CN104912373B - Assembly type supporting switching device for temporary power consumption at construction site - Google Patents

Assembly type supporting switching device for temporary power consumption at construction site Download PDF

Info

Publication number
CN104912373B
CN104912373B CN201510355153.2A CN201510355153A CN104912373B CN 104912373 B CN104912373 B CN 104912373B CN 201510355153 A CN201510355153 A CN 201510355153A CN 104912373 B CN104912373 B CN 104912373B
Authority
CN
China
Prior art keywords
socket
support tube
tube
fastening bolt
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510355153.2A
Other languages
Chinese (zh)
Other versions
CN104912373A (en
Inventor
乔永洁
陆怀谷
金志惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201611159424.8A priority Critical patent/CN106760874B/en
Priority to CN201611160204.7A priority patent/CN106801534B/en
Priority to CN201611159421.4A priority patent/CN106677590B/en
Priority to CN201510355153.2A priority patent/CN104912373B/en
Publication of CN104912373A publication Critical patent/CN104912373A/en
Application granted granted Critical
Publication of CN104912373B publication Critical patent/CN104912373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2238Sockets or holders for poles or posts to be placed on the ground
    • E04H12/2246Sockets or holders for poles or posts to be placed on the ground filled with water, sand or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V17/00Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
    • F21V17/10Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
    • F21V17/12Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening by screwing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/10Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
    • F21V21/108Arms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Non-Portable Lighting Devices Or Systems Thereof (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Arrangement Of Elements, Cooling, Sealing, Or The Like Of Lighting Devices (AREA)

Abstract

The invention provides an assembly type supporting switching device for temporary power consumption at a construction site. The assembly type supporting switching device comprises a base, a socket supporting tube, an electric box holder, a screw, insulated porcelain bottles and a lamp holder bracket, wherein the base comprises a box body, a gasket, a fixed supporting tube, a reinforcing rib, a grounding bolt and a first fastening bolt; the socket supporting tube and the fixed supporting tube are in socket connection and are fixed by a bolt; the electric box holder comprises a sleeve, a hanging rod, an end socket and a second fastening bolt; the sleeve and the socket supporting tube are in socket connection and are fixed by a bolt; the two insulated porcelain bottles are fixedly mounted on the screw, and the screw is fixedly arranged on the socket supporting tube; the lamp holder bracket comprises a socket tube, a mounting plate and a third fastening bolt; and the socket tube and the socket supporting tube are in socket connection and are fixed by a bolt. According to the assembly type supporting switching device, various functions of temporary power-consumption line overhead supporting and switching, illuminating lamp fixing, electric box erecting, earth joint setting and the like are integrated, so that the assembly type supporting switching device is convenient to erect and use at the site, and good in safety; and various parts are convenient to assemble and disassemble for being easy to carry and realize transition transportation.

Description

Construction site temporary electricity assembled supports switching device
Technical field
The present invention relates to Electricity on Construction Site auxiliary Work tool is and in particular to a kind of construction site is used for temporarily The assembled that electricity consumption fixed track usage plan supports switching, lighting is fixed, electronic box hangs supports switching device.
Background technology
Construction site substantial amounts of construction node needs electricity consumption, and such as electric tool needs power supply, needs to set up illuminating lamp Tool etc..Common construction site, due to lacking specification, effective stringer, temporary electricity wire hanging bracket, photograph in addition Not accordingly unified regulation in the industries such as bright frame, thus in construction site temporary electricity implementation process, overhead transmission line Support, lighting lamp bracket, electronic box support etc. are varied, and often install everywhere, connect, to construction temporary electricity Bring potential safety hazard.
Content of the invention
The purpose of the present invention is: provides that one kind is easy to install, multiple functional, security is good, is easy to carry and transition transport And can effectively meet the construction site temporary electricity assembled support switching device of construction site temporary electricity needs.
The technical scheme is that the construction site temporary electricity assembled of the present invention supports switching device, its It is structurally characterized in that: include pedestal, socket support tube, electronic box hanger, screw rod, porcelain insulator and light holder support;
Above-mentioned pedestal includes casing, backing plate, fixed support tube, reinforcement, earth stud and the first fastening bolt;Casing Quadrangle box part for upper end open;Backing plate is rectangular plate body part, and backing plate is fixedly installed on the upper surface of the base plate of casing On;Fixed support tube is the circular tube piece of hollow, and fixed support tube is fixedly connected with the middle part upper surface of backing plate by its lower end; Reinforcement is provided with 2 to 8, and one end of each reinforcement is fixedly connected with fixed support tube;The other end of each reinforcement and casing Inwall is fixedly connected;Earth stud is arranged on fixed support tube and is located at the top of the upper surface of casing;First fastening bolt It is movably disposed in the top of fixed support tube;
Socket support tube is the circular tube piece of hollow;The top of socket support tube is provided with screw rod installing hole;Socket supports Guan Youqi lower end is inserted from the top down in the fixed support tube of pedestal and is fixed by the first fastening bolt;
Electronic box hanger includes sleeve pipe, peg, termination and the second fastening bolt;Sleeve pipe is the circular tube piece of hollow;Peg For being bent into the body of rod part of l shape, peg is fixedly mounted on the left side central portion wall body of sleeve pipe;Termination is fixedly installed on a left side for peg Upper lateral part;Second fastening bolt is arranged on the right side central of sleeve pipe;Sleeve pipe is socketed on the tube wall of socket support tube and passes through the Two fastening bolts are fixed;
Screw rod arranges 1, and screw rod is fixedly installed on socket by the middle part of it through after the screw rod installing hole of socket support tube On stay tube;The left and right two ends of screw rod are protruding;
Porcelain insulator is provided with 2, and this 2 porcelain insulators are fixedly mounted on screw rod, and is located at a left side for socket support tube Right both sides;
Light holder support includes socket pipe, installing plate and the 3rd fastening bolt;Socket pipe is the circular tube piece of hollow;Socket Pipe is provided with the 3rd fastening bolt;Installing plate is rectangular plate body part, and installing plate is provided with the connecting bolt of upward and downward insertion Hole;Socket pipe is fixedly connected with the middle part lower surface of installing plate by its upper end;The bottom of socket pipe and the upper end being socketed support tube Portion is fixed by the 3rd fastening bolt after socket-connecting.
Further scheme is: the material of the casing of above-mentioned pedestal is 3mm steel plate;The size of casing be 300mm × 300mm×210mm;The material of backing plate is the thick steel plate of 5mm;To the upper surface of the base plate being weldingly fixed on casing about backing plate On, and backing plate is located at the sagittal middle part of the base plate of casing.
Further scheme is: the fixed support tube of above-mentioned pedestal is diameter 60mm, the stainless steel tube of length 1.2m;Set Connecing support tube is diameter 50mm, the stainless steel tube of length 2m;The sleeve pipe of electronic box hanger be diameter 60mm, length 100mm stainless Steel pipe;The socket pipe of light holder support is diameter 60mm, the stainless steel tube of length 100mm;The installing plate of light holder support be 350mm × The steel plate of 60mm × 5mm size.
Further scheme is: the reinforcement of above-mentioned pedestal is provided with 4, and one end of this 4 reinforcements is all propped up with fixing The lower weld that stay tube is located in casing;The other end of this 4 reinforcements is all welded with the inwall of casing, and this 4 reinforcements In casing centered on fixed support tube be in cross.
Further scheme is: the tip height of above-mentioned socket support tube can be adjusted between 2.0m to 3.0m;Electronic box The height of hanger can be adjusted between 1.2m to 2.6m.
Further scheme is: set-up mode on fixed support tube for the first fastening bolt of above-mentioned pedestal is solid Determine to open up bolt hole on the wall body of support tube, WELD NUTS on the wall body of the fixed support tube at bolt hole;First fastening spiral shell Bolt is matched with the nut of the bolt hole opening up on the wall body of fixed support tube and welding;Second fastening bolt of electronic box hanger The set-up mode on sleeve pipe and light holder support set-up mode on socket pipe for the 3rd fastening bolt all with the first fastening The set-up mode of bolt is identical.
Further scheme also has: the casing of above-mentioned pedestal completely fills for counterweight and the defensive Huang that disappears when using Sand.
The present invention has positive effect: the construction site temporary electricity assembled of (1) present invention supports switching dress Put, by the design of structure, by temporary electricity fixed track usage plan in construction support switching, lighting is fixed, electronic box hangs, The several functions such as earth point setting are integrated in one, and erected on site and property easy to use, safe are good.(2) construction of the present invention Live temporary electricity assembled supports switching device, its critical piece be detachable, when needing to use, can be in construction field side Just assembled, then can easily each part be dismantled using after finishing, be easy to carry and transition transport.
Brief description
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of the pedestal in Fig. 1;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structural representation of the electronic box hanger in Fig. 1;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the structural representation of the light holder support in Fig. 1;
Fig. 7 is the upward view of Fig. 6.
Reference in above-mentioned accompanying drawing is as follows:
Pedestal 1, casing 11, backing plate 12, fixed support tube 13, reinforcement 14, earth stud 15, the first fastening bolt 16,
Socket support tube 2,
Electronic box hanger 3, sleeve pipe 31, peg 32, termination 33, the second fastening bolt 34,
Screw rod 4,
Porcelain insulator 5,
Light holder support 6, socket pipe 61, installing plate 62, link bolt hole 62-1, the 3rd fastening bolt 63.
Specific embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
(embodiment 1)
See Fig. 1, the construction site temporary electricity assembled of the present embodiment supports switching device, its mainly by pedestal 1, Socket support tube 2, electronic box hanger 3, screw rod 4, porcelain insulator 5 and light holder support 6 form.
Referring to Fig. 2 and Fig. 3, pedestal 1 is mainly by casing 11, backing plate 12, fixed support tube 13, reinforcement 14, earth stud 15 and first fastening bolt 16 form.
Casing 11 is the quadrangle box part of upper end open;The material of casing 11 is steel plate.In the present embodiment, the chi of casing 11 Very little preferably employ long 300mm × wide 300mm × high 210mm;Steel plate thickness preferably employs 3mm.Backing plate 12 is rectangular plate body Part, preferably employs the thick steel plate of 5mm in backing plate 12 the present embodiment;Backing plate 12 about is upper to the base plate being weldingly fixed on casing 11 On end face, and backing plate 12 is located at the sagittal middle part of the base plate of casing 11.Fixed support tube 13 is the circular tube piece of hollow, In the present embodiment, fixed support tube 13 preferably employs diameter 60mm, length is the stainless steel tube of 1.2m;Fixed support tube 13 is by it Lower end and the middle part upper surface vertical welding of backing plate 12;Reinforcement 14 is provided with 2 to 8, and in the present embodiment, reinforcement 14 is preferably adopted With 4, the lower weld that one end of this 4 reinforcements 14 is all located in casing 11 with fixed support tube 13;This 4 reinforcements 14 The other end all weld with casing 11, and this 4 reinforcements 14 in casing 11 centered on fixed support tube 13 be in " ten " word Shape.Earth stud 15 is movably disposed on fixed support tube 13 and is located at the top of the upper surface of casing 11, earth stud 15 are used for being grounded, to protect Electrical Safety when using;First fastening bolt 16 is movably disposed in the upper of fixed support tube 13 Portion;The set-up mode of the first fastening bolt 16 is: opens up bolt hole on the top tube wall of fixed support tube 13, at bolt hole Tube wall on WELD NUTS, the nut of the bolt hole that the first fastening bolt 16 and fixed support tube 13 open up and welding matches Close.First fastening bolt 16 preferably employs butterfly bolt.
Socket support tube 2 be hollow circular tube piece, in the present embodiment, be socketed support tube 2 preferably employ diameter 50mm, Length is the stainless steel tube of 2m;The top of socket support tube 2 is provided with screw rod installing hole.During assembling, socket support tube 2 is by its lower end From the top down in the fixed support tube 13 of insertion pedestal 1, the tip height of socket support tube 2 can between 2.0m to 3.0m freely Adjust, socket support tube 2 adjustment determines the first fastening bolt 16 highly passing through pedestal 1 afterwards and fixed support tube 13 is fixing even Connect.
Referring to Fig. 4 and Fig. 5, electronic box hanger 3 is mainly made up of sleeve pipe 31, peg 32, termination 33 and the second fastening bolt 34.
Sleeve pipe 31 is the circular tube piece of hollow, and in the present embodiment, sleeve pipe 31 preferably employs diameter 60mm, length is The stainless steel tube of 100mm;The material of peg 32 is stainless steel, and peg 32 is the body of rod part being bent into l shape, and peg 32 is by its right-hand member It is welded on the left side central portion of sleeve pipe 31;The top of peg 32 is fixedly installed termination 33;Second fastening bolt 34 is arranged on sleeve pipe 31 right side central;Second fastening bolt 34 set-up mode is to open up bolt hole on the tube wall of sleeve pipe 31, welds at bolt hole Connect nut;Second fastening bolt 34 preferably employs butterfly bolt.During assembling, electronic box hanger 3 is socketed in socket by its sleeve pipe 31 On the tube wall of stay tube 2;Adjust to correct position and electronic box hanger 3 is fixed on by socket support tube 2 by the second fastening bolt 34 On;The height of electronic box hanger 3 freely can be adjusted between 1.2m to 2.6m.Electronic box hanger 3 is used for when using hanging temporary electricity end End case.
Still see Fig. 1, screw rod 4 arranges 1, screw rod 4 is set by fixing through after the screw rod installing hole of socket support tube 2 in the middle part of it Put on socket support tube 2;The left and right two ends of screw rod 4 are protruding.
Porcelain insulator 5 is provided with 2, and this 2 porcelain insulators 5 are fixedly mounted on screw rod 4, and is located at socket support tube 2 The left and right sides.Porcelain insulator 5 is used for the electric wire of temporary electricity when using, the hanging of cable.
Referring to Fig. 6 and Fig. 7, light holder support 6 is mainly made up of socket pipe 61, installing plate 62 and the 3rd fastening bolt 63.
Socket pipe 61 is the circular tube piece of hollow, and in the present embodiment, socket pipe 61 preferably employs diameter 60mm, length is The stainless steel tube of 100mm;Socket pipe 61 is provided with the 3rd fastening bolt 63, and the set-up mode of the 3rd fastening bolt 63 is in socket Bolt hole is opened up, WELD NUTS at bolt hole on the tube wall of pipe 61;Installing plate 62 is rectangular plate body part, on installing plate 62 It is provided with link bolt hole 62-1 of 2 upward and downward insertions;In the present embodiment, installing plate 62 preferably employ a size of long 350mm × The steel plate of wide 60mm × thickness 5mm;Socket pipe 61 is by the middle part lower surface welding of its upper end and installing plate 62.During assembling, lamp socket props up Frame 6 is fixing by the 3rd fastening bolt 63 after being socket-connected with the upper end of socket support tube 2 by the bottom of its socket pipe 61.Use When, light holder support 6 is used for fixedly mounting the lighting of construction site, when lighting is installed, lighting is placed in On installing plate 62, by 2 link bolt hole 62-1 bolts on installing plate 62, lighting is fixedly mounted on installing plate Above 62 upper surface.
The construction site temporary electricity assembled of the present embodiment supports switching device, faces dedicated in construction When electricity consumption switching, temporary electricity fixed track usage plan is supported switching by it, that lighting is fixed, electronic box hangs, earth point is arranged etc. is many Plant function to be integrated in one, convenient, efficient, energy-saving and environmental protection.And it can easily be assembled in construction field when using, and makes With then easily each part can be dismantled after finishing, it is easy to carry and transition transport.During use, fill in the casing 11 of pedestal 1 Yellow ground, as pedestal 1 counterweight to increase stability, also can to make fire-fighting fire extinguishing standby for yellow ground simultaneously.
Above example is the explanation of the specific embodiment to the present invention, rather than limitation of the present invention, relevant technology The technical staff in field without departing from the spirit and scope of the present invention, can also make various conversion and change and obtain To corresponding equivalent technical scheme, therefore all equivalent technical schemes all should be included into the patent protection model of the present invention Enclose.

Claims (1)

1. a kind of construction site temporary electricity assembled support switching device it is characterised in that: include pedestal (1), socket Support tube (2), electronic box hanger (3), screw rod (4), porcelain insulator (5) and light holder support (6);
Described pedestal (1) includes casing (11), backing plate (12), fixed support tube (13), reinforcement (14), earth stud (15) With the first fastening bolt (16);Casing (11) is the quadrangle box part of upper end open;Backing plate (12) is rectangular plate body part, pad Plate (12) is fixedly installed on the upper surface of base plate of casing (11);Fixed support tube (13) is the circular tube piece of hollow, Gu Determine support tube (13) to be fixedly connected with the middle part upper surface of backing plate (12) by its lower end;Reinforcement (14) is provided with 2 to 8, respectively plus One end of strong muscle (14) is fixedly connected with fixed support tube (13);The other end of each reinforcement (14) is solid with the inwall of casing (11) Fixed connection;Earth stud (15) is arranged on fixed support tube (13) and is located at the top of the upper surface of casing (11);First is tight Fixing bolt (16) is movably disposed in the top of fixed support tube (13);
Socket support tube (2) is the circular tube piece of hollow;The top of socket support tube (2) is provided with screw rod installing hole;Socket Stay tube (2) is inserted in the fixed support tube (13) of pedestal (1) and fixing by the first fastening bolt (16) from the top down by its lower end;
Electronic box hanger (3) includes sleeve pipe (31), peg (32), termination (33) and the second fastening bolt (34);During sleeve pipe (31) is Empty circular tube piece;Peg (32) is the body of rod part being bent into l shape, and peg (32) is fixedly mounted in the left side of sleeve pipe (31) On portion's wall body;Termination (33) is fixedly installed on the left upper portion of peg (32);Second fastening bolt (34) is arranged on sleeve pipe (31) Right side central;Sleeve pipe (31) is socketed on the tube wall of socket support tube (2) and fixing by the second fastening bolt (34);
Screw rod (4) arranges 1, and screw rod (4) is fixedly installed on set by the middle part of it through after the screw rod installing hole of socket support tube (2) Connect on support tube (2);The left and right two ends of screw rod (4) are protruding;
Porcelain insulator (5) is provided with 2, and this 2 porcelain insulators (5) are fixedly mounted on screw rod (4), and is located at socket support tube (2) the left and right sides;
Light holder support (6) includes socket pipe (61), installing plate (62) and the 3rd fastening bolt (63);Socket pipe (61) is hollow Circular tube piece;Socket pipe (61) is provided with the 3rd fastening bolt (63);Installing plate (62) is rectangular plate body part, installing plate (62) it is provided with the link bolt hole (62-1) of upward and downward insertion;Socket pipe (61) is by the middle subordinate of its upper end and installing plate (62) End face is fixedly connected;The 3rd fastening bolt is passed through after socket-connecting with the upper end being socketed support tube (2) in the bottom of socket pipe (61) (63) fixing.
CN201510355153.2A 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site Active CN104912373B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201611159424.8A CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201611160204.7A CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed
CN201611159421.4A CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device
CN201510355153.2A CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510355153.2A CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201611160204.7A Division CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed
CN201611159424.8A Division CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201611159421.4A Division CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device

Publications (2)

Publication Number Publication Date
CN104912373A CN104912373A (en) 2015-09-16
CN104912373B true CN104912373B (en) 2017-01-25

Family

ID=54081769

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201510355153.2A Active CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site
CN201611160204.7A Active CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed
CN201611159424.8A Active CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201611159421.4A Active CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201611160204.7A Active CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed
CN201611159424.8A Active CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201611159421.4A Active CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device

Country Status (1)

Country Link
CN (4) CN104912373B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029858A (en) * 2019-04-04 2019-07-19 浙江德宝通讯科技股份有限公司 Autonomous lifting and basis adjustment adapt to the communication pole of height
CN110565952A (en) * 2019-09-12 2019-12-13 上海建工一建集团有限公司 electric box installation device and installation method

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2091497U (en) * 1991-05-04 1991-12-25 张兆坤 Cylinder radio receiving antenna frame
JP2003018731A (en) * 2001-06-28 2003-01-17 Souki Kk Telescopic power pole and cable installation method
JP2003232143A (en) * 2002-02-05 2003-08-22 Attaka Morinokuni Kara:Kk Supporting structure of column material and standing signboard
US7098864B2 (en) * 2003-05-23 2006-08-29 Creative Design And Machining, Inc. Temporary cellular antenna site
CN1629437A (en) * 2003-12-18 2005-06-22 唐春芳 Safety electricity pylon
KR100645024B1 (en) * 2004-11-12 2006-11-15 윤명렬 a precast structure for pillar
CN201043360Y (en) * 2007-05-31 2008-04-02 西安航天复合材料研究所 Composite-material telegraph pole
JP2009002097A (en) * 2007-06-25 2009-01-08 Chugoku Electric Power Co Inc:The Electric pole with side ditch
CN201439930U (en) * 2009-08-04 2010-04-21 浙江海天建设集团有限公司 Movable lamp rack
CN201874292U (en) * 2010-05-13 2011-06-22 山西省电力公司太原供电分公司 Brick type bracing wire
CN102966258B (en) * 2012-11-30 2015-06-17 湖州电力局 Temporary supporting crossarm for live working
CN103334628B (en) * 2013-06-18 2015-08-26 浙江巨匠钢业有限公司 A kind of Portable lifting formula communication tower
CN103321471A (en) * 2013-07-11 2013-09-25 常熟市保得利电力通讯设备有限公司 Temporary telegraph pole
CN203571610U (en) * 2013-11-28 2014-04-30 马秀超 Multifunctional vertical rod for construction
CN203891551U (en) * 2014-05-29 2014-10-22 天津市津通电力铁塔制造有限公司 Portable communication tower
CN203980191U (en) * 2014-07-14 2014-12-03 中建安装工程有限公司 Construction site lamp bracket
CN204130682U (en) * 2014-10-24 2015-01-28 安徽电信规划设计有限责任公司 A kind of Novel belt lightning rod antenna tower
CN204326664U (en) * 2014-11-19 2015-05-13 国家电网公司 A kind of Multifunctional City electric pole
CN204313161U (en) * 2014-11-26 2015-05-06 陈丹燕 The working pin-connected panel temporary lighting device in a kind of construction site
CN204782190U (en) * 2015-06-24 2015-11-18 江苏省电力公司常州供电公司 On --spot interim power consumption assembled of construction supports switching device

Also Published As

Publication number Publication date
CN104912373A (en) 2015-09-16
CN106801534B (en) 2018-11-23
CN106677590B (en) 2018-11-02
CN106677590A (en) 2017-05-17
CN106801534A (en) 2017-06-06
CN106760874B (en) 2018-10-30
CN106760874A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN203150936U (en) Power distribution cabinet pedestal
CN104912373B (en) Assembly type supporting switching device for temporary power consumption at construction site
CN103057836A (en) Transportation fixed support of transformer wire outlet device
CN204782190U (en) On --spot interim power consumption assembled of construction supports switching device
CN210373323U (en) Combined lamp post
CN209229137U (en) One kind is for setting up line holder in pipe gallery
CN208074278U (en) A kind of assembled vertical shaft air hose combined bracket
KR100843058B1 (en) High Voltage Cable Supporter
CN205723059U (en) The fixing device of a kind of transformer middle voltage bus bar insulator and transformer
CN202074205U (en) Stand of roof antenna lightning rod
CN210326560U (en) Power distribution cabinet mounting structure
CN203336518U (en) Combined type metal halide lamp overhead support
CN203660456U (en) Support apparatus for combined electrical apparatus branch bus wall bushing
CN201489946U (en) Installation device of transformer on single-phase column
CN207672426U (en) A kind of detachable fixed structure of railing
CN105442873A (en) Lightweight steel structure awning of gas station
CN205724413U (en) A kind of distribution box
CN206685862U (en) A kind of mobile holder device for constructing tunnel illumination
CN207377261U (en) A kind of safe enclosing of road bridge construction
CN205730031U (en) A kind of hanging rack for safety belt
CN209011050U (en) A kind of easy-to-dismount guardrail
CN204795680U (en) Screen mounting structure is protected to burried arc furnace electrode water -cooling
CN205296908U (en) Filling station's lightweight steel construction awning
CN206494568U (en) A kind of wire-unfolding rack for communication manhole
CN211063271U (en) Adjustable inner supporting device of distribution box

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant