CN205954936U - Space hyperboloid curtain structure based on BIM accurate control construction quality - Google Patents
Space hyperboloid curtain structure based on BIM accurate control construction quality Download PDFInfo
- Publication number
- CN205954936U CN205954936U CN201620911036.XU CN201620911036U CN205954936U CN 205954936 U CN205954936 U CN 205954936U CN 201620911036 U CN201620911036 U CN 201620911036U CN 205954936 U CN205954936 U CN 205954936U
- Authority
- CN
- China
- Prior art keywords
- arc
- hyperboloid
- bim
- purlin
- aluminum plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a space space hyperboloid curtain structure based on BIM accurate control construction quality based on BIM accurate control construction quality among the building engineering should comprise hyperboloid aluminum plate finish coat, waterproof layer, heat preservation, indoor veneer layer and main body steel structure by the structure, hyperboloid aluminum plate finish coat, the waterproof layer, heat preservation and indoor veneer layer are the arc transition in proper order by constituting the hyperboloid structure to minispread greatly, hyperboloid aluminum plate finish coat wherein, arc time purlin, the processing preparation of arc owner purlin and arc glass decorative board is by three -dimensional BIM model system accurate control processing shape and size precision, the position of coordinate master control point is by three -dimensional its space coordinate numerical value of BIM model accurate control, primary member sets up the two -dimensional code, their positions in hyperboloid curtain BIM model of accurate control, do benefit to accurate control construction quality.
Description
Technical field
This utility model is related to reinforced concrete member template construction construction in architectural engineering, is more particularly, to based on BIM
The space hyperboloid curtain wall construction of precise control construction quality.
Background technology
Moulding due to building needs, and many landmarks devise arc Curtain Wall, or bi-curved curtain wall system
System, these bi-curved building exterior decoration faces, curve smoothness, modern design, give aesthetic feeling.
With the development of architecture information technology, BIM(Building Information Modeling)Technology has started to
Civil engineering is extensively applied.Whether BIM technology is applied to processing, making and the installation process of space hyperboloid curtain wall,
This is a problem being worth exploring.
To modern architecture, the novel moulding of space hyperboloid curtain wall, to the processing system of the components such as decoration panel, primary and secondary purlin
Make to increase difficulty, difficulty is also increased to the installation of hyperboloid structure simultaneously, how accurately to process, make and hyperboloid is installed
Curtain wall, needs detailed three-dimensional spatial information to support.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of space hyperbolic based on BIM precise control construction quality
Face curtain wall construction.
In order to solve above-mentioned technical problem, this utility model provides a kind of sky based on BIM precise control construction quality
Between hyperboloid curtain wall construction, this construction by hyperboloid aluminum plate facing layer, waterproof layer, heat-insulation layer, indoor facing layer and main body steel tie
Structure forms, described hyperboloid aluminum plate facing layer, waterproof layer, heat-insulation layer and the curved transition of indoor facing layer descending row successively
Row constitute hyperboloid structure, are provided with the main purlin of arc between described waterproof layer and hyperboloid aluminum plate facing layer, the main purlin of described arc
Bar periphery is provided with arc time purlin, and described main body steel construction is arranged at indoor facing layer side, described main body steel construction top
It is fixedly installed coordinate Master Node, described waterproof layer is provided with curtain wall drainage system, described hyperboloid aluminum plate facing layer and arc
Glass veneer is connected, and described arc glass decoration panel behind is provided with glass support system.
Preferably, described coordinate Master Node is connected with three-dimensional BIM model system, described hyperboloid aluminum plate facing layer, arc
Shape time purlin, the main purlin of arc and arc glass decoration panel are by three-dimensional BIM model system precise control machining shape and size essence
Degree, the position of described coordinate Master Node is by three-dimensional its space coordinatess numerical value of BIM model precise control.
Preferably, described hyperboloid aluminum plate facing layer, arc time purlin, the main purlin of arc and arc glass decoration panel set
Put Quick Response Code.
Preferably, described arc time purlin and the main purlin of arc pass through Water Cutting work by the shape that BIM model system is arranged
Skill precise forming.
Preferably, it is fixedly connected by organ plate waterproof adhesive tape between described main body steel construction and arc glass decoration panel.
After this utility model adopts said structure, its advantage is:
This construction is made up of hyperboloid aluminum plate facing layer, waterproof layer, heat-insulation layer, indoor facing layer and main body steel construction, profit
With BIM 3D modelling system integrated correlation processing and fabricating information, it is capable of all important structure of precise control space hyperboloid curtain wall
The shape of part and size.
Setting two dimension on described hyperboloid aluminum plate facing layer, arc time purlin, the main purlin of arc and arc glass decoration panel
Code, and communicates information to BIM control system, is capable of quantity and the position of all arc components of precise control, and associate plus
Factory and job site, beneficial to accelerating construction progress.
Between hyperboloid aluminum plate facing layer and arc glass decoration panel, carry out decorating transition using organ plate waterproof adhesive tape,
Beneficial to the negative effect expanded with heat and contract with cold eliminating between unlike material Curtain Wall, it is beneficial to the waterproof of decorative cover simultaneously.
Arc time purlin and the main purlin of arc, the shape according to BIM model adopts Water Cutting technique precise forming, better than biography
The clod wash of system or hot bending process, eliminate the residual stress of the component course of processing, it is to avoid during building uses, residual stress is drawn
Send out the deformation of arc component.
Brief description
What Fig. 1 this utility model adopted is shown based on the space hyperboloid curtain wall construction structure of BIM precise control construction quality
It is intended to.
In figure:1- hyperboloid aluminum plate facing layer, 2- arc time purlin, the main purlin of 3- arc, 4- waterproof layer, 5- heat-insulation layer,
6- indoor facing layer, 7- organ plate waterproof adhesive tape, 8- arc glass decoration panel, 9- glass support system, 10- main body steel construction,
11- curtain wall drainage system, 12- coordinate Master Node.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in detail it is impossible to be not understood as to this reality
With new restriction;
As shown in figure 1, a kind of space hyperboloid curtain wall construction based on BIM precise control construction quality, this construction is by double
Curved surface aluminum plate facing layer 1, waterproof layer 4, heat-insulation layer 5, indoor facing layer 6 and main body steel construction 10 form, described hyperboloid aluminium sheet
Finish coat 1, waterproof layer 4, heat-insulation layer 5 and the curved transition of indoor facing layer 6 is descending successively is arranged to make up hyperboloid structure,
It is provided with the main purlin of arc 3, described arc main purlin 3 periphery is provided with arc between described waterproof layer 4 and hyperboloid aluminum plate facing layer 1
Shape time purlin 2, described main body steel construction 10 is arranged at indoor facing layer 6 side, and described main body steel construction 10 top is fixedly installed
There is coordinate Master Node 12, described waterproof layer 4 is provided with curtain wall drainage system 11, described hyperboloid aluminum plate facing layer 1 and arc glass
Glass decoration panel 8 is connected, and described arc glass decoration panel 8 behind is provided with glass support system 9.
Described coordinate Master Node 12 is connected with three-dimensional BIM model system, described hyperboloid aluminum plate facing layer 1, arc time
The main purlin of purlin 2, arc 3 and arc glass decoration panel 8 are by three-dimensional BIM model system precise control machining shape and size essence
Degree, the position of described coordinate Master Node 12 is by three-dimensional its space coordinatess numerical value of BIM model precise control.
Arrange on described hyperboloid aluminum plate facing layer 1, arc time purlin 2, the main purlin of arc 3 and arc glass decoration panel 8
Quick Response Code.
It is accurate that described arc time purlin 2 and the main purlin of arc 3 pass through Water Cutting technique by the shape that BIM model system is arranged
Molding.
It is fixedly connected by organ plate waterproof adhesive tape 7 between described main body steel construction 10 and arc glass decoration panel 8.
Teachings herein is example of the present utility model and explanation, but does not mean that the obtainable advantage of this utility model is subject to
This limits, may be to realization in the simple transformation of structure and/or some embodiments in every this utility model practice process
Wherein one or more of advantage are all in the protection domain of the application.
Claims (5)
1. a kind of space hyperboloid curtain wall construction based on BIM precise control construction quality it is characterised in that:This construction is by hyperbolic
Face aluminum plate facing layer(1), waterproof layer(4), heat-insulation layer(5), indoor facing layer(6)And main body steel construction(10)Composition, described double
Curved surface aluminum plate facing layer(1), waterproof layer(4), heat-insulation layer(5)With indoor facing layer(6)Curved transition descending row successively
Row constitute hyperboloid structure, described waterproof layer(4)With hyperboloid aluminum plate facing layer(1)Between be provided with the main purlin of arc(3), described
The main purlin of arc(3)Periphery is provided with arc time purlin(2), described main body steel construction(10)It is arranged at indoor facing layer(6)One
Side, described main body steel construction(10)Top is fixedly installed coordinate Master Node(12), described waterproof layer(4)It is provided with curtain wall draining
System(11), described hyperboloid aluminum plate facing layer(1)With arc glass decoration panel(8)It is connected, described arc glass decoration panel
(8)It is provided with glass support system behind(9).
2. the space hyperboloid curtain wall construction based on BIM precise control construction quality according to claim 1, its feature exists
In:Described coordinate Master Node(12)It is connected with three-dimensional BIM model system, described hyperboloid aluminum plate facing layer(1), arc time purlin
Bar(2), the main purlin of arc(3)With arc glass decoration panel(8)By three-dimensional BIM model system precise control machining shape and size
Precision, described coordinate Master Node(12)Position by three-dimensional its space coordinatess numerical value of BIM model precise control.
3. the space hyperboloid curtain wall construction based on BIM precise control construction quality according to claim 1, its feature exists
In:Described hyperboloid aluminum plate facing layer(1), arc time purlin(2), the main purlin of arc(3)With arc glass decoration panel(8)On
Setting Quick Response Code.
4. the space hyperboloid curtain wall construction based on BIM precise control construction quality according to claim 1, its feature exists
In:Described arc time purlin(2)The main purlin with arc(3)Water Cutting technique is passed through by the shape that BIM model system is arranged accurate
Molding.
5. the space hyperboloid curtain wall construction based on BIM precise control construction quality according to claim 1, its feature exists
In:Described main body steel construction(10)With arc glass decoration panel(8)Between pass through organ plate waterproof adhesive tape(7)It is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620911036.XU CN205954936U (en) | 2016-08-22 | 2016-08-22 | Space hyperboloid curtain structure based on BIM accurate control construction quality |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620911036.XU CN205954936U (en) | 2016-08-22 | 2016-08-22 | Space hyperboloid curtain structure based on BIM accurate control construction quality |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205954936U true CN205954936U (en) | 2017-02-15 |
Family
ID=57977455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620911036.XU Expired - Fee Related CN205954936U (en) | 2016-08-22 | 2016-08-22 | Space hyperboloid curtain structure based on BIM accurate control construction quality |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205954936U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724299A (en) * | 2017-09-29 | 2018-02-23 | 上海宝冶集团有限公司 | A kind of manufacture method of hyperboloid anticollision barrier |
CN107882220A (en) * | 2017-10-31 | 2018-04-06 | 广州市恒盛建设工程有限公司 | A kind of construction method of L-shaped biplane hyperbolic aluminum facade |
CN110080440A (en) * | 2019-04-17 | 2019-08-02 | 深装总建设集团股份有限公司 | A kind of special-shaped mixing curtain wall based on BIM technology |
CN111173175A (en) * | 2020-01-10 | 2020-05-19 | 上海二十冶建设有限公司 | Precise forming method of space curved surface GRC curtain wall |
-
2016
- 2016-08-22 CN CN201620911036.XU patent/CN205954936U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724299A (en) * | 2017-09-29 | 2018-02-23 | 上海宝冶集团有限公司 | A kind of manufacture method of hyperboloid anticollision barrier |
CN107882220A (en) * | 2017-10-31 | 2018-04-06 | 广州市恒盛建设工程有限公司 | A kind of construction method of L-shaped biplane hyperbolic aluminum facade |
CN110080440A (en) * | 2019-04-17 | 2019-08-02 | 深装总建设集团股份有限公司 | A kind of special-shaped mixing curtain wall based on BIM technology |
CN111173175A (en) * | 2020-01-10 | 2020-05-19 | 上海二十冶建设有限公司 | Precise forming method of space curved surface GRC curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205954936U (en) | Space hyperboloid curtain structure based on BIM accurate control construction quality | |
CN102359209B (en) | Metal curtain wall system with monolayer structure and construction method thereof | |
TWI679329B (en) | Board and mounting method thereof and decoration panel formed by the board | |
Lee et al. | Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique | |
CN111058560B (en) | Construction method of multi-curved-surface special-shaped combined curtain wall system | |
CN109267712A (en) | A kind of wall decoration method | |
CN105089232A (en) | Multilayer composite structure flexible decorative finish product and production method thereof | |
CN206016173U (en) | Surface arranges EPS moulding used for building exterior wall and the system thereof of architectural surface | |
CN207469649U (en) | One kind can adjust, dismountable integrated wall Modularized installing structure | |
CN102296770B (en) | Manufacturing method of three-dimensional artificial stone plate for decoration of building | |
CN104110113B (en) | Flexible web veneer polyurethane insulation and decoration integrated plate and preparation technology thereof | |
CN107663933A (en) | A kind of Joining Technology method between wood decorations wallboard | |
CN108915136A (en) | A kind of construction method of open stone curtain wall | |
CN101839040A (en) | Embedded integrated plate, cavity plate and cavity integrated plate made by compounding buckle plate | |
CN101934676A (en) | Fabrication process of antique imitation art decorative material | |
CN105464322B (en) | A kind of environmental protection impact resistance composite decorating board and preparation method thereof | |
Januszkiewicz et al. | Glass as a component of curvilinear architecture in 21st century | |
CN106760137A (en) | A kind of receipts side of adjustable decoration panel surplus and its application | |
CN205369602U (en) | Decorate insulation construction integration template | |
RU2708296C1 (en) | Construction protective and decorative wall panel | |
CN107514721A (en) | Functional form decorations integrate cold-hot plate and its manufacture method | |
CN208934149U (en) | Metope expansion joint lightgage steel joist sliding system | |
CN203271021U (en) | Novel inorganic environment-friendly fireproof decorative substrate | |
CN106049867A (en) | Building method for special-shaped building model | |
CN207878784U (en) | A kind of assembly wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170215 Termination date: 20190822 |