CN106443794B - A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel - Google Patents

A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel Download PDF

Info

Publication number
CN106443794B
CN106443794B CN201610791248.3A CN201610791248A CN106443794B CN 106443794 B CN106443794 B CN 106443794B CN 201610791248 A CN201610791248 A CN 201610791248A CN 106443794 B CN106443794 B CN 106443794B
Authority
CN
China
Prior art keywords
electrode
hole
data
drilling
observation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610791248.3A
Other languages
Chinese (zh)
Other versions
CN106443794A (en
Inventor
周官群
刘惠洲
潘乐荀
陈光明
陈兴海
邓涛
李雪峰
钱同对
王奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI HUIZHOU GEOLOGY SECURITY INSTITUTE Co Ltd
Original Assignee
ANHUI HUIZHOU GEOLOGY SECURITY INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI HUIZHOU GEOLOGY SECURITY INSTITUTE Co Ltd filed Critical ANHUI HUIZHOU GEOLOGY SECURITY INSTITUTE Co Ltd
Priority to CN201610791248.3A priority Critical patent/CN106443794B/en
Publication of CN106443794A publication Critical patent/CN106443794A/en
Application granted granted Critical
Publication of CN106443794B publication Critical patent/CN106443794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The invention discloses a kind of three-dimensional parallel electrical method observation system and geologic body method for surveying.Three-dimensional parallel electrical method observation system is established by the way of being simutaneously arranged electrode in ground and multiple holes.One, electrode arrangement in hole:Arrange that an electrode array, electrode array are made of the electrode of several constant spacings in each drilling, the length of L.Two, ground electrodes group is arranged:Spacing in ground configuration grid electrode group, grid electrode group between each electrode is respectively the planar range to drill where electrode in a and grid range covering hole.Three, public electrode B is placed at infinity, and public relatively electrode N is placed at an arbitrary position;Public electrode B, public relatively electrode N, each electrode array, ground electrodes group are connected by parallel electrical prospecting apparatus respectively in drilling, by porous electrical method observation synchronous with ground, find out latent geologic anomaly.

Description

A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel
Technical field
The present invention relates to the three-dimensional method for surveying of a kind of three-dimensional parallel electrical method observation system and geologic body, more particularly to one kind The parallel electrical method observation system of three-dimensional based on multiple drillings and ground synchronous arrangement and geologic body method for surveying.
Background technology
Geologic body such as solution cavity, boulder etc. is lain concealed to various engineering projects with larger threat in underground, and especially some are small Range, region that ground survey line can not be arranged generally all can construction drill reconnoitred, as the karst cavity below highway is asked Topic, can frequently result in collapsing for road surface, constitutes a serious threat to the people's lives and property;Orphan during shield in front of shield machine Stone etc. constitutes material risk etc. to the driving of shield machine, therefore how to find out that geology is lain concealed in this small-scale underground finely required Body is of crucial importance.
For problems, current method for surveying is geophysical method and probing method, is drilled for local point It is more accurate that geological condition discloses, but the geological condition of continuum is difficult to disclose, the limitation with " a peephole view ". Hidden danger distribution situation except drilling is difficult to determine, extremely limited by drilling the geologic hidden peril that can be disclosed.
Geophysical exploration about exhausted be according to geologic body and the physical difference of surrounding medium for example resistivity, polarizability, dielectric constant, Elastic wave velocity etc. is observed using dedicated instrument by natural field source or the artificial field source of excitation.One piece of region can be obtained Physical property characteristic, break through probing " a peephole view " limitation.So using the exploring drill hole on ground, drilled, ground object It visits, can get than drilling better Effect on Detecting.But geophysical exploration about exhausted is carried out in hole there is also many problems, though some methods Right technical feasibility in theory, but during practice and be not suitable for.Such as Guangzhou Underground in process of construction by boulder It is affected, up to ten several geophysical prospecting methods has successively been selected to carry out engineering geophysical method experiment and case study, the results showed that: Transient electromagnetic, surface geology radar, Seismic Imaging Method cannot all obtain good Effect on Detecting, but the density electricity in physical prospecting that drills Method CT and seismic CT have good Effect on Detecting, but investigative range is two dimensional cross-section, and three-dimensional detection technology is not yet ripe, mesh The preceding observation system for across hole electrical method CT is mostly hole hole to wearing, and has ignored the letter in ground configuration electrode and hole between electrode Number, to the geological information being lost between the ground of hole, simultaneously because its data acquisition modes acquires for serial combination, collecting efficiency It is low.
Invention content
The present invention is insufficient existing for across hole detection method at present in order to solve, it is proposed that a kind of three-dimensional parallel electrical method observation System and geologic body method for surveying.The present invention is based on national inventing patent, " distributed parallel intelligent electrode potential difference signal acquires Method " (patent of invention number:ZL200410014020 on the basis of), three are constituted by being simutaneously arranged electrode in ground and drilling Observation system is tieed up, in addition the advantage of parallel electrical method data acquisition:When an electrode is powered, other all electrodes acquire number simultaneously According to such gathered data amount is huge.If since single survey line is shorter in drilling, can after completing one group of data test, All electrodes in drilling are divided several times while above being carried certain distance, then gathered data, ensure the entire search coverage of data cover; Inverting is carried out by extracting inverting file again, obtains the electrical inversion result of three dimensions, it is latent to reach three dimensions underground with this The Effect on Detecting of geologic body.
To achieve the above object, the present invention adopts the following technical scheme that:A kind of three-dimensional parallel electrical method observation system, according to ground The mode that electrode is combined in face electrode and hole arranges three-dimensional parallel electrical method observation system:
Electrode arrangement in hole:Arrange that an electrode array, electrode array are made of the electrode of several constant spacings in each drilling, Electrode array is sent into respective bore bottom, and ensures the spacing in electrode array between each electrode by the length of L, is ensured in drilling Position of the electrode in respective bore;
Ground electrodes group is arranged:Spacing in ground configuration grid electrode group, grid electrode group between each electrode Respectively a and grid range cover the planar range of drilling where electrode in hole;
Public electrode B is placed at infinity, and public relatively electrode N is placed at an arbitrary position;Public electrode B, Each electrode array, ground electrodes group are connected by parallel electrical prospecting apparatus respectively in public relatively electrode N, drilling, pass through porous and ground The synchronization electrical method in face is observed, and finds out latent geologic anomaly.
As being further improved for said program, in hole when electrode arrangement, electrode array by falling weight or is bundled in In thin bar, it is sent into foot of hole.
As being further improved for said program, in hole when electrode arrangement, if drying is anhydrous in drilling, need in the borehole It pours water, ensures the contact of electrode.
As being further improved for said program, the spacing in electrode array between each electrode is 0.2m~1m;Latticed electricity Spacing in the group of pole between each electrode is 1m~5m.
The present invention also provides a kind of geologic body method for surveying comprising following steps:
One, multiple drillings and the parallel electrical method observation system of the above-mentioned Arbitrary 3 D of ground configuration are based on;
Supply current when two, being powered using an electrode in the three-dimensional parallel electrical method observation system of electrical method test system acquisition The voltage data body obtained with other each electrode measurements, the interior all numbers comprising nature field, primary field and secondary field of the data volume According to;
Three, other each electrode measurements when all electrodes are powered successively are completed by the acquisition method of step 2, it is whole until completing The data acquisition of a detection section;
If four, drilling depth H is more than the length of electrode array in respective bore, several times by the survey line in all drillings point Above carry certain distance S, but S simultaneously<L ensures that two surveys line have certain overlapping region, until survey line all covers detecting area Between, by Step 2: three data acquisitions;
Five, collected data volume solution editorial afterword is handled according to virtual electrode coordinate, extraction inverting file carries out anti- Processing is drilled, the final electrical 3D data volume obtained in entire detection section;
Six, electrical 3D data volume is subjected to relevant treatment into figure, and combines practical geological condition, carry out related geology solution It releases.
As being further improved for said program, in step 2, the parallel electrical method test system is acquired using AM methods Data:I.e. one of electrode as current electrode when powering, other all electrode simultaneous observation potential datas;It is supplied with two kinds Electric period combination power supply mode power supply, i.e., the interior pulse direct current for including two different cycles of each power-up period;It is supplied at one Nature electric field data, primary field voltage data and secondary field voltage data are obtained in the electric period.
As being further improved for said program, in step 3, if drilling depth H is larger, along bore detecting distance compared with When long, due to the limitation of single survey line length in drilling, first electrode arranged upwards from drilling bottommost, complete an observation After system data acquisition, the survey line in all drillings is above carried into certain distance S, but S simultaneously<It is certain to ensure that two surveys line have by L Overlapping region, then acquired after data according still further to this step while above having carried the electrode array in each drilling, until completing entire detection The data of section acquire.
It is reconnoitred in construction geology before the three-dimensional parallel electrical method observation system of arrangement as being further improved for said program Kong Shi carries out relevant treatment to the hole of reconnoitring completed, with using scene drilling, cost is reconnoitred in saving to the greatest extent.
Further, when construction geology reconnoitres hole, the hole of reconnoitring completed is carried out adding non-metallic casing processing, set Pipe selects screen casing, if in the case of without screen casing, will substitute screen casing by several row's apertures of the spacing of 20cm arrangement outside casing.
Beneficial effects of the present invention are as follows:
1. the present invention is proposed when progress preliminary engineering is reconnoitred, anti-collapse hole processing is carried out to reconnoitring hole, rationally utilizes work Journey reconnoitres hole, has saved cost;
2. it is individually electric to breach conventional high-density electrical prospecting apparatus due to the unique data acquisition modes of parallel electrical method in the present invention When pole or two electrode power supplies, the limitation that two electrodes receive is powered for single-point, all electrodes whole acquisition electrical potential informations, Gathered data amount is huge, and on-site data gathering is efficient;
3. due to the scalability of parallel electrical prospecting apparatus, the present invention across hole electrical method CT three-dimensional to porous progress can detect simultaneously, And the latticed arrangement electrode of combined ground, form the full stereo observing system in ground and hole, coverage area bigger, data acquired It measures huge;
4. it is more to get parms:Can be obtained in each power-up period nature field, primary field, secondary field potential data, together When the primary field potential response of different frequency can be obtained by each power-up period power-on time length, obtain search coverage Polarizability parameter can carry out relevant parameter extraction and analysis in special item;
5. full three dimensions resistivity inversion, as a result more intuitive, while can also be extracted in 3D data volume by software Section between any two drilling.
Description of the drawings
Fig. 1 is the horizontal layout schematic diagram of three-dimensional parallel electrical method observation system of the invention;
Fig. 2 is the dimensional structure diagram of three-dimensional parallel electrical method observation system in Fig. 1;
Fig. 3 is emission electrode and receiving electrode relation schematic diagram in Fig. 2;
Fig. 4 is illustrated using the in-situ measurement of a kind of three-dimensional parallel electrical method observation system of the present invention and geologic body method for surveying Figure;
Fig. 5 is actual field detection of three dimensional solid result figure;
In figure:Electrode in 1- drillings;2- ground electrodes;3- drills;4- current electrodes.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
A kind of geologic body method for surveying of the present invention mainly includes the following steps that.
One, when construction geology reconnoitres hole, relevant treatment is carried out to the hole of reconnoitring completed, to utilize to the greatest extent Cost is reconnoitred in scene drilling, saving.
Certainly the work of this step can be omitted, and be directly entered second step.When construction geology reconnoitres hole, to complete At reconnoitre hole carry out plus non-metallic casing (such as PVC casings) processing, casing select screen casing, if in the case of without screen casing, will cover The outer spacing by 20cm of pipe arranges several row's apertures to substitute screen casing.
Two, multiple drillings and the three-dimensional parallel electrical method observation system of ground configuration are based on.
Using the parallel electrical method observation system of three-dimensional based on multiple drillings and ground configuration:According to ground electrodes and Kong Zhong electricity The mode that pole is combined arranges three-dimensional parallel electrical method observation system, specific as follows.
(1) electrode arrangement in hole:Arrange an electrode array in each drilling, electrode array by several constant spacings electrode structure At electrical method electrode array is sent into respective bore bottom, and ensures the spacing in electrode array between each electrode by the length of L, is ensured Position of the electrode in respective bore in drilling;
(2) ground electrodes group is arranged:In ground configuration grid electrode group, grid electrode group between each electrode between Away from the planar range to drill where electrode in respectively a and grid range covering hole.
(3) public electrode B is placed at infinity, and public relatively electrode N is placed at an arbitrary position;Public electrode B, each electrode array, ground electrodes group are connected by parallel electrical prospecting apparatus respectively in public relatively electrode N, drilling, by it is porous with The synchronization electrical method on ground is observed, and finds out latent geologic anomaly.
The key point of the present invention:It is simutaneously arranged electrod-array by ground and drilling, forms the full three-dimensional in ground and hole Observation system, coverage area bigger, data acquired amount are huge.It gets parms more:Can be obtained in each power-up period nature field, The potential data of primary field, secondary field, while the primary field potential response of different frequency can be obtained by power-on time length, The polarizability parameter for obtaining search coverage can extract in special item and use.
Wherein, in hole in electrode arrangement, electrode array by falling weight or can be bundled in thin bar, is sent into drilling bottom Portion.If drying is anhydrous in drilling, it need to pour water in the borehole, ensure the contact of electrode.Spacing in electrode array between each electrode is 0.2m~1m;Spacing in grid electrode group between each electrode is 1m~5m.
Supply current when three, acquiring that each electrode is powered in three-dimensional parallel electrical method observation system using parallel electrical prospecting apparatus and The collected voltage data of other electrodes.
The test system uses AM method gathered datas:When being powered as current electrode using one of electrode, other All electrode simultaneous observation potential datas;I.e. one of electrode is as current electrode, and in power supply, other all electrodes are same Walk observation voltage data;It is powered with two kinds of power-up period associating power supply modes, i.e., includes two different weeks in each power-up period The pulse direct current of phase;Nature electric field data, primary field voltage data and secondary field electricity can be obtained in a power-up period Data are pressed, the electrical parameters such as natural potential, resistivity, polarizability are can extract.
Four, the data acquisition of entire detection section is completed.
If drilling depth H is larger, when longer along bore detecting distance, due to the limitation of single survey line length in drilling, first It will be in the survey line whole in all drillings after completing an observation system data acquisition from drilling bottommost arrangement by electrode Carry certain distance S, but S<L ensures that two surveys line have certain overlapping region, then has acquired after one group of number according still further in this step The electrode array in each drilling is carried, until completing the data acquisition of entire detection section.
Five, collected data solution editorial afterword is handled according to virtual electrode coordinate, extraction inverting file carries out inverting Processing, the final three-dimensional electrical data body obtained in entire detection section.
Six, 3D data volume is subjected to relevant treatment into figure, and combines practical geological condition, carry out related geologic interpretation. Step 6 can also be omitted.
For the clearer introduction present invention, in the present embodiment, by taking four drilling as an example, four drilling depths are all 16m, bore diameter 90mm, spacing of wells 20m explain the present invention.
One, when construction geology reconnoitres hole, jacketed pipe processing is carried out to the hole of reconnoitring completed, casing selects PVC sieves Pipe, screen casing diameter 75mm, if in the case of PVC free screen casing, 5 row's apertures will be arranged by the spacing of 20cm outside pvc pipe with electric hand drill To substitute screen casing, it is therefore an objective to ensure the connection of pvc pipe inner electric field and outer electric field.
Two, three-dimensional parallel electrical method observation system is arranged in such a way that electrode in ground electrodes and hole is combined, incorporated by reference to Fig. 1 and Fig. 2, specially:
Electrode 1 is arranged in hole:Electrode array totally 16 electrodes 1,1 spacing 40cm of electrode, then per strip electrode string in each drilling 3 Length is 6m;Electrode array by falling weight or is bundled in thin bar, 3 bottoms of drilling are sent into;
Ground electrodes 2 are arranged:In ground configuration grid electrode group, 2 spacing 4m of electrode, range is bored where covering electrode 1 The planar range in hole 3.
Three, it after observation system arranges, if anhydrous in drilling 3, needs to pour water into drilling 3, until flooding topmost electrode 1 Connecting test system behind position carries out parameter setting to test system.It is used using AM method gathered datas incorporated by reference to Fig. 3 and Fig. 4 Two kinds of power-up period associating power supply modes of 0.1s and 1s are powered, i.e., include two differences in each power-up period of each electrode 1 The pulse direct current of period 0.1s and 1s.When one of electrode 1 being used to power for current electrode 4,1 simultaneous observation of all electrodes Potential data obtains and surveys area's electrical situation.
In step 3, specially each 3 16 electrodes of arrangement of drilling, 36 electrodes of ground configuration.If in first drilling 3 Electrode be respectively A1, A2 ... A16, electrode is respectively B1, B2 ... B16, electrode during third drills in second drilling Respectively C1, C2 ... C16, electrode is respectively D1, D2 ... D16 in the 4th drilling, ground electrodes 1,2 ... 36, shape At electrod-array.When carrying out AM measurements, the transmitting and reception of electrode are respectively:A1 powers, and A1~A16, B1~B16, C1~ C16, D1~D16,1~36 receives potential data simultaneously, and A2 powers, A1~A16, B1~B16, C1~C16, D1~D16,1~ 36 receive potential data simultaneously, until A16 powers, A1~A16, B1~B16, C1~C16, D1~D16,1~36 receives simultaneously Potential data;Analogize by this method, until each electrode in four drillings is powered successively;When ground electrodes 1# power supplies, 1~ 36, A1~A16, B1~B16, C1~C16, D1~D16 simultaneously gathered data, 2# power when, 1~36, A1~A16, B1~ B16, C1~C16, D1~D16 while gathered data, until 36# electrodes are powered, 1~36, A1~A16, B1~B16, C1~ C16, D1~D16 while gathered data.So far, the collecting work of all data of observation system is completed.
Four, due to every strip electrode string length far smaller than 3 depth of drilling, first electrode 1 is arranged from 3 bottommosts of drilling, After completing the acquisition of observation system data, the survey line in all drillings 3 is all above carried into 5m, 1m Chong Die with upper bar survey line, then Acquire one group of data;Acquired after data all electrodes 3 while will above carry 5m in drilling again, with last time observation system and be overlapped 1m Afterwards, gathered data so far completes the data acquisition of entire detection section.
Five, collected data are handled according to virtual electrode coordinate, extraction inverting file carries out inversion procedure, most The 3D data volume in entire coverage of survey area is obtained eventually, includes the parameters such as natural potential, resistivity, polarizability in data volume.
Six, 3D data volume is subjected to relevant treatment into figure, and combines practical geological condition, carry out related geologic interpretation, As shadow region is abnormal area in Fig. 4.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (9)

1. a kind of three-dimensional parallel electrical method observation system, it is characterised in that:In such a way that electrode is combined in ground electrodes and hole The three-dimensional parallel electrical method observation system of arrangement:
Electrode arrangement in hole:It arranges that an electrode array, electrode array are made of the electrode of several constant spacings in each drilling, grows Degree is L, electrode array is sent into respective bore bottom, and ensure the spacing in electrode array between each electrode, ensures electrode in drilling Position in respective bore;
Ground electrodes group is arranged:Spacing difference in ground configuration grid electrode group, grid electrode group between each electrode For the planar range to drill where electrode in a and grid range covering hole;
Public electrode B is placed at infinity, and public relatively electrode N is placed at an arbitrary position;It is public electrode B, public Compare that electrode N, each electrode array, ground electrodes group are connected by parallel electrical prospecting apparatus respectively in drilling, by porous with ground Synchronous electrical method observation, finds out latent geologic anomaly.
2. three-dimensional parallel electrical method observation system as described in claim 1, it is characterised in that:It, will be electric in hole when electrode arrangement Pole string is by falling weight or is bundled in thin bar, is sent into foot of hole.
3. three-dimensional parallel electrical method observation system as described in claim 1, it is characterised in that:In hole when electrode arrangement, if boring Drying is anhydrous in hole, need to pour water in the borehole, ensure the contact of electrode.
4. three-dimensional parallel electrical method observation system as described in claim 1, it is characterised in that:In electrode array between each electrode between Away from for 0.2m~1m;Spacing in grid electrode group between each electrode is 1m~5m.
5. a kind of geologic body method for surveying, it is characterised in that:It includes the following steps:
One, based on the three-dimensional of multiple drillings and ground configuration as described in any one of Claims 1-4 parallel electrical method observation system System;
Supply current when two, being powered using an electrode in the three-dimensional parallel electrical method observation system of electrical method test system acquisition and its The voltage data body that his each electrode measurement obtains, the interior all data comprising nature field, primary field and secondary field of the data volume;
Three, other each electrode measurements when all electrodes are powered successively are completed by the acquisition method of step 2, until completing entire visit Survey the data acquisition of section;
If four, drilling depth H is more than the length of electrode array in respective bore, simultaneously several times by the survey line in all drillings point Above carry certain distance S, but S<L ensures that two surveys line have certain overlapping region, until survey line all covers detection interval, presses Step 2: three data acquisitions;
Five, collected data volume solution editorial afterword is handled according to virtual electrode coordinate, extraction inverting file carries out at inverting Reason, the final electrical 3D data volume obtained in entire detection section;
Six, electrical 3D data volume is subjected to relevant treatment into figure, and combines practical geological condition, carry out related geologic interpretation.
6. geologic body method for surveying as claimed in claim 5, it is characterised in that:In step 2, the parallel electrical method test System uses AM method gathered datas:I.e. one of electrode as current electrode when powering, other all electrode simultaneous observations Potential data;It is powered with two kinds of power-up period associating power supply modes, i.e., includes the arteries and veins of two different cycles in each power-up period Rush direct current;Nature electric field data, primary field voltage data and secondary field voltage data are obtained in a power-up period.
7. geologic body method for surveying as claimed in claim 5, it is characterised in that:In step 3, if drilling depth H is larger, Along bore detecting distance it is longer when, due to drill in single survey line length limitation, first by electrode from drilling the upward cloth of bottommost It sets, after completing an observation system data acquisition, the survey line in all drillings is above carried into certain distance S, but S simultaneously<L is protected Two surveys line of card have certain overlapping region, then have acquired after data according still further to this step while above having carried the electrode in each drilling String, until completing the data acquisition of entire detection section.
8. geologic body method for surveying as claimed in claim 5, it is characterised in that:In the three-dimensional parallel electrical method observation system of arrangement Before, when construction geology reconnoitres hole, relevant treatment is carried out to the hole of reconnoitring completed, to be bored to the greatest extent using scene Cost is reconnoitred in hole, saving.
9. geologic body method for surveying as claimed in claim 8, it is characterised in that:When construction geology reconnoitres hole, to complete At reconnoitre that hole carries out plus non-metallic casing processing, casing select screen casing, if in the case of without screen casing, by outside casing by 20cm's Spacing arranges several row's apertures to substitute screen casing.
CN201610791248.3A 2016-08-30 2016-08-30 A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel Active CN106443794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610791248.3A CN106443794B (en) 2016-08-30 2016-08-30 A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610791248.3A CN106443794B (en) 2016-08-30 2016-08-30 A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel

Publications (2)

Publication Number Publication Date
CN106443794A CN106443794A (en) 2017-02-22
CN106443794B true CN106443794B (en) 2018-08-28

Family

ID=58164972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610791248.3A Active CN106443794B (en) 2016-08-30 2016-08-30 A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel

Country Status (1)

Country Link
CN (1) CN106443794B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107272068A (en) * 2017-06-09 2017-10-20 北京市地质调查研究院 It is a kind of to utilize the method without anti-interference across the hole resistivity method Underground space of cable
CN107346037B (en) * 2017-06-22 2019-02-05 广州市天驰测绘技术有限公司 Three-dimensional underground piping accurately detecting method
CN111721831A (en) * 2020-06-08 2020-09-29 重庆交通大学 Three-dimensional tomography dam hidden leakage channel scanning method based on electric stimulation
CN111856588B (en) * 2020-06-17 2022-09-27 南方科技大学 Ground fault early warning method, system, terminal device and storage medium
CN113031087B (en) * 2021-03-03 2022-10-28 王佳馨 Cross-street opposite-penetration resistivity measurement system and data acquisition method
CN112946756A (en) * 2021-03-31 2021-06-11 上海元易勘测设计有限公司 Site quality rapid detection method based on multi-frequency electromagnetic method and parallel direct current method
CN113125517B (en) * 2021-04-09 2023-11-28 浙江省水利河口研究院(浙江省海洋规划设计研究院) Device and method for monitoring root infiltrating irrigation by utilizing three-dimensional resistivity
CN114114431B (en) * 2021-11-29 2022-08-19 合肥工业大学 Small polar distance potential extraction method based on dual-mode parallel electrical method
CN114152987B (en) * 2021-12-21 2022-10-28 中国科学技术大学 True three-dimensional observation system arrangement and true three-dimensional data volume synthesis method based on dual-mode parallel electrical method
CN114545514A (en) * 2022-02-28 2022-05-27 河南省许昌新龙矿业有限责任公司 Mine water disaster monitoring device and method
CN114924323A (en) * 2022-04-14 2022-08-19 吉林大学 Permeable reactive barrier adsorption effect monitoring device and monitoring method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419455A (en) * 2011-08-23 2012-04-18 安徽理工大学 Interwell parallel resistivity CT (computed tomography) testing method
CN103837898A (en) * 2014-02-24 2014-06-04 吉林大学 High-density electrical method near-end dipole electromagnetic sounding method
CN204154907U (en) * 2014-08-20 2015-02-11 中煤科工集团西安研究院有限公司 The large line apparatus of a kind of distributed parallel electrical method data acquisition
CN104360402A (en) * 2014-10-15 2015-02-18 安徽理工大学 Well-to-ground joint electrical-method testing method and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9121963B2 (en) * 2013-12-05 2015-09-01 Baker Hughes Incorporated Dual mode balancing in OBM resistivity imaging

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419455A (en) * 2011-08-23 2012-04-18 安徽理工大学 Interwell parallel resistivity CT (computed tomography) testing method
CN103837898A (en) * 2014-02-24 2014-06-04 吉林大学 High-density electrical method near-end dipole electromagnetic sounding method
CN204154907U (en) * 2014-08-20 2015-02-11 中煤科工集团西安研究院有限公司 The large line apparatus of a kind of distributed parallel electrical method data acquisition
CN104360402A (en) * 2014-10-15 2015-02-18 安徽理工大学 Well-to-ground joint electrical-method testing method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《并地联合并行电法测试模拟与应用》;张平松等;《地质与勘探》;20150930;第51卷(第5期);964-968 *

Also Published As

Publication number Publication date
CN106443794A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106443794B (en) A kind of three-dimensional electrical method observation system and geologic body method for surveying parallel
Li et al. Detecting and monitoring of water inrush in tunnels and coal mines using direct current resistivity method: a review
Chen et al. Application of short-offset TEM (SOTEM) technique in mapping water-enriched zones of coal stratum, an example from East China
CN102419455B (en) Interwell parallel resistivity CT (computed tomography) testing method
Zha et al. An application of hydraulic tomography to a large‐scale fractured granite site, Mizunami, Japan
Xue et al. Detection and monitoring of water-filled voids using transient electromagnetic method: a case study in Shanxi, China
CN108107478B (en) Magnetotelluric synchronizing detection and real time inversion method and system
CN108226995B (en) Active source microseismic monitoring device and method
CN102866417A (en) Device and method for seismic cross hole computed tomography (CT) detection and tomography of underground cave
CN202837558U (en) Underground karst cave earthquake cross-hole CT (computer tomography) detection and tomographic imaging device
CN205958769U (en) Three -dimensional parallel electric method observation system based on a plurality of drillings and ground are arranged in step
CN103207412A (en) Method for detecting solution leaching and groundwater pollution scope of acid in-situ leaching of uranium
CN106907145A (en) A kind of apparent resistivity measuring system and method with brill advanced prediction
CN102720484B (en) A kind of acoustic logging while drilling instrument and logging method
CN109343130A (en) A kind of the Loop source ground well transient electromagnetic detecting method and system of broadside
Xue et al. Identification of double-layered water-filled zones using TEM: A case study in China
CN106802432A (en) The method for surveying and device of soil layer construction
CN109343131B (en) Lateral power supply ground well direct current method detection method and device
CN106869913A (en) A kind of method that utilization well-in-situ potential technology detects water injection well in oil fields waterflood front
CN103630938A (en) Imaging system and imaging method for well earthquake using hammer head of down-hole hammer as focus
CN111474592A (en) Interwell electromagnetic detection system and method
Dimovski et al. A geophysical approach for mapping of abandoned mining workings and unconsolidated zones in coal mining areas
CN105866848B (en) Deep mine electromagnetic detection method and apparatus thereof
Messias et al. Hydrogeophysics in fractured crystalline aquifers in English Guyana
CN202256701U (en) Cross-well parallel resistivity CT test system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant