CN206802866U - A kind of lamp installation sectional shelf-unit - Google Patents
A kind of lamp installation sectional shelf-unit Download PDFInfo
- Publication number
- CN206802866U CN206802866U CN201720537864.6U CN201720537864U CN206802866U CN 206802866 U CN206802866 U CN 206802866U CN 201720537864 U CN201720537864 U CN 201720537864U CN 206802866 U CN206802866 U CN 206802866U
- Authority
- CN
- China
- Prior art keywords
- branch
- pipe arrangement
- unit
- suspension rod
- clearly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 72
- 239000000725 suspension Substances 0.000 claims abstract description 41
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 31
- 230000000694 effects Effects 0.000 abstract description 11
- 238000012423 maintenance Methods 0.000 abstract description 8
- 238000013459 approach Methods 0.000 abstract description 5
- 230000008447 perception Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 229910052751 metal Inorganic materials 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010923 batch production Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003754 machining Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The utility model discloses a kind of lamp installation sectional shelf-unit, including multiple carrier units, two neighboring carrier unit is connected by socket component socket joint, carrier unit includes bright pipe arrangement and hangs unit with the branch that bright pipe arrangement is connected, bright pipe arrangement is in horizontal layout, the fixture for mounted lamp is set with bright pipe arrangement, branch is hung unit and laid in vertical, branch, which hangs unit, includes branch suspension rod and the branch swing pipe being connected with branch downrod lower end, the lower end of branch suspension rod is connected with the upper end of branch swing pipe, the upper end of branch suspension rod is fixed on top plate, and the lower end of branch swing pipe connects with the top of bright pipe arrangement.The utility model is designed reasonably, easy construction and using effect are good, the laying of pipeline is changed into bright and matched somebody with somebody from dark apply of traditional approach, it is easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, determine installation site of the branch device for hoisting on top plate, the collision problem in pipeline compact district lamp installation is avoided, lamp installation is in a row embarked on journey, and improves perception effect.
Description
Technical field
The utility model belongs to technical field of building construction, more particularly, to a kind of lamp installation sectional shelf-unit.
Background technology
The later stages such as underground garage, tunnel and factory building using when the building structure that need not be fitted up in, it is traditional at present
The dark pipe arrangement of the bright pipe arrangement generally use of the electric wire of light fixture or metal raceway in lamp installation construction technology.
Dark pipe arrangement is primarily present following deficiency:Secretly pipe arrangement is carried out pre-buried in top board construction, treats top board structure integral construction
After the completion of can carry out the installation of light fixture, installing engineering progress is influenceed by the project entirety duration, and is constructed in top board structure
Cheng Zhonghui causes the blocking of dark pipe arrangement, adds project progress and the difficulty of cost control;Have all operations of construction technique
High-rise working is belonged to, workload is big, and difficulty of construction is big, and work efficiency is low, and the duration is longer;Electric wire is secretly applied in pre-buried bright pipe arrangement,
The maintenance in later stage is not easy to, and maintenance cost is high;Lamp installation can only change the installation direction of light fixture when running into pipeline compact district,
Light fixture after installation rate of in a row embarking on journey is poor;The connection of generally use flexible cord or chain sling lifting, increase are applied during lamp installation
Work cost, and the less stable installed.
Metal raceway is primarily present following deficiency:Because its volume is larger, lamp installation needs office when running into pipeline compact district
Portion changes the position of lamp installation;Metal raceway installation connection process is more, and light fixture is installed on metal raceway using Clip Reed
Bottom, in shake frequency district occurred frequently such as underground garage, easy off card after the jump ring of fixed light fixture is shaken, influence the service life of light fixture.
The content of the invention
Technical problem to be solved in the utility model is to be directed to above-mentioned deficiency of the prior art, there is provided a kind of light fixture
Installation sectional shelf-unit, its reasonable in design, easy construction and using effect is good, the laying of pipeline is become by dark apply of traditional approach
Match somebody with somebody to be bright, be easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, it is determined that branch hangs installation position of the unit on top plate
Put, avoid the collision problem in pipeline compact district lamp installation, lamp installation is in a row embarked on journey, and improves perception effect.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of lamp installation sectional shelf-unit,
It is characterized in that:Including multiple carrier units, the two neighboring carrier unit is connected by socket component socket joint, the support list
Member includes bright pipe arrangement and hangs unit with the branch that stated clearly pipe arrangement is connected, and it is in horizontal layout to state pipe arrangement clearly, states clearly and is covered on pipe arrangement
Equipped with the fixture for mounted lamp, the branch is hung unit and laid in vertical, the branch hang unit include branch suspension rod and with it is described
The branch swing pipe of branch downrod lower end connection, the lower end of the branch suspension rod is connected with the upper end of the branch swing pipe, the branch suspension rod it is upper
End is fixed on top plate, and the lower end of the branch swing pipe connects with the top of stated clearly pipe arrangement.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The bright pipe arrangement of the two neighboring carrier unit passes through
The socket component socket joint connection, the cross sectional shape of the socket component is identical with the cross sectional shape of stated clearly pipe arrangement, and the socket joint
The sectional dimension of part is not less than the sectional dimension for stating pipe arrangement clearly, is offered on the socket component and states pipe arrangement level clearly for adjustment
The screwed hole that the regulating bolt of degree passes through.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The upper end of the branch swing pipe is welded with steel plate, the steel
The mounting hole for the branch hanger erection is offered on plate.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The branch swing pipe connects position with stated clearly pipe arrangement top
Pipe arrangement bottom is stated clearly corresponding to the place of putting and offers first through hole, is provided with the first through hole and is blocked up with what it was used cooperatively
Head.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The fixture includes being sleeved on stated clearly pipe arrangement
Jig body and the chuck being used cooperatively with the jig body, the jig body are shaped as U-shaped, opened up on the chuck
There is the block button hole passed through for the jig body both ends.
The utility model has advantages below compared with prior art:
1st, the combination rack structure is simple and processing and fabricating is easy, and input cost is relatively low.
2nd, the sectional shelf-unit includes multiple carrier units, and two neighboring carrier unit is connected by socket component socket joint, support
Unit includes bright pipe arrangement and hangs unit with the branch that bright pipe arrangement is connected, and bright pipe arrangement is in horizontal layout, is set with bright pipe arrangement for pacifying
The fixture of light fixture is filled, branch is hung unit and laid in vertical, and branch, which hangs unit, includes branch suspension rod and the branch swing pipe being connected with branch downrod lower end,
The lower end of branch suspension rod is connected with the upper end of branch swing pipe, and the upper end of branch suspension rod is fixed on top plate, the lower end of branch swing pipe and bright pipe arrangement
Top connection, connection is simple.
3rd, the sectional shelf-unit can realize batch production processing and field combinations, then overall to carry out lifting installation, reduce
The process of work high above the ground, reduces difficulty of construction, improves efficiency of construction, shortens the construction period.
4th, the bright pipe arrangement of the utility model need not be embedded on top plate, and the laying of pipeline is changed into bright from dark apply of traditional approach
Match somebody with somebody, the installation progress of light fixture is not influenceed by the project entirety duration, is easy to the maintenance in later stage.
5th, the utility model hangs installation site of the unit on top plate according to construction drawing in combination with BIM softwares it is determined that propping up,
The collision problem in pipeline compact district lamp installation is avoided, lamp installation is in a row embarked on journey, and improves perception effect.
6th, in the utility model, light fixture is clamped by fixture and bright pipe arrangement, and connected mode is simple, and connection is firm,
Fixture modern design is attractive in appearance simultaneously.
In summary, the utility model is designed reasonably, easy construction and using effect are good, by the laying of pipeline by tradition side
Dark apply of formula is changed into bright and matched somebody with somebody, and is easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, it is determined that branch hangs unit in top plate
On installation site, avoid the collision problem in pipeline compact district lamp installation, lamp installation is in a row embarked on journey, and improves perception
Effect.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use state figure of the present utility model.
Fig. 3 is the structural representation that the utility model branch hangs unit.
Fig. 4 is the structural representation of the utility model socket component.
Fig. 5 is the connection relationship diagram of the utility model branch swing pipe and steel plate.
Fig. 6 is the structural representation explosive view of the utility model fixture.
Fig. 7 is the method flow block diagram installed using the utility model to light fixture.
Description of reference numerals:
1-bright pipe arrangement;2-1-branch swing pipe;2-2-sleeve pipe;
2-3-branch suspension rod;3-top plate;4-fixture;
4-1-jig body;4-2-chuck;5-light fixture;
6-plug;7-steel plate;7-1-mounting hole;
8-socket component;9-screwed hole;10-rib tape.
Embodiment
A kind of lamp installation sectional shelf-unit as shown in Figure 1, Figure 2 and Figure 3, including multiple carrier units, it is two neighboring
The carrier unit is connected by the socket joint of socket component 8, and the carrier unit includes bright pipe arrangement 1 and is connected with stated clearly pipe arrangement 1
Branch hangs unit, and it is in horizontal layout to state pipe arrangement 1 clearly, states the fixture 4 being set with pipe arrangement 1 for mounted lamp 5, the branch clearly
Hang unit to lay in vertical, the branch, which hangs unit, includes branch suspension rod 2-3 and the branch swing pipe 2- being connected with the branch suspension rod 2-3 lower ends
1, the lower end of the branch suspension rod 2-3 is connected with the upper end of the branch swing pipe 2-1, and the upper end of the branch suspension rod 2-3 is fixed on top plate 3
On, the lower end of the branch swing pipe 2-1 connects with the top of stated clearly pipe arrangement 1.
During actual use, stating the effect of pipe arrangement 1 clearly has two:Bright pipe arrangement 1 is laid by the electric wire as electric wire
Laying is changed into bright and matched somebody with somebody from dark apply, and during the use of later stage light fixture 5, is easy to safeguard, it is traditional it is dark apply, used in later stage light fixture 5
When breaking down, it is necessary to top plate 3 is carried out into a certain degree of damage, and repair complicated, cost is higher;As the support list
A part for member, play a part of branch to light fixture 5 and hang.
Stated clearly pipe arrangement 1 need not be embedded on top plate 3, and the laying of pipeline is changed into bright and matched somebody with somebody from dark apply of traditional approach, lamp
The installation progress of tool 5 is not influenceed by the project entirety duration, meanwhile, it can pass through inserting in bright pipe arrangement 1 in pipeline compact district
The mode for connecing connection electric wire on device adjusts the problem of running into the point of impingement when light fixture 5 that staggers is installed, and makes the light fixture 5 of installation in a row
Arranged in column.
During actual use, the pipeline is by the bright pipe arrangement 1 in the present embodiment and the electric wire stated clearly in pipe arrangement 1 that is laid in.
During actual use, unit is hung to bright pipe arrangement 1, the branch in the factory and fixture 4 carries out batch machining, is then being applied
Work scene is assembled, and is readily transported, and largely reduces the process of work high above the ground, advantageously reduces security risk,
Difficulty of construction is reduced, improves efficiency of construction, shortens the construction period.
In the present embodiment, the periphery of the branch suspension rod 2-3 is set with sleeve pipe 2-2, preferably pvc pipe, it is therefore an objective to institute
State branch suspension rod 2-3 to play a protective role, and there is certain aesthetic.
During actual use, the branch swing pipe 2-1 is rectangular tube, the size of the branch swing pipe 2-1 be preferably 20mm ×
20mm × 100mm, and the lower end of the branch swing pipe 2-1 is welded with stated clearly pipe arrangement 1, compared with other connected modes, easily
Construct and process is simple.
During actual use, the rectangular cross-section section of pipe arrangement 1 is stated clearly, if the section of stated clearly pipe arrangement 1 is cut to be circular
Face, then the top of stated clearly pipe arrangement 1 is curved surface, and the branch is hung unit and is connected with the top of stated clearly pipe arrangement 1 typically using welding
Mode be fixedly connected, the lower end that the branch hangs unit is plane, when plane and curved surface are welded, is not easy to apply
Weldering, and connection is not firm.
The sectional dimension of stated clearly pipe arrangement 1 is preferably 20mm × 20mm.
As shown in figure 4, in the present embodiment, the bright pipe arrangement 1 of the two neighboring carrier unit passes through the socket joint of socket component 8
Connection, the cross sectional shape of the socket component 8 is identical with the cross sectional shape of stated clearly pipe arrangement 1, and the sectional dimension of the socket component 8
Not less than the sectional dimension of stated clearly pipe arrangement 1, the regulation for stating the levelness of pipe arrangement 1 clearly for adjustment is offered on the socket component 8
The screwed hole 9 that bolt passes through.
During actual use, the middle position on the length direction of socket component 8 is provided with rib tape 10, and the rib tape 10 is wrapped
The projection circumferentially laid along the inner and outer wall of socket component 8 is included, the length of the rib tape 10 is preferably 5mm, the muscle
Projection thickness with 10 on the inwall of the socket component 8 is identical with the thickness of stated clearly pipe arrangement 1, it is therefore an objective to stated clearly pipe arrangement
Length in the 1 insertion socket component 8 is limited, and is ensured previous and is stated the length that pipe arrangement 1 is inserted in the socket component 8 clearly
It is the 1/2 of the length of socket component 8 to state the length that pipe arrangement 1 inserted in the socket component 8 clearly with previous, prevents adjacent two
Socket joint length allocation of the individual bright pipe arrangement 1 in the socket component 8 is uneven, causes the carrier unit connection unstable, after influenceing
The service life of phase light fixture 5.
Projection of the rib tape 10 on the outer wall of the socket component 8 mainly plays effect attractive in appearance.
During actual use, the size of the socket component 8 is preferably 30mm × 30mm × 100mm.
During actual use, the quantity of the preferable regulating bolt is 8, and 8 regulating bolts are respectively symmetrically set
In the both sides of rib tape 10 and it is arranged on the side of the socket component 8, after the branch suspension rod 2-3 is connected with the top plate 3,
The levelness of stated clearly pipe arrangement 1 is finely adjusted by the regulating bolt, ensures the levelness that the light fixture 5 is installed.
As shown in figure 5, in the present embodiment, the upper end of the branch swing pipe 2-1 is welded with steel plate 7, is offered on the steel plate 7
For the mounting hole 7-1 of branch suspension rod 2-3 installations.
During actual use, the steel plate 7 is rectangular steel plates, and the size of the steel plate 7 is not more than cutting for the branch swing pipe 2-1
Face size, the size of the preferable steel plate 7 is 18mm × 18mm, the steel plate 7 and the inwall in the branch swing pipe 2-1 upper ends
Welding, under the premise of ensureing that connection is reliable, the weld seam of welding is arranged on to the inner side of the branch swing pipe 2-1, has reached attractive in appearance
Effect.
During actual use, the branch suspension rod 2-3 is fixedly connected with the steel plate 7, and connected mode can be welding or bolt
Connection, preferably bolt connection, it is therefore an objective in actual installation, it is easy to the adjustment to the height of light fixture 5, it is preferable described
Branch suspension rod 2-3 is leading screw, and the lower end of the leading screw is provided with screw thread, and the upper end of the leading screw is provided with tube expansion, the tube expansion with
After the top plate 3 connects, the sectional shelf-unit installation, the combination rack structure is simple and processing and fabricating is easy, input
Cost is relatively low.
During actual use, the mounting hole 7-1 is preferably a diameter of 10mm circular port.
In the present embodiment, the branch swing pipe 2-1 and corresponding stated clearly pipe arrangement 1 at stated clearly the top communicating position of pipe arrangement 1
Bottom offers first through hole, and the plug 6 being used cooperatively with it is provided with the first through hole.
During actual installation, be provided with the lower end of the branch suspension rod 2-3 with the branch suspension rod 2-3 be used cooperatively in six sides
After locking nut, the upper end of the branch suspension rod 2-3 by the first through hole and is passed through into the mounting hole 7-1, then by institute
The upper end for stating branch suspension rod 2-3 is connected with the top plate 3, the lower end of the branch suspension rod 2-3 by the interior six sides locking nut with
The steel plate 7 connects, easy for installation.
During actual use, the preferably a diameter of 16mm circular port of the first through hole.
During actual use, after the installation of light fixture 5, the first through hole is blocked using the plug 6,
Purpose is protection electric wire, while when later stage light fixture 5 is using breaking down or safeguarding, it is easy to disassemble after inspection to trouble point
And maintenance.
As shown in fig. 6, in the present embodiment, the fixture 4 include the jig body 4-1 being sleeved on stated clearly pipe arrangement 1 and
The chuck 4-2's, the jig body 4-1 being used cooperatively with the jig body 4-1 is shaped as U-shaped, is opened on the chuck 4-2
Provided with the block button hole passed through for the jig body 4-1 both ends.
During actual use, the material that the preferable fixture 4 is is the iron sheet of stainless steel, and the chuck 4-2's is shaped as
Rectangle, the size of the chuck 4-2 are preferably 20mm × 10mm, and the length of the block button hole is not less than the jig body 4-
The width at 1 both ends.
During actual use, when light fixture 5 is installed, after the both ends of the jig body 4-1 are passed through into second through hole, then
The jig body 4-1 is sleeved on stated clearly pipe arrangement 1, then inserts the chuck at the both ends of the jig body 4-1
4-2, the both ends of the jig body 4-1 are bent, complete the installation of light fixture 5, connected mode is simple, and connection is firm, simultaneously
The modern design of fixture 4 is attractive in appearance.
During actual use, the light fixture 5 is arranged on using the fixture and stated clearly on pipe arrangement 1, be connected with using flexible cord
Or chain sling lifting is compared, and has saved construction cost, and when typically being lifted with flexible cord connection or chain sling, the flexible cord or hang
Chain is slender member, while the length of the flexible cord or chain sling is 1.5m~2m, and it is poor that the light fixture 5 installs rear stability.
As shown in Fig. 1~Fig. 7, the method installed using the utility model to light fixture is comprised the following steps:
Step 1: preparation of construction:Initial installation positions of the branch suspension rod 2-3 on the top plate 3 is determined according to construction drawing
Put the initial makeup location on stated clearly pipe arrangement 1 with the light fixture 5, then by BIM softwares to the branch suspension rod 2-3 in institute
The initial makeup location of the initial makeup location on top plate 3 and the light fixture 5 on stated clearly pipe arrangement 1 is stated to optimize, will be excellent
Result after change is adjusted, and finally determines final installation sites and the light fixture of the branch suspension rod 2-3 on the top plate 3
The 5 final installation site on stated clearly pipe arrangement 1;
Step 2: the assembling of sectional shelf-unit, including procedure below:
The assembling of step 201, carrier unit:, will after institute branch swing pipe 2-1 lower end connects with the top of stated clearly pipe arrangement 1
The upper end of the branch swing pipe 2-1 is connected with the lower end of the branch suspension rod 2-3, forms the carrier unit;
Step 202, repeat step 201, complete the assembling of multiple carrier units;
Step 203, by step 202 multiple carrier units state clearly pipe arrangement 1 pass through the socket joint of socket component 8 connect
Afterwards, the sectional shelf-unit is completed;
Step 3: the installation of sectional shelf-unit:In step 203 after being completed of sectional shelf-unit, using hanging machinery by institute
State sectional shelf-unit to be lifted, the upper end of the branch suspension rod 2-3 is fixed on the branch suspension rod 2-3 determined in step 1 in institute
State the final installed position on top plate 3;
Step 4: the installation of light fixture:The light fixture 5 is fixedly connected on the institute determined in step 1 by the fixture 4
State final installed position of the light fixture 5 on stated clearly pipe arrangement 1.
During actual installation, in the preparation of construction of step 1, searched according only to construction drawing in pipeline compact district lamp installation
The point of impingement, the comprehensive of bright pipe arrangement is carried out using BIM softwares and arranged, detects and cuts down the pipeline point of impingement, make the bright of pipeline compact district
The arrangement of pipe arrangement 1 reaches overall balance, avoids the collision problem in pipeline compact district lamp installation, the installation of light fixture 5 is arranged as
OK, perception effect is improved.
During actual installation, in the preparation of construction of step 1, according only to construction drawing in combination with BIM softwares, finally determining
Final installation site drillings of the branch suspension rod 2-3 on the top plate 3, it is not necessary to the dark pipe arrangement 1 on the top plate 3, will manage
The laying of line is changed into bright and matched somebody with somebody from dark apply of traditional approach, and the installation progress of light fixture 5 is not influenceed by the project entirety duration, while just
Maintenance during the use of light fixture described in the later stage 5.
During actual installation, each processing of the sectional shelf-unit and assembling can realize that batch production is processed, after machining
It is combined at the construction field (site), it is then overall to carry out lifting installation, reduce the process of work high above the ground, reduce difficulty of construction,
Efficiency of construction is improved, shortens the construction period.
During actual installation, in step 3 during the installation of sectional shelf-unit, the branch suspension rod 2-3 is entered using infrared ray position indicator
Row location and installation, in a row embarked on journey after ensureing the branch suspension rod 2-3 installations, meet construction requirement.
In the present embodiment, the upper end of the branch swing pipe 2-1 is welded with steel plate 7, offers on the steel plate 7 and is hung for the branch
The mounting hole 7-1 of bar 2-3 installations;
The branch swing pipe 2-1 offers with corresponding stated clearly the bottom of pipe arrangement 1 at stated clearly the top communicating position of pipe arrangement 1
One through hole, the plug 6 being used cooperatively with it is provided with the first through hole.
In the present embodiment, when carrier unit described in step 201 assembles, the upper end of the branch suspension rod 2-3 is sequentially passed through
The first through hole and the mounting hole 7-1, after the branch suspension rod 2-3 lower ends are connected with the steel plate 7.
In the present embodiment, the fixture 4 include being sleeved on jig body 4-1 on stated clearly pipe arrangement 1 and with the fixture
The chuck 4-2's, the jig body 4-1 that body 4-1 is used cooperatively is shaped as U-shaped, is offered on the chuck 4-2 described in confession
The block button hole that jig body 4-1 both ends pass through;
The lampshade of the light fixture 5 is provided at both ends with the second through hole passed through for the jig body 4-1 both ends.
In the present embodiment, before step 4 lamp installation, electric wire is penetrated in stated clearly pipe arrangement 1 using conduit, and by described in
Electric wire at the first through hole and connector female joint connect;
In step 4 during lamp installation, the reserved line of the light fixture 5 is inserted to the pin end of the connector, completes grafting
After the connection of device, the first through hole is blocked with the plug 6, by the both ends of the jig body 4-1 described in
After second through hole, then the jig body 4-1 is sleeved on stated clearly pipe arrangement 1, then at the both ends of the jig body 4-1
The chuck 4-2 is inserted, the both ends of the jig body 4-1 are bent, completes the installation of light fixture 5.
During actual installation, the quantity of light fixture 5 determines according to construction drawing.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is imposed any restrictions, every
Any simple modification, change and the equivalent structure change made according to the utility model technical spirit to above example, still
Belong in the protection domain of technical solutions of the utility model.
Claims (5)
- A kind of 1. lamp installation sectional shelf-unit, it is characterised in that:Including multiple carrier units, the two neighboring carrier unit Connected by socket component (8) socket joint, the carrier unit includes bright pipe arrangement (1) and hangs list with the branch that stated clearly pipe arrangement (1) is connected Member, it is in horizontal layout to state pipe arrangement (1) clearly, states the fixture (4) being set with pipe arrangement (1) for mounted lamp (5) clearly, described Branch is hung unit and laid in vertical, and the branch, which hangs unit, includes branch suspension rod (2-3) and the branch being connected with branch suspension rod (2-3) lower end Swing pipe (2-1), the lower end of the branch suspension rod (2-3) are connected with the upper end of the branch swing pipe (2-1), the branch suspension rod (2-3) Upper end is fixed on top plate (3), and the lower end of the branch swing pipe (2-1) connects with the top of stated clearly pipe arrangement (1).
- 2. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The two neighboring support list The bright pipe arrangement (1) of member is connected by the socket component (8) socket joint, and the cross sectional shape of the socket component (8) is with stating pipe arrangement (1) clearly Cross sectional shape it is identical, and the sectional dimension of the socket component (8) is not less than and states the sectional dimension of pipe arrangement (1) clearly, described to hold Offered on plug-in unit (8) and state the screwed hole (9) that the regulating bolt of pipe arrangement (1) levelness passes through clearly for adjustment.
- 3. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The branch swing pipe (2-1) Upper end is welded with steel plate (7), and the mounting hole (7-1) for the branch suspension rod (2-3) installation is offered on the steel plate (7).
- 4. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The branch swing pipe (2-1) with Pipe arrangement (1) bottom is stated clearly corresponding at the communicating position of stated clearly pipe arrangement (1) top offers first through hole, the first through hole On be provided with the plug (6) being used cooperatively with it.
- 5. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The fixture (4) includes set Jig body (4-1) on stated clearly pipe arrangement (1) and the chuck (4-2) being used cooperatively with the jig body (4-1), institute The U-shaped that is shaped as of jig body (4-1) is stated, offers on the chuck (4-2) and is passed through for the jig body (4-1) both ends Block button hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720537864.6U CN206802866U (en) | 2017-05-12 | 2017-05-12 | A kind of lamp installation sectional shelf-unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720537864.6U CN206802866U (en) | 2017-05-12 | 2017-05-12 | A kind of lamp installation sectional shelf-unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206802866U true CN206802866U (en) | 2017-12-26 |
Family
ID=60740926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720537864.6U Expired - Fee Related CN206802866U (en) | 2017-05-12 | 2017-05-12 | A kind of lamp installation sectional shelf-unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206802866U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106989323A (en) * | 2017-05-12 | 2017-07-28 | 陕西建工第三建设集团有限公司 | A kind of installation method of lamp installation sectional shelf-unit and light fixture |
-
2017
- 2017-05-12 CN CN201720537864.6U patent/CN206802866U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106989323A (en) * | 2017-05-12 | 2017-07-28 | 陕西建工第三建设集团有限公司 | A kind of installation method of lamp installation sectional shelf-unit and light fixture |
CN106989323B (en) * | 2017-05-12 | 2023-09-26 | 陕西建工第三建设集团有限公司 | Combined support for lamp installation and lamp installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206802866U (en) | A kind of lamp installation sectional shelf-unit | |
CN102002949A (en) | Pipe burying device and method for ground source heat pump | |
CN201964025U (en) | Pipe burying device of ground source heat pump | |
CN207365244U (en) | A kind of supporting structure for building | |
CN103993667A (en) | Joint suitable for connection between string truss stay bar and multiple cables | |
CN106989323A (en) | A kind of installation method of lamp installation sectional shelf-unit and light fixture | |
CN209016567U (en) | A kind of assembly type cable bearer | |
CN209229137U (en) | One kind is for setting up line holder in pipe gallery | |
CN207581233U (en) | A kind of easy pipe fitting lifting device | |
CN206668315U (en) | Isolated blast water bottle canopy and system | |
CN104141929A (en) | Installation method for lighting device in large workshop | |
CN210713879U (en) | Steel column verticality adjusting device | |
CN209988990U (en) | Hoist and mount frame convenient to installation is dismantled | |
CN210439961U (en) | Plug-in type cat ladder of installation in ground well | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN203656365U (en) | Combination-type transition cable leading cage based on cable leading towards lower bridge surface | |
CN111827262A (en) | Construction method of fold-line-shaped irregular underground continuous wall | |
CN206033024U (en) | Pipeline hoist and mount mould | |
CN113137033B (en) | Power pipe well and construction process thereof | |
CN104878777B (en) | The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method | |
CN209133976U (en) | Penetration pipe adjusts mold into terminal box | |
CN208707270U (en) | It is a kind of can extension wire to house distance device | |
CN106926207A (en) | A kind of construction tool rack easy to use | |
CN213041025U (en) | Discharging pipe dismounting assembly of calcining furnace | |
CN206801049U (en) | A kind of mesh type auxiliary beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171226 |
|
CF01 | Termination of patent right due to non-payment of annual fee |