의 루프(13a)면에 침(23)들의 폭만큼 보풀이 형성된다. 형성된 보 풀이 테이블(20)의 상부면을 따라 수평으로 이송되어서 벨크로화스너(11)들의 이격폭만큼 이송되면 다시 침판(22)이 하강되어서 배수시트(13)에 삽입된 후 상승된다. 이와 같이 반복하면 배수시트(13)의 루프(13a)면에 보풀이 일정한 간격만큼 이격되어서 형성된다.On the other hand, to form a fluff so as to be spaced apart by the interval of the
방수시트(14)는, 루프(13a)의 반대측면인 배수시트(13)에 열융착되어서 고정된다. 이 방수시트(14)는, 라이닝 콘크리트층(3)의 형성을 위한 콘크리트 타설시 콘크리트의 압력 및 불규칙한 숏크리트층(2)의 표면에 의해 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부(14a)와 동일한 두께를 갖는 다수의 엠보싱돌기(14b)들이 형성된다.The
이러한 방수시트(14)에 형성된 엠보싱돌기(14b)들은, 다축방향으로 신장되도록 평면은 원형으로 이루어지고 단면은 호형상으로 이루어진다. 따라서 라이닝 콘크리트층(3)이 타설되어서 방수시트(14)가 불규칙한 숏크리트층(2)의 표면으로 밀착되면 불규칙한 방향으로 신장되도록 압력을 받는데, 이때 다축방향으로 신장되도록 이루어진 방수시트(14)의 엠보싱돌기(14b)들에 의해 숏크리트층(2) 및 라이닝 콘크리트층(3)에 의해 가해지는 다양한 방향의 신장 압력에 맞게 적절하게 신장된다.The
엠보싱돌기(14b)들은, 2∼150mm의 간격을 갖도록 형성된다. 엠보싱돌기(14b)들 사이의 간격이 2mm 미만인 경우, 엠보싱돌기(14b)들의 갯수가 불필요하게 많아지고 그만큼 재료가 낭비된다. 엠보싱돌기(14b)들 사이의 간격이 150mm를 초과한 경우, 콘크리트에 의해 압력을 받을 시 방수시트(14)가 충분히 신장되지 못하는 문 제점이 발생된다.The
이러한 방수시트(14)는 인접한 두 방수시트(14)들이 열융착되는 바, 엠보싱돌기(14b)들을 제외한 평면의 양측 접합 단부를 서로 겹친 후 그 부분을 열융착하여서 접합한다. 따라서 인접한 두 방수시트(14)를 융착시킬 때에 엠보싱돌기(14b)들이 변형되거나 손상되지 않으며 이에 따라 방수시트(14)의 신장 기능이 저하되지 않는다.The
도 10은 본 발명의 방수부재(10)를 이용한 터널 방수 시공방법을 보인 순서도로써, 이를 참조하여 터널용 방수부재(10)를 이용한 터널 방수 시공방법에 대해 설명하면 다음과 같다.10 is a flowchart illustrating a tunnel waterproofing construction method using the
먼저, 굴착된 터널(1)의 내면에 숏크리트층(2)을 타설하는 숏크리트층 형성단계(S10)를 갖는다. First, the shotcrete layer forming step (S10) of pouring the shotcrete layer (2) on the inner surface of the excavated tunnel (1).
숏크리트층(2)이 형성되면 숏크리트층(2)의 외주면을 따라 일정한 크기의 벨크로화스너(11)를 등간격으로 고정시키도록 후크(11a)가 형성된 벨크로화스너(11)를 일정한 크기로 재단하는 벨크로화스너 재단단계(S20)를 갖는다.When the
여기서 벨크로화스너(11)는 상술한 바와 같이 일정한 크기로 재단되어서 숏크리트층(2)에 고정될 수도 있지만 길게 한 줄로 이루어질 수도 있다. 이러한 한 줄의 벨크로화스너(11)를 여러 개의 고정못(12)으로 숏크리트층(2)의 내주면에 고정시킬 수도 있다.Here, the
벨크로화스너(11)가 일정한 크기로 재단되면, 재단된 벨크로화스너(11)를 고 정못(12)을 이용하여 숏크리트층(2)에 고정하는 벨크로화스너 고정단계(S30)를 갖는다. 재단된 벨크로화스너(11)들은 비교적 작은 크기이므로 휴대가 간편할 뿐 아니라 무게도 가볍워서 숏크리트층(2)에 타정하기가 매우 용이하다.When the
벨크로화스너 고정단계(S30) 후, 배수시트 및 방수시트 준비단계(S40)를 갖는다. 이 단계(S40)에서, 벨크로화스너(11)의 후크(11a)에 부착되도록 대응면에 루프(13a)가 형성된 배수시트(13)와, 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부(14a)와 동일한 두께를 갖는 다수의 엠보싱돌기(14b)들이 형성된 방수시트(14)가 준비된다. After the Velcro fastener fixing step (S30), it has a drainage sheet and a waterproof sheet preparation step (S40). In this step (S40), so as to be attached to the hook (11a) of the
배수시트(13) 및 방수시트(14)가 준비되면, 배수시트(13)의 루프(13a) 반대측 면과 방수시트(14)의 평면부(14a)를 열융착하여서 고정시키는 배수시트 및 방수시트 열융착단계(S50)를 갖는다. 여기서 배수시트(13) 및 방수시트(14)는 상술한 바와 같이 이들이 숏크리트층(2)에 고정되기 전에 먼저 부착될 수도 있지만 배수시트(13)를 숏크리트층(2)에 고정시킨 후 방수시트(14)를 배수시트(13)에 열융착할 수도 있다.When the
배수시트(13) 및 방수시트(14)가 부착되면 배수시트(13)의 루프(13a) 면을 벨크로화스너(11)의 후크(11a)에 부착시켜서 배수시트(13) 및 방수시트(14)를 터널(1)의 내측면을 따라 부착시키는 배수시트 및 방수시트 부착단계(S60)를 갖는다.When the
이와 같이 배수시트(13) 및 방수시트(14)가 숏크리트층(2)에 고정되면 방수시트(14)의 일면에 콘크리트를 타설하여서 마감하는 라이닝 콘크리트층 형성단계(S70)를 갖는다.As such, when the
이러한 본 발명의 터널용 방수부재 및 이를 이용한 터널 방수 시공방법은, 다음과 같은 장점이 있다.The tunnel waterproof member and the tunnel waterproof construction method using the same of the present invention has the following advantages.
첫째, 숏크리트층(2)의 둘레에는 배수시트(13)의 루프(13a)가 부착되도록 후크(11a)가 형성된 벨크로화스너(11)가 고정되어 있다. 따라서 배수시트(13)의 일단을 터널(1)의 일측 하단에 고정된 벨크로화스너(11)에 부착시킨 후 숏크리트층(2)의 곡면을 따라 배수시트(13)를 밀어 올리면 배수시트(13)의 루프(13a) 면이 대향된 벨크로화스너(11)의 후크(11a)들에 순차적으로 부착되면서 터널(1)의 내주면에 부착된다. First, the
그러므로 배수시트(13)를 숏크리트층(2)의 벨크로화스너(11)들에 밀착시키면 배수시트(13)가 숏크리트층(2)에 간단히 부착되므로 한 명의 작업자가 배수시트(13)를 간단히 설치할 수 있으며, 이에 따라 인건비가 절감될 뿐 아니라 작업 효율이 크게 향상된다.Therefore, when the
둘째, 본 발명의 배수시트(13)는 테이블(20)의 상부면을 따라 수평방향으로 이송되면서 권취롤러(21)에 권취되는 동안 다수의 침(23)들이 설치된 침판(22)이 배수시트(13) 내에 꽂힌 후 분리되도록 테이블(20)의 상부면 측으로 승강된다. 따라서, 배수시트(13)는 수평방향으로 이송되는 동안 다수의 침(23)들은 수직방향으로 승강되면서 배수시트(13)에 꽂힌 후 분리되므로 배수시트(13) 및 침(23)들의 이송방향이 엇갈리면서 침(23)들에 의해 배수시트(13)의 표면에는 보풀이 형성된다. Second, while the
배수시트(13)의 표면에 형성된 보풀은 평평한 상태의 배수시트(13)의 표면에 비해 벨크로화스너(11)의 후크(11a)에 확실하게 결합된다. 그러므로 배수시트(13)가 벨크로화스너(11)에 확실하게 부착되므로 작업성이 향상되고 시공상태가 양호하다.The fluff formed on the surface of the
도 8은 본 발명 방수부재(30)의 다른 실시예를 보인 개략적 부분 분리 단면도로써, 이는, 제1벨크로화스너(31), 고정못(32), 배수시트(33), 방수시트(34), 제2벨크로화스너(35)로 이루어진다.8 is a schematic partial separation cross-sectional view showing another embodiment of the
제1벨크로화스너(31)는, 숏크리트층(2)에 고정되고 일면에 제1후크(31a)가 형성된다. 고정못(32)은, 제1벨크로화스너(31) 및 숏크리트층(2)에 고정되어서 제1벨크로화스너(31)를 숏크리트층(2)에 고정시킨다. 배수시트(33)는, 제1벨크로화스너(31)의 제1후크(31a)에 부착되도록 대응면에 제1루프(33a)가 형성되고 제1루프(33a)의 반대측 면에 제2루프(33b)가 형성된다. 방수시트(34)는, 배수시트(33)의 제2루프(33b)에 부착되고 라이닝 콘크리트층(3)의 형성을 위한 콘크리트 타설시 콘크리트의 압력 및 불규칙한 숏크리트층(2)의 표면에 의해 불규칙한 방향으로 가해지는 신장 압력에 맞게 다축방향으로 신장되도록 평면부(34a)와 동일한 두께를 갖는 다수의 엠보싱돌기(34b)들이 형성된다. 제2벨크로화스너(35)는, 방수시트(34)에 고정되고 배수시트(33)의 제2루프(33b)에 부착되도록 일면에 제2후크(35a)가 형성된다.The
이러한 본 발명의 방수부재(30)는, 제1벨크로화스너(31)들이 숏크리트층(2)에 고정되어 있으므로 배수시트(33)의 제1루프(33a)면을 숏크리트층(2)에 간편히 부착시킬 수 있다. In the
또한, 방수시트(34)의 내측면에 제2벨크로화스너(35)가 부착되어 있으므로 방수시트(34)를 배수시트(33)이 제2루프(33b)면에 부착시키기가 매우 편리하다. 즉, 방수시트(34)를 배수시트(33)의 제2루프(33b)면에 대향시킨 후 누르기만 하면 제2벨크로화스너(35)의 제2후크(35a)가 배수시트(33)의 제2루프(33b)에 간단히 결합된다.In addition, since the
그러므로 본 발명의 방수부재(30)는 숏크리트층(2)에 배수시트(33) 및 방수시트(34)가 간편하게 부착된다. 또한 이들의 결합이 제1벨크로화스너(31) 및 제2벨크로화스너(35)에 의해 이루어지므로 부착상태가 용이하지 못할 시에는 간단히 떼었다가 다시 부착시키면 된다.Therefore, the
도 9는 배수시트(33)에 보풀을 형성시키는 또 다른 실시예를 보인 개략적 측면도로써, 이는, 배수시트(33)의 제1루프(33a) 및 제2루프(33b)에 보풀을 형성시키므로 제1벨크로화스너(31) 및 제2벨크로화스너(35)에 배수시트(33)의 양면이 잘 부착되도록 한 것이다.FIG. 9 is a schematic side view showing another embodiment of forming the fluff on the
이러한 본 발명은, 배수시트(33)가 제1테이블(40)의 하부면과 제2테이블(44)의 상부면을 지난 후 도 7의 권취롤러(21)에 권취되도록 설치된다. 제1테이블(40)의 하부면에는 다수의 제1침(43)들이 설치된 제1침판(42)이 제1테이블(40) 측으로 승강되도록 설치되어 있다. 제2테이블(44)의 상부면에는 다수의 제2침(46)들이 설치된 제2침판(45)이 제2테이블(44) 측으로 승강되도록 설치되어 있다. The present invention is installed such that the
따라서, 배수시트(33)가 제1테이블(40)의 하부면을 따라 수평방향으로 이송되면서 권취롤러(21)에 권취되는 동안 다수의 제1침(43)들이 배수시트(33)의 일면에 꽂힌 후 분리되도록 제1테이블(40)의 하부면 측으로 승강되면서 배수시트(33)의 제1루프(33a)에는 보풀이 형성된다.Accordingly, a plurality of
그리고 배수시트(33)가 제2테이블(44)의 상부면을 따라 수평방향으로 이송되면서 권취롤러(21)에 권취되는 동안 다수의 제2침(46)들이 배수시트(33)의 타면에 꽂힌 후 분리되도록 제2테이블(44)의 상부면 측으로 승강되면서 배수시트(33)의 제2루프(33b)에는 보풀이 형성된다.In addition, a plurality of
그러므로 배수시트(33)의 양면, 즉 제1루프(33a) 및 제2루프(33b)에 보풀이 형성되므로 배수시트(33)가 제1벨크로화스너(31) 및 제2벨크로화스너(35)에 용이하게 부착된다. Therefore, since the fluff is formed on both sides of the
도 1은 종래의 터널 방수구조를 개략적 전체 단면도1 is a schematic cross-sectional view of a conventional tunnel waterproof structure
도 2는 종래 방수부재의 일 실시예를 보인 개략적 부분 단면도Figure 2 is a schematic partial cross-sectional view showing an embodiment of a conventional waterproof member
도 3은 종래 방수부재의 다른 실시예를 보인 개략적 부분 단면도Figure 3 is a schematic partial cross-sectional view showing another embodiment of the conventional waterproof member
도 4는 본 발명의 터널용 방수부재가 시공된 상태를 보인 개략적 단면도Figure 4 is a schematic cross-sectional view showing a state in which the waterproof member for the tunnel of the present invention construction
도 5는 본 발명 방수부재의 일 실시예를 보인 개략적 부분 단면도Figure 5 is a schematic partial cross-sectional view showing an embodiment of the waterproof member of the present invention
도 6은 배수시트에 보풀을 형성시키는 일 실시예를 보인 개략적 측면도Figure 6 is a schematic side view showing an embodiment of forming a fluff on the drain sheet
도 7은 배수시트에 보풀을 형성시키는 다른 실시예를 보인 개략적 측면도Figure 7 is a schematic side view showing another embodiment of forming a fluff on the drain sheet
도 8은 본 발명 방수부재의 다른 실시예를 보인 개략적 부분 분리 단면도Figure 8 is a schematic partial separation cross-sectional view showing another embodiment of the present invention waterproof member
도 9는 배수시트에 보풀을 형성시키는 또 다른 실시예를 보인 개략적 측면도Figure 9 is a schematic side view showing another embodiment of forming a fluff on the drain sheet
도 10은 본 발명의 방수부재를 이용한 터널 방수 시공방법을 보인 순서도10 is a flowchart showing a tunnel waterproof construction method using the waterproof member of the present invention.
*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
1 : 터널 2 : 숏크리트층1: tunnel 2: shotcrete layer
3 : 라이닝 콘크리트층 10,30 : 방수부재3: lining
11 : 벨크로화스너 11a : 후크11:
12,32 : 고정못 13,33 : 배수시트12,32: Fixing
13a : 루프 14,34 : 방수시트13a:
14a,34a : 평면부 14b,34b : 엠보싱돌기14a, 34a:
20 : 테이블 21 : 권취롤러20: Table 21: Winding roller
22 : 침판 23 : 침22: needle plate 23: needle
31 : 제1벨크로화스너 31a : 제1후크31:
33a : 제1루프 33b : 제2루프33a:
35 : 제2벨크로화스너 35a : 제2후크35:
40 : 제1테이블 42 : 제1침판40: first table 42: first needle plate
43 : 제1침 44 : 제2테이블43: first hand 44: second table
45 : 제2침판 46 : 제2침45: second needle 46: second needle
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090008143A KR20100088973A (en) | 2009-02-02 | 2009-02-02 | Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090008143A KR20100088973A (en) | 2009-02-02 | 2009-02-02 | Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20100088973A true KR20100088973A (en) | 2010-08-11 |
Family
ID=42754980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090008143A KR20100088973A (en) | 2009-02-02 | 2009-02-02 | Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20100088973A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101100846B1 (en) * | 2011-04-05 | 2012-01-02 | 선구지오콘 주식회사 | Device fixing waterproof material up the tunnel shotcrete layer and method constructing the waterproof material on it |
KR101231060B1 (en) * | 2010-08-27 | 2013-02-07 | (주) 네스에프엔씨 | Waterproof sheet having velcro belt and manufacturing apparatus and method the sameof, tunnel waterproof method using the waterproof sheet |
CN110552724A (en) * | 2019-09-20 | 2019-12-10 | 铁科创恒新材料科技有限公司 | High-temperature-resistant water vapor sealed heat insulation felt and mounting method thereof |
-
2009
- 2009-02-02 KR KR1020090008143A patent/KR20100088973A/en active IP Right Grant
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101231060B1 (en) * | 2010-08-27 | 2013-02-07 | (주) 네스에프엔씨 | Waterproof sheet having velcro belt and manufacturing apparatus and method the sameof, tunnel waterproof method using the waterproof sheet |
KR101100846B1 (en) * | 2011-04-05 | 2012-01-02 | 선구지오콘 주식회사 | Device fixing waterproof material up the tunnel shotcrete layer and method constructing the waterproof material on it |
CN110552724A (en) * | 2019-09-20 | 2019-12-10 | 铁科创恒新材料科技有限公司 | High-temperature-resistant water vapor sealed heat insulation felt and mounting method thereof |
CN110552724B (en) * | 2019-09-20 | 2024-03-08 | 铁科创恒新材料科技有限公司 | High-temperature-resistant steam-sealing heat-insulating felt and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108194136B (en) | Lining construction method | |
CN101906768B (en) | Panel construction method of concrete faced rock-fill dam | |
CN104632277A (en) | Bonded flexible water proof and drainage coiled material for road and railway tunnel and laying method thereof | |
CN105370315B (en) | A kind of frost zone tunnel drainage construction technology | |
CN207004570U (en) | A kind of tunnel longitudinal drainage blind pipe fixed structure | |
KR20100088973A (en) | Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel | |
CN108678015A (en) | For road pavement lifting type well lid and its installation method | |
CN213450412U (en) | Shield/TBM tunnel supporting structure with limiting device telescopic steel pipe sheet | |
CN205936663U (en) | Undercut tunnel waterproof construction | |
KR200441911Y1 (en) | A protective mat for waterproofing layer | |
CN115898469A (en) | Tunnel secondary lining construction method | |
KR101171037B1 (en) | Method for compartmentalized tunnel waterproofing | |
CN208633159U (en) | A kind of underground pipe gallery waterproof structure for deformation seams | |
CN110552546B (en) | Method for building underground parking lot waterproof facility by using tower crane | |
CN204645093U (en) | Poured band of outer wall of basement advanced processing constructs | |
CN113982597A (en) | Tunnel excavation construction method suitable for strong-water-permeability unconsolidated formation in karst subsidence area | |
CN210857237U (en) | Combined protective blanket | |
KR100529195B1 (en) | Elasticized waterproofing sheet and waterproofing structure of tunnel using the same | |
KR101326185B1 (en) | Tunnel waterproofing sheet and construction method therefor | |
KR101262303B1 (en) | Construction Method of waterproof in tunnel | |
KR20160004627A (en) | The slope reinforcement method | |
CN219195988U (en) | Turnover formula foundation ditch side slope protector with locking protection that takes off | |
KR20090122661A (en) | Waterproof sheet having joint plate and waterproof member for tunnel using the same | |
CN217631436U (en) | Vertical reserved steel bar protection device and vertical reserved steel bar protection system | |
CN203487563U (en) | Water stop with positioning holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
NORF | Unpaid initial registration fee |