Construction method for high and cold region tunnel hole body water resistance Download PDFInfo
- Publication number
- CN105422142A CN105422142A CN201510913837.XA CN201510913837A CN105422142A CN 105422142 A CN105422142 A CN 105422142A CN 201510913837 A CN201510913837 A CN 201510913837A CN 105422142 A CN105422142 A CN 105422142A
- Authority
- CN
- China
- Prior art keywords
- hot melt
- splash guard
- construction method
- welded
- hot melting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 210000000476 body water Anatomy 0.000 title abstract 4
- 239000004745 nonwoven fabric Substances 0.000 claims abstract description 18
- 244000025254 Cannabis sativa Species 0.000 claims abstract description 13
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 claims abstract description 13
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 claims abstract description 13
- 235000009120 camo Nutrition 0.000 claims abstract description 13
- 235000005607 chanvre indien Nutrition 0.000 claims abstract description 13
- 239000011487 hemp Substances 0.000 claims abstract description 13
- 239000011378 shotcrete Substances 0.000 claims abstract description 10
- 238000003466 welding Methods 0.000 claims abstract description 10
- 239000012943 hotmelt Substances 0.000 claims description 22
- 238000010792 warming Methods 0.000 claims description 19
- 238000009413 insulation Methods 0.000 claims description 3
- 229920002635 polyurethane Polymers 0.000 claims description 3
- 239000004814 polyurethane Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 2
- 238000002844 melting Methods 0.000 abstract 7
- 230000008018 melting Effects 0.000 abstract 7
- 238000004321 preservation Methods 0.000 abstract 3
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/381—Setting apparatus or devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention relates to a construction method for high and cold region tunnel hole body water resistance, and relates to a construction method applicable to high and cold region tunnel hole body water resistance. The method mainly solves the problem that the existing high and cold region tunnel hole body water resistance construction speed is low. A non-woven fabric is laid on the surface of a sprayed concrete layer of a tunnel hole body, a plurality of hot melting liners are arranged on the outer surface of the non-woven fabric, the hot melting liners and the non-woven fabric are fixed to the sprayed concrete layer through fasteners, and the hot melting liners are arranged according to the quincunx; an inner layer waterproof plate is welded to the hot melting liners on the fixed non-woven fabric through an electric hot melting device, a plurality of suspenders are manufactured through offcut of the waterproof plate, hemp ropes are pressed below the suspenders, the suspenders are welded to the inner layer waterproof plate through a welding gun, a heat preservation plate is laid on the outer surface of the inner layer waterproof plate, the hemp ropes penetrate through the heat preservation plate, the outer ends of the hemp ropes are exposed and fixedly provided with the hot melting liners, and an outer layer waterproof plate is welded to the outer surface of the heat preservation plate through the electric hot melting device. The construction method has the advantage of being high in construction speed.
Description
Technical field:
The present invention relates to a kind of construction method being applicable to extremely frigid zones tunnel trunk waterproof.
Background technology:
The method of current extremely frigid zones tunnel trunk waterproof construction first two-layer splash guard is fixed on tunnel trunk sprayed mortar surface, establishes connecting band, and then be inserted between two-layer splash guard by warming plate, and fixed by connecting band between two-layer splash guard.Due to be fixed on tunnel trunk sprayed mortar surface two-layer splash guard between spacing at about 5 ㎝, so assign warming plate very inconvenient, speed of application is slow.
Summary of the invention:
Technical problem to be solved by this invention is to provide that a kind of speed of application is fast, matter measured extremely frigid zones tunnel trunk waterproof construction method.
Above-mentioned purpose is achieved in that shotcrete layer surface non-woven fabrics being laid on tunnel trunk, several hot melt liners are established at non-woven fabrics external surface, and by nailing, hot melt liner and non-woven fabrics are fixed on shotcrete layer, described hot melt liner is pressed blossom type and is arranged, wherein the spacing of the adjacent hot melt liner in arch is 0.5 meter-0.8 meter, and the spacing of the adjacent hot melt liner in abutment wall place is 0.8 meter-1.0 meters;
With electric heat welding device internal layer splash guard is welded on fixing non-woven fabrics hot melt liner on, the suspender belt some that 2 ㎝ are wide, 8 ㎝ are long is made with the leftover pieces of splash guard, under the rope made of hemp is pressed in suspender belt, with welding gun, described suspender belt is welded on internal layer splash guard, warming plate is laid on the external surface of internal layer splash guard, the rope made of hemp passes from warming plate and its outer end is exposed, the rope made of hemp outer end of exposing from warming plate is fixed with hot melt liner, is welded on warming plate external surface by waterproof outer plate with electric heat welding device.
Described internal layer splash guard and waterproof outer plate are ECB splash guard; Described warming plate is the polyurethane thermal insulation board of 5 cm thicks.
Advantage of the present invention is: because it first fixes nonwoven layer, more fixing successively internal layer splash guard, warming plate and waterproof outer plate, so construction easily, speed of application is fast, quality good.
Accompanying drawing illustrates:
Accompanying drawing 1 is extremely frigid zones tunnel trunk waterproof construction method constructing structure schematic diagram of the present invention; In figure, 1 is non-woven fabrics, and 2 is nailings, and 3 is hot melt liners, and 4 is ropes made of hemp, and 5 is internal layer splash guards, and 6 is waterproof outer plates, and 7 is warming plates, and 8 is suspender belts, and 9 is shotcrete layers.
Detailed description of the invention:
Non-woven fabrics is laid on the shotcrete layer surface of tunnel trunk, several hot melt liners are established at non-woven fabrics external surface, and by nailing, hot melt liner and non-woven fabrics are fixed on shotcrete layer, described hot melt liner is pressed blossom type and is arranged, wherein the spacing (horizontal spacing and longitudinal pitch) of the adjacent hot melt liner in arch is 0.5 meter-0.8 meter, and the spacing (horizontal spacing and longitudinal pitch) of the adjacent hot melt liner in abutment wall place is 0.8 meter-1.0 meters; Non-woven fabrics is laid and is wanted degree of tightness appropriateness, makes it to be close to shotcrete layer surface.
With electric heat welding device internal layer splash guard is welded on the hot melt liner be fixed on non-woven fabrics, the suspender belt some that 2 ㎝ are wide, 8 ㎝ are long is made with the leftover pieces of splash guard, under the rope made of hemp is pressed in suspender belt, with welding gun, described suspender belt is welded on internal layer splash guard, warming plate is laid on the external surface of internal layer splash guard, the rope made of hemp passes from warming plate and its outer end is exposed, the rope made of hemp outer end of exposing from warming plate is fixed with hot melt liner, is welded on warming plate external surface by waterproof outer plate with electric heat welding device.
Described internal layer splash guard and waterproof outer plate are ECB splash guard; Described warming plate is the polyurethane thermal insulation board of 5 cm thicks.
Claims (3)
1. extremely frigid zones tunnel trunk waterproof construction method, it is characterized in that: shotcrete layer surface non-woven fabrics being laid on tunnel trunk, several hot melt liners are established at non-woven fabrics external surface, and by nailing, hot melt liner and non-woven fabrics are fixed on shotcrete layer, described hot melt liner is pressed blossom type and is arranged, wherein the spacing of the adjacent hot melt liner in arch is 0.5 meter-0.8 meter, and the spacing of the adjacent hot melt liner in abutment wall place is 0.8 meter-1.0 meters;
With electric heat welding device internal layer splash guard is welded on fixing non-woven fabrics hot melt liner on, the suspender belt some that 2 ㎝ are wide, 8 ㎝ are long is made with the leftover pieces of splash guard, under the rope made of hemp is pressed in suspender belt, with welding gun, described suspender belt is welded on internal layer splash guard, warming plate is laid on the external surface of internal layer splash guard, the rope made of hemp passes from warming plate and its outer end is exposed, the rope made of hemp outer end of exposing from warming plate is fixed with hot melt liner, is welded on warming plate external surface by waterproof outer plate with electric heat welding device.
2., according to extremely frigid zones tunnel trunk waterproof construction method according to claim 1, it is characterized in that described internal layer splash guard and waterproof outer plate are ECB splash guard.
3., according to the extremely frigid zones tunnel trunk waterproof construction method described in claim 1 or 2, it is characterized in that described warming plate is the polyurethane thermal insulation board of 5 cm thicks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510913837.XA CN105422142A (en) | 2015-12-12 | 2015-12-12 | Construction method for high and cold region tunnel hole body water resistance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510913837.XA CN105422142A (en) | 2015-12-12 | 2015-12-12 | Construction method for high and cold region tunnel hole body water resistance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105422142A true CN105422142A (en) | 2016-03-23 |
Family
ID=55500635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510913837.XA Pending CN105422142A (en) | 2015-12-12 | 2015-12-12 | Construction method for high and cold region tunnel hole body water resistance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105422142A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996300A (en) * | 2017-04-19 | 2017-08-01 | 中铁十局集团第四工程有限公司 | A kind of anchor bar of waterproof plate in tunnels laying method |
CN107327308A (en) * | 2017-07-13 | 2017-11-07 | 高军 | A kind of Railway Tunnel waterproof method |
JP2018040201A (en) * | 2016-09-09 | 2018-03-15 | 株式会社ビーエスアイ | Composite waterproofing and heat insulation sheet and waterproofing sheet for tunnel, and installation method of composite sheet |
CN112983497A (en) * | 2021-02-23 | 2021-06-18 | 中铁十九局集团第三工程有限公司 | Waterproof and cold-proof heat-insulating structure for tunnel in frozen soil area and laying method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050095797A (en) * | 2005-08-02 | 2005-10-04 | 연일화섬공업(주) | A process for water-proof construction |
CN202731941U (en) * | 2012-08-15 | 2013-02-13 | 中铁十九局集团第二工程有限公司 | Waterproof device for tunnel construction |
CN203035206U (en) * | 2013-01-14 | 2013-07-03 | 长沙理工大学 | Waterproof heat-retaining plate for tunnel arch wall |
CN203161256U (en) * | 2013-03-08 | 2013-08-28 | 中铁二十二局集团第一工程有限公司 | Large-span swelling rock tunnel system in severe cold area |
CN204327123U (en) * | 2014-11-29 | 2015-05-13 | 中铁十九局集团有限公司 | Waterproof board hot melt welding mechanism |
-
2015
- 2015-12-12 CN CN201510913837.XA patent/CN105422142A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050095797A (en) * | 2005-08-02 | 2005-10-04 | 연일화섬공업(주) | A process for water-proof construction |
CN202731941U (en) * | 2012-08-15 | 2013-02-13 | 中铁十九局集团第二工程有限公司 | Waterproof device for tunnel construction |
CN203035206U (en) * | 2013-01-14 | 2013-07-03 | 长沙理工大学 | Waterproof heat-retaining plate for tunnel arch wall |
CN203161256U (en) * | 2013-03-08 | 2013-08-28 | 中铁二十二局集团第一工程有限公司 | Large-span swelling rock tunnel system in severe cold area |
CN204327123U (en) * | 2014-11-29 | 2015-05-13 | 中铁十九局集团有限公司 | Waterproof board hot melt welding mechanism |
Non-Patent Citations (1)
Title |
---|
潘奕庭: "严寒地区洞口段保温层施工技术浅谈", 《中华民居(下旬刊)》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018040201A (en) * | 2016-09-09 | 2018-03-15 | 株式会社ビーエスアイ | Composite waterproofing and heat insulation sheet and waterproofing sheet for tunnel, and installation method of composite sheet |
CN106996300A (en) * | 2017-04-19 | 2017-08-01 | 中铁十局集团第四工程有限公司 | A kind of anchor bar of waterproof plate in tunnels laying method |
CN106996300B (en) * | 2017-04-19 | 2019-02-19 | 中铁十一局集团第四工程有限公司 | A kind of anchor bar of waterproof plate in tunnels laying method |
CN107327308A (en) * | 2017-07-13 | 2017-11-07 | 高军 | A kind of Railway Tunnel waterproof method |
CN112983497A (en) * | 2021-02-23 | 2021-06-18 | 中铁十九局集团第三工程有限公司 | Waterproof and cold-proof heat-insulating structure for tunnel in frozen soil area and laying method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105422142A (en) | Construction method for high and cold region tunnel hole body water resistance | |
CN202937276U (en) | Waterproof structure for tunnel | |
HRP20151351T1 (en) | Fixing system for insulated installations | |
CN109441491A (en) | A kind of railway tunnel self-adhesive waterproof material and its construction method | |
KR101552162B1 (en) | Road freezing preventing system | |
KR101224293B1 (en) | The construction method for concrete wall using insulation gang form | |
CN101298790A (en) | Rubber water stop U anchor construction method | |
JP5874938B2 (en) | Concrete piece protection sheet | |
CN106939671B (en) | Metal sandwich roof plate construction method | |
CN105370315A (en) | Drainage construction technology for seasonally-frozen ground tunnel | |
CN205689219U (en) | A kind of grouting device of backfill after bored tunnel two backing | |
KR20190037227A (en) | Thermal insulation inner layer structure of low temperature storage tank with leakage trace function | |
JOP20190238B1 (en) | Reinforced removable thermal insulation | |
RU144437U1 (en) | HEAT-PROTECTED PIPE | |
CN104762927A (en) | Detection and repair method for seepage spots covered with dam heat preservation and moisture preservation layer | |
CN106996300B (en) | A kind of anchor bar of waterproof plate in tunnels laying method | |
KR101171037B1 (en) | Method for compartmentalized tunnel waterproofing | |
WO2015147679A1 (en) | Method for thermally insulating welded joints of pre-insulated pipes | |
CN204004996U (en) | The electric tracing thermal insulation device that possesses energy-conserving and environment-protective | |
CN104373686B (en) | Method for fixing alarm line of reducing pipe fitting of intelligent crosslinked polyethylene double-pipe heat-preservation pipe | |
CN105019923A (en) | Annular tensioning connection method for tunnel double-layer waterproof plate clamp insulation board | |
CN203755469U (en) | Waterproof concrete wall combined water stopping system | |
CN213175637U (en) | Cold plate device for improving heat conduction efficiency of subway communication channel freezing method | |
CN106894580B (en) | Two pieces of roof boardings of metal sandwich roof plate mutually overlapped construction method | |
KR20100088973A (en) | Tunnel waterproof process of construction work that use waterproof material for tunnel and waterproof material for tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160323 |
|
RJ01 | Rejection of invention patent application after publication |