CN106410718A - Construction site temporary power supply erecting system - Google Patents
Construction site temporary power supply erecting system Download PDFInfo
- Publication number
- CN106410718A CN106410718A CN201610966484.4A CN201610966484A CN106410718A CN 106410718 A CN106410718 A CN 106410718A CN 201610966484 A CN201610966484 A CN 201610966484A CN 106410718 A CN106410718 A CN 106410718A
- Authority
- CN
- China
- Prior art keywords
- hangs muscle
- faced
- job site
- construction system
- porcelain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
Landscapes
- Insulators (AREA)
Abstract
The invention relates to a construction site temporary power supply erecting system, which comprises a base, a primary hanging steel bar, a plurality of secondary supports and a plurality of porcelain insulators, and is characterized in that the porcelain insulators are respectively arranged on the primary hanging steel bar and the secondary supports, the primary hanging steel bar and the secondary supports are connected with the base, and the top of the primary hanging steel bar is provided with a connecting piece. According to the construction site temporary power supply erecting system, the accessories are simple and easy to find, the assembly is convenient and fast, welding processing is not required, and the cost is low; the height can be adjusted at will, and the applicable project scope is wider; no welding is required, and open fire operations at the construction site are reduced, so that part of the potential safety hazards are eliminated; the disassembly is convenient, the damage is small, construction of later working procedures is not affected, the construction space is not occupied in the process, and the construction space is spacious, bright and beautiful after overall arrangement.
Description
Technical field
Building decoration technical field of construction of the present invention, faces electric construction system particularly to job site.
Background technology
At present in installing construction field, scene is faced traditional 50 steel pipe top that typically adopt of electric construction system and is welded angles
Steel, bottom welding steel plate base, carry out erection on top after fixing with structural floor using expansion bolt and face electricity and steel ropes, this
Scheme of architecture antenna height is limited, and if faced, electric support point position arrangement is unreasonable, easily affects construction teams and groups near zone
Construction, and affect floor leveling and the surface construction in project later stage, could construct after need to removing completely, not only set up cost relatively
Height, have impact on efficiency of construction simultaneously.
Content of the invention
The present invention is in order to solve problem of the prior art, there is provided a kind of cost is relatively low, install convenient, easy-to-dismount applies
Electric construction system is faced at work scene.
Concrete technical scheme is as follows:Electric construction system is faced in job site, including pedestal, main hangs muscle, and multiple assistant supports and absolutely
Edge porcelain vase, described porcelain insulator is separately positioned on main hangs muscle and assistant support, and described main hangs muscle and assistant support are respectively with pedestal even
Connect, main hangs muscle top is provided with connector.
It is below the attached technical scheme of the present invention.
Preferably, described porcelain insulator includes hangs muscle porcelain vase, and hangs muscle porcelain vase two ends are provided with keeper.
Preferably, described main hangs muscle is connected with pedestal by fixer assembly.
Preferably, described porcelain insulator includes support porcelain vase, and support porcelain vase is located on assistant support, assistant support one
End is provided with the first regulating part, and the other end is fixed by the second regulating part and pedestal.
Preferably, leader cable is fixed with hangs muscle porcelain vase by tied silk, and plastic-cladded wirerope is wrapped on support porcelain vase.
Preferably, described keeper, fixer assembly, the first regulating part and the second regulating part are nut.
Preferably, described main hangs muscle and assistant support outer surface are provided with screw thread.
Preferably, described main hangs muscle is arranged in KBG pipe.
Preferably, described connector is assembled expansible plug, and connector is connected with building structure top.
The technique effect of the present invention:Electric construction system is faced in the job site of the present invention, and each accessory is simply easily sought, and assembles just
Victory, without soldering, cost is relatively low;Height can arbitrarily adjust, and applicable scope of project is wider;Need not weld, decrease construction
Live work with torches, eliminates Partial security hidden danger;Convenient disassembly, destroy little, do not affect later stage operation construction, and during not
Take construction space, after integral arrangement, construction space is spacious and well-lighted attractive in appearance.
Brief description
Fig. 1 is that the schematic diagram of electric construction system is faced in the job site of the embodiment of the present invention.
Fig. 2 is that the exploded view of electric construction system is faced in the job site of the embodiment of the present invention.
Specific embodiment
Below, in conjunction with example, the substantive distinguishing features of the present invention and advantage are further described, but the present invention not office
It is limited to listed embodiment.
As depicted in figs. 1 and 2, electric construction system is faced in the job site of the present embodiment, including pedestal 1, main hangs muscle 2, and multiple
Assistant support 3 and porcelain insulator 4, described porcelain insulator 4 is separately positioned on main hangs muscle 1 and assistant support 3, in the present embodiment, secondary
Frame has two.Described main hangs muscle 2 and assistant support 3 are connected with pedestal 1 respectively, and main hangs muscle 2 top is provided with connector 5.The present embodiment
Job site face electric construction system, convenient disassembly, destroy little, do not affect the construction of later stage operation, and during be not take up constructing
Space, after integral arrangement, construction space is spacious and well-lighted attractive in appearance;Assembling convenient, without soldering, saved substantial amounts of manpower and
Material resources, cost is relatively low.In the present embodiment, described pedestal 1 is angle steel, consequently facilitating the material using job site.
As depicted in figs. 1 and 2, described porcelain insulator 4 includes hangs muscle porcelain vase 41, and hangs muscle porcelain vase 41 two ends are provided with keeper 6.
Described main hangs muscle 2 is connected with pedestal 1 by fixer assembly 7.Described porcelain insulator 4 includes support porcelain vase 42, support porcelain vase 42
It is located on assistant support 3.Assistant support 3 one end is provided with the first regulating part 31, and it is solid with pedestal 1 that the other end passes through the second regulating part 32
Fixed.Leader cable 10 passes through tied silk 8 to be fixed with hangs muscle porcelain vase 41, and plastic-cladded wirerope 20 is wrapped on support porcelain vase 42.Described positioning
Part 6, fixer assembly 7, the first regulating part 31 and the second regulating part 32 are nut.Described main hangs muscle 2 and assistant support 3 outer surface
It is provided with screw thread, by connecting of nut and screw thread, can be easy to adjust height.Described main hangs muscle 2 is arranged in KBG pipe, thus
Structure floor floor height is of a relatively high, in the case that main hangs muscle intensity deficiency is rocked, main hangs muscle is worn and installs to KBG pipe again, with
Strengthen the intensity of overall overhead support.Described connector 5 is assembled expansible plug, and connector 5 is connected with building structure top.
Electric construction system is faced in assembling in the job site of the present embodiment, and main hangs muscle 2 passes through the assembled expansible plug of termination
After fixing with building structure top floor, keeper 6 be arranged in main hangs muscle 2 and be adjusted to correct position;By hangs muscle porcelain vase
41 are fixed in main hangs muscle 2 by second keeper 6;Fixer assembly 7 is installed in main hangs muscle 2 and adjusts to suitable position
Put, pedestal 1 is installed in main hangs muscle 2 by middle reserved circular hole, and utilize bottom nozzle mounts assembly 7 fixation;In pair
The termination of support 3 is respectively mounted the second regulating part 32, and assistant support 3 is passed through support porcelain vase 42, and entirety is placed into pedestal 1 surface
In reserved hole, assistant support is fixed by the first regulating part 31;Leader cable 10 is fixed to hangs muscle porcelain vase 41 by tied silk 8
On, plastic-cladded wirerope 20 is arranged on support porcelain vase 42 by way of being fastened, and can be utilized tied silk to carry out at reinforcing if necessary
Reason.
Electric construction system is faced in the job site of the present embodiment, and each accessory is simply easily sought, and assembling is convenient, without weld
Reason, cost is relatively low;Height can arbitrarily adjust, and applicable scope of project is wider;Need not weld, decrease job site work with torches,
Eliminate Partial security hidden danger;Convenient disassembly, destroy little, do not affect later stage operation construction, and during be not take up construction space,
After integral arrangement, construction space is spacious and well-lighted attractive in appearance.
It is pointed out that above-mentioned preferred embodiment technology design only to illustrate the invention and feature, its object is to
Allow person skilled in the art will appreciate that present disclosure and to implement according to this, the protection of the present invention can not be limited with this
Scope.All equivalence changes made according to spirit of the invention or modification, all should be included within the scope of the present invention.
Claims (9)
1. electric construction system is faced it is characterised in that including pedestal, main hangs muscle, multiple assistant supports and porcelain insulator, institute in job site
State porcelain insulator to be separately positioned on main hangs muscle and assistant support, described main hangs muscle and assistant support are connected with pedestal respectively, main hangs muscle
Top is provided with connector.
2. electric construction system is faced it is characterised in that described porcelain insulator includes hangs muscle porcelain in job site as claimed in claim 1
Bottle, hangs muscle porcelain vase two ends are provided with keeper.
3. electric construction system is faced it is characterised in that described main hangs muscle passes through fixture group in job site as claimed in claim 2
Part is connected with pedestal.
4. electric construction system is faced it is characterised in that described porcelain insulator includes support porcelain in job site as claimed in claim 2
Bottle, support porcelain vase is located on assistant support, and assistant support one end is provided with the first regulating part, and the other end passes through the second regulating part and pedestal
Fixing.
5. electric construction system is faced it is characterised in that leader cable passes through tied silk and hangs muscle porcelain in job site as claimed in claim 4
Bottle is fixing, and plastic-cladded wirerope is wrapped on support porcelain vase.
6. electric construction system is faced it is characterised in that described keeper, fixture group in the job site as described in claim 3 or 4
Part, the first regulating part and the second regulating part are nut.
7. electric construction system is faced it is characterised in that described main hangs muscle and assistant support appearance in job site as claimed in claim 1
Face is provided with screw thread.
8. electric construction system is faced it is characterised in that described main hangs muscle is arranged on KBG pipe in job site as claimed in claim 1
In.
9. electric construction system is faced it is characterised in that described connector expands for assembled in job site as claimed in claim 1
Bolt, connector is connected with building structure top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966484.4A CN106410718A (en) | 2016-11-01 | 2016-11-01 | Construction site temporary power supply erecting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966484.4A CN106410718A (en) | 2016-11-01 | 2016-11-01 | Construction site temporary power supply erecting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106410718A true CN106410718A (en) | 2017-02-15 |
Family
ID=58014495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610966484.4A Pending CN106410718A (en) | 2016-11-01 | 2016-11-01 | Construction site temporary power supply erecting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106410718A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012101074A4 (en) * | 2012-07-19 | 2012-08-16 | M3S Holdings Pty Ltd | A component tunnel ceiling structure and method of installing the same |
CN202405714U (en) * | 2011-10-19 | 2012-08-29 | 镇江默勒电器有限公司 | Anti-swirl lifting support |
CN102957113A (en) * | 2012-11-09 | 2013-03-06 | 苏州金螳螂建筑装饰股份有限公司 | Temporary power supply erecting system for decoration construction |
CN203398665U (en) * | 2013-08-13 | 2014-01-15 | 江苏南通二建集团有限公司 | Unloading fixator used for tower crane cable vertical erecting |
CN203951085U (en) * | 2014-05-23 | 2014-11-19 | 中建六局建设发展有限公司 | Electrical cables stringer is faced in job site |
CN204464856U (en) * | 2015-02-13 | 2015-07-08 | 上海建工七建集团有限公司 | Electrical cables stringer is faced in a kind of job site |
CN105207110A (en) * | 2015-06-18 | 2015-12-30 | 中建四局第三建筑工程有限公司 | Method and device for construction temporary electricity utilization arrangement |
CN204919945U (en) * | 2015-08-21 | 2015-12-30 | 浙江银建装饰工程有限公司 | Anti - bearing structure of furred ceiling |
CN205029274U (en) * | 2015-08-21 | 2016-02-10 | 中国建筑第八工程局有限公司 | Fixed bolster that faces cable |
CN206211471U (en) * | 2016-11-01 | 2017-05-31 | 金螳螂精装科技(苏州)有限公司 | Electric construction system is faced in job site |
-
2016
- 2016-11-01 CN CN201610966484.4A patent/CN106410718A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202405714U (en) * | 2011-10-19 | 2012-08-29 | 镇江默勒电器有限公司 | Anti-swirl lifting support |
AU2012101074A4 (en) * | 2012-07-19 | 2012-08-16 | M3S Holdings Pty Ltd | A component tunnel ceiling structure and method of installing the same |
CN102957113A (en) * | 2012-11-09 | 2013-03-06 | 苏州金螳螂建筑装饰股份有限公司 | Temporary power supply erecting system for decoration construction |
CN203398665U (en) * | 2013-08-13 | 2014-01-15 | 江苏南通二建集团有限公司 | Unloading fixator used for tower crane cable vertical erecting |
CN203951085U (en) * | 2014-05-23 | 2014-11-19 | 中建六局建设发展有限公司 | Electrical cables stringer is faced in job site |
CN204464856U (en) * | 2015-02-13 | 2015-07-08 | 上海建工七建集团有限公司 | Electrical cables stringer is faced in a kind of job site |
CN105207110A (en) * | 2015-06-18 | 2015-12-30 | 中建四局第三建筑工程有限公司 | Method and device for construction temporary electricity utilization arrangement |
CN204919945U (en) * | 2015-08-21 | 2015-12-30 | 浙江银建装饰工程有限公司 | Anti - bearing structure of furred ceiling |
CN205029274U (en) * | 2015-08-21 | 2016-02-10 | 中国建筑第八工程局有限公司 | Fixed bolster that faces cable |
CN206211471U (en) * | 2016-11-01 | 2017-05-31 | 金螳螂精装科技(苏州)有限公司 | Electric construction system is faced in job site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111042619A (en) | Make things convenient for salvage wire pole of dismouting | |
CN208078525U (en) | Three-phase conducting wire for distribution network live line work upright bar struts insulating frame | |
CN107792774B (en) | Integral hoisting method and hoisting tool for multiple steel platform secondary beams | |
CN206211471U (en) | Electric construction system is faced in job site | |
CN106410718A (en) | Construction site temporary power supply erecting system | |
CN109537863A (en) | Operating platform support frame and operating platform | |
CN206210734U (en) | One kind mounting fuse device operation stick | |
CN111593898A (en) | Adjustable turnover discharging platform and installation method | |
CN104533102A (en) | Temporary guard railing for stair | |
CN207660236U (en) | The quick connection hanging piece structure of wall | |
CN102664377A (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
CN104925687A (en) | Electric lifting device and working method thereof | |
CN202672692U (en) | Portable concrete telegraph pole work platform | |
CN104912373B (en) | Assembly type supporting switching device for temporary power consumption at construction site | |
CN104242214A (en) | Universal fixing device for cross arm type mounting of large cross-section cable laying | |
KR20080039771A (en) | High voltage cable supporter | |
CN208363777U (en) | A kind of cross-arm installation auxiliary device | |
KR101707037B1 (en) | A structure for assembled system scaffold and erecting method thereof | |
CN208604911U (en) | A kind of novel suspention beam bracket | |
CN106207850B (en) | The operational method of charged for replacement holes duplex board linear insulator chain | |
KR102062451B1 (en) | Frame of electric box for building | |
CN205077697U (en) | Reverse support system structure of block mount formula furred ceiling | |
CN204703489U (en) | Fast-assembled insulating scaffold special fixing device | |
CN109994941A (en) | A kind of quick installing mechanism of outdoor box | |
CN204782190U (en) | On --spot interim power consumption assembled of construction supports switching device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |