One kind can adjust, dismountable integrated wall Modularized installing structure
Technical field
The utility model is related to house ornamentation integrated wall technical field of structures, adjustable, detachable more particularly to one kind
Integrated wall Modularized installing structure.
Background technology
Integrated wall is also referred to as integrated wall plate, is a kind of novel fast package material of environmental protection, has low-carbon environment-friendly, quick for installation,
The features such as vdiverse in function, widely applicable, is approved and is used by more and more people, is widely used in house ornamentation and tooling room
Metope, top, wall finishing, market potential and product ductility are all very big.But the mounting structure of integrated wall and
Also there are certain technical deficiencies for method.
First, the installation of integrated wall at present is all to be combined by product splicing plus clasp nail with building wall, after fixing not
It is adjustable, and be difficult the installation solved on out-of-flatness blank wall.The existing mounting structure of integrated wall results in installation
Process is relatively cumbersome, easily does over again because installation dislocation or when out-of-flatness, causes installation effectiveness relatively low or product and auxiliary material waste, compared with
Increase installation cost greatly.
Secondly, integrated wall, if occurring metope damage in use by existing method after installation is complete
The part of damage is changed with regard to extremely difficult.Because existing mounting structure is all by product splicing plus clasp nail and building wall
With reference to, to dismantle the entire metope that will dismantle, in this way in disassembly process product itself and auxiliary material can be damaged, cause
Larger waste.
In addition, integrated wall installation now is all that integrated wall plate is transported to construction site, then by pacifying by manufacturer
Dress worker is installed.Some design models is needed to promote the class of finishing if client fits up, just by installer according to
Customer requirement first makes the moulding of client's needs with woodwork plate bottoming frame, then integrated wall plate is mounted on bottoming frame.Now
This installation method there are problems that it is more following:
1st, the moulding that installer works it out depends entirely on the technology of each installer, and technical difference is also just led
The difference on modeling effect is caused.
2nd, installer also there is certain difference to there are certain differences in modeling structure understanding on formative method
Different, this has resulted in installer, and there are the wastes of the unreasonable and material of structure in modeling process.
3rd, installer uses the formative method of traditional carpenter, and not only installation effectiveness is relatively low but also construction period is also big
It is big to increase.
Therefore, for installation that is more convenient, quick, aesthetically completing integrated wall, after making integrated wall installation is complete
Accomplish neat seam, fixation, smooth beautiful, convenient disassembly, it is necessary to propose a kind of adjustable, dismountable integrated wall
Modularized installing structure.
Utility model content
For set forth above for installation that is more convenient, quick, aesthetically completing integrated wall, pacify integrated wall
Accomplish neat seam, fixation, smooth beautiful, convenient disassembly after the completion of dress, it is necessary to propose a kind of adjustable, dismountable
The problem of integrated wall Modularized installing structure, the utility model provide a kind of adjustable, dismountable integrated wall module
Change mounting structure, this Modularized installing structure is easy for installation, and module bottom frame position is adjustable.
One kind can adjust, dismountable integrated wall Modularized installing structure, including skeleton, for skeleton and building body phase
Bolt even, the decoration panel on skeleton, the skeleton include main joist and false keel;
The false keel is in strip, and bar-shaped trough of the length direction along false keel length direction is provided on false keel,
The upper end of the bar-shaped trough is intersected with the upper end of false keel, and the lower end of bar-shaped trough is intersected with the lower end of false keel;
In both the upper end of main joist and the lower end of false keel, card slot is provided in one of which, is provided in another one
Card convex;
The connection of the main joist and false keel is embedded in card slot by card convex and realized, and main joist can be along false keel
Width direction is slided;
The connection of the bolt and false keel is embedded in bar-shaped trough by bolt and realized, and the bolt is in bar-shaped trough
Position is adjustable.
Specifically, in above scheme, bolt may include building as false keel and the connector of building body, the building body
Top plate, construction wall etc.;More than main joist is embedded in card slot by card convex with false keel and realized, i.e., main joist is formed with false keel
Clamping relationship;The decoration panel can be monolithic construction, may be alternatively provided as including panel skeleton, integrated wall plate is fixed on face
Form on framework.
In the present solution, by the restriction to skeleton, such as on the mounting surface of integrated wall, when the length direction position of false keel
During X-direction in plane coordinate system, then the width direction of false keel is located at Y direction, in this way, by changing bolt in item
In shape slot length direction position, it can be achieved that integrated wall the position of mounting surface X-direction adjust, meanwhile, the spy of bar-shaped trough
Setting formula is, it can be achieved that position is adjusted to linear in more than X-direction;Further, since main joist and false keel pass through card
It connects in succession, when main joist is slided along the width direction of false keel, it can be achieved that integrated wall is in the position of mounting surface Y direction
Adjustment.
Using this programme, the installation of house ornamentation and tooling field integrated wall is made to become simpler, convenient and quick;Together
When, according to the form of the prefabricated decoration panel of batch production or the form of integrated wall plate, it is ensured that decorative effect;It is special more than meanwhile
Fixed skeleton structure design, may be such that monolithically integrated shingle nail module position is adjustable, in this way, convenient for being decorated by module-spliced
Design quickly finishes the installation of large area decorative layer;The installation of this programme simultaneously is not influenced by building surface layer factor;Simultaneously originally
Scheme easily can carry out secondary use by being dismantled on building body, and resource, the purpose of environmental protection are rationally utilized conducive to realizing.It is comprehensive
On, compared with prior art, the structure of this structure is simple, can be as building top, the modularization integrated wall plate of metope, this
Sample may be such that the complicated procedures of forming during building decoration becomes very simple, improve building top, metope shape-designing is applied
Work efficiency rate and reduce building top, metope shape-designing production cost and installation cost.
Further technical solution is:
As the specific implementation of skeleton, the main joist and false keel are mutually parallel between main joist, false keel it
Between be mutually parallel;
Each false keel is connected with corresponding bolt fixation of the realization on building body by the bar-shaped trough on respectively;
Each main joist at least coordinates simultaneously with two false keels.Using this programme, main joist can after being connect with false keel
Tower structure is formed, and each side for forming tower structure can mutually constrain, conducive to the structural stability of this structure and right
The bearing capacity of decoration panel, integrated wall plate.
As a kind of specific realization method installed convenient for bolt and bolt bearing capacity is good, the bolt is expansion
Screw.
As the specific implementation of false keel, the false keel structure in the form of slot, and the open end width of groove-like structure
More than bottom end width;
Bar-shaped trough on false keel is located on the base of groove-like structure;
Card slot is arranged on false keel, and card slot is arranged on the side of groove-like structure, and card slot is arranged on groove-like structure
Openend on, be both provided with card slot on the two sides of groove-like structure;
The quantity of card convex is corresponding with the quantity of card slot on false keel on main joist, the relative position of card convex and pair on main joist
The relative position of card slot corresponds on keel.The specific form of false keel facilitates the connection for completing bolt and false keel in this programme;
In this programme as building top install, false keel when in use openend downward, main joist when in use openend upward,
The both sides of main joist are fastened on false keel, in this way, main joist and the ideal bonding strength of false keel can be obtained.Preferably,
It may be configured as two side bayonet slots on false keel to correspond in false keel width direction, in this way, the card convex of each side of main joist can be same
When coordinate with the card slots of false keel both sides, to achieve the purpose that further to strengthen skeleton bearing capacity and structural stability.
As the specific implementation form of card slot, the card slot is slot of the width maximum position between openend and bottom end
Shape structure.Using this programme, the cooperation of card convex and card slot is using will card convex again in the side insertion card slot of card slot.
As a kind of main joist way of realization easy to process, the main joist is in channel steel shape, and the card convex is is arranged on
Bending edge at the free end position in main joist side.
The decoration panel includes module bottom frame and module framework, and the main joist passes through attachment screw phase with module framework
Even, and the type of attachment of both module bottom frame and module framework is is detachably connected, in both module bottom frame and module framework,
Multiple grooves are provided in middle one, multiple protrusions are provided in another one, the quantity of the groove is consistent with the quantity of protrusion,
The relative position between relative position and protrusion between groove is consistent, after module bottom frame is connect with module framework, each protrusion
It is respectively embedded into a groove.In the present solution, installation frame body of the decoration panel as integrated wall plate, using arrangement above
It is the scheme for including groove and protrusion, may be such that module bottom frame and module framework are not only convenient for assembly, and assembly precision is high.
As module bottom frame and module framework concrete implementation form, the groove is located on module bottom frame, the protrusion
On module framework.
To mitigate the quality of this mounting structure, the module bottom frame and module framework are frame assembling structure.
The utility model has the advantages that:
Using this programme, the installation of house ornamentation and tooling field integrated wall is made to become simpler, convenient and quick;Together
When, according to the form of the prefabricated decoration panel of batch production or the form of integrated wall plate, it is ensured that decorative effect;It is special more than meanwhile
Fixed skeleton structure design, may be such that monolithically integrated shingle nail module position is adjustable, in this way, convenient for being decorated by module-spliced
Design quickly finishes the installation of large area decorative layer;The installation of this programme simultaneously is not influenced by building surface layer factor;Simultaneously originally
Scheme easily can carry out secondary use by being dismantled on building body, and resource, the purpose of environmental protection are rationally utilized conducive to realizing.It is comprehensive
On, compared with prior art, the structure of this structure is simple, can be as building top, the modularization integrated wall plate of metope, this
Sample may be such that the complicated procedures of forming during building decoration becomes very simple, improve building top, metope shape-designing is applied
Work efficiency rate and reduce building top, metope shape-designing production cost and installation cost.
Description of the drawings
Fig. 1 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
The vertical view of body embodiment;
Fig. 2 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
The side view of body embodiment in a state of use;
Fig. 3 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
In body embodiment, the side view of main joist;
Fig. 4 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
In body embodiment, the vertical view of false keel;
Fig. 5 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
In body embodiment, the front view of false keel;
Fig. 6 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
In body embodiment, the vertical view of module framework;
Fig. 7 is a kind of adjustable, dismountable one tool of integrated wall Modularized installing structure described in the utility model
In body embodiment, the vertical view of module bottom frame.
Reference numeral in figure is respectively:1st, module bottom frame, 101, groove.2nd, module framework, 201, protrusion, 3, main dragon
Bone, 301, card convex, 4, attachment screw, 5, false keel, 501, bar-shaped trough, 502, card slot, 6, setscrew, 7, integrated wall plate,
8th, building top.
Specific embodiment
With reference to embodiment, the utility model is described in further detail, but the structure of the utility model is not only
It is limited to following embodiment.
Embodiment 1:
As shown in Figures 1 to 7, a kind of adjustable, dismountable integrated wall Modularized installing structure, including skeleton, is used
The bolt that is connected with building body in skeleton, the decoration panel on skeleton, the skeleton include main joist 3 and false keel 5;
The false keel 5 is in strip, and bar shaped of the length direction along 5 length direction of false keel is provided on false keel 5
Slot 501, the upper end of the bar-shaped trough 501 are intersected with the upper end of false keel 5, the lower end of bar-shaped trough 501 and the lower end phase of false keel 5
It hands over;
In both the upper end of main joist 3 and the lower end of false keel 5, card slot 502 is provided in one of which, is set in another one
It is equipped with card convex 301;
The connection of the main joist 3 and false keel 5, which is embedded in by card convex 301 in card slot 502, to be realized, and main joist 3 can edge
The width direction for false keel 5 is slided;
The connection of the bolt and false keel 5, which is embedded in by bolt in bar-shaped trough 501, to be realized, and the bolt is in bar-shaped trough
Position in 501 is adjustable.
Specifically, in above scheme, bolt may include building as false keel 5 and the connector of building body, the building body
Build top plate 8, construction wall etc.;More than main joist 3 is embedded in card slot 502 by card convex 301 with false keel 5 and realized, i.e. main joist 3
Clamping relationship is formed with false keel 5;The decoration panel can be monolithic construction, may be alternatively provided as including panel skeleton, integrate
Shingle nail 7 is fixed on the form on panel skeleton.
In the present solution, by the restriction to skeleton, such as on the mounting surface of integrated wall, when the length direction of false keel 5
During X-direction in plane coordinate system, then the width direction of false keel 5 is located at Y direction, in this way, by changing bolt
In bar-shaped trough 501 length direction position, it can be achieved that integrated wall the position of mounting surface X-direction adjust, meanwhile, bar shaped
The particular form of slot 501 is, it can be achieved that position is adjusted to linear in more than X-direction;Further, due to main joist 3 and pair
Keel 5 are connected by being clamped, when main joist 3 is slided along the width direction of false keel 5, it can be achieved that integrated wall is in mounting surface
The position adjustment of Y direction.
Using this programme, the installation of house ornamentation and tooling field integrated wall is made to become simpler, convenient and quick;Together
When, according to the form of the prefabricated decoration panel of batch production or the form of integrated wall plate 7, it is ensured that decorative effect;It is special more than meanwhile
Fixed skeleton structure design, may be such that monolithically integrated 7 module position of shingle nail is adjustable, in this way, convenient for being filled by module-spliced
Decorations design quickly finishes the installation of large area decorative layer;The installation of this programme simultaneously is not influenced by building surface layer factor;Simultaneously
This programme easily can carry out secondary use by being dismantled on building body, and resource, the purpose of environmental protection are rationally utilized conducive to realizing.
To sum up, compared with prior art, the structure of this structure is simple, can as building top, the modularization integrated wall plate 7 of metope,
In this way, the complicated procedures of forming during may be such that building decoration becomes very simple, building top, metope shape-designing are improved
Construction efficiency and reduce building top, metope shape-designing production cost and installation cost.
Embodiment 2:
As shown in Figures 1 to 7, the present embodiment is further qualified on the basis of embodiment 1:Specific reality as skeleton
Existing mode, the main joist 3 and false keel 5 are mutually parallel between main joist 3, are mutually parallel between false keel 5;
Each false keel 5 is connected with corresponding bolt fixation of the realization on building body by the bar-shaped trough 501 on respectively;
Each main joist 3 at least coordinates simultaneously with two false keels 5.Using this programme, main joist 3 is connect with false keel 5
After can form tower structure, and each side for forming tower structure can mutually constrain, conducive to this structure structural stability with
And the bearing capacity to decoration panel, integrated wall plate 7.
As a kind of specific realization method installed convenient for bolt and bolt bearing capacity is good, the bolt is expansion
Screw 6.
As the specific implementation of false keel 5,5 structure in the form of slot of false keel, and the openend of groove-like structure is wide
Degree is more than bottom end width;
Bar-shaped trough 501 on false keel 5 is located on the base of groove-like structure;
Card slot 502 is arranged on false keel 5, and card slot 502 is arranged on the side of groove-like structure, and card slot 502 is set
On the openend of groove-like structure, card slot 502 is both provided on the two sides of groove-like structure;
The quantity of card convex 301 is corresponding with the quantity of card slot 502 on false keel 5 on main joist 3, card convex 301 on main joist 3
Relative position is corresponding with the relative position of card slot 502 on false keel 5.5 specific form of false keel, which facilitates, in this programme completes spiral shell
The connection of bolt and false keel 5;As installed for building top 8 in this programme, false keel 5 when in use openend downward, main dragon
Upward, the both sides of main joist 3 are fastened on false keel 5 bone 3 for openend when in use, in this way, main joist 3 and pair dragon can be obtained
5 ideal bonding strength of bone.Preferably, two side bayonet slots 502 be may be configured as on false keel 5 in 5 width direction of false keel one by one
It is corresponding, in this way, the card convex 301 of 3 each side of main joist can coordinate with the card slot 502 of 5 both sides of false keel simultaneously, to reach further strong
Change the purpose of skeleton bearing capacity and structural stability.
As the specific implementation form of card slot 502, the card slot 502 for width maximum position be located at openend and bottom end it
Between groove-like structure.Using this programme, the cooperation use of card convex 301 and card slot 502 is embedding by the side of card convex 301 and card slot 502
Enter in card slot 502.
As a kind of 3 way of realization of main joist easy to process, the main joist 3 is in channel steel shape, and the card convex 301 is sets
Put the bending edge at the free end position in 3 side of main joist.
The decoration panel includes module bottom frame 1 and module framework 2, and the main joist 3 is with module framework 2 by connecting spiral shell
Nail 4 is connected, and the type of attachment of 2 the two of module bottom frame 1 and module framework is to be detachably connected, module bottom frame 1 and module framework 2
Multiple grooves 101 are provided in the two, in one of which, multiple raised 201 are provided in another one, the number of the groove 101
Amount is consistent with the quantity of protrusion 201, and the relative position between groove 101 is consistent with the relative position between protrusion 201, in module
After bottom frame 1 is connect with module framework 2, each raised 201 are respectively embedded into a groove 101.In the present solution, the decoration panel is made
For the installation frame body of integrated wall plate 7, arrangement above is used to may be such that module bottom for the scheme including groove 101 and protrusion 201
Frame 1 is not only convenient for assembly with module framework 2, and assembly precision is high.
As module bottom frame 1 and 2 concrete implementation form of module framework, the groove 101 is located on module bottom frame 1, institute
Protrusion 201 is stated to be located on module framework 2.
To mitigate the quality of this mounting structure, the module bottom frame 1 and module framework 2 are frame assembling structure.
The above content is the further descriptions made with reference to specific preferred embodiment to the utility model, it is impossible to recognize
Determine specific embodiment of the present utility model and be confined to these explanations.For the common skill of the utility model technical field
For art personnel, the other embodiment that is obtained in the case where not departing from the technical solution of the utility model should be included in this practicality
In novel protection domain.