CN106429747B - The control method of Full-automatic construction elevator - Google Patents

The control method of Full-automatic construction elevator Download PDF

Info

Publication number
CN106429747B
CN106429747B CN201610870397.9A CN201610870397A CN106429747B CN 106429747 B CN106429747 B CN 106429747B CN 201610870397 A CN201610870397 A CN 201610870397A CN 106429747 B CN106429747 B CN 106429747B
Authority
CN
China
Prior art keywords
elevator
hopper
shaft
full
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610870397.9A
Other languages
Chinese (zh)
Other versions
CN106429747A (en
Inventor
林培青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Economic Development Zone Urban Construction Investment Co ltd
Original Assignee
Quanzhou Zhongyan Intelligent Electromechanical Resarch Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Zhongyan Intelligent Electromechanical Resarch Institute Co Ltd filed Critical Quanzhou Zhongyan Intelligent Electromechanical Resarch Institute Co Ltd
Priority to CN201610870397.9A priority Critical patent/CN106429747B/en
Publication of CN106429747A publication Critical patent/CN106429747A/en
Application granted granted Critical
Publication of CN106429747B publication Critical patent/CN106429747B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/02Door or gate operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • B66B13/303Details of door panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Elevator Door Apparatuses (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of control methods of Full-automatic construction elevator, it is characterized in that, hopper is equipped with the second shaft close to the side of destination and connects motor, it is equipped with third shaft at feed hopper bottom connection sliding block and connects motor, motor pioneer movable slider send the hopper for filling material to the elevator that spouts, first rotating shaft is driven to close elevator door, reach destination, first rotating shaft is driven to open another elevator door again, drive sliding block that hopper is sent out elevator simultaneously, when reaching the limit of position, drive the rotation of third shaft, the 4th shaft is driven to rotate again, material in hopper is all most;Whole process does not need manual operation.

Description

The control method of Full-automatic construction elevator
Technical field
A kind of construction elevator, especially a kind of Full-automatic construction elevator.
Background technique
Construction elevator in the prior art when dock floor position carries out material discrepancy, is very easy to that scrappy material occurs The accident fallen, so as to cause casualties;And material is all to need manually to transport the material in cart, labor intensive, Also dangerous, the prior art not yet solves such problems.
Summary of the invention
To solve the deficiencies in the prior art, the purpose of the present invention is to provide one kind can be automatically finished the material of ground Material is transported to the Full-automatic construction elevator of destination.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:
Full-automatic construction elevator, which is characterized in that including:Elevator body two sides are fixed in elevator body, bottom end rotation Two elevators
Door is placed in the moving member on the inside of two elevator doors and on the bottom plate of elevator body, is connected to moving member and can turn Dynamic hopper is connected to two connectors between elevator door and elevator body.
Full-automatic construction elevator above-mentioned, moving member are:Guide rail on the inside of two elevator doors and on bottom plate is set.
Full-automatic construction elevator above-mentioned, hopper are fixed on the sliding block of guide rail.
Full-automatic construction elevator above-mentioned further includes:It is placed in the locating part of elevator door tip edge.
Full-automatic construction elevator above-mentioned, locating part are retention bead.
Full-automatic construction electricity above-mentioned strokes, and connector is first rotating shaft.
Full-automatic construction elevator above-mentioned, which is characterized in that above-mentioned hopper is equipped with the second shaft close to destination side, Above-mentioned hopper, which is connected at above-mentioned sliding block, is equipped with third shaft.
The upper end of Full-automatic construction elevator above-mentioned, the outside of elevator door is equipped with bolster.
Full-automatic construction elevator above-mentioned, bolster are rubber pad.
Full-automatic construction elevator above-mentioned, which is characterized in that be connected to above-mentioned first rotating shaft, the second shaft, third shaft, The motor of sliding block controls the controller of above-mentioned motor.
The invention has the beneficial effects that:Elevator door can be opened and fill up the distance between elevator and dock floor, prevent Cargo is fallen, and safety accident occurs;And hopper can be loaded the goods into, and hopper transports elevator automatically, it reaches destination and again will Cargo transports elevator automatically, and whole process does not need manual operation, and full-automatic operation saves manpower.
Detailed description of the invention
Fig. 1 is a kind of sectional view of embodiment of the invention;
The meaning of appended drawing reference in figure:
1 elevator body, 2 elevator doors, 3 guide rails, 301 sliding blocks, 4 bolsters, 5 first rotating shafts, 6 second shafts, 7 thirds turn Axis.
Specific embodiment
Specific introduce is made to the present invention below in conjunction with the drawings and specific embodiments.
Full-automatic construction elevator, including:Elevator body 1, bottom end rotate two elevator doors for being fixed on 1 two sides of elevator body 2, the moving member being placed on the bottom plate of two elevator doors, 2 inside and elevator body 1 is connected to moving member and rotatably expects Bucket, the connector being connected between two elevator doors 2 and elevator body 1, as a preference, connector is first rotating shaft 5, the One shaft 5 connects motor.
Moving member is:Guide rail 3 on two elevator doors, 2 inside and bottom plate is set, and hopper is fixed on the sliding block of guide rail 3 301.Sliding block 301 connects motor, controls motor by controller and the movement of sliding block 301 and first rotating shaft 5 is driven by motor.
For the stability of operation, sliding block 301 is not allowed to skid off guide rail 3, Full-automatic construction elevator further includes:It is placed in elevator door The locating part of 2 tip edges, as a preference, locating part is retention bead.
Hopper is equipped with the second shaft 6 close to the side of destination and connects motor, sets at feed hopper bottom connection sliding block 301 There is third shaft 7 and connect motor, motor pioneer movable slider 301 send the hopper for filling material to the elevator that spouts, and drives first rotating shaft 5 Elevator door 2 is closed, reaches destination, then first rotating shaft 5 is driven to open another elevator door 2, while driving sliding block 301 that will expect Bucket sends out elevator, and when reaching the limit of position, driving third shaft 7 is rotated, then the second shaft 6 is driven to rotate, by the object in hopper Material is all most;Whole process does not need manual operation.
In order to avoid elevator door 2 hits floor ground damage, the upper end in the outside of elevator door 2 is equipped with bolster 4, as one Preferably, bolster 4 is that rubber pad is also possible to silicagel pad or other padded coamings to kind.
Elevator door 2 can be opened and fill up the distance between elevator and dock floor, prevent cargo from falling, and safe thing occurs Therefore;And hopper can be loaded the goods into, and hopper transports elevator automatically, it reaches destination and cargo is transported into elevator automatically again, entirely Journey does not need manual operation, and full-automatic operation saves manpower.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the above embodiments do not limit the invention in any form, all obtained by the way of equivalent substitution or equivalent transformation Technical solution is fallen within the scope of protection of the present invention.

Claims (1)

1. a kind of control method of Full-automatic construction elevator,
It is characterized in that,
Hopper is equipped with the second shaft close to the side of destination(6)And motor is connected, feed hopper bottom connection sliding block(301)Place is set There is third shaft(7)And motor is connected, motor pioneer's movable slider(301)Send the hopper for filling material to the elevator that spouts, driving first Shaft(5)Close elevator door(2), destination is reached, then drive first rotating shaft(5)By another elevator door(2)It opens, drives simultaneously Movable slider(301)Hopper is sent out into elevator, when reaching the limit of position, drives third shaft(7)Rotation, then drive the second shaft (6)Rotation, the material in hopper is all most;
Elevator door(2)It can open and fill up the distance between elevator and dock floor, prevent cargo from falling, safety accident occurs; And hopper can be loaded the goods into, and hopper transports elevator automatically, it reaches destination and cargo is transported into elevator automatically again.
CN201610870397.9A 2013-11-26 2013-11-26 The control method of Full-automatic construction elevator Expired - Fee Related CN106429747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610870397.9A CN106429747B (en) 2013-11-26 2013-11-26 The control method of Full-automatic construction elevator

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610870397.9A CN106429747B (en) 2013-11-26 2013-11-26 The control method of Full-automatic construction elevator
CN201310604557.1A CN103663025B (en) 2013-11-26 2013-11-26 Full-automatic construction elevator

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201310604557.1A Division CN103663025B (en) 2013-11-26 2013-11-26 Full-automatic construction elevator

Publications (2)

Publication Number Publication Date
CN106429747A CN106429747A (en) 2017-02-22
CN106429747B true CN106429747B (en) 2018-11-23

Family

ID=50301963

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310604557.1A Active CN103663025B (en) 2013-11-26 2013-11-26 Full-automatic construction elevator
CN201610870397.9A Expired - Fee Related CN106429747B (en) 2013-11-26 2013-11-26 The control method of Full-automatic construction elevator

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201310604557.1A Active CN103663025B (en) 2013-11-26 2013-11-26 Full-automatic construction elevator

Country Status (1)

Country Link
CN (2) CN103663025B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104030133A (en) * 2014-04-29 2014-09-10 苏州中远电梯有限公司 Construction site electric lift car

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6438388A (en) * 1987-07-31 1989-02-08 Toshiba Corp Elevator cage
JPH07101510A (en) * 1993-10-08 1995-04-18 Shinya Uchida Vertical transport device
CN2567189Y (en) * 2002-08-26 2003-08-20 李泽 Construction elevator
CN2704574Y (en) * 2004-05-31 2005-06-15 周天鑫 Programmable controlled box hoisters
CN202766043U (en) * 2012-09-11 2013-03-06 广州市京龙工程机械有限公司 Building hoist with electric platform trap door
CN203006673U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Construction elevator cage for super high-rise building
CN103663026A (en) * 2013-11-26 2014-03-26 苏州踵力重型机械有限公司 Construction elevator

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095355A (en) * 1993-05-20 1994-11-23 谭锦泉 Tower type combined elevator for building
JP4443579B2 (en) * 2007-02-20 2010-03-31 株式会社クマリフト技術研究所 Small luggage elevator
CN201258212Y (en) * 2008-08-11 2009-06-17 河北建工集团有限责任公司 Safe in and out pedal for construction hoist
CN201770390U (en) * 2010-08-19 2011-03-23 江苏华江建设集团有限公司 Super-tall building construction elevator cage
CN201825625U (en) * 2010-10-22 2011-05-11 中国建筑第四工程局有限公司 Construction elevator with flap gate
CN202518919U (en) * 2012-03-28 2012-11-07 中国建筑第八工程局有限公司 Derrick opening safety door system
CN203806891U (en) * 2013-11-26 2014-09-03 苏州踵力重型机械有限公司 Full-automatic construction elevator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6438388A (en) * 1987-07-31 1989-02-08 Toshiba Corp Elevator cage
JPH07101510A (en) * 1993-10-08 1995-04-18 Shinya Uchida Vertical transport device
CN2567189Y (en) * 2002-08-26 2003-08-20 李泽 Construction elevator
CN2704574Y (en) * 2004-05-31 2005-06-15 周天鑫 Programmable controlled box hoisters
CN202766043U (en) * 2012-09-11 2013-03-06 广州市京龙工程机械有限公司 Building hoist with electric platform trap door
CN203006673U (en) * 2012-11-28 2013-06-19 泰兴市第一建筑安装工程有限公司 Construction elevator cage for super high-rise building
CN103663026A (en) * 2013-11-26 2014-03-26 苏州踵力重型机械有限公司 Construction elevator

Also Published As

Publication number Publication date
CN106429747A (en) 2017-02-22
CN103663025B (en) 2017-01-04
CN103663025A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN105645314B (en) One kind decoration ceramic tile Palletised carry trolley
CN203269476U (en) Material handling machine
CN205527564U (en) Decorate ceramic tile pile up neatly floor truck
CN207272827U (en) Cage guide metal-planing machine automatic loading and unloading device
CN107082291A (en) A kind of feedbag entrucking palletizing apparatus and palletizing method, storage medium
CN105155371B (en) Automatic railway fastener unloading operating vehicle and operating method thereof
CN205417709U (en) From uninstallation handling trolley
CN106429747B (en) The control method of Full-automatic construction elevator
CN204917296U (en) Balk cargo device of unloading
CN108840206B (en) Material receiving device of super high-rise building construction lifter
CN205169499U (en) Automatic lift of passing in and out is shelved to LNG gas cylinder collection
CN204433755U (en) Material lifting feedway
CN206954075U (en) A kind of mechanization hearse
CN209177623U (en) A kind of train bag object automatic loading machine
CN206298091U (en) The elevator of roller material road
CN105000397A (en) Closed type vertical screw unloader achieving vertical lifting function
CN206351726U (en) A kind of gripping-type unpowered vehicle conveying device
CN206692026U (en) A kind of special logistics charging crane in harbour
CN203806891U (en) Full-automatic construction elevator
CN107378601A (en) Cage guide metal-planing machine automatic loading and unloading device
CN109437000A (en) A kind of car type lifting Cargo Lift
CN209740233U (en) Chain type lifting material pouring machine
CN202657525U (en) Bulk container
CN103663026B (en) Construction elevator
CN204823296U (en) Closed perpendicular screw unloader of vertical lift

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191018

Address after: 314511 room 1-402, building 647, Shiji Avenue, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Juteng Information Technology Co.,Ltd.

Address before: 362302, Quanzhou, Fujian, Nanan City, Xia Mei Town, innovation road, building two, multi dimensional public space

Patentee before: QUANZHOU ZHONGYAN INTELLIGENT ELECTRICAL AND MECHANICAL RESEARCH INSTITUTE Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20201127

Address after: 244000 No. 315 and 316, Building C, High-tech Entrepreneurship Service Center, Tongling City, Anhui Province

Patentee after: TONGLING GUANZUO CULTURE Co.,Ltd.

Address before: 314511 room 1-402, building 647, Shiji Avenue, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Juteng Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201202

Address after: 244000 No. 315 and 316, Building C, High-tech Entrepreneurship Service Center, Tongling City, Anhui Province

Patentee after: TONGLING GUANZUO CULTURE Co.,Ltd.

Address before: 314511 room 1-402, building 647, Shiji Avenue, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Juteng Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221213

Address after: No. 19, Chang'an Road, Linyi Economic Development Zone, Shandong 276000

Patentee after: Linyi Economic Development Zone Urban Construction Investment Co.,Ltd.

Address before: 244000 315 and 316 C building, Tongling high tech Innovation Service Center, Anhui

Patentee before: TONGLING GUANZUO CULTURE Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123