CN106437155A CN201610876887.XA CN201610876887A CN106437155A CN 106437155 A CN106437155 A CN 106437155A CN 201610876887 A CN201610876887 A CN 201610876887A CN 106437155 A CN106437155 A CN 106437155A
Authority
CN
China
Prior art keywords
spray
building
irregular
build
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610876887.XA
Other languages
Chinese (zh)
Inventor
赵嘉珩
赵建纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Original Assignee
ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd filed Critical ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Priority to CN201610876887.XA priority Critical patent/CN106437155A/en
Publication of CN106437155A publication Critical patent/CN106437155A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides an irregular building style construction method and belongs to the field of buildings. The irregular building style construction method comprises the following steps that 1, a net-shaped support is arranged at the part needing a building according to design requirements; 2, a spray-building robot is adopted to spray and build slurry sprayed and built in a site and rapid to solidify on the net-shaped support; 3, the style surface is finished. The step 1 is that steel wire meshes or steel plate meshes or other sheet materials are adopted to manufacture a guiding core meeting the design shape requirements. The step 2 is that the spray-building robot is adopted to spray the slurry sprayed and built in the site and rapid to solidify on the guiding core, and the spraying thickness and trend of all parts are controlled by the spray-building robot. The step 3 is that the style surface obtained after spray building is completed is manually finished and decorated. The irregular building style construction method has the advantages that rapid construction of pseudo-classic architectures and irregular building members can be achieved, a period is short, and the cost is low.

Description

A kind of construction process of irregular building moulding
Technical field
The invention belongs to building field, particularly to the construction process of a kind of irregular building moulding.
Background technology
With the raising of the development of travel industry and the requirement attractive in appearance to facade, in order to keep traditional architecture culture Style or in building in the style of the ancients and modern architecture, often use some decorative model components, these member profile moulding are multiple Miscellaneous, structure is irregular, it is impossible to use the common building mode of traditional body of wall or construction to build;At present, these buildings The construction of component is repaired after mostly using concrete block masonry or uses the method for the combination that bonds or employing to arrange at construction position Template, then uses the method shaping of concreting;The feature built by laying bricks or stones is that pattern is flexible, it is not necessary to template, and defect is time-consuming Arduously, its moulding is accurate not;And the method for concreting has moulding accurately, the features such as speed is fast, firm in structure, it lacks It is trapped in its template construct is difficult, builds difficulty, makes and lay cost high, the recycling rate variance of template;Thus cause Long construction period, building cost is high.
Content of the invention
The problem above present in architectural process for existing building in the style of the ancients and irregular building, the present invention proposes one The construction process of irregular building moulding, it is characterised in that:Comprise the following steps;1st, require to set at required construction site according to design Put network;2nd, use spray building machine device people spray on network to build a kind of on-the-spot spray and build rapid solidification slurry;3rd, finishing is made Type surface;Described step 1 refers to use steel wire or expanded metal lath or other thin sheet materials, produces and meets design shape The guiding core that shape requires;Described step 2 is to use spray building machine device people that scene spray is built rapid solidification pulp spraying to be coated in guiding core On, and have spray building machine device people to control thickness and the trend of each several part spraying;Described step 3 is to use manually after spray is built and completed Molding surface arrange go forward side by side luggage decorations;Described spray building machine device people is earlier application " a kind of Jian Qiang robot "(Application number: 2016301754720);It is earlier application " rapid solidification slurry is built in a kind of on-the-spot spray " that rapid solidification slurry is built in described on-the-spot spray (Application number:2013102435357).
Beneficial effect
The beneficial effects of the present invention is, be capable of the quick construction of building in the style of the ancients and irregular building component, the cycle is short, cost Low.
Detailed description of the invention
In order to further illustrate technical scheme, now illustrate the detailed description of the invention of the present invention;This example is selected Steel wire is as support, and the main application of the present invention is building in the style of the ancients or the building abnormity component for viewing and admiring and non-bearing structure Part;Design according to abnormity component requires, uses steel wire to be made into the guiding core identical with design shape center line, because of In order to use steel wire to build guiding core, than using template and surrounding abnormity cavity or use building block, pile up will simply and readily much; Rapid solidification slurry is built in the scene spray of employing and the requirement according to architectural environment and to abnormity component suitably adjusts on-the-spot spray and builds quick The proportioning of solidification slurry;Add water stirring, sends into pulp shooting machine;Spray building machine device people is placed in the scene needing to build abnormity component, Switching on power, the working procedure of the shape design robot according to abnormity component in robot, such as spray build thickness and change Pattern, speed and translational speed and moving direction are built in spray;Use spray building machine device people under the initial guide of guiding core, start spray Applying, owing to the characteristic of rapid solidification slurry is built in scene spray, rapid solidification slurry quick solidification is built in the on-the-spot spray spraying to guiding core And there is certain intensity, it is therefore sprayed on guiding core and initiate the spraying slurry at position and just formed good with guiding core and building substrate Good connection, and the offer support of rapid solidification slurry can be built for the on-the-spot spray of follow-up spraying;With the carrying out of spraying sequence, spray Build the setting according to control computer for the robot, spray out shape and the construction of various complexity, particularly hollow body;Spraying completes After, build the intensity of rapid solidification slurry due to scene spray and be not reaching to peak, the artificial table to its abnormity component can be used Face arranges, and then can use spray building machine device people that the spray of its end is built head to be replaced with polishing head, build spray after completing Abnormity component peace is polished according to the profile of the control computer installation of robot, the then incrustation veneer at abnormity component Or coating is decorated further, just complete the enforcement of the present invention;Because on-the-spot spray is built rapid solidification slurry and is had quickly The feature of solidification, needs solidification for a long time without as concrete, is exactly almost the solidification of limit construction limit, shorten construction week Phase;Carry out spray build owing to have employed spray building machine device people under computer simulation, it is possible to complete building of the abnormity component of complexity Building, and it being high with the design shape degree of approach to spray the component building up, and is beneficial to realize the design philosophy of building designers, good looking appearance is whole Together;Owing to not needing the template system of complexity, reduce construction cost.

Claims (1)

1. the construction process of an irregular building moulding, it is characterised in that:Comprise the following steps;1st, require required according to design Construction site arranges network;2nd, use spray building machine device people spray on network to build a kind of on-the-spot spray and build rapid solidification and starch Material;3rd, molding surface is repaired;Described step 1 refers to use steel wire or expanded metal lath or other thin sheet materials, makes Go out to meet the guiding core of design shape requirement;Described step 2 is to use spray building machine device people that scene spray is built rapid solidification slurry It is sprayed on guiding core, and have spray building machine device people to control thickness and the trend of each several part spraying;Described step 3 is to use manually Build the molding surface after completing in spray and arrange luggage decorations of going forward side by side.
CN201610876887.XA 2016-10-09 2016-10-09 Irregular building style construction method Withdrawn CN106437155A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610876887.XA CN106437155A (en) 2016-10-09 2016-10-09 Irregular building style construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610876887.XA CN106437155A (en) 2016-10-09 2016-10-09 Irregular building style construction method

Publications (1)

Publication Number Publication Date
CN106437155A true CN106437155A (en) 2017-02-22

Family

ID=58172767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610876887.XA Withdrawn CN106437155A (en) 2016-10-09 2016-10-09 Irregular building style construction method

Country Status (1)

Country Link
CN (1) CN106437155A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3749449B2 (en) * 2001-04-26 2006-03-01 東日本旅客鉄道株式会社 Wall repair method
CN1978843A (en) * 2005-12-09 2007-06-13 湖南大学 Construction method for reinforcing steel-bar net mortar thin layer
CN101672109A (en) * 2009-09-22 2010-03-17 上海维固工程实业有限公司 Construction method for spraying polymer mortar aiming at structural strengthening
CN103046709A (en) * 2013-01-14 2013-04-17 山西省第二建筑工程公司 Building construction method of inner wall surface
CN103850444A (en) * 2012-12-05 2014-06-11 上海英谷桥梁科技有限公司 Steel strand polymer mortar reinforcement technology
CN105275206A (en) * 2014-07-11 2016-01-27 郑州三迪建筑科技有限公司 A construction method of an external wall of a building
CN106049867A (en) * 2016-06-23 2016-10-26 郑州三迪建筑科技有限公司 Building method for special-shaped building model

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3749449B2 (en) * 2001-04-26 2006-03-01 東日本旅客鉄道株式会社 Wall repair method
CN1978843A (en) * 2005-12-09 2007-06-13 湖南大学 Construction method for reinforcing steel-bar net mortar thin layer
CN101672109A (en) * 2009-09-22 2010-03-17 上海维固工程实业有限公司 Construction method for spraying polymer mortar aiming at structural strengthening
CN103850444A (en) * 2012-12-05 2014-06-11 上海英谷桥梁科技有限公司 Steel strand polymer mortar reinforcement technology
CN103046709A (en) * 2013-01-14 2013-04-17 山西省第二建筑工程公司 Building construction method of inner wall surface
CN105275206A (en) * 2014-07-11 2016-01-27 郑州三迪建筑科技有限公司 A construction method of an external wall of a building
CN106049867A (en) * 2016-06-23 2016-10-26 郑州三迪建筑科技有限公司 Building method for special-shaped building model

Similar Documents

Publication Publication Date Title
CN101585205B (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN111364754A (en) Construction method of art wood grain veneer fair-faced concrete
CN205954936U (en) Space hyperboloid curtain structure based on BIM accurate control construction quality
CN111805696A (en) Manufacturing process of building decoration component
CN106049867A (en) Building method for special-shaped building model
CN103276845A (en) Brickwork of prefabricated outer wall and processing technology of brickwork
CN103556804A (en) Wall and floor decoration module and mounting method thereof
JP2011168976A (en) Cement composition with joint-like pattern, method for manufacturing the cement composition, and method for finishing surface of the cement composition
CN106437155A (en) Irregular building style construction method
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN101934676A (en) Fabrication process of antique imitation art decorative material
JP5672834B2 (en) Surface finishing method of cement composition
CN201908415U (en) Wall decorative board layer structure
CN114273175A (en) Coating method of imitation brick veneer
CN201193388Y (en) Ultrathin face brick composite thermal insulation decorative board
CA3177054A1 (en) Systems and methods for adhering cladding
CN112922248A (en) Indoor pretreatment decoration method
CN105155800A (en) Machining method of foam glass heat preservation and decoration integration plate
CN110259007A (en) A kind of granite soft rock material and preparation method thereof
US1233265A (en) Manufacture of artificial-stone structures.
CN202882303U (en) Cement decorative board wall
JP2022135579A (en) Structure construction method
Khoshnevis et al. Automated construction using contour crafting
CN207495773U (en) A kind of Pressing fastener for concrete prefabricated element production line
CN207538315U (en) Prefabricated composite exterior wall with glass curtain wall and compound glazed tiles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170222