CN106437743B - Service channel between upper and lower tunnel - Google Patents
Service channel between upper and lower tunnel Download PDFInfo
- Publication number
- CN106437743B CN106437743B CN201610783338.8A CN201610783338A CN106437743B CN 106437743 B CN106437743 B CN 106437743B CN 201610783338 A CN201610783338 A CN 201610783338A CN 106437743 B CN106437743 B CN 106437743B
- Authority
- CN
- China
- Prior art keywords
- service channel
- tunnel
- lateral
- lateral service
- fire escape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005641 tunneling Effects 0.000 claims description 4
- 238000009412 basement excavation Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention provides the service channels between a kind of tunnel up and down, it is characterized by: it includes the first tunnel and the second tunnel being parallel to each other, first tunnel excavation has and its perpendicular the first lateral service channel for being connected to and extending to the second tunnel, second tunnel excavation, which has, to be connected with its perpendicular the second lateral service channel for being connected to and extending to the first tunnel, the first lateral service channel and the second lateral service channel by longitudinal direction fire escape.The present invention meets the escape stair gradient, shortens the duration, saves project cost.
Description
Technical field
The invention belongs to the field of engineering technology such as Urban Underground rail traffic, and in particular to the contact above and below a kind of between tunnel
Channel.
Background technique
To solve the problems, such as the fire prevention in tunnel and evacuating, the contact between connection tunnel is set according to a fixed spacing between two tunnels and is led to
Road.In existing engineering, when upper and lower tunnel vertical range is big, horizontal distance is small, and linear type transverse direction service channel is unsatisfactory for evacuation building
When terraced slope requirement, and use open cut vertical shaft.Since transit tunnel construction carries out after the completion of Construction of Silo, and open cut vertical shaft is deposited
In house the problems such as pipeline removal, traffic data process, cause construction period length, project cost high and uncontrollable.
Summary of the invention
The purpose of the present invention is to the defects of the prior art, provide the service channel above and below a kind of between tunnel, meet
The escape stair gradient, shortens the duration, saves project cost.
The present invention provides the service channels between a kind of tunnel up and down, it is characterised in that: it includes first to be parallel to each other
Tunnel and the second tunnel, the first tunnel are located at the top in the second tunnel;First tunnel excavation has perpendicular to be connected to and to its
The first lateral service channel that two tunnels extend, the second tunnel excavation has perpendicular be connected to and to the of the extension of the first tunnel with its
Two lateral service channels, the first lateral service channel and the second lateral service channel are parallel to ground, the first lateral service channel
It is connected with the second lateral service channel by longitudinal fire escape.
The longitudinal direction fire escape is obliquely installed, the end phase of the upper end of longitudinal fire escape and the first lateral service channel
Connection;The lower end of longitudinal fire escape is connected with the end of the second lateral service channel.
The longitudinal direction fire escape is using ramp or the form of escape stair.
The end of described first lateral service channel extends and is raised in the second tunnel the first lateral service channel and indulges
To fire escape junction.
The end of described second lateral service channel extends and is raised in the first tunnel the second lateral service channel and indulges
To fire escape junction.
The present invention excavates service channel using subsurface excavation method, adapts to get in touch between overlapping tunnel closely, above and below big height difference logical
Road.The present invention is evacuated relative to vertical shaft folding step, and the one or two lateral service channel and longitudinal fire escape cooperatively form Z-type structure.Z
The evacuation of type inclined shaft, evacuation function substantially improve.The present invention effectively shortens the duration using subsurface excavation method, investment reduction, in Urban Underground
The fields such as rail traffic are with good application prospect.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the face 1-1 of the present invention cross-sectional view;
Wherein, the first tunnel 1-, the second tunnel 2-, the lateral service channel of 3- first, the lateral service channel of 4- second, 5- are vertical
To fire escape.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments, convenient for this hair is well understood
It is bright, but they limiting the invention.
As shown in Figure 1, the present invention provides the service channels between a kind of tunnel up and down, it is characterised in that: it includes mutual
Parallel the first tunnel 1 and the second tunnel 2,1 tunneling of the first tunnel have and its perpendicular for being connected to and extending to the second tunnel 2
One lateral service channel 3,2 tunneling of the second tunnel has laterally gets in touch with its perpendicular second for being connected to and extending to the first tunnel 1
Channel 4, the first lateral service channel 3 pass through longitudinal fire escape 5 with the second lateral service channel 4 and are connected.First laterally joins
Network channel 3 and the second lateral service channel 4 are parallel to the ground.First lateral service channel 3 and the second lateral service channel 4 with it is vertical
It matches to form Z-type inclined shaft to fire escape 5, adapts to short distance, big height difference overlapping tunnel up and down, dredged relative to vertical shaft folding step
It dissipates, effectively reduces the gradient of fire escape, evacuation function substantially improves, and shortens the construction period effectively save investment.
Described first lateral service channel 3 and the connection angle of 5 axis of longitudinal fire escape and the second lateral service channel 4
It is identical as the angle [alpha] of longitudinal 5 axis of fire escape to be not less than 90 °.
It is described longitudinal direction fire escape 5 using ramp form, longitudinal 5 axis of fire escape with perpendicular to 1 axis of the first tunnel
The angle of line plane is not more than 7 °.The longitudinal direction fire escape 5 is using the form of escape stair, and longitudinal 5 gradient of fire escape is not
Greater than 35 °.Longitudinal 5 length of fire escape is true according to the difference in height of the first lateral service channel 3 and the second lateral service channel 4
It is fixed, i.e. L=hcot β.
The end of the first lateral service channel 3 extends to the second tunnel 2 and is raised in the first lateral service channel 3 and
The end of second lateral service channel 4 described in longitudinal 5 junction of fire escape extends to the first tunnel 1 and is raised in second laterally
5 junction of service channel 4 and longitudinal fire escape;Guarantee the connective stability of longitudinal fire escape 5.
When construction, the first tunnel 1 is excavated first and the second tunnel 2 to hole is logical.Then supporting and excavation both ends first are lateral
Service channel 3 and the second lateral service channel 4, while pouring two lining structures.Supporting and the longitudinal fire escape 5 of excavation again, connection
After first lateral service channel 3 and the second lateral service channel 4, two lining structures are poured.
The content that this specification is not described in detail belongs to the prior art well known to professional and technical personnel in the field.
Claims (4)
1. the service channel between a kind of tunnel up and down, it is characterised in that: it includes the first tunnel (1) and the second tunnel being parallel to each other
Road (2), the first tunnel (1) are located at the top in the second tunnel (2);First tunnel (1) tunneling has perpendicular to be connected to and to its
The first lateral service channel (3) that two tunnels (2) extend, the second tunnel (2) tunneling has perpendicular to be connected to and to the first tunnel with its
The second lateral service channel (4) that road (1) extends, the first lateral service channel (3) and the second lateral service channel (4) are parallel to
Ground, the first lateral service channel (3) pass through longitudinal fire escape (5) with the second lateral service channel (4) and are connected;First is horizontal
It matches to form Z-type inclined shaft with longitudinal fire escape (5) to service channel (3) and the second lateral service channel (4);Longitudinal evacuation
Channel (5) is using ramp or the form of escape stair.
2. the service channel between tunnel up and down according to claim 1, it is characterised in that longitudinal fire escape (5) inclination is set
It sets, the upper end of longitudinal fire escape (5) is connected with the end of the first lateral service channel (3);Under longitudinal fire escape (5)
It holds and is connected with the end of the second lateral service channel (4).
3. the service channel between tunnel up and down according to claim 1, it is characterised in that the first lateral service channel (3)
End extends to the second tunnel (2) and is raised in the first lateral service channel (3) and longitudinal fire escape (5) junction.
4. the service channel between tunnel up and down according to claim 1, it is characterised in that the second lateral service channel (4)
End extends to the first tunnel (1) and is raised in the second lateral service channel (4) and longitudinal fire escape (5) junction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610783338.8A CN106437743B (en) | 2016-08-31 | 2016-08-31 | Service channel between upper and lower tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610783338.8A CN106437743B (en) | 2016-08-31 | 2016-08-31 | Service channel between upper and lower tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106437743A CN106437743A (en) | 2017-02-22 |
CN106437743B true CN106437743B (en) | 2019-02-01 |
Family
ID=58091850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610783338.8A Active CN106437743B (en) | 2016-08-31 | 2016-08-31 | Service channel between upper and lower tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437743B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057817B (en) * | 2018-08-02 | 2020-02-07 | 中铁隆工程集团有限公司 | C-shaped connection channel structure suitable for vertically-stacked floor iron sections and construction method |
CN109386303A (en) * | 2018-09-19 | 2019-02-26 | 云南省交通投资建设集团有限公司 | A kind of broken-line type fire escape construction method for highway double width tunnel |
CN110273694A (en) * | 2019-05-17 | 2019-09-24 | 深圳市综合交通设计研究院有限公司 | A kind of single-hole double-layer tunnel vehicle dispersal system and its implementation method |
CN113605923B (en) * | 2021-09-18 | 2023-11-21 | 中铁第六勘察设计院集团有限公司 | Subway line overlapping section tunnel connection channel structure and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102400701A (en) * | 2010-09-10 | 2012-04-04 | 上海同岩土木工程科技有限公司 | Road tunnel intercommunication type longitudinal ventilation mode |
CN203685276U (en) * | 2013-12-14 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for double single-track railway tunnels |
CN204312086U (en) * | 2014-12-09 | 2015-05-06 | 山西省交通规划勘察设计院 | Tunnel ventilation accessory channel and main hole intersect integral structure |
CN104675424A (en) * | 2015-02-10 | 2015-06-03 | 招商局重庆交通科研设计院有限公司 | Underwater tunnel ventilation system and ventilation method |
CN206035498U (en) * | 2016-08-31 | 2017-03-22 | 中铁第四勘察设计院集团有限公司 | Contact passageway between upper and lower tunnel |
-
2016
- 2016-08-31 CN CN201610783338.8A patent/CN106437743B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102400701A (en) * | 2010-09-10 | 2012-04-04 | 上海同岩土木工程科技有限公司 | Road tunnel intercommunication type longitudinal ventilation mode |
CN203685276U (en) * | 2013-12-14 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for double single-track railway tunnels |
CN204312086U (en) * | 2014-12-09 | 2015-05-06 | 山西省交通规划勘察设计院 | Tunnel ventilation accessory channel and main hole intersect integral structure |
CN104675424A (en) * | 2015-02-10 | 2015-06-03 | 招商局重庆交通科研设计院有限公司 | Underwater tunnel ventilation system and ventilation method |
CN206035498U (en) * | 2016-08-31 | 2017-03-22 | 中铁第四勘察设计院集团有限公司 | Contact passageway between upper and lower tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN106437743A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437743B (en) | Service channel between upper and lower tunnel | |
CN104612698B (en) | A kind of shallow-depth-excavation tunnel top bar interval wall construction method | |
AU2015281641B2 (en) | Method for removing hydraulic support for solid filling coal mining | |
CN105221179B (en) | A kind of highly gassy mine Y type method of ventilations | |
CN105240024B (en) | A kind of method of parallel shield method enlarging construction subway station | |
CN205977229U (en) | Arcading tunnel non - flushes entrance to a cave structure suitable for bias voltage condition | |
CN102767379A (en) | Shallow-buried unsymmetrical pressure section tunnel drilling construction method | |
CN107131001A (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN107130968A (en) | A kind of tunnel construction mid-board | |
CN104632245A (en) | Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station | |
CN106988760A (en) | Facility-sliding strata tunnel portal reinforcing construction and construction method | |
CN106930768B (en) | Tunnel Construction and application | |
CN207485466U (en) | Gas at upper corner drainage device during high methane coal working face is just adopted | |
CN104863588A (en) | Advanced pier column pre-arranging gob-side entry retaining method | |
CN109538219A (en) | In-situ expansion super-large section and partial excavation method of broken hard rock tunnel | |
CN102383373B (en) | Be applied to elevated bridge invisible rainwater collecting system and the method to set up thereof of flat slope | |
CN103742098B (en) | A kind of colliery Di Chou lane layer-through drilling return slag hole sealing device and method | |
CN105927252B (en) | It is a kind of to excavate big cross section underground space structure transforming methods of structural system using rectangular top pipe | |
CN104184097A (en) | Non-migration suspension protection system and method for communication pipes and cables | |
CN206035498U (en) | Contact passageway between upper and lower tunnel | |
WO2021237912A1 (en) | Subsidence-restricted stoping method for false mined-out layer support formed in combination with waste rock | |
CN204059401U (en) | Novel combined traffic tunnel | |
CN204677208U (en) | A kind of inclined shaft enters Zheng Dong and to caunch structure | |
CN109119943A (en) | System of laying optimization method of the cable at push pipe both ends | |
CN205894100U (en) | Underground transfer passage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |